4_ES7034_Rework_and_Repair_of_Nonconforming_Material.doc

DOC document 26 KB Posted

Attached to
THRUSTER, CARTRIDGE ACTUATED Federal contract opportunity
Solicitation number
FA8213-20-R-0009
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines rework and repair procedures for nonconforming materials under a federal contract. The contractor must document rework procedures and submit them to the Government Quality Assurance Representative for approval prior to implementation. Repair procedures require submission of a Request for Deviation/Waiver to the Contracting Officer and written approval. For any rework or repair submission, the contractor must include a description of the original nonconformance and corrective actions to prevent recurrence. The procedure must also specify a re-inspection process taking precedence over technical requirements and providing assurance that items meet reprocessing standards. These rework and repair requirements flow down to all contractors, suppliers, vendors and subcontractors involved in the contract.

The related federal contract opportunity is a solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base to purchase 35 cartridge-actuated thrusters per the National Stock Number provided.

View the file

Other files for this federal contract opportunity

Other files attached to THRUSTER, CARTRIDGE ACTUATED, newest first.
File Type Posted
Request For Proposal FA8213-20-R-0009.pdf PDF
2_Statement_of_Work_Ammunition_Data_Card.doc DOC document
6_Report_of_Shipment.pdf PDF
7_CADPAD_Item_Marking.pdf PDF
10_SOW_for_Packaging_and_Preservation.pdf PDF
15_Section_L_Lowest_Price.docx DOCX document
1_Airmunition_Specification.docx DOCX document
3_Quality_Assurance_Letter_of_Instruction.pdf PDF
5_REPSHIP_of_HAZMAT.doc DOC document
11_Item_Description.pdf PDF
8_Contract_Data_Requirements_List.pdf PDF
9_AFMC_Form_158_Packaging_Requirements.pdf PDF
12_Engineering_Data_List.pdf PDF
13_Bid_Sets.doc DOC document
16_Section_M_Lowest_Price.docx DOCX document
14_JFQR_1377-00-313-4761ES_F-15_ARR_Thruster).pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the non-conformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)

File details come from the government source that posted it. Updated .