4-Replace Substation Relays - Blank -AF FORM 3052.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Replace Substation Relays Bldg 4739 Federal contract opportunity
- Solicitation number
- FA487720R0034
About this file
This document contains a construction cost estimate breakdown template for replacing relays at a substation on Davis-Monthan Air Force Base in Arizona. The template includes line items for general conditions, architectural, civil, structural, mechanical, plumbing and electrical work. It provides unit costs and labor rates for each line item based on reference sources. Standard markups are included for overhead, profit, taxes and bonds to calculate a total projected price. The related federal contract opportunity is solicitation number FA487720R0034 to replace substation relays at Building 4739 on Davis-Monthan Air Force Base. The solicitation is issued by the Department of the Air Force Air Combat Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Davis-Monthan Electrical Substation.pdf | ||
| Solicitation Amendment FA487720R00340002.pdf | ||
| 53002_07_DWG_01 One Line Drawing.pdf | ||
| Solicitation Amendment FA487720R00340001 SF 30.pdf | ||
| 1-SOW - Replace Substion Relays - Revised 8 May 20.pdf | ||
| 7-Wage Determinations.pdf | ||
| Solicitation - FA487720R0034.pdf | ||
| 2-Replace Substation Relays - AF Form 66.xlsx | XLSX spreadsheet | |
| 8. Section L.pdf | ||
| 9. Section M.pdf | ||
| 3-NEW Contractor EAL Template.xls | XLS spreadsheet | |
| 6-Contractor Environmental Guide.pdf | ||
| 5-DMAFB Design Compatibility Guidelines 2017.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 3052
| CONSTRUCTION COST ESTIMATE BREAKDOWN | AE Notes: | ||||||||||
| CONTRACTOR | ADDRESS | 1. Only edit the items in blue. | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | Replace Relays Base Substation | PROPOSED TOTAL CONTRACT PRICE | 2. The costs references are from the Means 2019 Facilities Construction Cost Data book. | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV XXXXXX | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | |||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | ||||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL | |
| SUMMARY | |||||||||||
| 1 | SUBTOTAL GENERAL CONDITIONS | 0 | 0 | 0 | 0 | ||||||
| 2 | SUBTOTAL ARCHITECTURAL | 0 | 0 | 0 | 0 | ||||||
| 3 | SUBTOTAL CIVIL | 0 | 0 | 0 | 0 | ||||||
| 4 | SUBTOTAL STRUCTURAL | 0 | 0 | 0 | 0 | ||||||
| 5 | SUBTOTAL MECHANICAL | 0 | 0 | 0 | 0 | ||||||
| 6 | SUBTOTAL PLUMBING | 0 | 0 | 0 | 0 | ||||||
| 7 | SUBTOTAL ELECTRICAL | 0 | 0 | 0 | 0 |
| LINE TOTALS | 0 | 0 | 0 | 0 | |
| OVERHEAD (15%) | 0 | Standard base overhead markup; may be changed with justification. See 010-060. | |||
| SUBTOTAL | 0 | ||||
| PROFIT (10%) | 0 | Standard base profit markup; may be changed with justification. Taken on the LINE TOTAL, not the SUBTOTAL of the LINE TOTAL plus OVERHEAD markup. | |||
| SUBTOTAL | 0 | ||||
| TAX (3.97%) | 0 | Standard AZ sales tax markup. | |||
| BOND (2.0%) | 0 | Standard base bond markup; may be changed with justification. See 010-068. | |||
| TOTAL PROJECT PRICE | 0 |
| DATE: | FIRM NAME: |
| TITLE: | BY: |
| GENERAL CONDITIONS | |||||
| 1 | A | ||||
| 2 | B | ||||
| 3 | C | ||||
| 4 | D | ||||
| 5 | E | ||||
| 6 | F | ||||
| 7 | G | ||||
| 8 | H | ||||
| 9 | I | ||||
| 10 | J | ||||
| 11 | K | ||||
| 12 | L | ||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 |
| SUBTOTAL ALL PAGES | 0 | 0 | 0 | 0 | |
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL GENERAL CONDITIONS | 0 | 0 | 0 | 0 | ||
| ARCHITECTURAL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL ARCHITECTURAL | 0 | 0 | 0 | 0 | ||
| CIVIL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL CIVIL | 0 | 0 | 0 | 0 | ||
| STRUCTURAL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL STRUCTURAL | 0 | 0 | 0 | 0 | ||
| MECHANICAL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL MECHANICAL | 0 | 0 | 0 | 0 | ||
| PLUMBING | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL PLUMBING | 0 | 0 | 0 | 0 | ||
| ELECTRICAL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL ELECTRICAL | 0 | 0 | 0 | 0 | |
| THIS PORTION EXPLAINS HOW TO HANDLE MULTIPLE PAGES FOR ANY DISCIPLINE. |
| WHATEVER | ||||||||||
| 1 | A | EA | 0.0 | 200.00 | 0 | 16.00 | 30.82 | 0 | 0 | 0 |
| 2 | B | SF | 0.0 | 2.10 | 0 | 0.20 | 30.82 | 0 | 0 | 0 |
| 3 | C | EA | 0.0 | 326.00 | 0 | 3.00 | 30.82 | 0 | 0 | 0 |
| 4 | D | LBS | 0.0 | 2.10 | 0 | 0.35 | 30.82 | 0 | 0 | 0 |
| 5 | E | LS | 0.0 | 250.00 | 0 | 5.00 | 30.82 | 0 | 0 | 0 |
| 6 | F | EA | 0.0 | 50.00 | 0 | 4.00 | 30.82 | 0 | 0 | 0 |
| 7 | G | LF | 0.0 | 2.10 | 0 | 0.10 | 30.82 | 0 | 0 | 0 |
| 8 | H | LF | 0.0 | 1.00 | 0 | 0.20 | 30.82 | 0 | 0 | 0 |
| 9 | I | EA | 0.0 | 14.70 | 0 | 0.50 | 30.82 | 0 | 0 | 0 |
| 10 | J | LS | 0.0 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0 | 0 |
| 11 | K | LS | 0.0 | 300.00 | 0 | 60.00 | 30.82 | 0 | 0 | 0 |
| 12 | L | LF | 0.0 | 3.75 | 0 | 0.00 | 15.00 | 0 | 0 | 0 |
| 13 | M | EA | 0.0 | 55.00 | 0 | 0.47 | 27.66 | 0 | 0 | 0 |
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||||||
| WHATEVER (continued) | ||||||||||
| 14 | N | EA | 0.0 | 200.00 | 0 | 16.00 | 30.82 | 0 | 0 | 0 |
| 15 | O | SF | 0.0 | 2.10 | 0 | 0.20 | 30.82 | 0 | 0 | 0 |
| 16 | P | EA | 0.0 | 326.00 | 0 | 3.00 | 30.82 | 0 | 0 | 0 |
| 17 | Q | LBS | 0.0 | 2.10 | 0 | 0.35 | 30.82 | 0 | 0 | 0 |
| 18 | R | LS | 0.0 | 250.00 | 0 | 5.00 | 30.82 | 0 | 0 | 0 |
| 19 | S | EA | 0.0 | 50.00 | 0 | 4.00 | 30.82 | 0 | 0 | 0 |
| 20 | T | LF | 0.0 | 2.10 | 0 | 0.10 | 30.82 | 0 | 0 | 0 |
| 21 | U | LF | 0.0 | 1.00 | 0 | 0.20 | 30.82 | 0 | 0 | 0 |
| 22 | V | EA | 0.0 | 14.70 | 0 | 0.50 | 30.82 | 0 | 0 | 0 |
| 23 | W | LS | 0.0 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0 | 0 |
| 24 | X | LS | 0.0 | 300.00 | 0 | 60.00 | 30.82 | 0 | 0 | 0 |
| 25 | Y | LF | 0.0 | 3.75 | 0 | 0.00 | 15.00 | 0 | 0 | 0 |
| 26 | Z | EA | 0.0 | 55.00 | 0 | 0.47 | 27.66 | 0 | 0 | 0 |
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 |
SUBTOTAL PREVIOUS PAGE(S) 0 0 0 0
| SUBTOTAL ALL PAGES | 0 | 0 | 0 | 0 | |
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
SUBTOTAL WHATEVER 0 0 0 0
| AF Form 3052 (Computer Generated) | &"Univers (WN)"&8 |
| &10*FOR OFFICIAL USE ONLY* | &"Univers (WN)"&8 |
&10PAGE &P OF &N
Ktr's Blank
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | TITLE OF PROJECT | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV XXXXXX | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | |||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | ||||||||||
| 1 | SUBTOTAL GENERAL CONDITIONS | |||||||||
| 2 | SUBTOTAL ARCHITECTURAL | |||||||||
| 3 | SUBTOTAL CIVIL | |||||||||
| 4 | SUBTOTAL STRUCTURAL | |||||||||
| 5 | SUBTOTAL MECHANICAL | |||||||||
| 6 | SUBTOTAL PLUMBING | |||||||||
| 7 | SUBTOTAL ELECTRICAL |
| LINE TOTALS |
| OVERHEAD (___%) |
| SUBTOTAL |
| PROFIT (___%) |
| SUBTOTAL |
| TAX (5.6% of 65%) |
| BOND (___%) |
| TOTAL PROJECT PRICE |
| DATE: | FIRM NAME: |
| TITLE: | BY: |
| GENERAL CONDITIONS | Standard base format. Don't forget to include cost adjustment factors for such requirements as: cutting/patching to match existing, dust protection and protection of existing, working space and material handling limitations, shift work, overtime, etc. Include safety measures, temporary controls, etc., as applicable. See 010-032. | |||
| 1 | Field Office (expenses+rent) | MO | 1.0 | UNIT MATERIAL COST = 010-034-0100 thru 0160, plus 015-904-0350, which includes office equipment rental, office supplies, telephone bill (w/o initial charge), lights & HVAC, trailer rental, bottled water ($50/month), and postage ($40/month) costs, respectively. DIRECT COSTS = $30 for average 20 mile roundtrip delivery/pickup + $300 telephone initial charge costs. |
| 2 | Field Clerk | WK | 1.0 | LABOR COST RATE = 010-036-0100 w/o per diem (usually local hire). |
| 3 | General Purpose Laborer | WK | 1.0 | LABOR COST RATE = 010-036-0160 w/o per diem (usually local hire). |
| 4 | Project Manager | WK | 1.0 | LABOR COST RATE = 010-036-0200. DIRECT COSTS = $150 per week for per diem costs. |
| 5 | Superintendent | WK | 1.0 | LABOR COST RATE = 010-036-0260. DIRECT COSTS = $150 per week for per diem costs. |
| 6 | Builder's Insurance | JOB | 1.0 | DIRECT COSTS = 010-040-0200 TOTAL INCL O&P x Estimated Project Construction Costs. |
| 7 | Permits | JOB | 1.0 | DIRECT COSTS = 010-070-0010 TOTAL INCL O&P x Estimated Project Construction Costs + permit fees from Section 01010. |
| 8 | Small Tools | JOB | 1.0 | DIRECT COSTS = 010-082-0010 TOTAL INCL O&P x Estimated Project Construction Costs. |
| 9 | Scheduling | JOB | 1.0 | DIRECT COSTS = 013-104-0600 TOTAL INCL O&P x Estimated Project Construction Costs. |
| 10 | Surveying (3-man crew) | DAY | 2.0 | LABOR COST RATE = 013-306-1200 TOTAL INCL O&P (subcontractor's cost) with a 2 day minimum. |
| 11 | Shop Drawings/Submittals | LS | 1.0 | LABOR COST RATE = estimator's experience and judgement. |
| 12 | Construction Photos | DAY | 1.0 | UNIT MATERIAL COST = 013-804-0200 & 1720. |
| 13 | Testing Lab Service | JOB | 1.0 | DIRECT COSTS = 014-108-0015, to be increased or decreased per the estimator's judgement and experience. |
| 14 | Traffic Cones | EA | 1.0 | UNIT MATERIAL COST = 015-302-0800. |
| 15 | Construction Fence | LF | 1.0 | 015-304-0200. LABOR COST RATE should reflect the current wage labor rates. |
| 16 | Project Sign | SF | 32.0 | UNIT MATERIAL COST = 015-804-0010. DIRECT COSTS = $50 based on estimator's experience and judgement. |
| 17 | Storage Building | MO | 1.0 | UNIT MATERIAL COST = 015-904-1350. DIRECT COSTS = $30 for average 20 mile roundtrip delivery/pickup. |
| 18 | Portable Toilets | WK | 1.0 | UNIT MATERIAL COST = 016-420-6410. DIRECT COSTS = $8 per day for cleaning (assumed once per week). |
| SUBTOTAL THIS PAGE | ||||
| GENERAL CONDITIONS (continued) | ||||
| 19 | Truck -Project Manager | WK | 1.0 | UNIT MATERIAL COST = 016-420-7100. DIRECT COSTS = $125.50 per day for miscellaneous costs (assumed once per week). |
| 20 | Truck - Superintendent | WK | 1.0 | UNIT MATERIAL COST = 016-420-7100. DIRECT COSTS = $125.50 per day for miscellaneous costs (assumed once per week). |
| 21 | Cleanup (after job completion) | JOB | 1.0 | DIRECT COSTS = 017-104-0010 x Estimated Project Construction Costs. |
| 22 | Cleanup (final floor area) | MSF | 1.0 | 017-104-0100. LABOR COST RATE should reflect the current wage labor rates. |
| 23 | Dumpsters | WK | 1.0 | DIRECT COSTS = 020-620-0910/0920/0930 for 7 days/0950 for 4 tons (non-hazardous) or 10 CY capacity TOTAL INCL O&P (subcontractor's cost). |
| 24 | Equipment Mobilization | EA | 1.0 | DIRECT COSTS = 022-274-0020 + 022-274-1100 TOTAL INCL O&P (subcontractor's costs). |
| 25 | AutoCAD Service | LS | 1.0 | DIRECT COSTS = estimator's experience and judgement. |
| 26 | Asbestos Removal | JOB | 1.0 | DIRECT COSTS = abatement subcontractor's costs including subcontractor's overhead and profit. |
| 27 | Asbestos Dumping Fees | TON | 1.0 | DIRECT COSTS = Tucson rates, not including hauler's direct costs, overhead or profit. |
| 28 | Lead Paint Removal | JOB | 1.0 | DIRECT COSTS = estimator's judgement of abatement subcontractor's costs including subcontractor's overhead and profit. See Division 099-902 for abatement of specific materials. |
| 29 | Contractor Mobilization | JOB | 1.0 | DIRECT COSTS = Prime Contractor's justifiable mobilization costs x Estimated Project Construction Costs. |
| 30 | Safety Items | JOB | 1.0 | DIRECT COSTS = estimator's judgement of safety items such as fire extinguishers (105-225-2080 @ ~$75/each), hard hats (~$10/each), and first aid kit (~$30/each). |
| SUBTOTAL THIS PAGE |
SUBTOTAL PREVIOUS PAGE(S)
| SUBTOTAL ALL PAGES |
| LABOR BURDEN (___%) |
| SUBTOTAL GENERAL CONDITIONS | |
| ARCHITECTURAL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL ARCHITECTURAL | |
| CIVIL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL CIVIL | |
| STRUCTURAL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL STRUCTURAL | |
| MECHANICAL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL MECHANICAL | |
| PLUMBING | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL PLUMBING | |
| ELECTRICAL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
SUBTOTAL ELECTRICAL
| AF Form 3052 (Computer Generated) | &"Univers (WN)"&8 |
| &10*FOR OFFICIAL USE ONLY* | &"Univers (WN)"&8 |
&10PAGE &P OF &N
File details come from the government source that posted it. Updated .