38233_Aug_3_26_solicitation_doc.pdf

PDF 15 KB Posted

Attached to
777 Pump Station Improvement Project
Solicitation number
38233
Issued by
Connecticut

About this file

This is an Invitation to Bid (ITB) solicitation document issued by Brookfield Water Pollution Control in Connecticut for the 777 Pump Station Improvement Project. The project encompasses the installation of a turnkey packaged pump station with valve pit and associated appurtenances, including removal of the existing pump station wet well and valve pit. Work includes dewatering, temporary sewer bypass, removal of the existing propane tank and generator with replacement by a diesel generator, and retrofitting of the existing oversized manhole structure inlet with a grinder. Rock removal is not anticipated. The solicitation opened on July 29, 2026 at 3:00 PM EDT and closes on September 11, 2026 at 11:00 AM EDT. The vendor question and answer period runs from July 29, 2026 at 3:15 PM EDT through August 21, 2026 at 12:00 PM EDT. All vendors are eligible to respond to this bid.

The solicitation specifies vendor-determined payment terms with no specific delivery requirements noted as applicable. The estimated total value of the contract is not disclosed in the available documentation. Interested parties should direct inquiries to Kristi McPadden at Brookfield Water Pollution Control, 53A Commerce Rd. Unit 1, Brookfield, CT 06804, telephone 203-775-7319, or email kristi@brookfieldwpca.org. The bid package and full drawing set are available as supporting documents for prospective bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: 38233

777 Pump Station Improvement Project

Invitation to Bid (ITB)

Brookfield Water Pollution Control

July 29, 2026 - September 11, 2026

Page:2

General Header Information

This bid has no questions defined.

38233

No. 38233 Title: 777 Pump Station Improvement Project Start Date: July 29, 2026 at 3:00:00 PM EDT End Date: September 11, 2026 at 11:00:00 AM EDT Vendor Q&A Start Date: July 29, 2026 at 3:15:00 PM EDT Vendor Q&A End Date: August 21, 2026 at 12:00:00 PM EDT Estimated Total Value:

Who can respond to this bid? : All Vendors Description: The work covered under this contract includes the installation of a turnkey packaged pump station with valve pit and associated appurtenances. The existing pump station wet well and valve pit will be removed. The project will include dewatering and a temporary sewer bypass. Rock removal is not anticipated. The project also includes removal of the existing propane tank and generator, to be replaced with a diesel generator.

Additionally, the existing oversized manhole structure inlet will be retrofitted with a grinder.

Delivery Terms: N/A: Not Applicable Payment Terms: Vendor Specified Contact Information: Brookfield Water Pollution Control

Kristi McPadden 53A Commerce Rd. Unit 1 Brookfield CT, 06804 United States Tel: 203-775-7319 Fax:

kristi@brookfieldwpca.org

Contact Details: If you have any questions, please contact:

Kristi McPadden 53A Commerce Rd. Unit 1 Brookfield CT, 06804 United States Tel: 203-775-7319 Fax:

kristi@brookfieldwpca.org

Selected Categories:

Page:3

Documents:

2026-07-23 Bid Package 777 Pump Station for posting.pdf

2026-07-23 Full Drawing Set for posting.pdf

Page:4

Item Specifications Solicitation has been designated as having no line items.

Page:5

File details come from the government source that posted it. Updated .