4. Warm Springs IRSC_Appendix C.pdf

PDF 454 KB Posted

Attached to
Warm Springs Stewardship IRSC Federal contract opportunity
Solicitation number
12363N22Q4053
Issued by
Department of Agriculture Forest Service

About this file

This document includes specifications for a federal stewardship contract opportunity on the Pike National Forest in Colorado. The primary objective of the project is to protect the Warm Springs Ranch community from potential wildfire through hazardous fuels reduction treatments on 228 acres, including cut and removal of included timber and mastication. Optional additional work includes 53 acres of timber cut and removal and 91 acres of mastication. The contractor will also be responsible for road maintenance during and after haul on specified roads totaling 4.46 miles. Interested parties should direct questions to the identified contracting officer and plan to attend an optional site visit on June 28, 2022. The contract will be awarded on a best value basis with work to be completed by June 1, 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Warm Springs Stewardship IRSC, newest first.
File Type Posted
Amendment-1 12363N22Q4053.pdf PDF
2. Warm Springs IRSC_Appendix A.pdf PDF
5. Warm Springs IRSC CAM_update.pdf PDF
3. Warm Springs IRSC_Appendix B.pdf PDF
7. Warm Springs IRSC TemporaryRoadUsePermit.pdf PDF
8. Warm Springs_WD_1976_1351_April2022.pdf PDF
6. Warm Springs IRSC_Fire Plan.pdf PDF
1. Warm Springs IRSC_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Warm Springs Stewardship IRSC Pike National Forest Page 1 of 14 South Park Ranger District

Appendix C

Mandatory Item 4: Road Maintenance

C(T)5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

POST HAUL

ROAD TERMINI MILES

ROAD MAINTENACE T-SPECIFICATIONS

FROM TO T-800 T-802 T-803 T-805 T-807 T-808 T-814

NFSR 176 Forest Boundary

Western project boundary

1.6 C C C C C C C

High Creek Rd EOR JCT with

Ahrens Ct 1.1 - - C - - - -

Ahrens Ct EOR JCT with

High Creek Rd

0.1 - - C - - - -

Notes:

C = Contractor Performance Item CR = Contractor’s Responsibility (Non-mandatory, non-paid performance item) The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards O = Optional Contract Line Item NFSR = National Forest Service Road CR = County Road JCT = Junction MP = Milepost EOR = End of Road

DURING HAUL

ROAD TERMINI MILES ROAD MAINTENACE T-SPECIFICATIONS

FROM TO T-800 T-802 T-803 T-805 T-808 T-814

NFSR 176 Forest Boundary

Western project boundary

1.6 C C C C C C

Page 2 of 14 South Park Ranger District

PROJECT SPECIFIC CLAUSES:

1. Before any use of the authorized roads in this Temporary Road Use Permit, a pre-meeting must be conducted with the representatives of the Forest Service, hauling contractor, and Warm Springs HOA.

2. Construction road gate, located adjacent to the main entrance of the Warm Springs subdivision (Exhibit A), will be the only means of ingress and egress for vehicles and/or trailers (or both) whose Gross Combined Vehicle Weight (GCWR)exceeds 35,000 pounds.

3. Construction road gate, when not in immediate use, will be secured closed.

4. Haulage, through the Warm Springs subdivision, must be restricted to Monday thru Friday (excluding Holidays) from 6am to 6pm.

5. Any vehicle and/or trailer (or both) in connection with Warm Springs Fuels Mitigation Project will be restricted to a speed limit of 20mph or less when traversing through the Warm Spring subdivision.

6. Routine maintenance(grading) of authorized roads should be conducted only by the approved contractor of the grantor; except for post-contract maintenance as outlined in the Warm Springs Integrated Resource Stewardship Contract (IRSC). Post-contract road maintenance will adhere to Warm Springs HOA road maintenance standards and guidelines. All costs associated with road maintenance will be wholly responsible by those contracting or conducting road maintenance.

7. Snowplowing of authorized roads should be conducted by the approved contractor of the grantor; with the exception of those roads that are not currently in the Warm Springs subdivisions plowing routine (Exhibit A). All costs associated with snowplowing will be wholly responsible by those contracting or conducting snow plowing.

8. To protect utility services (power, telephone, etc.) in the Warm Springs subdivision, a map of all utilities, within the authorized areas (Exhibit A) will be disseminated by Forest Service representatives to the hauling contractor.

9. Vehicles and/or trailers (or both) whose Gross Combined Vehicle Weight (GCWR) exceeds 10,000 pounds will be restricted from use when conditions are present or anticipated as such road or other damage would be created from their use. Drivers should be cognizant of present and future conditions (weather, road, etc.) and make appropriate decisions regarding theirs and others safety and for the protection of surrounding land(s) and all private properties.

10. Any vehicle and/or trailer (or both) in connection with Warm Springs Fuels Mitigation Project must stop, regardless of condition, at the junction of the Ahrens Court and High Creek Roads when proceeding from Ahrens Court onto High Creek Road.

Page 3 of 14 South Park Ranger District

11. Safety signage will be temporarily installed, maintained, and removed, within the authorized routes and with the HOA’s approval, prior to, throughout, and after project implementation to reflect current project conditions.

MANDATORY CLAUSES, UNLESS OTHERWISE SPECIFIED:

1. This contract is subject to all valid rights existing on this date.

2. This contract does not convey any right, title, or interest in real property, and does NOT provide public access to National Forest System (NFS) lands.

3. Grantee claims no interest in the premises by virtue of this contract, nor through occupancy or use hereunder.

4. Grantor agrees that valid rights held by Grantee in the premises, if any, shall not be extinguished, relinquished, terminated nor diminished by virtue of this contract.

5. Grantee shall fully repair all damage to road, other than ordinary wear and tear, and provide routine maintenance commensurate with use by Grantee in exercising the privileges granted by this contract.

6. Grantee shall prevent unnecessary damage to Grantor’s adjacent land, timber, soil, water and other resources, and improvements. Grantee shall ensure its operations on Grantor’s land comply with applicable federal and state laws, regulations, and standards regarding resource protection, fire prevention and control, slash disposal, and noxious weed prevention and control.

7. The United States liability to the Grantor shall be governed by the Federal Tort Claims Act.

8. This contract shall terminate December 31st, 2025, unless earlier terminated by Grantor for breach of any terms or conditions herein, or upon written request by Grantee. Provided however, Grantor shall provide Grantee notice in writing a minimum of sixty (60) days prior to termination for breach and shall provide Grantee with reasonable opportunity to satisfactorily cure the breach

Page 4 of 14 South Park Ranger District

ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS

Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

Contractor will be responsible for doing all pre, during and post haul road maintenance with no compensation from the Forest Service.

T-SPECIFICATIONS

T-SPEC NUMBER SPECIFICATION TITLE

T-800 Definitions T-802 Ditch Cleaning T-803 Surfacing Blading T-805 Drainage Structures T-808 Miscellaneous Structures T-814 Drainage Excavation

Page 5 of 14 South Park Ranger District

SPECIFICATION T-800 DEFINITIONS

Wherever the following terms or pronouns are used, the intent and meaning shall be interpreted as follows:

800-1.1—Agreement—Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.

These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.

It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.

800-1.2—Annual Road Maintenance Plan—A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.

800-1.3—Base Course—Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.

800-1.4—Berm—Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.

800-1.5—Borrow—Select Material taken from designated borrow sites.

800-1.6—Clearing Limits—The limits of clearing as designated on the ground or on the drawings.

800-1.7—Crown, Inslope, and Outslope—The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.

800-1.8—Culverts—A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.

800-1.9—Drainage Dip—A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.

800-1.10—Drainage Structures—Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, culverts and the like.

800-1.11—Dust Abatement Plan—A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.

800-1.12—Lead-off Ditches—A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.

800-1.13 —Material—Any substances specified for use in the performance of the work.

800-1.14—Prehaul Maintenance—Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Contractor's use, provided Contractor's operations do not damage improvements in Section H.21 of the contract/solicitation or National Forest resources and hauling can be done safely. This work will be shown in the above Road Maintenance Requirements.

Prehaul Maintenance work the Contractor elects to perform will be in compliance with the Road Maintenance T- Specifications.

Page 6 of 14 South Park Ranger District

800-1.15—Right-of-Way—A general term denoting:

(1) The privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or

(2) Land, appurtenances thereto, or interest therein, usually in a strip, acquired for public or private passageway.

800-1.16—Roadbed—The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.

800-1.17—Road Maintenance Requirements—A table which shows applicable road maintenance specifications to be performed by Contractor on specific roads.

800-1.18—Roadside—A general term denoting the area adjoining the outer edge of the Roadway.

800-1.19—Roadway—The portion of a road within the limits of excavation and embankment.

800-1.20—Shoulder—That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.

800-1.21—Slide—A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated raveling.

800-1.22—Slough—Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.

800-1.23—Slump—A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.

800-1.24—Special Project Specifications—Specifications which detail conditions and requirements peculiar to the individual project.

800-1.25—Subgrade—Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.

800-1.26—Surface Course—The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.

800-1.27—Surface Treatment Plan—A table which lists the roads and surface treatments to be applied.

800-1.28—Traveled Way—That portion of Roadway, excluding Shoulders, used for the movement of vehicles.

800-1.29—Turnouts—That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.

800-1.30—Water Source—A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.

800-1.31—Waterbar—A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway.

A Waterbar is not designed to be traversable by logging trucks.

Page 7 of 14 South Park Ranger District

ILLUSTRATION OF ROAD STRUCTURE TERMS

Page 8 of 14 South Park Ranger District

SPECIFICATION T-802 DITCH CLEANING

DESCRIPTION:

1.1—Ditch cleaning is removing and disposing of all Slough Material and other debris from Roadway ditches, including outlet and lead-off ditches, to provide a free-draining waterway.

REQUIREMENTS:

3.1—Ditch cleaning shall be repeated during the year as often as necessary to facilitate proper drainage.

3.2—All Slough Material or other debris which might obstruct water flow in the Roadway ditch shall be removed.

Material removed from the ditch, if suitable, may be blended into existing native road surface or Shoulder or placed in designated Berms in conjunction with Surface Blading T-803 operations.

Material removed from ditches that is not by Agreement blended into existing roads or placed in Berms shall be loaded and hauled to the disposal site designated by the Forest Service.

3.3—Roadway backslope or Berm shall not be undercut.

MEASUREMENT:

4.1—Ditch cleaning will be measured to the nearest one-tenth (0.1) mile of cumulative ditchline cleaned on each road.

Page 9 of 14 South Park Ranger District

SPECIFICATION T-803 SURFACE BLADING

1.1—Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the Crown, Inslope or Outslope of the Traveled Way, Turnouts, and Shoulder;

repairing Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.

REQUIREMENTS:

3.1—Surface blading shall be performed before, during, and after Contractor's use as often as necessary to facilitate traffic and proper drainage.

3.2—The surface blading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.

3.3—Water, taken from Water Sources designated on Contract Area Map shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface Material.

3.4—On native surfaced roads, Material generated from backslope sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads, this Material shall not be blended with Surface or Base Course Material unless agreed otherwise.

3.5—Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed otherwise.

Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section.

3.6—Drainage Dips and Lead-off Ditches shall be cleaned and maintained to reasonably blend with existing line, grade, and cross-section.

3.7—Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.

3.8 —Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way.

Unless otherwise designated by the Forest Service, the oversized Material shall be disposed of by sidecasting.

Sidecasting into streams, lakes, or water courses will not be permitted.

3.9—Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.

3.10—Material resulting from work under this specification, plus any other accumulated debris, shall be removed from bridge decks and the deck drains opened. This includes existing debris under pre haul maintenance.

MEASUREMENT:

4.1—Surface blading will be measured to the nearest one-tenth (0.1) mile as measured by calibrated vehicle odometer along the road centerline.

Page 10 of 14 South Park Ranger District

SPECIFICATION T-805 DRAINAGE STRUCTURES

1.1—This work consists of maintaining Drainage Structures and related items such as conveyor belt water deflectors, inlet and outlet channels, existing riprap, trash racks, and drop inlets.

MATERIALS:

2.1—All Materials used in the maintenance of Drainage Structures shall conform by type and specification to the Material in the structure being maintained.

REQUIREMENTS:

3.1—Drainage Structures and related items shall be cleared of all foreign Material which has been deposited above the bottom of the structure and all vegetative growth which interferes with the flow pattern. Material removed that cannot be incorporated into maintenance work shall be hauled to a disposal site designated by the Forest Service.

3.2—If outlet or inlet riprap was installed by Contractor as a construction item or existed prior to Contractor’s haul, it shall be maintained in good condition including the replacement of riprap if necessary to previous line, grade and cross-section.

3.3—Perform maintenance to insure the proper functioning of the head walls, aprons, inlet assemblies, overside drains, riprap, trash racks, and other facilities related to the Drainage Structure.

MEASUREMENT:

4.1—Culvert cleaning measurement will be the number of units of each culvert type. Cleaning of catch basins, outlet ditches, headwalls, riprap, and drop inlets shall be incidental to this item.

Drainage dip clearing measurement will be the number of dips completed and accepted. Lead-off ditch cleaning shall be incidental to this item.

Page 11 of 14 South Park Ranger District

SPECIFICATION T-808 MISCELLANEOUS STRUCTURES

1.1—Maintenance of miscellaneous structures includes cattleguards, gates, and other similar structures that have been previously installed to insure safe and efficient operation of the road.

MATERIALS:

2.1—Any Materials needed in the maintenance of miscellaneous structures shall be similar in type and quality to the Material in the structure being maintained.

REQUIREMENTS:

3.1—Cattleguards—Loose rails shall be welded or bolted back in place.

Excess Material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open.

3.2—Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly.

Brush and debris shall be removed from within the swinging radius.

MEASUREMENT:

4.1—Measurement will be the number of units for each item listed in the Annual Road Maintenance Plan completed and accepted.

Page 12 of 14 South Park Ranger District

Page 13 of 14 South Park Ranger District

SPECIFICATION T-814 DRAINAGE EXCAVATION

1.1—This work shall consist of excavation and shaping of roadway drainage structures to drain freely including rolling dips, grade dips, roadway ditches, lead-off ditches, and catch basins. Any clearing and grubbing necessary to accomplish the drainage excavation is considered incidental to the pay item.

WORK REQUIREMENTS:

3.1—Clearing & Grubbing—All trees, stumps, roots and other protruding vegetative material shall be cleared from drainage. Trees shall be cut into lengths not to exceed 5 feet and all limbs removed. Logs, slash and stumps shall be scattered outside the drainage or as directed by the Forest Service.

3.2—Excavation—Drainage structures shall be excavated and shaped to a depth and width to provide drainage in conformity with the line grades and cross section as shown on drawings at locations designated on the ground. Hand work may be necessary to obtain a smooth surface and uniform cross section. Lead-off ditches shall be provided for a distance necessary to drain unless otherwise approved by the Forest Service. Roadside ditches shall be free draining. Material removed if suitable, shall be blended into the existing native road surface or shoulders. Unsuitable material shall be spread evenly and not heaped against existing vegetation. Large rocks encountered during excavation of drainage structures that interfere with the lines and grades of the structure shall be removed, when practical and placed so that they will not roll or obstruct the use and maintenance of the roadway or moved to locations approved by the Forest Service.

MEASUREMENT:

4.1—Drainage dip and catch basin measurement will be the number of each item completed and accepted.

Roadside ditches and lead-off ditches will be measured by linear measurement, horizontally along the centerline of the ditch.

Page 14 of 14 South Park Ranger District

ROLLING DIP:

File details come from the government source that posted it. Updated .