2-Replace Substation Relays - AF Form 66.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Replace Substation Relays Bldg 4739 Federal contract opportunity
Solicitation number
FA487720R0034
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a schedule of material submittals for the replacement of substation relays under solicitation number FA487720R0034 issued by the Department of the Air Force Air Combat Command. The contractor will be required to provide submittals for various equipment including a new feeder protection relay, satellite-synchronized network clock, Ethernet switch, automated controller, test switch, arc-flash point sensor, Ethernet cable, retrofit bezels, HMI display, mounting kit, HMI keyboard and mouse, and laptops with software no later than six days after the notice to proceed date. Additional required submittals include an air quality permit if necessary, disposal manifests, progress schedules for projects over 59 days, warranty booklets, and operations and maintenance manuals. The submittal schedule specifies the number of copies and required submission dates for each item.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Substation Relays Bldg 4739, newest first.
File Type Posted
Solicitation Amendment FA487720R00340002.pdf PDF
Davis-Monthan Electrical Substation.pdf PDF
53002_07_DWG_01 One Line Drawing.pdf PDF
Solicitation Amendment FA487720R00340001 SF 30.pdf PDF
7-Wage Determinations.pdf PDF
Solicitation - FA487720R0034.pdf PDF
4-Replace Substation Relays - Blank -AF FORM 3052.xlsx XLSX spreadsheet
8. Section L.pdf PDF
1-SOW - Replace Substion Relays - Revised 8 May 20.pdf PDF
9. Section M.pdf PDF
3-NEW Contractor EAL Template.xls XLS spreadsheet
6-Contractor Environmental Guide.pdf PDF
5-DMAFB Design Compatibility Guidelines 2017.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF66

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
Replace Substation Relays Facility (4739)
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVAL
CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSAS-BUILTSOTHERAwarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1"Prelim Construction Set" Dwgs - (4) Half Size DrawingsAs DirectedNOT REQUIRED
2"Construction Set" Dwgs (3) Half Size and 1 Full Size setsAs DirectedNOT REQUIRED
3AF Form 3064, Contract Progress Schedule (for projects > 59 calendar days)2 Copies7 Days after NTP
4Air Quality Activity Permit (If Necessary)2 Copies7 Days after NTP
5Disposal Manifests (for both hazardous and regulated materials and for non-hazardous or non-regulated materials)2 Copies1 Day after receipt
6Dump Tickets2 Copies1 Day after receipt
7AF Form 103 (For Gov't Review Only)1 CopyNOT REQUIRED
8Approved AF Form 1032 CopiesNOT REQUIRED
9New Feeder Protection Relay (SOW Item 3, Line 2)2 CopiesNLT 6 Days after NTP
10New Satellite-Synchronized Network Clock (SOW Item 3)2 CopiesNLT 6 Days after NTP
11Enthernet Switch (SOW Item 3)2 CopiesNLT 6 Days after NTP
12Automated Controller (SOW Item 3)2 CopiesNLT 6 Days after NTP
13Test Switch (SOW Item 3)2 CopiesNLT 6 Days after NTP
14Arc-Flash Point Sensor (SOW Item3, Line 6)2 CopiesNLT 6 Days after NTP
15Ethernet Cable (SOW Item 3)2 CopiesNLT 6 Days after NTP
16Retrofit Bezels (SOW Item 3)2 CopiesNLT 6 Days after NTP
17HMI Display (SOW Item 3, Line 9)2 CopiesNLT 6 Days after NTP
18Mounting Kit (SOW Item 3, Line 8)2 CopiesNLT 6 Days after NTP
19HMI Keyboard and Mouse (SOW Item 3, Line 9 & 13)2 CopiesAs Needed/Requested
20Laptops w/software (SOW Item 3, Line 13)2 CopiesIf Required
21DD Form 1354 Checklist1 CopyPre-Final Inspection
22DD Form 13542 CopiesFinal Inspection
23Warranty Booklet: (1) Hard Copy/(1) CD-PDF Format12 Copies10 Days after final
24O&M Manuals: (1) Hard Copy set/(1) CD-PDF Format111 Copy ea.10 Days after final
25Contractor to add submittals as required or requestedAs Needed/Requested

AF FORM 66

(Computer Generated) PAGE &P of &N