4-24Q-057 SITE WORK AND UTILITIES BID FORM.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- 24Q-057 FLEET SERVICES - NEW FACILITY State and local contract opportunity
- Solicitation number
- 24Q-057
- Issued by
- Marion County, Orlando City, Florida
About this file
This document is a detailed Site Work and Utilities Bid Form for the Marion County Fleet Services New Facility project in Ocala, Florida, prepared by Dinkins Construction as the construction manager. The project is anticipated to start in November 2025 and involves comprehensive site preparation and infrastructure development, including demolition, earthwork, storm drainage, sanitary sewer, water systems, asphalt pavement, concrete work, pavement marking, signage, and sodding. The bid form provides an extensive itemized breakdown of work components with multiple categories such as general site work, SWPPP compliance, demolition, earthwork, storm drainage, sanitary sewer, water systems, and pavement infrastructure, with options for various alternates including additional parking areas, site lighting, building additions, and specific site improvements.
The bid form is structured as a lump sum bidding process with unit cost options, requiring subcontractors to provide all services, submittals, labor, materials, equipment, and necessary permits to complete the project in compliance with County Maintained Facilities and City of Ocala requirements. Twelve specific alternates are included, ranging from performance bonds to additional site features like fuel islands, parking expansions, and building additions, with unit cost options for soil replacement, asphalt surfacing, and landscaping. The document emphasizes that bidders must verify all information, add to the list as required to provide a complete scope of work, and understand that listing quantities does not relieve them of responsibility for providing all work indicated in specifications or drawings.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 1-24Q-057 BID PACKAGE.pdf | ||
| 3-A000 INDEX OF DRAWINGS Rev.6 markup.pdf | ||
| 2-C0.0 COVER SHEET Rev.3 markup.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| MC - CONSOLIDATED FLEET FACILITY |
| Site Work and Utilities |
| Subcontractor Name: | ||||
| · Bidders are to verify all information within this spreadsheet. In no way is this list intended to limit the typical scope of work.· This form is for scope review and bid tabulation only. | ||||
| · All bids are considered lump sum bids unless specifically indicated otherwise. Vendors and contractors that list quantities are not relieved from the responsibility of providing all work indicated in the specifications or on the drawings. Listing of quantities may not, at Dinkins Construction option, allow relief from incorrect quantity takeoffs. | ||||
| · Bidders are to add to this list as required to provide a full and complete Site Work and Utilities Scope of Work | ||||
| · Bidders are to provide all services, submittals, shop drawings, supervision, labor, material, equipment, transportation, shipping, taxes, permits and all items whether specifically listed or not, that are required for a complete project for this trade. | ||||
| · All construction to comply with Standards for Design/Construction of County Maintained Facilities and City of Ocala requirements. | ||||
| · Site Preparation per Geotechnical Report | ||||
| · All Survey, Layout, and As-Builts | ||||
| · All Material Testing and Testing of Installed Lines, including but not limited to television inspection, manhole test, bacteriological testing, backflow certifications, etc. | ||||
| · All Maintenance of Traffic | ||||
| · SWPPP Complete | ||||
| · Demolition Complete. Removal of Demolition debris form site. Export of Demolition Debris. All Clearing Grubb and Stripping | ||||
| · All Import, Export, Cut and Fill to Provide Finished Grades | ||||
| · All Rough Grading and Finish Grading | ||||
| · All Compaction | ||||
| · All Subgrade Preparation for Concrete | ||||
| · Stormwater System Complete | ||||
| · Domestic Water Service Complete. (From Connection to within 5' of Building) | ||||
| · Gravity Sanitary Sewer Complete. (From Connection to within 5' of the Building) | ||||
| · Lift Station and Force Main Complete | ||||
| · Fire Main Complete (From Connection to 1' above Finished Floor) | ||||
| · All Asphalt Pavement, Limerock, Stabilized Subgrade, Pavement Markings, Signage Complete. | ||||
| · All Concrete Curbs, and Concrete Related to Storm Water | ||||
| · All Sodding of DRA, Irrigation Sleeves, Irrigation BRP | ||||
| · ADA Warning Mats on Concrete Ramps Installed by this Subcontractor | ||||
| ***See Alternates at End of Bid Form | ||||
| GENERAL | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| Mobilization | 0 | LS | $ - 0 | $ - 0 |
| Layout and Survey | 0 | LS | $ - 0 | $ - 0 |
| As-Builts | 0 | LS | $ - 0 | $ - 0 |
| Testing | 0 | LS | $ - 0 | $ - 0 |
| MOT | 0 | LS | $ - 0 | $ - 0 |
| Permits | 0 | LS | $ - 0 | $ - 0 |
| GENERAL | Total | $ - 0 | ||
| SWPPP | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| Construction Entrance | 0 | EA | $ - 0 | $ - 0 |
| Silt Fence | 0 | LF | $ - 0 | $ - 0 |
| Tree Protection Fencing | 0 | LF | $ - 0 | $ - 0 |
| Inlet Protection | 0 | EA | $ - 0 | $ - 0 |
| Maintenance | 0 | LS | $ - 0 | $ - 0 |
| SWPPP | Total | $ - 0 | ||
| DEMOLITION | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| Tree Removal and Clearing | 0 | ACRE | $ - 0 | $ - 0 |
| Remove Existing Inlet Top | 0 | EA | $ - 0 | $ - 0 |
| Demolish Sidewalk | 0 | SF | $ - 0 | $ - 0 |
| Demolish Sidewalk for Force Main Install | 0 | SF | $ - 0 | $ - 0 |
| Demolish Curbing | 0 | LF | $ - 0 | $ - 0 |
| Removal of Demolition Debris | 0 | LS | $ - 0 | $ - 0 |
| DEMOLITION | Total | $ - 0 | ||
| EARTHWORK | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| Site Cut | 0 | CY | $ - 0 | $ - 0 |
| Site Fill | 0 | CY | $ - 0 | $ - 0 |
| Import Fill | 0 | CY | $ - 0 | $ - 0 |
| Export Fill | 0 | CY | $ - 0 | $ - 0 |
| Place and Compact Building Pads | 0 | SY | $ - 0 | $ - 0 |
| Rough Grade | 0 | SY | $ - 0 | $ - 0 |
| Finish Grade | 0 | SY | $ - 0 | $ - 0 |
| Grade for Concrete | 0 | SY | $ - 0 | $ - 0 |
| Pressure Grouting - By Others | 0 | SY | $ - 0 | By Others |
| EARTHWORK | Total | $ - 0 | ||
| STORM | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| 15" RCP Piping | 0 | LF | $ - 0 | $ - 0 |
| 15" Storm Drain Piping | 0 | LF | $ - 0 | $ - 0 |
| 18" Storm Drain Piping | 0 | LF | $ - 0 | $ - 0 |
| 24" Storm Drain Piping | 0 | LF | $ - 0 | $ - 0 |
| 30" Storm Drain Piping | 0 | LF | $ - 0 | $ - 0 |
| 36" Storm Drain Piping | 0 | LF | $ - 0 | $ - 0 |
| 12" Storm Drain Piping | 0 | LF | $ - 0 | $ - 0 |
| 12" Cleanout (With brass caps in paved areas) | 0 | LF | $ - 0 | $ - 0 |
| 15" MES | 0 | LF | $ - 0 | $ - 0 |
| 15" MES with Rip Rap | 0 | LF | $ - 0 | $ - 0 |
| 30" MES with Rip Rap | 0 | LF | $ - 0 | $ - 0 |
| 36" MES with Rip Rap | 0 | LF | $ - 0 | $ - 0 |
| Adjust Existing Curb Inlet | 0 | LF | $ - 0 | $ - 0 |
| Manhole | 0 | LF | $ - 0 | $ - 0 |
| Type E Inlet with Skimmer | 0 | LF | $ - 0 | $ - 0 |
| Type F Inlet | 0 | LF | $ - 0 | $ - 0 |
| Branch Piping for Downspout Connections | 0 | LF | $ - 0 | $ - 0 |
| Fittings (Bidders may list specific fittings) | 0 | LS | $ - 0 | $ - 0 |
| Round to Square Adaptors | 0 | EA | $ - 0 | $ - 0 |
| Testing | 0 | LS | $ - 0 | $ - 0 |
| STORM | Total | $ - 0 | ||
| SANITARY SEWER | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| 8" PVC SDR 21 | 0 | LF | $ - 0 | $ - 0 |
| 4" PVC SDR 21 | 0 | LF | $ - 0 | $ - 0 |
| Manhole | 0 | EA | $ - 0 | $ - 0 |
| Doghouse Manhole HDPE Lined | 0 | EA | $ - 0 | $ - 0 |
| Oil Water Separators | 0 | EA | $ - 0 | $ - 0 |
| 4" Cleanout with concrete collar (With brass cap at paved areas) | 0 | EA | $ - 0 | $ - 0 |
| Lift Station - Turn Key including all gravel, fencing, concrete etc. Electrical subcontractor will furnish and install (1) disconnect. All other work is to be included by Site Work and Utilities Subcontractor | 0 | LS | $ - 0 | $ - 0 |
| Air Release Valve at Lift Station | 0 | EA | $ - 0 | $ - 0 |
| Air Release Valve (off site) | 0 | EA | $ - 0 | $ - 0 |
| 2" Force Main | 0 | LF | $ - 0 | $ - 0 |
| 2" Force Main Directional Drill | 0 | LF | $ - 0 | $ - 0 |
| 2" Force Main Jack and Bore with 5" Steel Casing | 0 | LF | $ - 0 | $ - 0 |
| Re-Direct Existing 8" PVC to Doghouse Manhole | 0 | LF | $ - 0 | $ - 0 |
| Fittings (Bidders may list specific fittings) | 0 | LS | $ - 0 | $ - 0 |
| Testing | 0 | LS | $ - 0 | $ - 0 |
| SANITARY SEWER | Total | $ - 0 | ||
| WATER | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| 8" PVC DR18 | 0 | LF | $ - 0 | $ - 0 |
| 6" PVC DR14 | 0 | LF | $ - 0 | $ - 0 |
| 6" PVC DR18 | 0 | LF | $ - 0 | $ - 0 |
| 3" PVC SDR 21 | 0 | LF | $ - 0 | $ - 0 |
| 1" PVC SDR 21 | 0 | LF | $ - 0 | $ - 0 |
| 3/4" PVC | 0 | LF | $ - 0 | $ - 0 |
| 8"x8" Tapping Sleeve and Valve | 0 | EA | $ - 0 | $ - 0 |
| 8"x3" Tapping Sleeve and Valve | 0 | EA | $ - 0 | $ - 0 |
| 8" DDC with FDC | 0 | EA | $ - 0 | $ - 0 |
| Fire Hydrant Assembly | 0 | EA | $ - 0 | $ - 0 |
| 6" Fire Riser | 0 | EA | $ - 0 | $ - 0 |
| 3" Water Service Complete. Including Meter and Vault | 0 | LS | $ - 0 | $ - 0 |
| 8" Gate Valve | 0 | EA | $ - 0 | $ - 0 |
| 6" Gate Valve | 0 | EA | $ - 0 | $ - 0 |
| 1" Gate Valve | 0 | EA | $ - 0 | $ - 0 |
| 3" Gate Valve | 0 | EA | $ - 0 | $ - 0 |
| Fittings (Bidders may list specific fittings) | 0 | LS | $ - 0 | $ - 0 |
| 3" 90 | 0 | EA | $ - 0 | $ - 0 |
| 3" Reducer | 0 | EA | $ - 0 | $ - 0 |
| 3" Tee | 0 | EA | $ - 0 | $ - 0 |
| 3" Cap | 0 | EA | $ - 0 | $ - 0 |
| 8" MJ 90 | 0 | EA | $ - 0 | $ - 0 |
| 8" MJ 45 | 0 | EA | $ - 0 | $ - 0 |
| 8"x8" Tee | 0 | EA | $ - 0 | $ - 0 |
| 8"x6" Tee | 0 | EA | $ - 0 | $ - 0 |
| 1" 45 | 0 | EA | $ - 0 | $ - 0 |
| Joint Restraints | 0 | EA | $ - 0 | $ - 0 |
| Testing | 0 | EA | $ - 0 | $ - 0 |
| WATER | Total | $ - 0 | ||
| ASPHALT PAVEMENT | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| Standard Duty Asphalt | ||||
| Rough Grading | 0 | SY | $ - 0 | $ - 0 |
| 12" Stabilized Subgrade | 0 | SY | $ - 0 | $ - 0 |
| 6" Limerock | 0 | SY | $ - 0 | $ - 0 |
| Prime | 0 | SY | $ - 0 | $ - 0 |
| 1.5" SP12.5 | 0 | SY | $ - 0 | $ - 0 |
| Heavy Duty Asphalt | ||||
| Rough Grading | 0 | SY | $ - 0 | $ - 0 |
| 12" Stabilized Subgrade | 0 | SY | $ - 0 | $ - 0 |
| 6" Limerock | 0 | SY | $ - 0 | $ - 0 |
| Prime | 0 | SY | $ - 0 | $ - 0 |
| 1.5" SP12.5 (2 Lifts) | 0 | SY | $ - 0 | $ - 0 |
Stabilized Subgrade at Concrete Pavement 0 SY $ - 0 $ - 0
| ASPHALT PAVEMENT | Total | $ - 0 | ||
| CONCRETE | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| D Curbs | 0 | LF | $ - 0 | $ - 0 |
| Type F Curb | 0 | LF | $ - 0 | $ - 0 |
| Valley Curb | 0 | LF | $ - 0 | $ - 0 |
| 6' Curb Taper | 0 | LF | $ - 0 | $ - 0 |
| Sidewalks Replacement for Force Main Install | 0 | SF | $ - 0 | $ - 0 |
| ADA Mats on Concrete Installed by this contractor | 0 | LS | $ - 0 | $ - 0 |
| Caulking of Sidewalks Installed by this contractor | 0 | LS | $ - 0 | $ - 0 |
| Sidewalks - At Site - By others | 0 | SF | $ - 0 | By Others |
| Concrete Pavement - By Others | 0 | SF | $ - 0 | By Others |
| CONCRETE | Total | $ - 0 | ||
| PAVEMENT MARKING AND SIGNAGE | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| On Site | ||||
| Wheel Stops | 0 | EA | $ - 0 | $ - 0 |
| 30" Stop Sign | 0 | EA | $ - 0 | $ - 0 |
| 6" White Stripe | 0 | LF | $ - 0 | $ - 0 |
| 6' Wide Crosswalk with 24" Stripes Spaced at 60" OC | 0 | LF | $ - 0 | $ - 0 |
| Handicap Stall, Wheel Stop and Sign | 0 | EA | $ - 0 | $ - 0 |
| Double Yellow | 0 | LF | $ - 0 | $ - 0 |
| Directional Arrow with Message | 0 | EA | $ - 0 | $ - 0 |
| Right Turn Only Sign | 0 | EA | $ - 0 | $ - 0 |
| Off Site | ||||
| Remove Striping | 0 | LS | $ - 0 | $ - 0 |
| 6" White | 0 | LF | $ - 0 | $ - 0 |
| 6" White with RPM's | 0 | LF | $ - 0 | $ - 0 |
| 6" White 2'-4' Skip | 0 | LF | $ - 0 | $ - 0 |
| 6" Double Yellow with RPM's | 0 | LF | $ - 0 | $ - 0 |
| 18" Yellow Stripe | 0 | LF | $ - 0 | $ - 0 |
| White Directional Arrow per FDOT Index 711-001 | 0 | EA | $ - 0 | $ - 0 |
| PAVEMENT MARKING AND SIGNAGE | Total | $ - 0 | ||
| SOD | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| Palletized Bahia Sod | 0 | SF | $ - 0 | $ - 0 |
| Seed and Mulch | 0 | SF | $ - 0 | $ - 0 |
SOD Total $ - 0
| GRAND TOTAL | $ - 0 | |||
| ALTERNATES and UNIT COSTS | ||||
| Item | Qty | Units | Unit Cost | Extended Total |
| *Bidders are to include itemized proposal with unit cost for each alternate. Attach itemized proposal to this bid form. |
| ADD ALTERNATE 1: Performance and Payment Bond. Must be a percentage. Will be applied to accepted alternates |
| ADD ALTERNATE 2: (Green) Add Parking at NW Side of Site |
| ADD ALTERNATE 3: (Pink) Parking Adjacent ISO Building Increase to HD Asphalt |
| ADD ALTERNATE 4: (Orange) Drive East of Building Increase to HD Asphalt |
| ADD ALTERNATE 5: (Red) Parking and Drive East Side of Site. Relocate Parking Stalls and Delete Drive. Relocate Storm Sewer |
| ADD ALTERNATE 6: (Teal) Parking on West Side of Site. Add Parking Stalls. |
| ADD ALTERNATE 7: (Blue) Add Fuel Island |
| ADD ALTERNATE 8: (Yellow) Area at SW Side of Site. Add Gravel Storage, Fencing, Asphalt to complete area per plan |
| ADD ALTERNATE 9: Add Site Lighting - NO IMPACT TO SITE WORK AND UTILITIES |
| ADD ALTERNATE 10: Add ISO Building |
| ADD ALTERNATE 11: Add Lightning Protection |
| ADD ALTERNATE 12: Add Service Writer Canopy. NO IMPACT TO SITE WORK AND UTILITIES. GRADING FOR CONCRETE SLAB TO BE IN BASE BID |
| ADD ALTERNATE 13: Increase Slab Thickness and Reinforcement at Parts Storage and Adjacent Corridor |
| UNIT COST: Remove and Replace Unsuitable Soils (Per CY) |
| UNIT COST: Silica Sand on Asphalt (Per Sy) |
| UNIT COST: Add or Deduct Bahia Sod (Per SF) |
| UNIT COST: Add or Deduct Bahia Seed and Mulch (Per SF) |
ALTERNATES and UNIT COSTS Total $ - 0