36H79718R0024-0003000.docx

DOCX document 18 KB Posted

Attached to
Grand Junction 36H79718R0024 laundry
Solicitation number
36H79718R0024
Issued by

About this file

36H79718R0024 0003 36H79718R0024 0003.docx

View the file

Other files

File Type Posted
36H79718R0024-0002000.docx DOCX document
36H79718R0024-0001000.docx DOCX document
36H79718R0024-0001004.pdf PDF
36H79718R0024-0001003.pdf PDF
36H79718R0024-0001002.docx DOCX document
36H79718R0024-0001001.docx DOCX document
36H79718R0024-005.pdf PDF
36H79718R0024-002.docx DOCX document
36H79718R0024-003.docx DOCX document
36H79718R0024-004.pdf PDF
36H79718R0024-001.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 10-29-2018 575-B70007, 575-B70011, 575-B86011 Department of Veterans Affairs NAC, NCS, HTME Contracts Bldg 37 PO Box 76 Hines

IL

60141 Department of Veterans Affairs OPAL / National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines

IL

60141 To all Offerors/Bidders

36H79718R0024 10-15-2018

X X X X The purpose of this Amendment to Solicitation 36H79718R0024 is to provide answers to questions asked.

The answers are enclosed following the amendment. The closing date of the Grand Junction solicitation remains at November 6, 2018 at 2PM CT. All other terms and conditions remain unchanged.

Patricia Gibson Grand Junction, CO 36H79718R0024 Answers to October 29, 2018 questions

Section a) Equipment Capability – Specification states: “Proposed equipment [small piece folder] must work with the existing equipment and not prevent operational capabilities”

Q1 – Clarify the reference to “existing equipment” specifically means not preventing operational capabilities of the existing 1) folding station repositioned to enable sling loading utilizing the existing overhead dry-fold clean monorail loop with horizontal lift as was originally designed, and 2) clean linen take-away conveyor system; all combined.

Answer: Yes, the small piece folder must work with existing monorail and takeaway conveyor.

Section b) Space Utilization – Specification states: “Offerors should submit space utilization information that fully includes all the Government’s requirements with details that show satisfactory egress around all pieces of equipment.” The Medical Center laundry may be considered compact with equipment layout limitations for replacing the existing small piece folder.

Q1 – So that proposal reviewer(s) may confirm an offeror’s folder brand & model proposed complies with the above stated space utilization requirements for egress around all pieces of equipment, is it a requirement to submit a scaled layout drawing (one quarter inch equals one foot) of the clean production equipment in the work area where the new small piece folder is to be installed and include dimensions? If no, please state the method proposals will be reviewed to confirm an offeror’s proposed folding machine will not create “bottlenecks that affect overall production and space utilization;” as well as, confirm that proposed machine location “provides sufficient access for daily maintenance and cleanup with minimal adjustment of equipment or components”.

Answer: Yes layout drawings 1/4" scale with dimensions are required to show new and existing equipment.

Q2 – Will the VA consider proposals that include reworking existing equipment within the clean production area that improve both work flow and space utilization?

Answer: Yes but must conform to all egress

File details come from the government source that posted it.