4731A_Project Estimate Summary.pdf

PDF 109 KB Posted

Attached to
IFB 4-2026 Prospect Street Bridge Replacement
Solicitation number
IFB-122244
Issued by
Stafford County, Virginia

About this file

This is a Project Estimate Summary document prepared for the Town of Front Royal, Virginia, in connection with IFB 4-2026 for the East Prospect Street Bridge Superstructure Replacement. The project involves the construction and replacement of the bridge superstructure located in the Town of Front Royal. A pre-bid conference is scheduled for July 2nd, 2026 at 2:00 PM at the Town of Front Royal Office in Town Hall Chambers, located at 102 E. Main Street, Front Royal, Virginia 22630, with a virtual attendance option available. While attendance at the pre-bid conference is encouraged, it is not mandatory. A site visit will be conducted following the pre-bid conference to allow potential bidders to assess project conditions and requirements.

The estimate summary document provides financial and technical details to support the bidding process for this infrastructure replacement project. Prospective bidders should review the estimate summary in conjunction with all project specifications, scope of work documents, and supporting exhibits to develop accurate bids. The document serves as a reference tool to establish the project's anticipated costs and scope parameters, enabling qualified contractors to submit competitive and compliant proposals for consideration by the Town of Front Royal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT ESTIMATE SUMMARY (PES) UPC: 125437 Prospect Street Bridge over Happy Creek

PRELIMINARY ENGINEERING PHASE Field Key

Category Comments Defined Cost Allowance Contingency Total User-Entered Data (editable)

1 Overall PE Phase Not applicable. Already completed. $0 0% $0 Dropdown Choices (editable)

Roadway $0 0% $0 Calculated Fields (protected)

Structures & Bridge $0 0% $0 Imported from POOL (protected)

Right-of-Way and Utilities $0 0% $0

Survey and SUE $0 0% $0 PROJECT INFORMATION

Hydraulics

(SWM, E&S, Nutrient Purchase) $0 0% $0 Date Prepared 6/5/2026

Traffic (MOT & permanent) $0 0% $0

Materials and Geotech $0 0% $0 #N/A

Environmental

(NEPA, permits, etc.)

$0 0% $0 Administered By Locally

Project Management & VDOT/LAP

Coordination $0 0% $0

Other $0 0% $0 Lead Designer 2

PE PHASE SUBTOTAL: $0 $0 $0 0% $0 Mattern & Craig

Details

RIGHT OF WAY AND UTILITIES PHASE

Category Comments Defined Cost Allowance Contingency Total PWA Schedule

Template Type

1 Overall RW Phase Not applicable.

$0 0% $0

Right-of-Way Acquisition $0 0% $0 PCES Estimate Type

(Milestone) Final Submission

Utilities (relocations) $0 0% $0 UPC and APP ID

VDOT RW/UT Oversight &

VDOT/LAP Coordination $0 0% $0 1 125437

RW PHASE SUBTOTAL: $0 $0 $0 0% $0

CONSTRUCTION PHASE - BID ITEMS Project Manager Chad Thomas, PE

Category Comments Defined Cost Allowance Contingency Total

2 Overall CN Bid Items $0 0% $0

Roadway (road, earthwork) $100,000 $0 0% $100,000 Project Description Prospect Street Bridge over Happy Creek

Bridge (bridges, major retaining walls & culverts, etc.)

$583,000 $0 0% $583,000

Utilities (in-plan utilities, including water & sewer)

None.

$0 0% $0

District Staunton

Hydraulics (drainage, SWM, E&S, env, etc.)

$3,400 $0 0% $3,400

Traffic (signals, signs, pavement markings, etc.)

$6,200 $0 0% $6,200

Jurisdiction

(City/Town/County) Front Royal

MOT $42,000 $0 0% $42,000

Mobilization & CN Survey $160,000 $0 0% $160,000 Project Complexity Moderately complex

Other None.

$0 0% $0

BID ITEMS SUBTOTAL: $894,600 $0 $0 0% $894,600 BETTERMENT BREAKOUT

PE

Category Comments Defined Cost Allowance Contingency Total RW

Non-Bid Items

(State Police, State Forces, etc.)

$0 0% $0 CN Defined Cost

Railroad Not applicable.

$0 0% $0 CN Allowance

Project CEI

User can modify % or $-value $178,920 20% Default = 20% $178,920 Contingency $0 0%

Project Management & VDOT/LAP

Coordination $0 0% $0 Subtotal $0

Management Reserve

User can modify % or $-value $67,095 7.5% Complexity max=7.5% $67,095 CEI $0 0%

Contract Requirements

(Incentives & Disincentives) $0 0.0% Not to exceed 5% $0

Management

Reserve

NON-BID ITEMS SUBTOTAL: $246,015 $0 $0 0% $246,015

Contract

Requirements

CN PHASE (Bid and Non-Bid) SUBTOTAL $1,140,615 $0 $0 0% $1,140,615 Inflation

(Same as CN) $0 3.0%

TOTAL PROJECT ESTIMATE WITHOUT INFLATION IN CURRENT DAY DOLLARS (PE, RW & CN): $1,140,615

BETTERMENT

TOTAL

$0

TOTAL PROJECT ESTIMATE SUMMARY Comments

Project Phase Comments Phase Start Date Total Estimate Inflation Total with inflation

Note: The Betterment Breakdown is for information purposes only. Betterment costs must be included in the respective phase costs.

Preliminary Engineering (PE) Not applicable. Already completed.

$0 Start

Date?

$0 PROJECT ESTIMATE SUMMARY V 3.0

Right of Way and Utilities (RW) None.

$0 Start

Date?

$0

Form revised

06/26/25

Construction (CN) 9/1/2026 $1,140,615 $34,218 3.0% $1,174,833 VBA code revised

6/26/25

TOTAL ESTIMATE (PE, RW & CN) WITH INFLATION: $0 $1,174,833 Need support? Email PMO@VDOT.Virginia.gov

Edit Project Information

In-House Consultant

UPC

APP

File details come from the government source that posted it. Updated .