2. Warm Springs IRSC_Appendix A.pdf

PDF 190 KB Posted

Attached to
Warm Springs Stewardship IRSC Federal contract opportunity
Solicitation number
12363N22Q4053
Issued by
Department of Agriculture Forest Service

About this file

This document provides details for a federal stewardship contract opportunity on the Pike National Forest. The primary objective of the contract is to protect the Warm Springs Ranch community from potential wildfire through several forest management activities including reducing mid-closed structural stages, protecting large old trees, creating a mosaic of forest conditions, and enhancing aspen components. Mandatory work items include cutting and removing timber from 228 acres and masticating 228 acres. Optional items include masticating 91 additional acres and cutting timber from 53 acres. A site visit will be held on June 28, 2022 for interested parties to view the project area. The contract will be awarded by the Forest Service and must be completed by June 1, 2025. All contractors must be registered in the System for Award Management to be considered for the award.

View the file

Other files for this federal contract opportunity

Other files attached to Warm Springs Stewardship IRSC, newest first.
File Type Posted
Amendment-1 12363N22Q4053.pdf PDF
5. Warm Springs IRSC CAM_update.pdf PDF
1. Warm Springs IRSC_Solicitation.pdf PDF
3. Warm Springs IRSC_Appendix B.pdf PDF
4. Warm Springs IRSC_Appendix C.pdf PDF
7. Warm Springs IRSC TemporaryRoadUsePermit.pdf PDF
8. Warm Springs_WD_1976_1351_April2022.pdf PDF
6. Warm Springs IRSC_Fire Plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Warm Springs Stewardship IRSC Pike National Forest Page 1 of 7 South Park Ranger District

APPENDIX A

TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS

SECTION I – DESCRIPTION OF WORK:

The primary objective of this project is to protect the Warm Springs Ranch community from potential wildfire. Other objectives include removal of the severe dwarf mistletoe infestation, reduction of high severity fire potential, and increased landscape heterogeneity. These objectives will be accomplished through the following:

• A reduction in mid-closed structural stages to encourage the development of more mid-open, late- open conditions.

• Protect and/or encourage the maintenance and development of large (18”+ dbh) old-trees and snags to add structural complexity.

• Create a mosaic of forest conditions and structures that allow for wildfires to burn and other insect and disease and disturbance agents to occur at intensities and severities and scales within the natural range of variability for specific ecological systems.

• Enhance the quaking aspen component of the landscape by expanding access to available growing space through the removal of encroaching conifer and/or through regeneration.

• Standing live trees containing cavities will not be disturbed or felled unless they present an imminent safety hazard.

• Select for retention of an average of 20 – 30 live character trees per 10 acres as reserve/snag recruitment trees, where available.

• Retain the largest live character trees available.

• Retain individual or groups of live character trees, as determined by availability.

SECTION II – WORK ITEMS

Unit Acres

1 47 2 98 3 38 4 7 5 6 6 123

Mandatory Item 1: Cut and Remove Included Timber:

Units 2, 4, and 6 (228 Acres)

Cut and remove from Contract Area all trees which meet the minimum utilization standards as identified in Appendix B.

Page 2 of 7 South Park Ranger District

Mandatory Item 2: Mastication:

Units 2, 4, and 6 (228 Acres)

UNIT REQUIREMENTS

2, 4, and 6

Masticate all live conifer species 1 foot in height to 5 inches DBH. Excludes aspen.

Masticate all standing dead trees, including aspen, under 10 inches DBH.

Masticate all ground fuels with a diameter of >3 inches and <12 inches at any one point.

Masticated material shall be less than 6” in depth.

Mandatory Items 3a and 3b: Road Maintenance

See Appendix C for Road Maintenance requirements.

Optional Work Item 4: Mastication Unit 1, 3, and 5 (91 Acres)

UNIT REQUIREMENTS

1 and 5

Masticate all live conifer species 1 foot in height to 5 inches DBH. Excludes aspen.

Masticate all standing dead trees, including aspen, under 10 inches DBH.

Masticate all ground fuels with a diameter of >3 inches and <12 inches at any one point.

Masticate all live standing trees 1 foot in height up to 11.9 inches dbh.

Excludes aspen.

Masticate all standing dead trees, including aspen, 1 foot in height up to 9.9 inches dbh.

1, 3 and 5 Masticated material shall be less than 6” in depth.

Optional Work Item 5: Cut and Remove Timber Subject to Agreement Units 1 and 5 (53 Acres)

Cut and remove from Contract Area all trees which meet the minimum utilization standards as identified in Appendix B.

SECTION III – CONTROL OF WORK

The Contractor agrees to conduct its operations under this contract and other related business activities in compliance with Federal, State, and local statutes, standards, orders, permits and other regulations.

The Contractor shall meet all State and local environmental quality laws applicable to National Forest system lands.

Work may be done any time during the term of the contract, except under the following conditions:

(1) Restrict treatment activities from 6:00 pm on Fridays through 6:00 am on Mondays (6:00 am on Tuesdays when a

Monday is a federal holiday).

(2) If an active northern goshawk nest is located, additional human-caused noise and disruption beyond that occurring at the time of nest initiation (for example, road traffic, timber harvests, and construction activities) will be minimized

Page 3 of 7 South Park Ranger District between March 1 to September 30 in an approximate 420-acre area around the nest to reduce potential effects on nesting and fledgling success.

When seasonal operating restrictions for active raptor nests are in effect. All active nest sites and areas of restriction are shown on CAM and listed in the solicitation under Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources. Restrictions would apply:

(3) If new wildlife sites are discovered. All new nesting and denning sites for threatened, endangered, or Forest Service sensitive species observed prior to or during implementation would be reported immediately to the District Wildlife Biologist and appropriate protection measures would be implemented.

(4) When soil moisture conditions create excessive risk of damage to the soil,

(5) When snow depth creates a situation where requirements cannot be met and/or work cannot be inspected, as determined by the COR.

(6) The government reserves the right to prioritize the order in which Units are treated.

(7) If any cultural or archeological sites are discovered during operations of this contract, work will be suspended in the immediate vicinity of the site until a reconnaissance survey is completed by the Forest Archeologist. Areas excluded from treatment shall be deleted from the contract.

SECTION IV – INSPECTION AND ACCEPTANCE

For All Work Items:

At any point during the project, the Contractor and/or Project Manager may request (documented through email, text, or hand-written request) an in the field consultation with the Forest Service to inspect work progress, review contract specifications, or clarify issues. The Forest Service shall respond to Contractor’s request within 5 working days, excluding weekends and federal holidays.

GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

The COR, or a designated inspector (GTM), will make periodic inspections while work is in progress, usually daily at first, as needed to assure work is proceeding satisfactorily. The Contractor shall notify the COR when units are started, when problems are encountered and when contract work needs government oversight.

1. Each unit will be inspected as a separate unit. Unit will not be averaged with other units for acceptance or payment.

2. When units are completed and ready for government inspection, Contractor’s designated Project manager shall request unit inspection in writing, prior to moving out of the general area.

3. The COR, or designated inspector, will determine compliance with contract specifications through informal visual inspections. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.

4. The method of inspecting the contractor’s required leave tree mark prior to harvest operation will be completed by visual inspection.

Government Inspection Procedures

1. In the event visual inspection indicates work and/or rework to be in non-compliance with contract specifications, a series of verification plots shall be installed by the Government to determine compliance with specifications and percent of satisfactory work for treatment of each unit not meeting specification as observed with visual inspection.

Page 4 of 7 South Park Ranger District

2. Government verification plots will consist of a series of fixed area plots that will have 4 quadrants of pass or fail.

3. Plots and grid will be distributed so that a representative sample is obtained. Pile locations including landings may be sampled in plots to determine overall quality.

4. The COR or designated inspector will mark the center of each plot on the ground using flagging, stakes, or pin flags. Additional flagging will be hung near the plot center so that it may be seen from a distance. The inspector will include the plot number, their initials and date on the flagging.

5. Plots will be numbered to correlate with the inspection form and transects on a unit map.

6. The minimum number of verification plots, per treatment unit, shall be as follows:

Unit Acreage Minimum No. of Plots

1 – 9 1 plot per 2 acres 10 – 29 10 plots 30 – 59 1 plot per 4 acres 60 – 99 20 plots 100 1 plot per 5 acres

7. Determination of acceptability of the work performed will be based on Government verification inspections and will be considered conclusive.

8. At each plot, the Government will examine the plot area and record findings.

Table 1 – Minimum Acceptable Quality Levels (AQL) of Work

ITEM DESCRIPTION SCHEDULE UNIT Min AQL

1 Cut and Remove Included Timber MANDATORY ACRE 100% 2 Mastication MANDATORY ACRE 90%

3a and 3b Road Maintenance MANDATORY MILE 100% 4 Mastication OPTIONAL ACRE 90% 5 Cut and Remove TSA OPTIONAL ACRE 100%

Unsatisfactory Performance

1. If the work quality falls below the minimum AQL, the COR will immediately notify the Contractor, in writing, and order him to improve the quality of subsequent tree cutting.

2. If after rework has been performed and reinspected, and work quality still falls below minimum AQL percent, payment will either be made at a reduced rate, or not at all, as determined in SECTION V below.

3. Repeated failure to produce work quality at or above the minimum acceptable standard will be considered reason for contract termination for cause.

Reinspection Upon Contractor Request

1. If Government inspection results are unacceptable to the Contractor, a reinspection may be requested, in writing, within 5 business days after receipt of notice of said inspection results. The same inspection procedure will be used; however, the inspection pattern will be shifted so that new inspection plots will not overlap previously inspected plots.

2. If reinspection results – rounded up to the nearest whole percent – indicate a variance of more than 5 percent

Page 5 of 7 South Park Ranger District from the first inspection, the results of the second inspection will be used to calculate work quality and payment, and the Government will bear the cost of reinspection.

3. If reinspection results – rounded up to the nearest whole percent – are within 5 percent of the first inspection, plots from the initial inspection and the reinspection will be combined and used to calculate work quality and payment, and the Contractor shall bear the cost of reinspection.

SECTION V – PAYMENT METHODS

Method of Measurement for Acreages

Acreages were determined by using Global Positioning Systems (GPS). The acreage for each work item will be rounded to the nearest acre and is final unless:

a. The contract is modified or,

b. The Government makes a determination to remeasure or,

c. The Contractor exercises his/her option under the following Remeasurement provisions:

Remeasurement

1. The Contractor may request, in writing, remeasurement of any units under this contract if he/she feels that acreage stated on the project maps is incorrect. The remeasurement must be within the existing perimeter of the respective unit. No variance of the unit perimeters as laid out on the ground for this contract will be allowed.

All requests for remeasurement must be made prior to payment for each completed unit. Remeasurement will be performed by the Government.

2. If remeasurement indicates that a variance of ten percent or less exists on units of 1 to 5 acres, five percent or less exists on units of more than five but less than 20 acres, or if three percent or less exists on units of 20 acres or larger, the Contractor shall pay for the actual costs of the remeasurement. Under this condition, payment will be made on the acreage stated on the project maps. If the remeasurement indicates the actual acreage varies by more than the above factors from that stated on the project maps, the payment will be made on the remeasured acreage and the Forest Service will pay for the cost of the remeasurement.

Acceptance and Payment – Items 1 and 5

1. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.

2. Contractor shall rework all areas of treatment units found not in compliance with Appendix B specifications.

Agreements and acceptances of work not required to be 100 percent quality, made by COR and/or authorized GTM, shall not count against contractor for payment purposes.

Acceptance and Payment – Items 2 and 4

3. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.

4. In the event that formal inspections are used, the rate of payment to the Contractor will be calculated as follows:

(a) For work quality of 90 percent or higher, the Contractor will be paid 100 percent of their bid rate.

(b) For work quality from 85 to 89 percent after rework, the Contractor will be paid the total multiplied by the bid rate.

(c) For work quality 84 percent and less after rework, no payment made to the Contractor.

Acceptance and Payment – Items 3a and 3b Road Maintenance

1. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.

Page 6 of 7 South Park Ranger District

2. Only one rework opportunity will be allowed for this item.

* Stewardship Credits will be earned first, whenever practical. Forest Service Funds will be used if the availability of Stewardship Credits is exhausted or if appropriated dollars are obligated to a specific item.

SECTION VI – DEFINITIONS

ACCEPTABLE QUALITY LEVEL (AQL): Acceptance of work will be based on compliance with all specifications corresponding to the appropriate task(s); refer to the Performance Requirements Summary in Section E.4 of the contract. A minimum AQL is required for all service work – hand or mechanical. The minimum AQL will receive a satisfactory performance rating.

BIOMASS TREES: Any conifer material 2 feet in height to 4.9 inches DBH.

BOLE SPACING: The horizontal distance in feet from the edge of one leave tree bole to another leave tree bole, measured from the outside bark of each tree.

CIRCULAR PLOT: A sample plot within a thinning unit that is used to determine the number of desirable trees and other contract specifications.

COARSE WOODY DEBRIS: Woody material left on the ground to meet wildlife habitat requirements.

CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.

CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.

CLEARCUT: A cutting prescription in which all trees within a boundary are designated to be cut.

CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.

CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.

CUT TREES: Trees that do not possess the characteristics of desirable leave trees and are required to be cut. As described by the contract or otherwise marked to be cut.

CUTTING UNIT: See Treatment Unit definition

DAMAGED TREES: Trees damaged beyond recovery. A tree that is larger than 2 feet in height, and has the top knocked out, is leaning more than 10 degrees, has less than one half of its original limbs, or has approximately 50% of bark removed from the circumference of the bole.

DBH: Diameter at breast height, measured at a point of 4.5 feet above the ground level on the uphill side of the tree.

DECKING: Stockpiling of trees in a designated area.

DEAD/DYING TREES: Trees with the crown foliage changing from green to red, yellow, or needleless. Any tree that has pitch tubes indicating Mountain Pine Beetle infestation.

DESIGNATION BY SPECIES AND DIAMETER (DXSD): A cutting prescription in which species and diameter are used to determine which trees will be left and which will be cut.

DIB: Diameter inside bark.

HANG-UP TREE: Any cut tree suspended above ground level.

HEALTHY REGENERATION: Young, healthy, dwarf mistletoe free conifers, less than 4.9 inches in diameter, free of defect or characteristics listed in Section II, 2.2.2.

LEAVE TREE: Trees that possess desirable characteristics and that serve to create the basis for designated spacing requirements or are otherwise designated to be left.

Page 7 of 7 South Park Ranger District

NON-SAWTIMBER TREE: For all conifer species, minimum diameter of 5 inches DBH to minimum diameter by species identified in Appendix B, Division A.

OVERSTORY REMOVAL: A cutting prescription where all trees greater than a specified size are cut. Trees less than the specified size are protected.

PAYMENT UNIT: See Treatment Unit.

PERFORMANCE REQUIREMENTS SUMMARY (PRS): Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.

PILING: Material moved to an agreed upon location shall be piled for future treatment by Forest Service.

PROGRESSION OF WORK: Work conducted in a progressive, workmanlike and orderly manner by the Contractor.

RESERVE CLUMPS: Groups of trees within a treatment area that are protected from cutting, may also include Individual Reserve trees.

SAWTIMBER TREE: Included timber meeting sawlog size specifications as defined in Appendix B, Division A.2.

SLASH: Woody material existing or created that has accumulated on the forest floor. Woody material includes logs, pieces of logs, tops, and branches.

UNIT: See Treatment Unit.

TEMPORARY ROADS: Non-permanent roads that are constructed by Contractor for the purpose of treatment unit access.

TREATMENT UNIT: An individual area on the ground in which activities will be performed and which may appear as a separate pay item in the Schedule of Items.

UNSATISFACTORY WORK: If work quality falls below the AQL, the COR will issue a work order or notice of noncompliance to the Contractor in writing. Untreated or unsatisfactory treated areas shall be reworked to obtain satisfactory work quality.

WHOLE TREE YARDING: Whole tree logging includes cutting tree and removing the entire tree, including tops and branches, to the landing.

WILDLIFE TREE: Standing tree marked to be reserved as a wildlife tree. Used by birds and small mammals for shelter, nesting, perching, etc.

Acceptance and Payment – Items 3a and 3b Road Maintenance
2. Only one rework opportunity will be allowed for this item.

File details come from the government source that posted it. Updated .