Summary of 3c_Statement_of_Work.pdf

This Statement of Work document outlines gutter cleaning and inspection services for TRACEN (Training Center) Petaluma housing units operated by the California state government. The project scope requires comprehensive cleaning, flushing, and inspection of gutters and downspouts across designated housing units to ensure proper drainage and system functionality. The work encompasses both routine maintenance and diagnostic evaluation of the drainage infrastructure to identify any deficiencies or repair needs. The contract is structured as a Total Small Business Set-Aside opportunity, classified under NAICS code 561790 (Other Services to Buildings and Dwellings), restricting bidding eligibility to certified small business enterprises.

The statement of work establishes specific service standards and performance requirements for the contractor to meet while maintaining the integrity and operational efficiency of the residential drainage systems. Detailed specifications regarding inspection procedures, cleaning methodologies, documentation requirements, and reporting obligations are defined to ensure consistent service quality across all designated units. The contract terms, pricing structure, performance schedules, and payment conditions are established to provide clear expectations for contractor performance and state oversight of the work completion.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #: 61200PR260031752

STATEMENT OF WORK

LAST UPDATED: 06/23/2026 PAGE 1/3

STATEMENT OF WORK (SOW)

FOR

Gutter Cleaning Service in Military Housing

1.0 GENERAL

1.1 BACKGROUND

U.S. Coast Guard (USCG) Training Center (TRACEN) Petaluma located at 599 Tomales Road Petaluma; CA 94952 is the Coast Guard’s largest West Coast Training Center. Our graduates are the latest chefs, medics, storekeepers, yeoman, information systems technicians, electronics technicians, operations specialists, and aviation survival technicians (AST). We are also home to the Coast Guard Leadership Development Center’s Chief Petty Officer Academy.

1.2 SCOPE

The scope of this project is to clean, flush, and inspect the gutters and downspouts of the designated TRACEN housing units to ensure proper drainage and system functionality.

1.3 OBJECTIVE

This Statement of Work outlines the requirements for cleaning and flushing gutters and downspouts to ensure proper water drainage while adhering to strict safety standards. The contractor must perform these services on both the first and second levels for housing units 305, 306, 308, 309, and 400 through 405. Additionally, the same services must be completed exclusively on the second level for units 413 through 418, 430 through 433, and 701 through 715.

1.4 SITE VISIT

Bidders are encouraged to conduct a site visit prior to submitting their proposals. To schedule a site visit, interested parties must coordinate with Isaiah Ashton-Baker via email at Isaiah.R.Ashton-Baker@uscg.mil. Site visits will be hosted on July 14, 2026 from 0900- 1100 PST. Visitors must provide Government issued Identification, Driver’s License, registration of vehicle and proof of insurance

2.0 SPECIFIC REQUIREMENTS/TASKS

2.1 TASK ONE. SITE SAFETY SETUP

Ensure secure access to rooflines using appropriate personal protective equipment (PPE), ladders, or lifts. The contractor must establish a ground safety perimeter below the active work zone to prevent hazards from falling debris.

2.2 TASK TWO. DEBRIS REMOVAL

Manually clear all leaves, sediment, and solid debris from designated gutters and downspout openings. Immediately place all cleared material directly into waste bags; do not discard debris onto the ground or surrounding landscaping.

2.3 TASK THREE. CLEAN THE GUTTERS IN FOLLOWING HOMES

The Contractor must clean the gutters in housing following the guidance listed below:

2.3.1 Group A (Clean All Levels): Buildings 305, 306, 308, 309, 400, 401, 402, 403, 404, 405.

https://uscg.sharepoint-mil.us/sites/cg9/ARM/SCOPE%20PARAGRAPHS.doc

LAST UPDATED: 06/23/2026 PAGE 2/3

2.3.2 Group B (Clean Second Level Gutters ONLY): Buildings 413, 414, 415, 416, 417, 418, 430, 431, 432, 433, 701, 702, 703, 704, 705, 706, 707, 708, 709, 710, 711, 712, 713, 714, 715.

2.4 TASK FOUR. FLUSH GUTTERS AND DOWNSPOUTS

Flush all gutters and downspouts with water to clear any remaining debris, and verify that the system flows freely and discharges properly at the ground level.

2.5 TASK FIVE. SITE CLEANUP

Remove all bagged debris from the property and thoroughly clean any building exteriors, walkways, or ground areas impacted during the process. The site must be returned to its pre-work condition prior to final inspection.

2.6 TASK SIX. DAMAGE REPORTING

Report any damaged or deteriorating gutters, hardware, or downspouts immediately upon discovery to ensure timely repairs can be coordinated.

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this

SOW.

3.2 CONTINUITY OF SUPPORT

The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Government Technical Representative prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.

3.3 EMPLOYEE IDENTIFICATION

3.3.1 Contractor employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.

3.3.2 Contractor employees working on-site at Government facilities must wear a Government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times.

3.4 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at

LAST UPDATED: 06/23/2026 PAGE 3/3

Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.5 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.

Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 OTHER APPLICABLE CONDITIONS

4.1 SECURITY

Contractor access to classified information is not currently required under this SOW

4.2 PLACE OF PERFORMANCE

U.S. Coast Guard (USCG) Training Center (TRACEN) Petaluma located at 599 Tomales Road, Petaluma, CA 94952-4154

4.3 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0800 through 1530 PST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

4.4 TRAVEL

Contractor travel must not be required for this requirement.

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

6.0 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and SOW 5.0.

STATEMENT OF WORK (SOW)
FOR
2.0 SPECIFIC REQUIREMENTS/TASKS
Ensure secure access to rooflines using appropriate personal protective equipment (PPE), ladders, or lifts. The contractor must establish a ground safety perimeter below the active work zone to prevent hazards from falling debris.
2.2 TASK TWO. DEBRIS REMOVAL
2.3 TASK THREE. CLEAN THE GUTTERS IN FOLLOWING HOMES
The Contractor must clean the gutters in housing following the guidance listed below:
2.3.1 Group A (Clean All Levels): Buildings 305, 306, 308, 309, 400, 401, 402, 403, 404, 405.
2.3.2 Group B (Clean Second Level Gutters ONLY): Buildings 413, 414, 415, 416, 417, 418, 430, 431, 432, 433, 701, 702, 703, 704, 705, 706, 707, 708, 709, 710, 711, 712, 713, 714, 715.
2.5 TASK FIVE. SITE CLEANUP
Remove all bagged debris from the property and thoroughly clean any building exteriors, walkways, or ground areas impacted during the process. The site must be returned to its pre-work condition prior to final inspection.
2.6 TASK SIX. DAMAGE REPORTING
Report any damaged or deteriorating gutters, hardware, or downspouts immediately upon discovery to ensure timely repairs can be coordinated.