2-Replace Substation Relays - AF Form 66.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Replace Substation Relays Bldg 4739 Federal contract opportunity
- Solicitation number
- FA487720R0034
About this file
This document is a schedule of material submittals for the replacement of substation relays under solicitation number FA487720R0034 issued by the Department of the Air Force Air Combat Command. The contractor will be required to provide submittals for various equipment including a new feeder protection relay, satellite-synchronized network clock, Ethernet switch, automated controller, test switch, arc-flash point sensor, Ethernet cable, retrofit bezels, HMI display, mounting kit, HMI keyboard and mouse, and laptops with software no later than six days after the notice to proceed date. Additional required submittals include an air quality permit if necessary, disposal manifests, progress schedules for projects over 59 days, warranty booklets, and operations and maintenance manuals. The submittal schedule specifies the number of copies and required submission dates for each item.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA487720R00340002.pdf | ||
| Davis-Monthan Electrical Substation.pdf | ||
| 53002_07_DWG_01 One Line Drawing.pdf | ||
| Solicitation Amendment FA487720R00340001 SF 30.pdf | ||
| 7-Wage Determinations.pdf | ||
| Solicitation - FA487720R0034.pdf | ||
| 4-Replace Substation Relays - Blank -AF FORM 3052.xlsx | XLSX spreadsheet | |
| 8. Section L.pdf | ||
| 1-SOW - Replace Substion Relays - Revised 8 May 20.pdf | ||
| 9. Section M.pdf | ||
| 3-NEW Contractor EAL Template.xls | XLS spreadsheet | |
| 6-Contractor Environmental Guide.pdf | ||
| 5-DMAFB Design Compatibility Guidelines 2017.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF66
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | ||||||||||||||||||
| Replace Substation Relays Facility (4739) | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | |||||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | AS-BUILTS | OTHER | Awarded: | |||||||||||
| Pre-Con: | |||||||||||||||||||||
| NTP: | |||||||||||||||||||||
| Const. Start: | |||||||||||||||||||||
| Const. End: | |||||||||||||||||||||
| Finalled: | |||||||||||||||||||||
| DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||||||||||
| 1 | "Prelim Construction Set" Dwgs - (4) Half Size Drawings | As Directed | NOT REQUIRED | ||||||||||||||||||
| 2 | "Construction Set" Dwgs (3) Half Size and 1 Full Size sets | As Directed | NOT REQUIRED | ||||||||||||||||||
| 3 | AF Form 3064, Contract Progress Schedule (for projects > 59 calendar days) | 2 Copies | 7 Days after NTP | ||||||||||||||||||
| 4 | Air Quality Activity Permit (If Necessary) | 2 Copies | 7 Days after NTP | ||||||||||||||||||
| 5 | Disposal Manifests (for both hazardous and regulated materials and for non-hazardous or non-regulated materials) | 2 Copies | 1 Day after receipt | ||||||||||||||||||
| 6 | Dump Tickets | 2 Copies | 1 Day after receipt | ||||||||||||||||||
| 7 | AF Form 103 (For Gov't Review Only) | 1 Copy | NOT REQUIRED | ||||||||||||||||||
| 8 | Approved AF Form 103 | 2 Copies | NOT REQUIRED | ||||||||||||||||||
| 9 | New Feeder Protection Relay (SOW Item 3, Line 2) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 10 | New Satellite-Synchronized Network Clock (SOW Item 3) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 11 | Enthernet Switch (SOW Item 3) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 12 | Automated Controller (SOW Item 3) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 13 | Test Switch (SOW Item 3) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 14 | Arc-Flash Point Sensor (SOW Item3, Line 6) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 15 | Ethernet Cable (SOW Item 3) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 16 | Retrofit Bezels (SOW Item 3) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 17 | HMI Display (SOW Item 3, Line 9) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 18 | Mounting Kit (SOW Item 3, Line 8) | 2 Copies | NLT 6 Days after NTP | ||||||||||||||||||
| 19 | HMI Keyboard and Mouse (SOW Item 3, Line 9 & 13) | 2 Copies | As Needed/Requested | ||||||||||||||||||
| 20 | Laptops w/software (SOW Item 3, Line 13) | 2 Copies | If Required | ||||||||||||||||||
| 21 | DD Form 1354 Checklist | 1 Copy | Pre-Final Inspection | ||||||||||||||||||
| 22 | DD Form 1354 | 2 Copies | Final Inspection | ||||||||||||||||||
| 23 | Warranty Booklet: (1) Hard Copy/(1) CD-PDF Format | 1 | 2 Copies | 10 Days after final | |||||||||||||||||
| 24 | O&M Manuals: (1) Hard Copy set/(1) CD-PDF Format | 1 | 1 | 1 Copy ea. | 10 Days after final | ||||||||||||||||
| 25 | Contractor to add submittals as required or requested | As Needed/Requested |