This document is an Addendum for the Baraga Correctional Facility Sally Port Upgrades project in Baraga, Michigan. The project is being managed by the State of Michigan and the engineering firm Matrix Consulting Engineers. The addendum modifies the original contract documents, noting the removal of two specification sections and including an attendance record and photos from a pre-bid contractor walk-through held on December 14, 2023. The project is identified as Job Number 23328.00. No other details about the scope of work, timeline, or bid submission requirements are provided in this addendum.
The related state and local contract opportunity indicates that this is a project for upgrades to the sallyport gate at the Baraga Correctional Facility, located in Baraga County, Michigan. No additional information is provided about the specific products or services required, the estimated value of the contract, the bidding process, or the timeline for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1601 E. CÉSAR E. CHÁVEZ AVENUE, LANSING, MI 48906
PHONE: (517) 487-2511
FAX: (517) 487-2544
ADDENDUM NO. 1
Baraga Correctional Facility
Sally Port Upgrades Date:12/18/2023
Job Number: 23328.00
OWNER: ENGINEER:
State of Michigan Matrix Consulting Engineers 13924 Wadaga Rd. 1601 E. Cesar E. Chavez Ave.
Baraga, MI 49908 Lansing, MI 48906
This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.
All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.
This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Proposal Form in the appropriate location.
Items:
1. Specification Section 01030 – Alternates:
a. Not included – Removed from Table of Contents
2. Specification Section 019113 – General Commissioning Requirements:
a. Not included - Removed from Table of Contents
3. Attendance Record – Contractor Walk-through 12/14/2023
4. Photos – Contractor Walk-through 12/14/2023
END OF ADDENDUM 1
DTMB-0441 (R 19.02)
MEETING ATTENDANCE RECORD
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division TIMEDATEi’ROJECT DESCRIFHON/LOCATION
7, 1 -oohA I'lLE NUMBER
47Z .TAift
MEETING PI.ACET NUMBERCONTR
TELEPHONE NUMBEREMAIL ADDRESSFIRM YOU REPRESENTPLEASE PRINT YOUR NAME
T^l(y . ■ :T6a//?T5C/W/ytT-y p-jo(IMa ^ ^>7-ggt^
"toC “7 - S / 3-S//^ f^i Q. hi’' IA- <S Ci/
(i<sKi-rc' ^c?/r\KC> T'7=hi-h\
ZA% i<^oOrngv'/g.i/^t4‘^ <~R.vAcu.g ●3<3w\ 6 ~ n-.c,r-g.Myd-Vg f^wT.c.e.
L j jZ^i/y’-hu ^lar-hk rup
'Jef'~ P<2wA^T yi^rya^rgl(^(^fYVir/hM^^ -\?TVrHg?
0^ \ 'C* ^ ●(—
;' i I
File details come from the government source that posted it. Updated .