4 - SCOPE - 26RFCSP61 ILA Dehumidification 2026.07.24.pdf
PDF 6 MB Posted
- Attached to
- Inner Loop Annex Dehumidification Solicitation
- Solicitation number
- 26RFCSP61
- Issued by
- Williamson County, Texas
About this file
Summary of Scope of Work - Inner Loop Annex Dehumidification Project
This document is a Scope of Work prepared by the Architect/Engineer (A/E) for Williamson County's Inner Loop Annex (ILA) Dehumidification project, outlining the General Contractor's (GC) responsibilities in a Construction Manager at Risk (CMAR) delivery method. The project involves HVAC system upgrades at the county facility located at 301 SE Inner Loop, Georgetown, Texas, including replacement of five packaged rooftop units and one 100% outside air unit with new equipment featuring DX cooling, natural gas heating, and hot gas reheat dehumidification capabilities. The scope of work requires the GC to coordinate closely with the designated A/E and County throughout all project phases, including pre-construction planning, construction execution, administration, and closeout. Key GC responsibilities encompass personnel management with a full-time on-site superintendent from construction start through substantial completion, construction cost management including pay request processing and change order administration, construction scheduling with milestone reviews, on-site job administration (trailer, fencing, utilities), weekly coordination meetings with subcontractors, safety program oversight, shop drawing and submittal review, and progress documentation. The contract documents reference structural modifications including roof framing reinforcement, mechanical equipment installation with ductwork modifications, electrical connections through existing panels, and plumbing work for gas piping connections.
The document specifies detailed construction administration requirements including visual inspections of workmanship, specialized inspections to verify quality compliance with specifications, maintenance of comprehensive job site records, and coordination of necessary testing services. Project closeout responsibilities require the GC to supervise final testing and equipment startup, prepare punch lists in coordination with the County and A/E, obtain operational manuals and preventive maintenance plans from subcontractors, verify appropriate owner training, and compile all product data, warranties, keys, and maintenance materials for delivery to the County. The structural engineer's scope excludes responsibility for construction means, methods, safety programs, and construction loads; the contractor bears full responsibility for these elements and for verifying structural adequacy. Special inspections for welding of structural steel are required and must be performed by an independent testing agency, with the contractor responsible for ensuring shop drawings compliance prior to fabrication and maintaining detailed fabrication records.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7/16/2026
4 – Scope – CMAR/ GC Page 1 of 3 Form rev. 01/2024
4 – Scope of Services for GC
All services provided are to be performed in conjunction with the A/E and County.
Architects and Engineers (A/E) Before selecting GC, County has selected and designated an A/E who shall prepare the construction documents for the Project and who has full responsibility for complying with, the laws relating to architectural and engineering services in Texas including, but not limited to the Texas Engineering Practice Act (Occupations Code Chapters 1001 and 1051), as applicable.
Personnel Respondent shall maintain a staff of properly trained and experienced personnel to ensure satisfactory performance under this Contract.
- Respondent shall assign to County a designated representative who will be responsible for the coordination and administration of County's requirements.
- County will insist that the superintendent be on the job full time (all day/all working days) from the start of construction through substantial completion. After substantial completion, on-site respondent supervision will be required at any time work is under way at the site.
Project Execution Except as otherwise set forth in the Contract between County and GC and other Contract Documents, County shall provide or contract for, independently of GC, the inspection services, the testing of construction materials engineering, and the verification testing services necessary for acceptance of the facility by County.
Construction Cost
- Complete accounting records of work performed on the Project
- Review all pay requests and process for payment through A/E
- Review and prepare summary application for payment based on the Contractors' Certificate of
Payment and material vendors' invoicing
- Coordinate change orders, verify subcontractors' estimates as reasonable and accurate, secure County's approval before change order work is completed
- Provide all necessary materials, facilities, and ancillary services (such as cleanup) necessary for provision of the Services not being provided by the subcontractor(s) when necessary for the performance of the Services during construction and for completion of the construction
Construction Scheduling
- Review County's anticipated opening date and develop project schedule
- Sequence schedule to support contract documents and opening date and recommend any necessary corrective actions
4 – Scope – CMAR/ GC Page 2 of 3 Form rev. 01/2024
- Attend milestone review meetings with County and Project team immediately before commencing each Project phase
- At the milestone review meetings, assist County in identifying goals for the upcoming work, examine the performance of the Project team against the goals in the preceding phase, and propose corrective measures as necessary or appropriate.
- Coordinate and expedite the ordering and delivery of materials, especially those requiring a long lead time
Construction Administration
- Provide on-site job trailer, temporary fencing, temporary utilities, and other services as appropriate
- Schedule, conduct, and report with the A/E on weekly meetings with subcontractors
- Require safety programs and certificates of insurance from subcontractors
- Monitor and supervise safety programs of subcontractors and verify compliance with laws and regulations
- Coordinate interpretation of the meaning and intent of drawing and specification and assist in resolution of questions
- Review all shop drawings and submittals from subcontractors
- Keep records of all documents at the job site, including red-line changes
- Administer construction contracts prepared by County
- Coordinate necessary testing services
- Record progress of Project
Fulltime Onsite Supervision
- Experienced Construction Field Superintendent on site daily, every workday, to monitor work and progress of the Project
- Manage subcontractor performance
- Monitor and enforce County construction conditions
- Visual inspections of workmanship and special inspections as needed to verify quality of work, and maintenance to specifications
- Written progress reports to County and A/E submitted weekly during contractor meetings
- Arrange for delivery and storage of all material purchased by County
- Coordinate contract scheduling, monitor contractor labor force, verify delivery of contractor materials
Disputes and Resolution
- Assist County and A/E with review and management of claims
- Mediate conflicts between Contractor and County, if necessary
- Mediate conflicts between A/E and County, if necessary
Project Close Out
- Supervise subcontractors' final testing and start-up of utilities, operations systems and equipment
4 – Scope – CMAR/ GC Page 3 of 3 Form rev. 01/2024
- Walk through and prepare "punch list" with County, A/E and consulting engineers
- Participate in final inspection with County and A/E
- Prepare equipment operational manuals and provide preventive maintenance plan
- Verify appropriate training and in-service has been provided by subcontractors for County
- Supervise completion of punch list items
- Compile all product data, samples, warranties, owner manuals, red line drawings, keys, maintenance stock, extra materials, and other information or materials to be provided to County
- Coordinate Project substantial completion and final payments with A/E and County
Plans, Drawings, and Specifications Attached below:
REVISION:
SEAL:
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
IC
E
Q
U A
L
IT
Y
I N
T E
G R
S
U S
T A
IN
A
B
IL
IT
Y
S
E I
N N
E R
L O
O P
G E
O R
G E
T O
W N
T
X
CHECKED BY:
SHEET TITLE:
SHEET NUMBER:
PROJECT NUMBER
DRAWN BY:
DATE:
TBPE Firm Registration No. 2234
06/09/2026
255034.000
C0.00
COVER SHEET
W ill ia m s o n C o u n ty I
L A
D e h u m id if ic a ti o n
06/09/2026
DBR
DBR
WILLIAMSON COUNTY INNER LOOP ANNEX -
DEHUMIDIFICATION
WILLIAMSON COUNTY, TX
100% DESIGN DELIVERABLE
JUNE 9, 2026
INDEX OF DRAWINGS
APPLICABLE CODES
VICINITY MAP
2021 IBC INTERNATIONAL BUILDING CODE
2021 IEBC INTERNATIONAL EXISTING BUILDING CODE
2021 IPC INTERNATIONAL PLUMBING CODE
2021 IMC INTERNATIONAL MECHANICAL CODE
2021 IECC INTERNATIONAL ENERGY CONSERVATION CODE
2023 NEC NATIONAL ELECTRIC CODE
2021 IFC INTERNATIONAL FIRE CODE
2021 IFGC INTERNATIONAL FUEL GAS CODE
C0.00 COVER SHEET
S1.01 STRUCTURAL NOTES & SPECIAL INSPECTIONS
S2.01 EXISTING ROOF FRAMING PLAN
S3.01 TYPICAL SECTIONS AND DETAILS
S3.02 SECTIONS AND DETAILS
MEPD2.31 MEP DEMO ROOF PLAN
MEP2.31 MEP ROOF PLAN
M0.01 MECHANICAL SYMBOL LEGEND
M0.11 MECHANICAL GENERAL NOTES
MD2.11 MECHANICAL DEMO PLAN LEVEL 1
M2.11 MECHANICAL PLAN LEVEL 1
M4.01 MECHANICAL CONTROLS
M4.02 MECHANICAL CONTROLS
M5.01 MECHANICAL SCHEDULES
M6.01 MECHANICAL DETAILS
E0.01 ELECTRICAL SYMBOL LEGEND
E0.11 ELECTRICAL GENERAL NOTES
E2.11 ELECTRICAL POWER PLAN LEVEL 1
E4.01 ELECTRICAL ONE-LINE DIAGRAM
E5.01 ELECTRICAL SCHEDULES
E6.01 ELECTRICAL DETAILS
P0.01 PLUMBING SYMBOL LEGEND
P0.11 PLUMBING GENERAL NOTES
P6.01 PLUMBING DETAILS
WILLIAMSON COUNTY INNER LOOP ANNEX
301 SE INNER LOOP
GEORGETOWN, TX 78626
No. DATE DESCRIPTION
GENERAL:
1. BUILDING CODE: IBC 2021 EDITION WITH LOCAL AMENDMENT.
2. THE DETAILS DESIGNATED AS "TYPICAL DETAILS", APPLY GENERALLY TO THE DRAWINGS IN ALL
AREAS WHERE CONDITIONS ARE SIMILAR TO THOSE DESCRIBED IN DETAILS.
3. THE GENERAL CONTRACTOR SHALL VERIFY AND COORDINATE REQUIREMENTS OF OTHER TRADES
(ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, ETC.) WITH THE STRUCTURAL
DOCUMENTS PRIOR TO FABRICATION OR INSTALLATION OF ANY STRUCTURAL MEMBERS.
4. THE CONTRACTOR AND FABRICATOR SHALL VERIFY ALL QUANTITIES, DIMENSIONS AND
CONDITIONS THOROUGHLY WITH THE CONTRACT DOCUMENTS AND THEN NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR INCONSISTENCIES BEFORE SUBMITTING SHOP
DRAWINGS AND PROCEEDING WITH THE WORK. DO NOT SCALE DRAWINGS FOR DIMENSIONS.
5. COMPLETED SHOP DRAWINGS SHALL BE PROVIDED, AS SPECIFIED, FOR ALL FABRICATED ITEMS
AND SHALL BE REVIEWED BY THE GENERAL CONTRACTOR PRIOR TO FABRICATION. STRUCTURAL
DRAWINGS SHALL NOT BE REPRODUCED FOR SHOP DRAWINGS. USE OF STRUCTURAL DRAWINGS
WITHOUT PERMISSION IS GROUNDS FOR REJECTION OF SHOP DRAWINGS. THE STRUCTURAL
ENGINEER WILL REVIEW SHOP DRAWINGS FOR THE LIMITED PURPOSE OF CHECKING FOR
CONFORMANCE WITH INFORMATION GIVEN AND THE DESIGN CONCEPT EXPRESSED IN THE
CONTRACT DOCUMENTS. THEREFORE, ALL CLOUDED DIMENSIONS, INDICATED ON ANY SHOP
DRAWINGS, THAT ARE RELATIVE TO EXISTING STRUCTURES SHALL BE VERIFIED BY THE
CONTRACTOR AND FABRICATOR. AS A MINIMUM, THE FOLLOWING SHOP DRAWINGS SHALL BE
SUBMITTED AS WELL AS SHOP DRAWINGS LISTED IN THE DEFERRED SUBMITTAL SECTION OF
THESE NOTES:
A. STRUCTURAL STEEL SHOP DRAWINGS.
6. SHOP DRAWINGS NOT PREVIOUSLY REVIEWED BY THE GENERAL CONTRACTOR SHALL BE
RETURNED WITHOUT REVIEW BY STRUCTURAL ENGINEER. STRUCTURAL ENGINEER DOES NOT
BEAR ANY RESPONSIBILITY TO THE STRUCTURAL MEMBERS BUILT WITHOUT APPROVED SHOP
DRAWINGS.
7. GENERAL CONTRACTOR SHALL INSPECT JOB FOR COMPLETION BEFORE SCHEDULING ANY
OBSERVATION BY THE ENGINEER.
8. SEE ARCH'L. AND MEP DRAWINGS FOR LOCATIONS AND SIZES OF SLAB OPENINGS, SLEEVES, INSERTS, ANCHORS AND BOLTS REQUIRED BY VARIOUS TRADES.
9. THE STRUCTURE HAS BEEN DESIGNED TO RESIST DESIGN LOADS ONLY AS A COMPLETED
STRUCTURE. CONTRACTOR SHALL CONSIDER ALL CONSTRUCTION LOADS APPLIED TO THE
PARTIALLY COMPLETED STRUCTURE UNTIL ALL PERMANENT CONNECTIONS ARE MADE, AND
ENCLOSED PERMANENTLY AS PER CONSTRUCTION DOCUMENTS. TEMPORARY BRACING SHALL
BE PROVIDED BY THE CONTRACTOR IN ALL DIRECTIONS. WHEN REQUIRED, BY THE
CONSTRUCTION DOCUMENTS OR THE STRUCTURAL ENGINEER, CONTRACTOR SHALL PROVIDE
CALCULATIONS SEALED BY A LICENSED STRUCTURAL ENGINEER IN THE STATE OF TEXAS WHICH
VERIFY THE MEANS OF STRUCTURALLY MAINTAINING THE INTEGRITY OF THE COMPLETED
PORTION OF THE STRUCTURE. SHORING SHALL NOT BE THE RESPONSABILITY OF THE EOR.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING THE ADEQUACY OF THE STRUCTURE
TO SUPPORT ALL CONSTRUCTION LOADS. THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE TO
DESIGN OR CHECK THE STRUCTURE FOR CONSTRUCTION ACTIVITIES.
11. CONTRACTOR TO INCLUDE $8,000 FOR STRUCTURAL ALLOWANCE IN THEIR BID PRICE FOR USE
PER DESIGN TEAM MEMBERS. ANY UNUSED MONEY SHALL BE CREDITED BACK TO THE OWNER AT
THE END OF THE PROJECT.
12. THE ENGINEER SHALL NOT HAVE CONTROL OF, AND SHALL NOT BE RESPONSIBLE FOR,
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES, FOR SAFETY
PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, FOR THE ACTS OR OMISSIONS
OF THE CONTRACTOR, SUBCONTRACTOR, OR ANY OTHER PERSONS PERFORMING ANY OF THE
WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS.
13. PERIODIC SITE OBSERVATIONS BY FIELD REPRESENTATIVES OF ALPHA CONSULTING ENGINEERS, INC. ARE SOLELY FOR THE PURPOSE OF DETERMINING IF THE WORK OF THE CONTRACTOR IS
PROCEEDING IN ACCORDANCE WITH THE STRUCTURAL CONTRACT DOCUMENTS. THESE LIMITED
SITE OBSERVATIONS ARE NOT INTENDED TO BE A CHECK OF THE QUALITY OR QUANTITY OF THE
WORK, BUT RATHER PERIODIC IN AN EFFORT TO INFORM THE OWNER OF DEFECTS AND
DEFICIENCIES IN THE WORK OF THE CONTRACTOR.
14. ASSUMPTIONS HAVE BEEN MADE BY THIS OFFICE REGARDING EXISTING CONDITIONS. ACTUAL CONDITIONS MAY VARY FROM THOSE ASSUMED. FIELD VERIFICATION OF EXISTING CONDITIONS
MAY BE REQUIRED TO PROVIDE ADEQUATE SHOP DRAWINGS. THE CONTRACTOR IS TO
COORDINATE EFFORTS AS REQUIRED AND IS TO REPORT ANY DISCREPANCIES REGARDING THE
EXISTING CONDITIONS TO THE ENGINEER FOR POSSIBLE MODIFICATIONS NEEDED TO THE
CONTRACT DRAWINGS.
15. PROTECT ALL REMAINING EXISTING STRUCTURES. ANY DAMAGE TO AN EXISTING STRUCTURE
SHALL BE REPAIRED TO EQUIVALENT OR BETTER CONDITION.
16. IF CONFLICT EXISTS BETWEEN DRAWINGS, NOTES, AND SPECIFICATIONS, THE STRICTEST
REQUIREMENTS SHALL GOVERN.
STRUCTURAL STEEL:
1. THE STEEL DESIGN AND CONSTRUCTION SHALL CONFORM TO THE FOLLOWING:
A. AISC 360-16 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS
B. AISC 303-16 CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES
C. RCSC SPECIFICATIONS FOR STRUCTURAL JOINTS USING HIGH STRENGTH BOLTS
D. CODE APPLICABLE EDITION OF THE STRUCTURAL WELDING CODE - STEEL, AMERICAN
WELDING SOCIETY (AWS D1.1 AND AWS D1.3).
2. VERIFY THE EXACT SIZE AND LOCATION OF ALL ROOF OPENINGS FOR MECHANICAL AND ELECTRICAL REQUIREMENTS AND COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTOR PRIOR TO FABRICATION OF MATERIALS.
3. STEEL SHALL MEET THE FOLLOWING REQUIREMENTS:
ELEMENT ASTM COMMENT
ANGLES A572 Fy=50 KSI CHANNELS A992 Fy=50 KSI PLATES/FLAT BAR A572 Fy=50 KSI HSS SQ / RECTANGLE A500 Gr. C Fy=50 KSI
BOLTS F3125 UNO
ANCHOR BOLTS F1554 Gr. 55 UNO
4. STEEL SHALL BE CLEANED PER SSPC-SP2 SURFACE PREPARATION STANDARDS. STEEL SHALL BE PAINTED WITH ONE SHOP COAT OF RED OXIDE PRIMER, MINIMUM OF 1.5 MILS (DRY FILM THICKNESS). DO NOT PAINT STRUCTURAL STEEL AND ANCHOR
RODS THAT ARE TO BE EMBEDDED IN CONCRETE OR TO RECEIVE FIREPROOFING.
5. WELDING SHALL BE PERFORMED BY WELDERS HOLDING VALID CERTIFICATES, IN ACCORDANCE WITH SECTION 4 OF THE AWSD1.1 "STRUCTURAL WELDING CODE-STEEL", AND HAVING CURRENT EXPERIENCE IN THE TYPE OF WELDS AS SHOWN ON THE DRAWINGS. ALL WELDS SHALL BE PERFORMED USING E70XX SERIES LOW HYDROGEN RODS. ALL WELDS SHALL BE VISUALLY INSPECTED IN ACCORDANCE WITH SECTIONS 6.5 AND 6.9 OF THE AWSD1.1 "STRUCTURAL WELDING CODE-STEEL".
VISUAL INSPECTIONS OF WELDS SHALL BE PERFORMED BY AN INDEPENDENT TESTING AGENCY. UNLESS NOTED OTHERWISE ON THE PLANS, ALL SHOP FABRICATED OR FIELD ASSEMBLED ADJOINING STEEL MEMBERS SHALL BE CONNECTED USING CONTINUOUS, ALL AROUND/BOTH SIDES OF MEMBER FILLET WELDS IN ACCORDANCE WITH THE MINIMUM SIZE FILLET WELD SHOWN ON THE TABLE BELOW. UNLESS NOTED OTHERWISE ON THE PLANS, THE CONTRACTOR MAY SHOP WELD OR FIELD
WELD AT THEIR DISCRETION.
6. THE CONTRACTOR SHALL REVIEW SHOP AND FIELD WELD REQUIREMENTS FOR COMPATIBILITY WITH THE CONSTRUCTION SEQUENCE. PROPOSED REVISIONS FROM SHOP TO FIELD WELDS OR FROM FIELD TO SHOP WELDS SHALL BE IDENTIFIED BY
THE CONTRACTOR ON THE SHOP DRAWINGS.
7. NO MECHANICAL UNITS (SUCH AS A/C UNITS, HEATER UNITS, ETC.) ARE TO BE HUNG FROM STRUCTURE WITHOUT THE
ENGINEER'S APPROVAL, UNLESS SHOWN ON THE STRUCTURAL DRAWINGS.
8. CONTRACTOR SHALL PROVIDE PROTECTION FOR ALL EXISTING CONSTRUCTION DURING ALL FIELD WELDING OPERATIONS. A FIRE EXTINGUISHER SHALL BE ON THE JOB SITE AND IN THE IMMEDIATE WORKING AREA OF ALL FIELD WELDING.
MINIMUM SIZE OF FILLET WELDS
MATERIAL THICKNESS OF
THINNER PART JOINED, IN.
TO 1/4 INCLUSIVE
OVER 1/4 TO 1/2
OVER 1/2 TO 3/4
OVER 3/4
MINIMUM SIZE OF
FILLET WELD, IN.
3/16
1/4
5/16
3/8
LEG DIMENSION OF FILLET WELDS. SINGLE
PASS WELDS MUST BE USED.
1. DEAD LOADS INCLUDE THE WEIGHT OF CONSTRUCTION MATERIALS INCORPORATED INTO THE BUILDING, INCLUDING BUT NOT LIMITED TO WALLS, FLOORS, ROOFS, CEILINGS, STAIRWAYS, BUILT-IN PARTITIONS, FINISHES, CLADDING AND OTHER SIMILARLY INCORPORATED ARCHITECTURAL AND STRUCTURAL ITEMS, AND FIXED SERVICE EQUIPMENT. ALL DEAD LOADS ARE
CONSIDERED PERMANENT LOADS.
2. DEAD LOADS FOR MECHANICAL UNITS ARE BASED ON THE WEIGHTS OF EQUIPMENT, AS INDICATED ON THE STRUCTURAL DRAWINGS (INCLUDING THE WEIGHT OF CONCRETE PADS, WHERE INDICATED). ANY CHANGES IN TYPE, SIZE, LOCATION OR NUMBER OF PIECES OF EQUIPMENT SHOULD BE REPORTED TO THE ARCHITECT FOR VERIFICATION OF THE ADEQUACY OF
SUPPORTING MEMBERS PRIOR TO THE PLACEMENT OF SUCH EQUIPMENT.
3. UNIFORM DESIGN LIVE LOADING IS AS FOLLOWS:
o EXISTING ROOF ....................................................20 PSF (PER AS-BUILT PLANS)
4. WIND LOADS: 20 PSF (PER AS-BUILT PLANS)
5. UNLESS SPECIFICALLY NOTED, THERE ARE NO PROVISIONS FOR FUTURE FLOORS, ROOFS OR OTHER LOADS.
DESIGN LOADS:
STRUCTURAL SPECIAL INSPECTIONS NOTES:
1. SPECIAL INSPECTION WORK IS NOT INCLUDED IN THE STRUCTURAL ENGINEER'S SCOPE OF SERVICES. THE OWNER WILL ENGAGE A TESTING AGENCY TO CONDUCT SPECIAL TESTS AND INSPECTIONS REQUIRED BY AUTHORITIES HAVING JURISDICTION AS THE RESPONSIBILITY OF THE OWNER. ALL INSPECTION REPORTS SHALL BE COPIED TO THE STRUCTURAL ENGINEER, AND A FINAL LETTER OF COMPLIANCE SHALL BE PROVIDED BY THE REGISTERED DESIGN PROFESSIONAL IN
RESPONSIBLE CHARGE (TYPICALLY ARCHITECT) TO THE OWNER OR BUILDING AUTHORITY.
SPECIAL INSPECTION SHALL INCLUDE:
o WELDING OF STRUCTURAL STEEL
2. INSPECTOR QUALIFICATIONS: QUALIFICATIONS LISTED IN THE TESTING & INSPECTION REQUIREMENTS TABLES ARE RECOMMENDATIONS OF THE LOCAL MEMBERS OF THE TEXAS COUNCIL OF ENGINEERING LABORATORIES. IT IS ALSO RECOMMENDED THAT THE SPECIAL INSPECTORS SHOULD BE EMPLOYED BY AN AGENCY ACCREDITED BY ANY NATIONALLY
RECOGNIZED ACCREDITING BODY SUCH AS AASHTO, A2LA, NVLAP, ICC ETC.
3. DEFINITIONS:
ACI - AMERICAN CONCRETE INSTITUTE
ADSC-IAFD - ADSC: THE INTERNATIONAL ASSOCIATION OF FOUNDATION DRILLING
AISC - AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ASNT - AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING
ASTM - AMERICAN SOCIETY FOR TESTING MATERIALS
AWS - AMERICAN WELDING SOCIETY
CWI - CERTIFIED WELDING INSPECTOR
CRSI - CONCRETE REINFORCING STEEL INSTITUTE
IBC - INTERNATIONAL BUILDING CODE
PCI - PRECAST/PRESTRESSED CONCRETE INSTITUTE
PTI - POST-TENSIONING INSTITUTE
*4. TESTING AND INSPECTION DIRECTED BY ASTM E329 GUIDELINES WHERE NOTED ON THE TESTING & INSPECTION
REQUIREMENTS TABLES.
5. THE SPECIAL INSPECTOR CANNOT BE AN EMPLOYEE OF THE CONTRACTOR.
6. WHERE STRUCTURAL MEMBERS AND ASSEMBLIES ARE SHOP FABRICATED, THE SPECIAL INSPECTOR SHALL VERIFY THAT THE FABRICATOR MAINTAINS DETAILED FABRICATION AND QUALITY CONTROL PROCEDURES THAT PROVIDE A BASIS FOR INSPECTION CONTROL OF THE WORKMANSHIP AND THE FABRICATOR'S ABILITY TO CONFORM TO THE CONSTRUCTION DOCUMENTS AND REFERENCED STANDARDS, UNLESS THE FABRICATOR IS REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. EXCEPTION: SPECIAL INSPECTIONS SHALL NOT BE REQUIRED WHERE THE WORK IS PERFORMED ON THE PREMISES OF A FABRICATOR THAT IS ENROLLED IN A NATIONALLY ACCEPTED INSPECTIONS PROGRAM ACCEPTABLE TO THE REGISTERED DESIGN PROFESSIONAL IN CHARGE. AT THE COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE BUILDING OFFICIAL UPON REQUEST AND TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE STATING THAT THE WORK WAS PERFORMED IN
ACCORDANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS.
VERIFICATION AND SPECIAL INSPECTION TASKS FOR
WELDING OF STRUCTURAL STEEL
(AISC 360-16)
1. Inspection tasks prior to welding:
a. Welding procedure specifications (WPSs) available.
f. Configuration and finish of access holes.
2. Inspection tasks during welding:
a. Placement and installation of steel headed stud anchors.
b. Control and handling of welding consumables
1) Packaging
2) Exposure control
c. No welding over cracked tack welds
3. Inspection tasks after welding:
a. Welds cleaned
Continuous
Periodic
Periodic
Continuous
Periodic
Required Verification and Inspection Frequency of
Verification and Inspection
Inspector Qualifications
WELDING OF STRUCTURAL STEEL
b. Manufacturer certifications for welding consumables available. Continuous
c. Material identification (type/grade) 2 Periodic
d. Welder identification system 2,4 Periodic
e. Fit-up of groove weld (including joint geometry)
1) Joint preparation.
2) Dimensions (alignment, root opening, root face, bevel)
3) Cleanliness (condition of steel surfaces)
4) Tacking (tack weld quality and location)
5) Backing type and fit (if applicable)
g. Fit-up of fillet welds
1) Dimensions (alignment, gaps at root)
2) Cleanliness (condition of steel surfaces)
3) Tacking (tack weld quality and location)
Periodic
2 Periodic
d. Environmental conditions
1) Wind speed within limits
2) Precipitation and temperature
Periodic
e. WPS followed
1) Settings on weld equipment
2) Travel speed
3) Selected welding materials
4) Shielding gas type/flow rate
5) Preheat applied
6) Interpass temperature maintained (min./max.)
7) Proper position (F, V, H, OH)
Periodic
f. Welding Techniques
1) Interpass and final cleaning
2) Each pass within profile limitations
3) Each pass meets quality requirements.
Periodic
b. Size, length and location of welds
c. Welds meet visual acceptance criteria
1) Crack Prohibition
2) Weld/base-metal fusion
3) Crater cross section
4) Weld profiles
5) Weld size
6) Undercut
7) Porosity
Continuous
Continuousd. Arc strikes
Continuousf. Weld access holes in rolled heavy shapes and built-up heavy shapes[b]
Continuousg. Backing removed and weld tabs removed (if required)
Continuoush. Repair activities
Continuous
i. Document acceptance or rejection of welded joint or member
1. Inspection tasks noted in this table are the responsibility of the Special Inspector or Quality Assurance Inspector (QAI). The fabricator and erector are responsible for all inspection tasks indicated in AISC 360-10 Section N5 and assigned to the Quality Control Inspector (QCI)
2. Inspection tasks may be coordinated with the fabricator or erector's Quality Control Inspector (QCI) where indicated with this footnote. All other tasks shall be performed by the Special Inspector.
3. When welding of doubler plates, continuity plates or stiffeners has been performed in the k-area, visually inspect the web k-area for cracks within 3 in. (75 mm) of the weld.
4. The fabricator or erector, as applicable, shall maintain a system by which a welder who has welded a joint or member can be identified. Die stamping of members subjected to fatigue shall be prohibited unless approved by the engineer of record.
As required by building official
As required by building official
As required by building official
h. Welder qualifications records and continuity records. Periodic
Continuous
Continuous
Continuouse. k-area3
j. No prohibited welds have been added without the approval of the engineer of record
Periodic
JESUS H. ZAPATA
140522
Alpha Consulting Engineers F-1010
Alpha Consulting Engineers 8023 Vantage Drive
Suite 1101, San Antonio, TX 78230 O 210.227.3647
F-1010
REVISION:
S E
R V
U
A L
N
T E
G R
S
T A
IN
A
B
IL
IT
Y
S E
I N
N E
R L
O O
P G
E O
R G
E T
O W
N
T X
CHECKED BY:
SHEET TITLE:
SHEET NUMBER:
PROJECT NUMBER
DRAWN BY:
DATE:
TBPE Firm Registration No. 2234
Alpha Project No.A25005.1
255034.000
S1.01
STRUCTURAL NOTES &
SPECIAL INSPECTIONS
W ill ia m s o n C o u n ty
I L A
D e h u m id if ic a ti o n
06/09/2026
A.G.
J.Z.
STRUCTURAL NOTES:
1. ALL STRUCTURAL ELEMENTS OF THE BUILDING SHALL BE OBSERVED BY THE STRUCTURAL
ENGINEER'S REPRESENTATIVE DURING THE CONSTRUCTION PHASE, SO THAT A FINAL LETTER
OF COMPLIANCE CAN BE PROVIDED TO THE OWNER AND/OR BUILDING AUTHORITY.
2. PRIOR TO THE BEGINNING OF CONSTRUCTION, THE CONTRACTOR SHALL ARRANGE A MEETING
WITH THE STRUCTURAL ENGINEER TO SET UP A SCHEDULE FOR THE FOLLOWING
OBSERVATIONS, NOT TO EXCEED THE SPECIFIED NUMBER OF VISITS:
A. STRUCTURAL STEEL: BEFORE CONNECTIONS AND STRUCTURAL MEMBERS ARE HIDDEN BY
INSTALLATION OF ARCHITECTURAL FINISHES - ONE VISIT.
B. NOTIFY ARCHITECT AT LEAST 24 HOURS BEFORE EACH SITE OBSERVATION IS REQUIRED
TO ALLOW TIME FOR ARRANGEMENTS TO BE MADE WITH ENGINEER FOR SITE OBSERVATION.
3. THESE STRUCTURAL OBSERVATIONS ARE THE REQUIREMENTS OF THE STRUCTURAL
ENGINEER AND DOES NOT INCLUDE OR WAIVE THE RESPONSIBILITY FOR THE SPECIAL
INSPECTIONS REQUIRED BY CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE. SPECIAL
INSPECTION SHALL BE PERFORMED BY THE SPECIAL INSPECTOR WHO SHALL BE HIRED BY
OWNER TO MEET CHAPTER 17 OF THE IBC.
SCHEDULE OF SITE VISITS BY ENGINEER:
DEMOLITION / SHORING:
1. THE INFORMATION AND DATA INDICATED IN THE DRAWINGS RELATED TO THE EXISTING
BUILDING, IS THE BEST AVAILABLE FOR ASSISTING THE GENERAL CONTRACTOR IN THE
PREPARATION AND UNDERSTANDING OF THE SCOPE OF WORK RELATING TO THE DEMOLITION
WORK, AND IS NOT INTENDED AS THE ONLY MEANS OF DETERMINING THE TOTAL SCOPE OF
WORK INVOLVED.
2. THE INFORMATION AND DATA CONTAINED IN THE DRAWINGS IS ONLY PARTIAL AND SCHEMATIC IN CONTEXT AND IN NO WAY SHALL IT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR VISITING THE SITE TO VERIFY EXISTING CONDITIONS, LIMITATIONS AND DIFFICULTY INVOLVED.
(SEE ALSO GENERAL NOTE 4).
3. LOCATION OF JOISTS, BEAMS AND OTHER STRUCTURAL MEMBERS, MAY VARY FROM THAT
SHOWN ON THE DRAWINGS. GENERAL CONTRACTOR IS TO VERIFY ACTUAL LOCATION OF
MEMBERS AND REPORT ANY DISCREPANCIES TO THE STRUCTURAL ENGINEER BEFORE
SUBMITTING SHOP DRAWINGS.
4. ALL PORTIONS OF THE STRUCTURE MUST BE ADEQUATELY SHORED PRIOR TO ANY SAW
CUTTING OR DEMOLITION PROCESS. THE STRUCTURE MUST BE LEFT IN A STABLE AND
SECURED POSITION ALL THE TIME.
SPECIAL INSPECTIONS NOTES:
No. DATE DESCRIPTION
06/09/2026
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
U A
L
N
T E
G R
U S
T A
IN
A
B
IL
A B C D E F G H I J
(E) W21X50(E) W21X50 (E) W21X44 (E) W21X50 (E) W21X44 (E) W21X44 (E) W21X44 (E) W21X50
(E) W21X50 (E) W21X50(E) W21X50 (E) W21X50
(E) W21X50 (E) W21X50(E) W21X50 (E) W21X50
(E) 28K9 BAR JOISTS @ 6'-0"o.c.
(E) 28K9 BAR JOISTS @ 6'-0"o.c.
(E) 28K9 BAR JOISTS @ 6'-0"o.c.
(E) 28K9 BAR JOISTS @ 6'-0"o.c.
(E) W21X44 (E) W21X44 (E) W21X44
(E) W21X44(E) W21X44(E) W21X44
(E) W21X44(E) W21X44
(E) W21X44
(E) RTU-1
NEW
DOAS-1
4,600 LBS
(E) RTU-2
(E) RTU-3
(E) RTU-5
NEW
RTU-15
900 LBS
(E) RTU-4
(E) RTU-13
NEW
RTU-17
1,500 LBS
NEW
RTU-18
1,500 LBS
(E) RTU-10
(E) RTU-8
(E) RTU-6
NEW
RTU-16
900 LBS
(E) RTU-11
(E) RTU-7
(E) RTU-14
(E) RTU-9 (E) RTU-12 NEW
RTU-19
1,500 LBS
ELEV. "J1"
REF. JST.
ELEV. "J1"
REF. JST.
ELEV. "J2"
REF. JST.
ELEV. "J1"
REF. JST.
JESUS H. ZAPATA
140522
Alpha Consulting Engineers F-1010
Alpha Consulting Engineers 8023 Vantage Drive
Suite 1101, San Antonio, TX 78230 O 210.227.3647
F-1010
REVISION:
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
A L
T E
G R
S
T A
IN
A
B
IL
IT
Y
S E
I N
N E
R L
O O
P G
E O
R G
E T
O W
N
CHECKED BY:
SHEET TITLE:
SHEET NUMBER:
PROJECT NUMBER
DRAWN BY:
DATE:
TBPE Firm Registration No. 2234
Alpha Project No.A25005.1
255034.000
S2.01
EXISTING ROOF
FRAMING PLAN
W ill ia m s o n C o u n ty
I L A
D e h u m id if ic a ti o n
05/08/2026
A.G.
J.Z.
SCALE : 1/16" = 1'-0"
EXISTING WAREHOUSE ROOF FRAMING PLAN1
NOTE:
1. EXISTING FRAMING SHOWN PER AS-BUILT PLANS SEALED BY KENT OWEN MAXWELL, P.E.
WITH KMAX ENGINEERS, INC., DATED 03-15-1994.
2. THE DESIGN INCLUDED HEREWITH IS BASED ON EQUIPMENT INFORMATION MADE
AVAILABLE TO OUR OFFICE. ANY CHANGE OF EQUIPMENT MUST BE COORDINATED WITH
OUR OFFICE.
3. ALL STRUCTURAL STEEL TO BE GALVAZINED, PRIMED AND/OR PAINTED FOR MOISTURE
DAMAGE PROTECTION.
C X° Ø A.B.
AESS
APPROX.
ARCH.
ADH.
ALT.
B.P.
B.L.
B.U.R.
BM.
B.W.
BOT.
BLDG.
BSMT.
BRG.
BTWN.
CANT.
C.I.P
CLG.
CLR.
CMU
COL.
CONC.
CONTR.
C.J.
CONN.
CONST.
CONT.
D.E.
DEMO.
DIA.
DIAG.
DIM.
D.L.
DBL.
DN.
DWL.
DWG.
EA.
E.F.
E.J.
ELEV.
EQ.
EQUIP.
E.W.
EXIST.
EXP.
EXT.
FDN.
F.D.
F.S.
FIN.
FLD.
FLR.
FT.
FTG.
F.V.
GA.
GALV.
GR.
HK.
HORIZ.
HCA
H.S.
- AND
- AT
- CENTERLINE
- DEGREE
- DIAMETER
- NUMBER/POUND
- ANCHOR BOLT
- ARCHITECTURALLY EXPOSED
STRUCTURAL STEEL
- APPROXIMATE
- ARCHITECT/ARCHITECTURAL
- ADHESIVE
- ALTERNATE
- BASE PLATE
- BUILDING LINE
- BUILT-UP ROOF
- BEAM
- BOTH WAYS
- BOTTOM
- BUILDING
- BASEMENT
- BEARING
- BETWEEN
- CANTILEVER
- CAST-IN-PLACE
- CEILING
- CLEAR
- CONCRETE MASONRY UNITS
- COLUMN
- CONCRETE
- CONTRACTOR
- CONSTRUCTION JOINT
- CONNECTION
- CONSTRUCTION
- CONTINUOUS
- DECK EDGE
- DEMOLITION
- DIAMETER
- DIAGONAL
- DIMENSION
- DEAD LOAD
- DOUBLE
- DOWN
- DOWEL
- DRAWING
- EACH
- EACH FACE
- EXPANSION JOINT
- ELEVATION
- EQUAL
- EQUIPMENT
- EACH WAY
- EXISTING
- EXPANSION
- EXTERIOR
- FOUNDATION
- FLOOR DRAIN
- FAR SIDE
- FINISH
- FIELD
- FLOOR
- FOOT OR FEET
- FOOTING
- FIELD VERIFY
- GAGE
- GALVANIZED
- GRADE
- HOOK
- HORIZONTAL
- HEADED CONCRETE ANCHOR
- HIGH STRENGTH
I.D.
IN.
INV.
INT.
JST.
JT.
K L
LBS.
L.D.H.
LF
LLH
LG.
LLV
MAX.
MECH.
MEZZ.
MFR.
MID.
MIN.
MISC.
MAS.
NS
NOM.
N.T.S.
O.C.
O.D.
O.H.
OPNG.
OPP.
P/C
PREFAB.
PSF
PSI
PL.
R
RAD.
R.D.
REF.
REINF.
REQ'D
SPAC.
SCHED.
SECT.
SHT.
SIM.
SPEC.
SL.
SSS
STIFF.
STIR.
SQ.
STD.
STL.
STR.
STRUCT.
SYM.
T.
T&B
THK.
T.O.C.
T.O.J.
T.O.S.
T.O.W.
TYP.
U.N.O.
VERT.
W/ W.P.
W.W.F.
- INSIDE DIAMETER
- INCH
- INVERTED
- INTERIOR
- JOIST
- JOINT
- KIP (THOUSAND POUNDS)
- ANGLE
- POUND
- LONG DIMENSION HORIZONTAL
- LINEAR FOOT
- LONG LEG HORIZONTAL
- LONG
- LONG LEG VERTICAL
- MAXIMUM
- MECHANICAL
- MEZZANINE
- MANUFACTURER
- MIDDLE
- MINIMUM
- MISCELLANEOUS
- MASONRY
- NEAR SIDE
- NOMINAL
- NOT TO SCALE
- ON CENTER
- OUTSIDE DIAMETER
- OPPOSITE HAND
- OPENING
- OPPOSITE
- PRECAST
- PREFABRICATED
- POUND PER SQUARE FOOT
- POUND PER SQUARE INCH
- PLATE
- RISER
- RADIUS
- ROOF DRAIN
- REFERENCE
- REINFORCING/REINFORCED
- REQUIRED
- SPACES/SPACING
- SCHEDULE
- SECTION
- SHEET/SHEATHING
- SIMILAR
- SPECIFICATION
- SLOPE
- STANDARD STRUCTURAL STEEL
- STIFFENERS
- STIRRUPS
- SQUARE
- STANDARD
- STEEL
- STAIR
- STRUCTURE/STRUCTURAL
- SYMMETRICAL
- TREAD
- TOP AND BOTTOM
- THICK/THICKNESS
- TOP OF CONCRETE
- TOP OF JOIST
- TOP OF STEEL
- TOP OF WALL
- TYPICAL
- UNLESS NOTED OTHERWISE
- VERTICAL
- WITH
- WORK POINT
- WELDED WIRE FABRIC
ABBREVIATIONS
No. DATE DESCRIPTION
06/09/2026
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
U A
L
N
T E
G R
U S
T A
IN
A
B
IL
IT
06/09/2026
NEW
L3x3x1/4
NOTE:
1. METAL ROOF NOT SHOWN FOR CLARITY.
2. EXISTING FRAMING IS PERMITTED TO BE USED IF FRAMING MATCHES OR EXCEEDS WHAT IS SHOWN. CONTRACTOR TO FIELD VERIFY.
MECH. UNIT ABOVE
PLAN
NEW L4x3x3/8 (LLV)
"1B"
EXISTING JOIST
EXISTING JOIST
NEW MECH. UNIT
MECH. UNIT OPENING
REF. DETAIL, SEE
MEP FOR OPENING
NEW L2x2x1/4
FRAME AT EACH
MECH. OPENING
NEW L3x3x1/4
AT EACH SIDE
OF OPENING NEW L2x2x1/4 FROM
POINT OF LOAD TO
BOTTOM CHORD
PANEL
NEW L4x3x3/8 (LLV) CUT
BETWEEN JOISTS
FIELD MEASURE FIELD MEASURE
NEW MECH.
UNIT
NEW L4x3x3/8
NEW L3x3x1/4 UNDER
CURB ABOVE
"1A"
EXIST. METAL ROOF
DECKING
PROVIDE C3x4.1 x 0'-3" DECK
STIFFENER IN CORRUGATIONS
OF ROOF DECK @ 2'-0" MAX.
ALONG CURB, ALL SIDES.
EXISTING
JOISTS
NEW L2x2x1/4 FROM POINT OF
LOAD TO BOTTOM CHORD
PANEL POINT.
CURB
1A
S3.01
B
S .0
TYP. TOP & BOTT.
3/16
3/16
TYP.
3/16
EXISTING METAL
ROOF DECKING
NEW L3x3x1/4
"2A"
NOTE : METAL ROOF DECK NOT SHOWN FOR CLARITY
PLAN
NEW
L3x3x1/4
NEW L4x3x3/8
(LLV)
OPENING
SEE PLAN FOR SPACING
2A
S3.01
1B
S3.01
2A
S3.01
EXISTING JOIST
NEW L4x3x1/4
EXISTING
JOISTS
NEW L2x2x1/4, WELD
TO EXISTING JOIST
TYP.
3/16
WELD EACH FLUTE OF
EXISTING DECK TO STEEL
SUPPORT
EXISTING STEEL
JOIST, REF. PLAN
ADD NEW DOUBLE L2 x 2 x 3/16 TO JOISTS WHERE
CONCENTRATED LOAD OR HANGERS OCCUR MORE
THAN 4" FROM JOIST PANEL POINT AND THE
CONCENTRATED LOAD EXCEEDS 50 #
HANGER ROD AT
CONCENTRATED LOAD
LOCATED BETWEEN JOISTS
IF CONCENTRATED LOAD
EXCEEDS 200# ON JOIST'S
BOTTOM CHORD, ENGINEER
OF RECORD MUST APPROVE
PANEL
POINT
CONCENTRATED LOAD
ON JOIST'S TOP CHORD
PROVIDE NEW L4x4x1/4
BETWEEN JOISTS
4" MAX.
MAX.
4"
PANEL
POINT
TYP.
TYP.
ADD NEW DOUBLE L2 x 2 x 3/16 TO JOISTS WHERE
CONCENTRATED LOAD OR HANGERS OCCUR MORE
THAN 4" FROM JOIST PANEL POINT AND THE
CONCENTRATED LOAD EXCEEDS 50 #
4A
S3.01
4A
S3.01
TYP. ALL WEB MEMBERS
WHERE INDICATED ON
JOIST ELEVATION
JOIST TOP & BOTTOM
REINFORCING SCHEDULE
JOIST ELEVATION
J1
J2
REINFORCING ROD DIA., (IN.)
1/2"
5/8"
NEW ROD, WELD TO TOP &
BOTTOM CHORDS ANGLES,
SEE SCHEDULE FOR ROD SIZE.
(TYP.)
1-6
1-6
EXISTING JOIST WEB
ANGLE, FIELD VERIFY
SIZE AND LENGTH
NOTE 1
EXISTING CHORD
NEW ROD EACH
SIDE OF JOIST
NOTE:
1. PROVIDE 1" LONG WELDS AT EACH
PANEL POINT LOCATION AND EQUALLY
SPACED BETWEEN PANEL POINTS.
SPACING SHALL NOT EXCEED 1'-0" o.c.
NEW ROD, SEE JOIST TOP
& BOTTOM CHORD REINF.
SCHEDULE
JOIST TOP & BOTTOM
REINFORCING SCHEDULE
JOIST ELEVATION
J2
REINFORCING ROD DIA., (IN.)
1/2"
3/16"
3/16"
TYP.
EXISTING CHORD
NEW 4" LONG HSS2X2X1/4
ON EA. SIDE OF JOIST
SEAT, CONTRACTOR TO
FIELD CONFIRM HSS AND
SHIM REQUIREMENTS PART
OF NOTE 1
NOTE:
1. FILL GAP W/ STEEL PLATE SHIM OR UPSIZE HSS
TO FILL GAP. FIELD COORDINATE REQUIREMENT.
JESUS H. ZAPATA
140522
Alpha Consulting Engineers F-1010
Alpha Consulting Engineers 8023 Vantage Drive
Suite 1101, San Antonio, TX 78230 O 210.227.3647
F-1010
REVISION:
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
A L
T E
G R
S
T A
IN
A
B
IL
IT
Y
S E
I N
N E
R L
O O
P G
E O
R G
E T
O W
N
CHECKED BY:
SHEET TITLE:
SHEET NUMBER:
PROJECT NUMBER
DRAWN BY:
DATE:
TBPE Firm Registration No. 2234
Alpha Project No.A25005.1
255034.000
S3.01
TYPICAL SECTIONS
AND DETAILS
W ill ia m s o n C o u n ty
I L A
D e h u m id if ic a ti o n
05/08/2026
A.G.
J.Z.
A B SCALE : 3/4" = 1'-0"
TYPICAL ROOF FRAMING AT NEW MECHANICAL UNITS ON EXISTING ROOF STRUCTURE1 1 1 A SCALE : 3/4" = 1'-0"
TYPICAL FRAMING AT NEW ROOF OPENINGS AND ROOF DRAINS2 2
SCALE : 3/4" = 1'-0"
TYP. DETAIL AT CONCENTRATED LOADS ON JOIST3 A SCALE : 3/4" = 1'-0"
EXISTING STEEL JOIST WEB REINFORCING4 4
"4A"
SCALE : 1" = 1'-0"
TOP AND BOTTOM CHORD REINFORCEMENT5 SCALE : 3" = 1'-0"
JOIST SEAT REINFORCEMENT6
No. DATE DESCRIPTION
06/09/2026
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
U A
L
N
T E
G R
U S
T A
IN
A
B
IL
IT
S3.01
S3.01
S3.01 11B
CENTERLINE
OF JOIST
SEE NOTE 1
SHORE EXISTING ROOF DECK AND JOIST TO BE REINFORCED,
STEEL JOIST WEB MEMBERS TO
BE REINFORCED. REF. NOTE 5. EXISTING ROOFING
NEW/REPLACEMENT RTU
ON EXISTING ROOF
EXISTING STEEL WF BEAMS OR
STRUCTURAL WALL TO REMAIN,
(TYP.)
NOTES (TYP.):
1. SHORING WILL BE REQUIRED WHILE REINFORCING THE JOISTS NOTED ON PLAN, TYPICAL ALONG THE ENTIRE LENGTH OF THE JOISTS. INSTALL ALL REINFORCING PRIOR TO INSTALLING NEW/REPLACEMENT RTU UNITS. SHORE THE DECK AROUND THE JOISTS BEING REINFORCED UNTIL ALL REINFORCING IS COMPLETE. KEEP SHORING TWO FEET AWAY FROM
ADJOINING JOISTS NOT BEING REINFORCED. DO NOT PUSH UP ON THE DECK WITH SHORING.
2. EXISTING ELECTRICAL CONDUIT, PLUMBING, HANGERS, ETC. THAT ARE ATTACHED TO EXISTING JOIST MEMBERS REQUIRING REINFORCING SHALL BE MOVED AS REQUIRED TO INSTALL THE REINFORCING AS DETAILED ON THESE DRAWINGS. WHERE REINFORCING MUST BE SPLICED, THE REINFORCING SHALL BE FULLY BUTT WELDED TO PROVIDE
THE FULL TENSION CAPACITY OF THE REINFORCING.
3. ALL NEW STEEL REINFORCING SHALL BE GR.50. THE STEEL REINFORCING IS INDICATED WITH
4. PROVIDE TOP /BOTTOM CHORDS REINFORCING AS NOTED ON JOIST ELEVATION DETAILS. REFER TO DETAIL
PROVIDE GR.50 RODS.
5. PROVIDE WEB REINFORCING PER DETAIL FOR ALL INDICATED WEB MEMBERS. CONTRACTOR TO VERIFY
EXISTING JOIST WEB MEMBER SHAPES MATCH STRUCTURAL DETAILS.
6. REF. FOR ADDITIONAL JOIST REINFORCING AT CONCENTRATED LOADS.
7. ALL JOIST REINFORCING SHALL BE CONTINUOUS. IF SPLICE IS REQUIRED, PROVIDE COMPLETE JOINT PENETRATION
WELD AT SPLICE.
/5 S3.01
/4 S3.01
/3 S3.01
S3.01
S3.01
S3.01 11B
CENTERLINE
OF JOIST
SEE NOTE 1 ON DETAIL 1 / S3.02
SHORE EXISTING ROOF DECK SUPPORTED BY JOIST TO BE REINFORCED,
ADD (2) NEW CONT. RODS TO
EXISTING TOP AND BOTTOM
CHORDS PER JOIST ELEVATIONEXISTING ROOFING
NEW/REPLACEMENT RTU
ON EXISTING ROOF
EXISTING STEEL WF BEAMS OR
STRUCTURAL WALL TO REMAIN,
(TYP.)
NOTES:
1. REF. FOR ADD'L INFO./1 S3.02
CONTRACTOR TO COORDINATE REINFORCING ENDS AT PANEL POINTS
REINFORCE MIDDLE 28' - 0" OF BOTTOM CHORD,
CONTRACTOR TO COORDINATE REINFORCING ENDS AT PANEL POINTS
REINFORCE MIDDLE 32' - 0" OF TOP CHORD
SCALE : 1/2" = 1'-0"
EXISTING ROOF JOIST "J1" ELEVATION1
JESUS H. ZAPATA
140522
Alpha Consulting Engineers F-1010
Alpha Consulting Engineers 8023 Vantage Drive
Suite 1101, San Antonio, TX 78230 O 210.227.3647
F-1010
REVISION:
S E
R V
A L
T E
G R
S
T A
IN
A
B
IL
IT
Y
S E
I N
N E
R L
O O
P G
E O
R G
E T
O W
N
CHECKED BY:
SHEET TITLE:
SHEET NUMBER:
PROJECT NUMBER
DRAWN BY:
DATE:
TBPE Firm Registration No. 2234
Alpha Project No.A25005.1
255034.000
S3.02
SECTIONS AND
DETAILS
W ill ia m s o n C o u n ty
I L A
D e h u m id if ic a ti o n
05/26/2026
A.G.
J.Z.
SCALE : 1/2" = 1'-0"
EXISTING ROOF JOIST "J2" ELEVATION2
No. DATE DESCRIPTION
06/09/2026
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
U A
L
N
T E
G R
U S
T A
IN
A
B
IL
IT
(E)
RTU-13
(E)
RTU-4
(E)
RTU-3
(E)
RTU-10
(E)
RTU-9
(E)
RTU-12(E)
RTU-14
(E)
RTU-7
(E)
RTU-11
(E)
RTU-6
(E)
RTU-8
(E)
RTU-1
(E)
RTU-2
(E)
RTU-5
(E)
RTAC-5
HD-2
(E)
RTAC-6
(E)
RTAC-3
(E)
RTAC
(E)
RTAC-4
(E)
RTAC-1
(E)
RTAC-2
(D)
RTU-16
(D)
RTU-17
(D)
RTU-18
(D)
RTU-19
(D)
RTU-15M0.3
M0.1 M0.1
M0.1
M0.1 M0.1
M0.2
M0.2
M0.2 M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
M0.2
E3.1
E3.1
E3.1
E3.1
E3.1
E3.1
P6.5
P6.4
P6.4
P6.4
P6.4
P6.4 1 1/4"G (E)
1/
4" G
E
2"G (E)
2" G
E
1"G (E)
2" G
E
1"G (E)
1 1/2"G (E) 1 1/2"G (E)
1"G (E) 1"G (E)
1 1/4"G (E)
1/
4" G
E
1" G
E
1"G (E)
1/
4" G
E
1"G (E)
1"G (E) 1"G (E)
1 1/4"G (E)
1" G
E
1" G
E
1" G
E
1"G (E) 1"G (E)
1"G (E)1"G (E)
1" G
E
1"
G
E
1"G (E)
3/4"G (E)
1"G (E)
1" G
E
1"G (E)
1" G
E
1"G (E)
P6.2
(D)
MAU-1
REVISION:
SEAL:
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
U A
L
N
T E
G R
U S
T A
IN
A
B
IL
IT
Y
S
E I
N N
E R
L O
O P
G E
O R
G E
T O
W N
T
X
CHECKED BY:
SHEET TITLE:
SHEET NUMBER:
PROJECT NUMBER
DRAWN BY:
DATE:
TBPE Firm Registration No. 2234
06/09/2026
255034.000
MEPD2.31
MEP DEMO ROOF PLAN
W ill ia m s o n C o u n ty I
L A
D e h u m id if ic a ti o n
06/09/2026
DBR
DBR
1/16" = 1'-0"
MEP DEMO ROOF PLAN
▯ ELECTRICAL KEYED NOTES
E3.1 EXISTING UNIT TO BE REMOVED. DEMOLISH EXISTING ELECTRICAL
EQUIPMENT, CONDUIT, AND CONDUCTORS ASSOCIATED WITH UNIT
BACK TO PANEL. SALVAGE UNIT EXISTING-TO-BE REMOVED AND
RETURNED TO OWNER. OWNER SHALL HAVE FIRST RIGHT TO
REFUSAL.
▯ MECHANICAL KEYED NOTES
M0.1 EXISTING ROOFTOP EQUIPMENT AND ALL ASSOCIATED CONTROLS,
ELECTRICAL, AND ACCESSORIES SHALL BE REMOVED. EXISTING ROOF
CURB SHALL REMAIN. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL
FOR ALL DEMOLISHED EQUIPMENT TO SALVAGE COMPONENTS AS
DESIRED. EXISTING SMOKE DETECTOR SHALL BE SALVAGED FOR
REUSE IN NEW UNIT. DEMOLISH EXISTING CONDENSATE PIPE BACK TO
APPROXIMATELY 1 FOOT FROM CONNECTION TO CONDENSATE MAIN.
M0.2 EXISTING ROOFTOP UNIT SHALL REMAIN.
M0.3 EXISTING ROOFTOP EQUIPMENT AND ALL ASSOCIATED CONTROLS,
ELECTRICAL, AND ACCESSORIES SHALL BE REMOVED. DEMOLISH
EXISTING ROOF CURB IN ENTIRETY, AND PREPARE ROOF FOR NEW
ROOF CURB. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL
DEMOLISHED EQUIPMENT TO SALVAGE COMPONENTS AS DESIRED.
EXISTING SMOKE DETECTOR SHALL BE SALVAGED FOR REUSE IN NEW
UNIT. DEMOLISH EXISTING CONDENSATE PIPE BACK TO
APPROXIMATELY 1 FOOT FROM CONNECTION TO CONDENSATE MAIN.
TN PN
▯ PLUMBING KEYED NOTES
P6.2 (E)2-1/2" GAS DN TO METER.
P6.4 DISCONNECT EXISTING GAS PIPING AT EXISTING RTU'S, ASSOCIATED
APPURTENANCES AND REMOVE TO NEAREST ACTIVE MAIN. RE: NEW
WORK PLAN
P6.5 DISCONNECT EXISTING GAS PIPING AT EXISTING MAU, ASSOCIATED
APPURTENANCES AND REMOVE TO NEAREST ACTIVE MAIN. RE: NEW
WORK PLAN
(E)
RTU-4
(E)
RTU-3
(E)
RTU-10
(E)
RTU-9
(E)
RTU-12(E)
RTU-14
(E)
RTU-7
(E)
RTU-11
(E)
RTU-6
(E)
RTU-8
(E)
RTU-1
(E)
RTU-2
(E)
RTU-5
(E)
RTAC-5
HD-2
(E)
RTAC-6
(E)
RTAC-3
(E)
RTAC
(E)
RTAC-4
(E)
RTAC-1
(E)
RTAC-2
RTU-16
DOAS-1
RTU-15
RTU-17
RTU-18
RTU-19
M4.13 M4.13
M4.13
M4.13 M4.13
M4.12
1"ø-CD
1"ø-CD
1"ø-CD
3/4"ø-CD
3/4"ø-CD
1 1/4"ø-CD
P6.3
P6.1
P6.1
P6.1
P6.1 P6.1
30A/3P/
15AF/N3R
30A/3P/20AF/N3R
30A/3P/30AF/N3R
30A/3P/30AF/N3R
30A/3P/30AF/N3R
100A/3P/90AF/N3R
(E)HA-20,22,24
(E)HA-43,45,47
(E)HB-35,37,39
(E)HB-43,45,47
(E)HB-49,51,53
(E)HB-55,57,59
WP GFCI
WP GFCI
WP GFCI
WP GFCI
WP GFCI
WP GFCI
1"G (E)
1/
4" G
E
1"G (E) 1"G (E)
1"G (E)
1/
4" G
E
1 1/2"G (E)
1" G
E
1 1/4"G (E)
1/
4" G
E
1"G (E)
2" G
E
1"G (E)
1 1/2"G (E)
1"G (E) 1"G (E)
1 1/4"G (E) 1 1/4"G (E)
1"G (E) 1"G (E)
1" G
E
1"G (E)
1" G
E
1"G (E) 1"G (E) 1"G (E)
1" G
E
3/4"G (E)
1" G
E
1" G
E
1"G (E)
1" G
E
1"G (E)
P6.2
(E)LB2-13
E6.1
(ON)(E)LB2-13
(ON)(E)LB2-13
(E)LB2-15
(ON)(E)LB2-15
(E)LB2-17
(65 MBH)
(300 MBH)
(90 MBH)
(175 MBH)
(90 MBH) (90 MBH)
(270 MBH) (120 MBH)
(90 MBH)
(70 MBH)
(300 MBH)
(175 MBH)
(270 MBH)
(120 MBH)
REVISION:
SEAL:
S H ig h w a y
S u it e
A u s ti n
T e x a s
.6
.4 p
.6
.4 f
S E
R V
U A
L
N
T E
G R
U S
T A
IN
A
B
IL
IT
Y
S
E I
N N
E R
L O
O P
G E
O R
G E
T O
W N
T
X
CHECKED BY:
SHEET TITLE:
SHEET NUMBER:
PROJECT NUMBER
DRAWN BY:
DATE:
TBPE Firm Registration No. 2234
06/09/2026
255034.000
MEP2.31
MEP ROOF PLAN
W ill ia m s o n C o u n ty I
L A
D e h u m id if ic a ti o n
06/09/2026
DBR
DBR
1/16" = 1'-0"
MEP ROOF PLAN
▯ ELECTRICAL KEYED NOTES
E6.1 TYPICAL OF ALL CIRCUIT TAGS. CIRCUIT TAGS DENOTED WITH '(E)'
INDICATE USAGE OF EXISTING PANELS FOR NEW CIRCUITS.
▯ MECHANICAL KEYED NOTES
M4.12 PROVIDE PACKAGED ROOFTOP UNIT ON ROOF AT APPROXIMATE
LOCATION SHOWN. PROVIDE UNIT WITH ROOF CURB TO MATCH ROOF
SLOPE. PROVIDE NEW CONDENSATE PIPE, SIZED AS INDICATED, AND
CONNECT TO EXISTING CONDENSATE MAIN DRAIN LINE. PROVIDE
DRAIN LINE WITH ROOF SUPPORTS. PROVIDE ALL CLEARANCES
AROUND UNIT AS REQUIRED BY EQUIPMENT MANUFACTURER.
COORDINATE FINAL LOCATION WITH STRUCTURAL. INSTALL SMOKE
DETECTOR FROM REPLACED UNIT IN NEW UNIT. COORDINATE WITH
DIVISION 26 AND 28 FOR POWER AND INTERLOCK OF DETECTOR WITH
UNIT. RE: DETAILS 4, 5, & 6/M6.01.
M4.13 PROVIDE PACKAGED ROOFTOP UNIT ON ROOF AT APPROXIMATE
LOCATION SHOWN. PROVIDE ROOF CURB ADAPTER AS REQUIRED FOR
NON-BASIS OF DESIGN LENNOX UNITS. PROVIDE NEW CONDENSATE
PIPE, SIZED AS INDICATED, AND CONNECT TO EXISTING CONDENSATE
MAIN DRAIN LINE. PROVIDE DRAIN LINE WITH ROOF SUPPORTS.
PROVIDE ALL CLEARANCES AROUND UNIT AS REQUIRED BY
EQUIPMENT MANUFACTURER. COORDINATE FINAL LOCATION WITH
STRUCTURAL. INSTALL SMOKE DETECTOR FROM REPLACED UNIT IN
NEW UNIT. COORDINATE WITH DIVISION 26 AND 28 FOR POWER AND
INTERLOCK OF DETECTOR WITH UNIT. RE: DETAILS 4, 5, 6, & 10/M6.01.
▯ PLUMBING KEYED NOTES
P6.1 MODIFY & CONNECT NEW GAS PIPING TO RTU. SIZE SHALL BE EQUAL
TO EXISTING ROUGH-IN. PROVIDE NEW LUBRICATED PLUG VALVE,
UNION, PRESSURE REGULATOR, DIRT LEG, AND FLEX CONNECTION.
CONTRACTOR TO ENSURE THAT ALL PIPING PATHS AND FINAL
CONNECTIONS SHALL NOT INTERFERE WITH UNIT SERVICE DOORS.
SET REGULATORS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATION.
P6.2 (E)2-1/2" GAS DN TO METER.
P6.3 MODIFY & CONNECT NEW GAS PIPING TO MAU. SIZE SHALL BE EQUAL
TO EXISTING ROUGH-IN. PROVIDE NEW LUBRICATED PLUG VALVE,
UNION, PRESSURE REGULATOR, DIRT LEG, AND FLEX CONNECTION.
CONTRACTOR TO ENSURE THAT ALL PIPING PATHS AND FINAL
CONNECTIONS SHALL NOT INTERFERE WITH UNIT SERVICE DOORS.
SET REGULATORS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
TN PN
CONDENSATE DRAIN LINE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HOT WATER SUPPLY
HOT WATER RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
E
D
K
C
B
A
ABBREVIATIONS
I
H
G
R
PIPING TYPES
BOILER
BELOW COUNTER
BACK OF CURB
BELOW FINISHED FLOOR
BUTTERFLY VALVE
BUILDING
BENCHMARK
BOTTOM OF FOOTING
BOTTOM OF STRUCTURE
BACKFLOW PREVENTER
BRITISH THERMAL UNIT
BALL VALVE
CELSIUS
CABINET
CONDENSATE DRAIN LINE
CUBIC FEET PER MINUTE
CUBIC FEET PER SECOND
CHILLER
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER
CHILLED WATER PUMP
CAST IRON
CIRCULATING
CENTERLINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COLUMN
COMBINATION
COMPRESSOR
CONCRETE, CONCENTRIC
CONDENSER
CONNECTION
CONTINUOUS,CONTINUATION
CENTER
COPPER
CONSTANT VOLUME
DEPTH, DRAIN, DRYER
DRY BULB
DIRECT CURRENT
DIRECT DIGITAL CONTROL
DUAL DUCT MIXING BOX
DESIGNATION
DETAIL
DIAMETER
DIFFUSER
DIMENSION
DISCONNECT
DOWN
DAMPER
DISHWASHER
DRAWING
DIRECT EXPANSION
EACH
ENTERING AIR TEMPERATURE
ELECTRICAL CONTRACTOR
ECCENTRIC
ENTERING DRY BULB
ELECTRIC DUCT HEATER
EXHAUST FAN
EFFICIENCY
EXPANSION JOINT
ELEVATION
ELECTRICAL
EMERGENCY
ENCLOSURE
ENGINEER
EQUAL
EQUIPMENT
EXTERNAL STATIC PRESSURE
EXPANSION TANK
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
ELECTRIC UNIT HEATER
EVAPORATOR
ENTERING WET BULB
ENTERING WATER TEMPERATURE
EXPLOSION PROOF
EXTERNAL
EXISTING
KEC
KO
KVA
KW
ID
IE
IH
IN
INSUL
INT
HDT
HORIZ
HP
HSTAT
HT
HTG
HTR
HW
HWP
HWR
HWS
HX
HZ
G
GA
GAL
GALV
GC
GLV
GND
GPM
GUH
GV
RA
RAD
RAF
RAG
RAT
RCP
RD
RE
RED
REFR
REG
REINF
REQD
REV
RH
RHG
RL
RLA
RM
RPM
RS
RTU
RV
SUPPLY AIR
SUPPLY AIR FAN
SUPPLY AIR GRILLE
SUPPLY AIR REGISTER
STEAM CONDENSATE
SCHEDULED
SECONDARY
SECTION
SENSIBLE
SQUARE FEET
SPRINKLER FLOOR CONTROL STATION
SHOWER
SHEET
SIMILAR
SHEETMETAL
STATIC PRESSURE, SUMP PUMP
SPECIFICATION
SPRINKLER
SQUARE
STAINLESS STEEL
SOLID STATE SPEED CONTROL
STANDARD
STEEL
STEAM
STRAINER
SURFACE
SUSPEND
SANITARY VENT
SOFT WATER
SINGLE ZONE
CD
CHS
CHR
HWS
HWR
CWS
CWR
AIR (COMPRESSED)
ABOVE
AIR CONDITIONING
ALTERNATING CURRENT, AIR COMPRESSOR
AIR COOLED CHILLER
AIR COOLED CONDENSING UNIT
ACCESS DOOR, AREA DRAIN
ADJUSTABLE
AIR FILTER
ABOVE FINISHED CEILING
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR-CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE
AIR HANDLING UNIT
ALUMINUM
AMBIENT
ACCESS PANEL
AIR PRESSURE DROP
ARCHITECT, ARCHITECTURAL
AIR SEPARATOR
AIR SOURCE HEAT PUMP
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-
CONDITIONING ENGINEERS
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AMERICAN SOCIETY OF TESTING AND MATERIALS
AVERAGE
AMERICAN WELDING SOCIETY
AUXILIARY
A
ABV
A/C
AC
ACCH
ACCU
AD
ADJ
AF
AFC
AFF
AFG
AHRI
AHU
AL
AMB
AP
APD
ARCH
AS
ASHP
ASHRAE
ASME
ASTM
AVG
AWS
AUX
B
BC
B/C
BFF
BFV
BLDG
BM
BOF
BOS
BP
BTU
BV
C
CAB
CD
CFM
CFS
CH
CHR
CHS
CHW
CHWP
CI
CIRC
CL
CLG
CLR
CMU
COL
COMB
COMP
CONC
COND
CONN
CONT
CTR
CU
CV
D
DB
DC
DDC
DDMB
DESIG
DTL
DIA
DIFF
DIM
DISC
DN
DPR
DW
DWG
DX
EA
EAT
EC
ECC
EDB
EDH
EF
EFF
EJ
EL
ELEC
EMERG
ENCL
ENGR
EQ
EQUIP
ESP
ET
ETD
ETR
EUH
EVAP
EWB
EWT
EX
EXT
EXTG
GAS
GAUGE
GALLON
GALVANIZED
GENERAL CONTRACTOR
GLOBE VALVE
GROUND
GALLONS PER MINUTE
GAS UNIT HEATER
GATE VALVE
M
N
L
N.C.
NFPA
NIC
N.O.
NO.
NTS
MAT
MAX
MBTUH
MC
MECH
MFR
MH
MI
MIN
MP
MTD
MU
MVD
MSAH
MSCU
MZ
L
LAT
LF
LP
LRA
LVL
LWB
LWCO
LWT
HORIZONTAL DRAW THROUGH
HORIZONTAL
HORSEPOWER, HEAT PUMP
HUMIDISTAT
HEIGHT
HEATING
HEATER
HOT WATER
HEATING WATER PUMP
HOT WATER RETURN
HOT WATER SUPPLY
HEAT EXCHANGER
HERTZ
INSIDE DIAMETER
INVERT ELEVATION
INFRARED HEATER
INCH
INSULATION
INTERNAL, INTERIOR
KITCHEN EQUIPMENT CONTRACTOR
KNOCKOUT
KILOVOLT- AMPS
KILOWATT
LENGTH
LEAVING AIR TEMPERATURE
LINEAR FEET
LOW PRESSURE
LOCKED ROTOR AMPS
LEVEL
LEAVING WET BULB
LOW WATER CUT OFF
LEAVING WATER TEMPERATURE
MIXED AIR TEMPERATURE
MAXIMUM
THOUSAND OF BTU'S
MECHANICAL CONTRACTOR
MECHANICAL
MANUFACTURER
MANHOLE
MALLEABLE IRON
MINIMUM
MEDIUM PRESSURE
MOUNTED
MAKE-UP
MANUAL VOLUME DAMPER
MINI-SPLIT AIR HANDLER
MINI-SPLIT CONDENSING UNIT
MULTI-ZONE
NORMALLY CLOSED
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NORMALLY OPEN
NUMBER
NOT TO SCALE
P
O
OA
OAF
OAHU
OBD
OC
OD
OFCU
OPG
OS&Y
PG
PP
PPM
PRI
PRS
PRV
PSF
PSI
PSIG
PV
PVC
OUTSIDE AIR
OUTSIDE AIR FAN
OUTSIDE AIR HANDLING UNIT
OPPOSED BLADE DAMPER
ON CENTER
OUTSIDE DIAMETER, OVERFLOW DRAIN
OUTSIDE AIR FAN COIL UNIT
OPENING
OUTSIDE SCREW AND YOKE
PRESSURE GAUGE
POLYPROPYLENE
PART PER MILLION
PRIMARY
PRESSURE REDUCING STATION
PRESSURE REDUCING VALVE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH GAUGE
PLUG VALVE
POLYVINYL CHLORIDE
RETURN AIR
REFRIGERATED AIR DRYER
RETURN AIR FAN
RETURN AIR GRILLE
RETURN AIR TEMPERATURE
REFLECTED CEILING PLAN
ROOF DRAIN
REFERENCE, REFER
REDUCER
REFRIGERATOR
REGISTER
REINFORCING
REQUIRED
REVISION, REVISE
RELATIVE HUMIDITY
REFRIGERANT HOT GAS
REFRIGERANT LIQUID
RUNNING LOAD AMPS
ROOM
REVOLUTIONS PER MINUTE
REFRIGERANT SUCTION
ROOFTOP UNIT
RELIEF VALVE
SA
SAF
SAG
SAR
SC
SCHED
SEC
SECT
SENS
SF
SFCS
SH
SHT
SIM
SM
SP
SPEC
SPR
SQ
SS
SSSC
STD
STL
STM
STR
SURF
SUSP
SV
SW
SZ
S
W
Z
V
U
T
TC
TDH
TF
TH BLK
THERM
TMV
TSP
TSTAT
TW
TYP
UCD
UG
UH
UL
UNO
U/F U/S
V
VA
VAC
VAV
VB
VD
VDT
VEL
VERT
VFD
VIB
VOV
VP
VRF
VVR
W W/ W/O
WB
WM
WP
WPD
WSHP
WWF
Z
TEMPERATURE CONTROL
TOTAL DYNAMIC HEAD
TRANSFER FAN
THRUST BLOCK
THERMOMETER
THERMOSTATIC MIXING VALVE
TOTAL STATIC PRESSURE
THERMOSTAT
TEMPERED HOT WATER
TYPICAL
UNDER CUT DOOR
UNDERGROUND
UNIT HEATER
UNDERWRITERS LABORATORIES, INC
UNLESS NOTED OTHERWISE
UNDERFLOOR
UNDERSLAB
VOLT
VOLT- AMPERE
VACUUM
VARIABLE AIR VOLUME
VALVE BOX, VACUUM BREAKER
VOLUME DAMPER
VERTICAL DRAW THROUGH
VELOCITY
VERTICAL
VARIABLE FREQUENCY DRIVE
VALVE IN BOX
VALVE ON VERTICAL
VACUUM PUMP
VARIABLE REFRIGERANT FLOW
VARIABLE AIR VOLUME REHEAT
WATT, WIDTH
WITH
WITHOUT
WET BULB
WATER METER
WEATHERPROOF
WATER PRESSURE DROP
WATER SOURCE HEAT PUMP
WELDED WIRE FABRIC
ZONE
DUCTWORK
WALL MOUNTED SENSOR AND DEVICE TYPES
T
H
C
CO
N
THERMOSTAT / TEMPERATURE SENSOR
HUMIDISTAT / HUMIDITY SENSOR
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
AIR DEVICE TYPES
SQUARE SUPPLY AIR CEILING DIFFUSER
SQUARE RETURN AIR CEILING DEVICE
SQUARE EXHAUST AIR CEILING DEVICE
ROUND SUPPLY AIR CEILING DEVICE
A 10"ø
225 CFM
AIR DEVICE TYPE (RE: SCHEUDLE)
NECK SIZE
AIRFLOW RATE
RECTANGULAR SUPPLY OF RETURN SIDEWALL GRILLE
SUPPLY OR RETURN AIR SLOT CEILING DEVICE
S REFRIGERANT DETECTION SENSOR
DRAWING/DETAIL REFERENCE KEY
RE: 1 /M5.01
REFER TO
DRAWING/ DETAIL NUMBER
SHEET NUMBER M5.01
F
FBO
FCU
FD
FLA
FLEX
FLR
FPTU
FT
FUT
FAHRENHEIT, FIRE
FURNISHED BY OTHERS
FAN COIL UNIT
FLOOR DRAIN, FIRE DAMPER
FULL LOAD AMPS
FLEXIBLE
FLOOR
FAN POWERED TERMINAL UNIT
FOOT, FEET
FUTURE
F Q
QTY QUANTITY
ANALOG INPUT
ANALOG OUTPUT
DIGITAL/BINARY INPUT
DIGITAL/BINARY OUTPUT
ON-OFF MOTORIZED DAMPER
MODULATING TYPE MOTORIZED DAMPER
AIR FLOW MEASURING STATION
CONTROL VALVE MODULATING TYPE
VARIABLE FREQUENCY DRIVE
CURRENT SENSING RELAY
FREEZESTAT
HIGH STATIC LIMIT
STATIC PRESSURE TRANSMITTER
DIFFERENTIAL PRESSURE TRANSDUCER
FLOW METER
CONTROLS SCHEMATIC SYMBOLS LEGEND
FLOW SWITCH
DISCHARGE AIR TEMPERATURE SENSOR
WALL SENSOR
THERMOSTAT
CARBON DIOXIDE SENSOR
SET POINT
SUPPLY AIR
RETURN AIR
OUTSIDE AIR
HEATING COIL
COOLING COIL
DIRECT EXPANSION COOLING COIL
PRESSURE INDEPENDENT CHARACTERIZED CONTROL VALVE
AIRFLOW CROSS
DIFFERENTIAL PRESSURE SWITCH
FS
DAT
CO2
SP
S/A
R/A
O/A
HC
CC
DX
PICCV
AFC
DPS
AI
AO
DI/BI
DO/BO
MD
MMD
AFMS
MCV
VFD
CSR
FRZ
HSL
SPT
DPT
FM
DESIGN CRITERIA
LOCATION:
301 SE INNER LOOP
GEORGETOWN, TX 78626
ELEVATION: 755 FEET
DESIGN CONDITIONS:
HEATING DB: 26.3 °F (ASHRAE 99.6%)
COOLING DB / WB: 99.2 °F / 73.2 °F (ASHRAE 0.4%)
DEHUMIDIFICATION DP / DB: 74.5 °F / 80.9 °F (ASHRAE 0.4%)
SPACE INDOOR DESIGN TEMPERATURE:
HEATING DB: 70 °F
COOLING DB: 75 °F
RELATIVE HUMIDITY 45-50%
BUILDING CODES & STANDARDS
EPO
ON/OFF SWITCH
EMERGENCY POWER OFF BUTTON
P PRESSURE SENSOR
AV REFRIGERANT AUDIO/VISUAL DETECTION ALARM
APPLICABLE CODES:
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FUEL GAS CODE
2023 NATIONAL ELECTRICAL CODE
REFRIGERANT PIPING SIZED BY MFR.
HIGH PRESSURE STEAM SUPPLY
HIGH PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM SUPPLY
LOW PRESSURE CONDENSATE RETURN
PUMPED CONDENSATE RETURN
REF
HPS
HPR
LPS
LPR
PCR
OPPOSED BLADE VOLUME DAMPER
FIRE DAMPER
SMOKE DAMPER
COMBINATION FIRE/SMOKE DAMPER
MOTORIZED DAMPER
SUPPLY OR OUTSIDE AIR DUCT UP
DUCT CONTINUATION
SUPPLY AIR DEVICE
FLEXIBLE DUCT CONNECTION
ROUND DUCT (BRANCH)
ROUND DUCT TAP WITH DAMPER
SUPPLY OR OUTSIDE AIR DUCT DOWN
TURNING VANES
DUCTWORK TEE
SLOT DIFFUSER W/PLENUM CONNECTION
DEMOLISHED UP TO LOCATION INDICATED
CONNECT NEW TO EXISTING AT LOCATION INDICATED
RECTANGULAR DUCT SIZE (WIDTH x HEIGHT)
RECTANGULAR DUCT TAP
DEMO
NEW
RETURN DUCT DOWN
RETURN DUCT UP
DUCT TRANSITION UP
DUCT TRANSITION DOWN
RETURN AIR DEVICE
M
FSD
FD
VD
SD
"x
VD VD
EXISTING
EXISTING
U P
D N
REVISION:
SEAL:
S H ig h w a y
S u it e
A u s ti n
T e xa s
.6
.4 p
.6
.4 f
S E
R V
U A
L
N
T E
G R
U S
T A
IN
A
B
IL
IT
Y
S
E I
N N
E R
L O
O P
G E
O R
G E
T O
W N
T
X
CHECKED BY:
SHEET TITLE:
SHEET NUMBER:
PROJECT NUMBER
DRAWN BY:
DATE:
TBPE Firm Registration No. 2234
06/09/2026
255034.000
M0.01
MECHANICAL SYMBOL
LEGEND
W ill ia m s o n C o u n ty I
L A
D e h u m id if ic a ti o n
06/09/2026
DBR
DBR
A. MECHANICAL DRAWINGS AND SPECIFICATIONS ARE DIAGRAMMATIC IN NATURE AND INTENDED TO DESCRIBE AND ILLUSTRATE SYSTEMS THAT WILL NOT INTERFERE WITH THE ARCHITECTURAL / STRUCTURAL CONDITIONS OF THE BUILDING AND WILL FIT INTO AVAILABLE SPACES. CONTRACTOR SHALL COORDINATE ALL WORK TO CONFORM TO THE ARCHITECTURAL, STRUCTURAL, FINISH CONDITIONS, EQUIPMENT MANUFACTURER / FIXTURE CUTSHEETS AND WITH OTHER TRADES, TO AVOID OBSTRUCTIONS, AND TO ALLOW THE PROPER INSTALLATION OF EACH ITEM. EQUIPMENT SIZES, DIMENSIONS, AND REQUIRED CONNECTIONS SHALL BE VERIFIED WITH THE MANUFACTURER'S DRAWINGS AND CUTSHEETS PRIOR TO FABRICATING OF DUCTWORK, PIPING, OR POURING OF CONCRETE HOUSEKEEPING PADS. CONTRACTOR SHALL OBTAIN ALL ARCHITECTURAL DRAWINGS AND STRUCTURAL DATA, LOCATIONS OF PIERS, BEAMS, COLUMNS, JOISTS, ETC., FROM STRUCTURAL DRAWINGS AND PROVIDE OFFSETS, RELOCATIONS, ETC., AS REQUIRED TO MEET THIS INTENT AT NO ADDITIONAL COST. PROVIDE ALL NECESSARY PIPING, DUCTWORK, FITTING, INSULATION, AND OTHER
ACCESSORIES IN ORDER TO COMPLETE THE INSTALLATION.
B. CONTRACTOR SHALL BE RESPONSIBLE TO EXAMINE ALL THE CONTRACT DOCUMENTS CAREFULLY BEFORE SUBMITTING THEIR BID, WITH PARTICULAR ATTENTION TO ERRORS,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .