36E77618R0088-005.pdf
PDF 2 MB Posted
- Attached to
- Perform X-Ray Room #3 Site-Prep Togus VAMC Federal contract opportunity
- Solicitation number
- 36E77618R0088
About this file
36E77618R0088 ATTACHMENT 2 - SOW Appendix 2 - Philips Equipment Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36E77618C0035-000.docx | DOCX document | |
| 36E77618R0088-0002000.docx | DOCX document | |
| 36E77618R0088-0002001.pdf | ||
| 36E77618R0088-0001001.pdf | ||
| 36E77618R0088-0001000.docx | DOCX document | |
| 36E77618R0088-010.docx | DOCX document | |
| 36E77618R0088-012.pdf | ||
| 36E77618R0088-004.pdf | ||
| 36E77618R0088-013.docx | DOCX document | |
| 36E77618R0088-003.docx | DOCX document | |
| 36E77618R0088-009.pdf | ||
| 36E77618R0088-007.docx | DOCX document | |
| 36E77618R0088-001.docx | DOCX document | |
| 36E77618R0088-011.docx | DOCX document | |
| 36E77618R0088-002.doc | DOC document | |
| 36E77618R0088-008.pdf | ||
| 36E77618R0088-014.pdf | ||
| 36E77618R0088-006.zip | ZIP file | |
| 36E77618R0088-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w n
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
G S
A
N D
R
E L A
T E
D
I N
S T
R U
C T
I O
P
O
V I D
B
Y
P
H I L I P
S
A
C C
E P
T A
B L
F
O
U
T
H
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
T
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S
V
M e d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j k h i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n i w o l o r p a r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a y
A n t o n o s
Section A - Equipment Plan
General Notes ----------------------------------------- AN
Section S - Support Plan
Section E - Electrical Plan
Support Notes ------------------------------------------ SN
Support Plan - Floor & Wall ------------------------- S1
Support Plan - Ceiling -------------------------------- S2
Electrical Notes ---------------------------------------- EN
Electrical Details ------------------------------------- ED1
Remote Services Network --------------------------- N1
Checklist ---------------------------------------------- CHK
Table of Contents
Equipment Plan --------------------------------- A1
Section N - Network Plan
Ceiling Height Guide -------------------------- A2
Healthcare www.healthcare.philips.com
Revision History
Note for Architects and/or Contractors: If revisions are listed, these drawings must be thoroughly reviewed so that all changes can be incorporated into your project
Rev. Date
Revision Descriptions By
A 2/7/2017
Created final site preparation support document per Order: 6600267602.010000. Updated room layout per new CAD.
AR
Final Site Preparation Support Document
The equipment components shown in this drawing package are based on the current proposed purchase and are subject to change if modifications are made to the configuration.
Section C - Site Readiness
Equipment Details -------------------------- AD2 - AD3
Support Details ------------------------------ SD3 - SD5
Anchor Reference List ----------------------------- SD1
Ceiling Clearance ----------------------------------- SD2
Transport Information ------------------------------ AD1
Electrical Plan and Legend ------------------------- E1
Conduit List ------------------------------------------- E2
AN
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
HVAC Requirement for General Equipment Locations
Heating, ventilation, air conditioning requirement for general equipment locations must maintain temperature at 75° +/- 11°Fahrenheit (24° +/- 6°Celsius) and non-condensing relative humidity at 52.5%, +/- 22.5%.
(13.0)
Minimum Site Preparation Requirements
A smooth efficient installation is vital to Philips and their customers. Understanding what the minimum site preparation requirements are will help achieve this goal. The following list clearly defines the requirements which must be fulfilled before the installation can begin.
1. Walls shall be painted or covered, baseboards installed, floors shall be tiled and/or covered, ceiling shall have grid tiles and lighting fixtures installed and operational.
2. Doors and windows, especially radiation protection barriers, installed and finished with lock sets operational.
3. All electrical convenience, conduit, raceway, knockouts, cable openings, chase nipples, and junction boxes installed and operational.
4. Incoming mains power operational and connected to room x-ray breaker.
5. 115v convenience outlets operational.
6. All support structure correctly installed. All channels, pipes, beams and/or other supporting devices should be level, parallel, and free of lateral or longitudinal movements.
7. All contractor-supplied cables pulled and terminated.
8. A dust-free environment in and around the procedure room.
9. All HVAC (heating, ventilating and air conditioning) installed and operational as per specifications. BTUs shown on sheet A1 are average heat capacity.
10. Architectural features such as computer floor, wood floor, casework, bulkheads, installed and finished. When technical cabinets are installed in a closet with doors, it is suggested that the customer install a temperature alarm in the event of an air conditioner failure.
11. All plumbing installed and finished.
12. Philips does not install or connect developing tanks, automatic processors or associated equipment, built in illuminators, cassette pass boxes, loading benches and cabinets, lead protective screens, panels or lead glass window and frame. This is to be done by the customer/contractor.
13. Refer to Transport Information page for clear door openings and corridor widths.
Note
Once Philips has moved equipment into the suite and started the installation, the contractor shall schedule his work around the Philips installation team on site. It is suggested that a telephone be provided in the room to receive telephone calls. This would alleviate facility staff from answering calls for Philips personnel.
Remote Service Diagnostics
Medical imaging equipment to be installed by Philips Healthcare is equipped with a service diagnostic feature which allows for remote and on site service diagnostics. To establish this feature, a RJ45 type ethernet 10/100/1000 Mbit network connector must be installed as shown on plan. Access to customer's network via their remote access server is needed for Remote
Service Network (RSN) connectivity. All cost with this feature is the responsibility of the customer.
(13.0)
General Specifications
1. Responsibility
The customer shall be solely responsible, at its expense for preparation of site, including any required structural alterations. The site preparation shall be in accordance with plans and specifications provided by Philips. Compliance with all safety electrical and building codes relevant to the equipment and its installation is the sole responsibility of customer. The customer shall advise Philips of conditions at or near the site which could adversely affect the carrying out of the installation work and shall ensure that such conditions are corrected and that the site is fully prepared and available to Philips before the installation work is due to begin. The customer shall provide all necessary plumbing, carpentry work, or conduit wiring required to attach and install products ready for use.
2. Permits
Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and related rules, regulations, shall bear any expense in obtaining same or in complying with any ordinances and statutes.
3. Radiation Protection
The customer or his contractor, at his own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection. (X-Ray Tube output 150 KVp max.)
4. Asbestos and Other Toxic Substances
Philips assumes no hazardous waste (i.e., PCB's in existing transformers) exists at the site. If any hazardous material is found, it shall be the sole responsibility of the customer to properly remove and dispose of this material at its expense. Any delays caused in the project for this special handling shall result in Philips time period for completion being extended by like period of time. Philips assumes that no asbestos material is involved in this project in any ceilings, walls or floors. If any asbestos material is found anywhere on the site, it shall be the customer's sole responsibility to properly remove and/or make safe this condition, at the customer's sole expense.
5. Labor
In the event local labor conditions make it impossible or undersirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate engineering supervision for proper completion of the installation.
6. Schedule
The general contractor should provide Philips with a schedule of work to assist in the coordination of delivery of Philips supplied products which are to be installed by the contractor and delivery of the primary equipment.
7. Extended Installation or Turnkey Work by Philips
Any room preparation requirements for Philips equipment indicated on these drawings is the responsibility of the customer. If an extended installation or turnkey contract exists between
Philips and the customer for room preparation work required by the equipment represented on these drawings, some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract workscope and these drawings, the turnkey contract workscope shall govern.
(13.0)
(13.0)
Electrical Requirements
M-Cabinet CXA 65
Supply Configuration: 3 phase, 3 wire power, neutral and ground. Wye.
or
3 phase, 3 wire power, ground. Delta.
Nominal Line Voltage: 400, 440, 460 or 480 VAC, 60 Hz
Branch Power Requirement: 112.5 kVA minimum
Circuit Breaker: 3 pole, 60 Amps (@ 480V)
MS
PS
ME
ELW
15'-2
8'4'2'1'0
2m1m.5m0
W a l l
B u c k y
Tube Location
102" S.I.D.
7' High Wall
CS
DVS
5'-2
3'-0"
3'-9
1'-3"
10'-11
Weight
(lbs)
Heat Load
(btu/hr)
Detail Sheet
Equipment Designation
Description
Equipment Legend
A Furnished and installed by Philips
B Furnished by customer/contractor and installed by customer/contractor
C Installed by customer/contractor
D Furnished by Philips and installed by contractor
E Existing
F Future
G Optional item furnished by Philips
A1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
A ELW Eleva Workspot
- Eleva Examination Control
- Acquisition Workspot (on shelf under counter)
- Uninterruptible Power Supply (on shelf under counter)
- Keyboard and Mouse
- mShield (optional, not shown)
127 786 AD2
DVS 956618
BuckyDiagnost VS Digital Tiltable (Right)
A
AD3
Equipment Layout
1/4" = 1'-0"
Recommended Minimum Ceiling Height: 8'-9" (2667mm)
Recommended Maximum Ceiling Height: 10'-6" (3200mm)
Ceiling Heights other than recommended may impact equipment functionality - see Ceiling Height Guide and consult with Philips.
Ceiling Height measured from finished floor to bottom of Unistrut.
ME Generator M-Cabinet CXA 342259
A
AD2
CSM Long
CS
879 444 A
AD2
A MS Height Adjustable Trolley TA-M 294 0 AD3
--154 AD2PS Patient SupportA
Site Planning Issues and Considerations
Notes to Philips Field Personnel
* Transverse carriage to be shortened by 3'-6". (1'-9" at the front and 1'-9" at the back)
General Notes
* Any counters, keyboard trays and cabinetry shown to be supplied and installed by contractor. Shelf under control counter for UPS and CPU is required.
* Optional stitching shots at 102" S.I.D. will be available. See layout.
8'4'2'1'0
2m1m.5m0
Ceiling Height Guide for Chest Room
Not Site Specific
Tube can cover full range of movement of the
Wall Bucky
Allows comfortable working height for 40" S.I.D. to
Tilted Bucky
Tube can cover full range of movement of the
Wall Bucky
Allows comfortable working height for 40" S.I.D. to
Tilted Bucky
8'-9" to 10'-6" * Full Vertical Tube Movement
Limitations
8'-8" to 8'-9" Tube cannot reach Highest Position of Wall Bucky
7'-11" to 8'-8" Limitation noted above, plus horizontal (tilted) Bucky must be lowered for 40" SID
Loss of Coverage
7'-7" to 7'-11" 40" SID to horizontal (tilted) Bucky not available
7'-7" Absolute Minimum Ceiling Height
* Ceiling Heights higher than 10'-6" - consult with Site Planning for limitations/loss of coverage
Highest
Tube
Position
Highest
Tube
Position
Lowest Tube
Position
Highest
Tube
Position
Highest
Tube
Position
Lowest Tube
Position
A2
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n s
AD1
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
DigitalDiagnost 4.1 (Tube Crane, TH Table, Wall Bucky) Transport Information
Crate Packed Crate Packed
Weight 697 lbs (3100N) 383 lbs (1700N)
Height 2'-9" (0.83m) 1'-10" (0.55m)
Length (L) 4'-6" (1.36m) 7'-4" (2.22m)
Width (W) 3'-2" (0.96m) 2'-6" (0.76m)
Width of Corridor "X"
Minimum Width of
Corridor/Door "Y"
Minimum Width of
Corridor/Door "Y"
3'-4" (1.0m) 5'-1" (1.54m) 6'-1" (1.85m)
3'-8" (1.1m) 4'-6" (1.36m) 5'-8" (1.72m)
4'-0" (1.2m) 4'-1" (1.25m) 5'-3" (1.60m)
4'-4" (1.3m) 3'-10" (1.17m) 4'-11" (1.50m)
4'-8" (1.4m) 3'-9" (1.12m) 4'-7" (1.40m)
5'-0" (1.5m) 3'-8" (1.08m) 4'-4" (1.30m)
5'-3" (1.6m) 3'-6" (1.06m) 4'-0" (1.20m)
5'-7" (1.7m) 3'-6" (1.06m) 3'-9" (1.13m)
5'-11" (1.8m) 3'-6" (1.06m) 3'-6" (1.10m)
6'-3" (1.9m) 3'-6" (1.06m) 3'-4" (1.00m)
6'-7" (2.0m) 3'-6" (1.06m) 3'-2" (0.95m)
6'-11" (2.1m) 3'-6" (1.06m) 3'-0" (0.91m)
Telescopic Carriage
Longitudinal Carriage
Long
Longitudinal Carriage
Short
326 lbs (1450N) 405 lbs (1800N) 212 lbs (940N)
4'-7" (1.38m) 1'-4" (0.41m) 1'-4" (0.41m)
4'-0" (1.20m) 13'-9" (4.18m) 8'-0" (2.42m)
2'-7" (0.78m) 2'-7" (0.77m) 3'-1" (0.94m)
Minimum Width of
Corridor/Door "Y"
Minimum Width of
Corridor/Door "Y"
Minimum Width of
Corridor/Door "Y"
3'-7" (1.07m) 12'-3" (3.72m) 7'-11" (2.4m)
3'-3" (.99m) 11'-9" (3.58m) 7'-2" (2.17m)
3'-1" (.93m) 11'-4" (3.45m) 6'-8" (2.02m)
2'-11" (.88m) 10'-11" (3.32m) 6'-3" (1.89m)
2'-11" (.88m) 10'-6" (3.20m) 5'-10" (1.77m)
2'-11" (.88m) 10'-2" (3.10m) 5'-6" (1.66m)
2'-11" (.88m) 9'-10" (2.98m) 5'-2" (1.56m)
2'-11" (.88m) 9'-5" (2.87m) 4'-10" (1.47m)
2'-11" (.88m) 9'-1" (2.76m) 4'-8" (1.40m)
2'-11" (.88m) 8'-9" (2.66m) 4'-4" (1.31m)
2'-11" (.88m) 8'-4" (2.55m) 4'-1" (1.24m)
2'-11" (.88m) 8'-1" (2.45m) 3'-11" (1.18m)
TH Table
Wall Bucky
CSM
Corridor X
W
L
C o r r i d o r o r
D o o r
(13.0)
AD2
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
(13.0)
ME
Generator M-Cabinet CXA
Weight Heat Dissipation
259 lbs (118 kg) 342 Btu/hr (100 W)
Noise measured at 1 meter distance at 1 meter high over floor < 52 dB(A).
Front
Top
Side
2'-3
[702mm] m m
1 2 m m
2'-5
[748mm]
Service Area
(cable outlet
@ rear)
S e r v i c e a c a b u t l e t s d e
1'-7
[488mm]
1'-3
[403mm]
[50mm]
[215mm]
Top
Side
[275mm] m m
Front
Top
Side
(14.0)
ELW
Eleva Workspot
Weight Heat Dissipation
127 lbs (99 kg) 786 Btu/hr (230 W)
Front
1'-7
[493mm]
[206mm]
[88mm]
1 4 m m
Front
Top
Side
CPU Tower
Weight: 32 lbs (15 kg)
Heat Diss.: 444 Btu/hr (130W)
1'-5
[456mm] m m
1'-6
[467mm]
1'-0
[315mm]
Eleva Examination Control
Weight: 38 lbs (18 kg)
Heat Dissipation: 342 Btu/hr (100W)
Uninterruptible Power Supply
Weight: 57 lbs (26 kg)
14'-1
[4300mm]
2'-2
[666mm]
[171mm]
Top
Alpha Drive
Toothed Belt m m m m m m
Tube Support Upper Position Tube Support Lower Position
1 2 m m m m m m
7'-8
[2356mm]
2'-8
[829mm]
3'-3
[1010mm]
1'-0
[317mm]
[273mm]
Alpha Drive
R e a r
W a l l
8 x 45°
FrontSide
(15.0)
CS
BuckyDiagnost CSM
Weight Heat Dissipation
Short: 801 lbs (364 kg)*
444 Btu/hr (130 W)
Long: 879 lbs (399 kg)*
6'-0"
[1829mm]
Short Long
13'-4
[4076mm]
Short Long
180° 180°
* Full length extension rails add 101 lbs (46 kg).
m m
(13.0)
PS
Patient Support
Weight Heat Dissipation
154 lbs (70 kg) 0 Btu/hr (0 W)
Side Front
Maximum Patient Weight of 496 lbs (225 kg)
X-Ray filtration of < 0.9mm AI equivalent
3'-7
[1110mm]
Top
2'-10
[881mm]
3 8 m m
AD3
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
Weight of Wall Connection Box: 36 lbs (16 kg)
Front
Side m m
5 8 m m m m m m
1'-4"
[406mm]
7 8 m m
[61mm]
Optional Spacer m m
[227mm]
(13.0)
DVS
BuckyDiagnost VS Digital Tiltable
Weight Heat Dissipation
618 lbs (280 kg) 956 Btu/hr (280 W)
Top m m m m m m m m
Top
(with Optional Spacer) m m
1'-11
[596mm] m m
(13.0)
MS
Height Adjustable Trolley TA-M
Weight Heat Dissipation
294 lbs (133 kg) 0 Btu/hr (0 W)
Standard Version Bariatric Version
7'-5
[2270mm]
5'-8
[1730mm] m m
2'-0
[620mm]
[100mm]
[100mm]
2'-2
[675mm]
2'-2
[670mm]
[100mm]
[100mm]
2'-2
[675mm] m m m m
FrontSide
Top
SN
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
Equipment Support Information
1. General
The customer shall be solely responsible, at its expense, for preparation of the site, including any required structural alterations. The site preparation shall be in accordance with this plan and specifications, the architectural/construction drawings and in compliance with all safety and building codes. The customer shall be solely responsible for obtaining all construction permits from jurisdictional authority.
2. Equipment Anchorage
Philips provides, with this plan and specifications, information relative to equipment size, weight, shape, anchoring hole locations and forces which may be exerted on anchoring fasteners. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of equipment anchoring to floors, wall and/or ceiling of the building. Any anchorage test required by local authority shall be the customer's responsibility. Stud type anchor bolts should not be specified as they hinder equipment removal for service. Consult with Philips service prior to specifying anchor methods.
3. Floor Loading and Surface
Philips provides, with this plan and specifications, information relative to size, weight and shape of floor mounted equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings confirmation of the structural adequacy of the floor upon which the equipment will be placed.
Any load test required by local authority, shall be the customer's responsibility.
a. The floor surface upon which Philips equipment (except floor rails) is to be placed/anchored shall be flat and level to within plus or minus 1/16 inch (2mm) over a length of 39" (1m).
b. The floor surface upon which Philips floor rails are to be placed/anchored shall be flat and level to within plus or minus 1/4 inch (6mm) over the length of the floor rails.
4. Ceiling Support Apparatus
a. Philips provides, with this plan and specifications, information relative to size, weight and shape of ceiling supported equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of structural support apparatus, fasteners and anchorage to which Philips will attach equipment. Any anchorage and/or load test required by local authority shall be the customer's responsibility.
b. Contractor to clearly mark Philips equipment longitudinal centerline on bottom of each structural support.
c. The structural support apparatus surface to which Philips equipment is to be attached, shall have horizontal equipment attachment surfaces parallel, square and level to within plus or minus 1/16 inch (2mm).
d. Any drilling and/or tapping of holes required to attach Philips equipment to the structural support apparatus shall be the responsibility of the customer.
e. Fasteners, anchors (e.g. bolts, spring nuts, lock and flat washers), and strip closures shall be provided by the customer.
5. Lighting
Lighting fixtures shall be placed in such a position that they are not obscured by equipment or its movement, nor shall they interfere with Philips ceiling rails and equipment movement or otherwise adversely affect the equipment. Such lighting fixture locations shall be the sole responsibility of the customer.
6. Ceiling Obstructions
There shall be no obstructions that project below the finished ceiling in the area covered by ceiling suspended equipment travel.
7. Seismic Anchorage (For Seismic Regions Only)
All seismic anchorage hardware, including brackets, backing plates, bolts, etc., shall be supplied and installed by the customer/contractor unless otherwise specified within the support legend on sheet S1. Installation of electronic cabinets to meet seismic anchorage requirements must be accomplished using flush mounted expansion type anchor/bolt systems to facilitate the removal of a cabinet for maintenance. Do not use threaded rod/adhesive anchor systems. Consult with Philips regarding any anchor system issues.
8. Floor Obstructions/Floor Coverings
There shall be no obstructions on the floor (sliding door tracks, etc.) in front of the Philips electronic cabinets. Floor must be clear to allow cabinets to be pulled away from the wall for service. Contractor to verify the preferred floor covering installation method with Philips.
ME
2m1m.5m0
W a l l
B u c k y
Floor Surface to be flat and level to within plus or minus
" (2mm) over a length of 39" (1m).
DVS
S1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
Floor & Wall Support Legend
Item Number
Description
Detail Sheet
Notes:
1. Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor.
2. Anchors for items that are installed/anchored by Philips shall be provided by Philips. If customer's engineering documents specify anchors other than those listed in this document, the anchors shall be provided by customer/contractor and installed by Philips.
3. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.
A Furnished and installed/anchored by Philips (see exceptions - Note 2, below)
B Furnished by customer/contractor and installed/anchored by customer/contractor
C Installed/anchored by customer/contractor
D Furnished by Philips and installed/anchored by contractor
E Existing
F Future
G Optional item furnished by Philips
All dimensions must be off of the finished wall.
If a wall is furred out to hide electrical duct or boxes, the dimensions included in this plan must come off of the finished furred wall.
Floor Support Layout
1/4" = 1'-0"
Recommended Minimum Ceiling Height: 8'-9" (2667mm)
Recommended Maximum Ceiling Height: 10'-6" (3200mm)
Ceiling Heights other than recommended may impact equipment functionality - see Ceiling Height Guide and consult with Philips.
Ceiling Height measured from finished floor to bottom of Unistrut.
A ELW
Eleva Examination Control - optional wall mounting (not shown, location to be determined by customer/contractor)
SD3
B DVS Support in wall for BuckyDiagnost VS SD4
A DVS Anchors in floor and wall for BuckyDiagnost VS SD4
A VSC Anchors in wall for BuckyDiagnost VS Connection Box (not shown) SD4
B ME Anchorage for Generator Cabinet (see seismic calculations for details) --A PS Anchors in floor for Patient Support Floor Fixing Plates (not shown)
SD5
4'-4"
2m1m.5m0
4'-4" 4'-4"
CSR
UNI
Typ.
2"
9"
S2
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
Ceiling Support Legend
Item Number
Description
Detail Sheet
A Furnished and installed by Philips
B Furnished by customer/contractor and installed by customer/contractor
C Installed by customer/contractor
D Furnished by Philips and installed by contractor
E Existing
F Future
G Optional item furnished by Philips
All dimensions must be off of the finished wall.
If a wall is furred out to hide electrical duct or boxes, the dimensions included in this plan must come off of the finished furred wall.
Ceiling Support Layout
1/4" = 1'-0"
Recommended Minimum Ceiling Height: 8'-9" (2667mm)
Recommended Maximum Ceiling Height: 10'-6" (3200mm)
Ceiling Heights other than recommended may impact equipment functionality - see Ceiling Height Guide and consult with Philips.
Ceiling Height measured from finished floor to bottom of Unistrut.
B UNI Unistrut (P1001 or equal) SD3
A CSR Philips Equipment Rails SD3
See Ceiling Clearance Detail (sheet SD2) for information on restricted areas for objects that project below the finished ceiling.
SD1
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
Equipment Option Anchor Style (provided by Philips) Anchor Size (provided by Philips) Qty.
Support Size & Material (provided & installed by customer/contractor)
Eleva Examination Control
(Wall Mounted)
A
SPAX Multipurpose Flat Head Screw
#10 x 1
"L 4
Drywall with min.
" plywood backing
B
Toggler Snaptoggle with Round Head Screw and flat fender washers and nuts
#BA with #10-24 x 2
"L 4
Drywall (
"D min)
Digital VM Guide Rail with
Wall Holders
A
A307 bolts (min. ASME Grade 5) 3/8", 3"L
Drywall with min. 16 Gauge Steel Backing Thru bolted with head of bolt behind backing and threads sticking out of wall for attachment to wall holders
B
Lag Screw 3/8", 3"L
Drywall with min 4"x4" Douglas Fir # 2 Grade backing
C Hex Head Tek Screw #14 x 3"L 6
Drywall with min. 10 Gauge Steel Backing
D Hilti KB-TZ
" x 3"L 6
Concrete Wall (min. embedment = 2")
Digital VM Floor Rail
A
Toggler Alligator with SPAX Multipurpose Flat Head Screw
#A6 with SPAX #10 x 1
"L 20 Concrete Floor
B
SPAX Multipurpose Flat Head Screw
#10 x 1
" L 20 Wood Frame Floor
Patient Support
Floorplates
A
Simpson or Hilti Drop-in with Stainless Steel Phillips Oval Head Screw with dress washer
" x 1"L 4 Concrete Slab
B
Hex Head Lag Bolt with flat washer
#14 x 1"L 4 Wood Frame Floor
Wireless Detector Docking
Station
A
SPAX Multipurpose Flat Head Screw
#10 x 1
"L 2
Drywall with minimum
" plywood backing
B
Round Phillips Head Self Drilling Screw
#10-16 x 1
"" 2
Drywall with min. 10 Gauge Steel Backing
C
Toggler SnapToggle with Round Head Screw
#BA with #10-24 x 2
"L 2 Drywall
"D min)
D
Toggler Alligator with SPAX Multipurpose Flat Head Screw Toggler Alligator #A6 with SPAX #10 x 1
"L
2 Concrete Wall
BuckyDiagnost VS
(Advanced and Digital)
Wall Anchorage
A
Through Bolt
" diameter 4
Minimum 10 gauge steel plate¹, or Minimum 4"x 4" Douglas Fir # 2 grade
B
Self Drilling Tek Screw
# 14 4
Minimum 10 gauge steel plate¹
C
Lag Screw
" 4
Minimum 4" x 4" Douglas Fir # 2 Grade
D
Toggler Snaptoggle Anchor
" diameter expansion screw
Minimum 10 Gauge Steel Plate¹
BuckyDiagnost VS
Connection Box
A
SPAX Multipurpose Flat Head Screw
#10 x 1
"L 4
Drywall with Wood Backing
B
Round Phillips Head Self Drilling Screw
#10-16 x 1
L" 4
Drywall with min. 10 Gauge Steel Backing
C
Toggler SnapToggle with Round Head Screw
#BA with #10-24 x 2
"L 4
Drywall (
"D min)
D
Round Phillips Head Self Drilling Screw
# 10-16 x 1
"L 4
Metal junction box or raceway
E
Toggler Alligator with SPAX Multipurpose Flat Head Screws Toggler Alligator #A6 with SPAX #10 x 1
"L
4 Concrete Wall or Hollow Concrete Block Wall
Parking Frame for
Accessories (RAD)
A
SPAX Multipurpose Flat Head Screw
#10 x 1
" L 4
Drywall with min.
" plywood backing
B
Phillips Round Head Self Drilling Screw
#10-16 x 1
"L 4
Minimum 16 Gauge Steel Backing
C
Toggler SnapToggle with Round Head Screw
#BA with #10-24 x 2
"L 4
Drywall (
"D min)
D
Toggler Alligator with SPAX Multipurpose Flat Head Screw
#A6 with SPAX #10 x 1
"L 4 Concrete Wall
Pediatric Support Parking
Stand
A Hilti KB-TZ with OD flat washer and hex nut x 3
"L TBD Concrete Slab
B
Long Lag Bolt with ID and OD flat washer
" x 2
"L TBD Wood Frame Floor
Stretch Grip Parking
Bracket
A
SPAX Multipurpose Flat Head Screw
#10 x 1
" L 3
Drywall with min.
" plywood backing
B
Toggler SnapToggle with Round Head Screw
#BA with #10-24 x 2
"L 3
Drywall
Tube Crane Box Cover
A
Round Phillips Head Self Drilling Screw
#10-16 x 1
"L 4
Metal junction box or raceway
¹ Unistrut, angle, or c -channel material is preferred.
Pre-Evaluated and -Approved Anchor Reference List for Philips Installers
Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor.
Anchors for items that are installed/anchored by Philips shall be provided by Philips. If customer's engineering documents specify anchors other than those listed below, the anchors shall be provided by customer/contractor and installed by Philips.
In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.
(15.0)
SD2
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
Ceiling Clearance Detail - Restricted Ceiling Area for Objects that Project Below Finished Ceiling
(Not site specific)
A
B
Objects that project below finished ceiling are NOT allowed in this area
(e.g. lights, smoke detectors, sprinkler heads, soffits, ceiling rails, etc).
Objects that project more than 3.5" below finished ceiling are NOT allowed in this area (e.g. lights, smoke detectors, sprinkler heads, soffits, etc).
B
A
CSM Long
4"
[100mm]
13'-5
[4092mm]
[108mm] m m m m m m m m
1 2 m m m m
B
B
14.0
SD3
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
(13.0)
Finished Ceiling
Fixing Block
Detail - Ceiling Support
(Not to scale)
P1001 (or equal) Unistrut
Self-locking
Bolt, M10x40
Clip Rail
Fixing Block
[72mm] m m
Clip Rail Detail
Fixing Block for Philips Ceiling Rails (Clip Rails) Detail
[32mm]
[151mm]
· Philips does not specify the overhead equipment support structure. Unistrut (or equal) may or may not be used. If Unistrut are used, it is up to Unistrut and the structural engineer for the project to determine which of it's products are appropriate for each project.
· Finished ceiling must NOT be lower than the bottom of the Unistrut in order to prevent damage to the finished ceiling during the installation of clip rails.
· Finished ceiling height to be 1/4" above bottom of Unistrut.
· Nothing shall be attached to the Unistrut with any fastener that protrudes into the Unistrut which would interfere with positioning of the fixing block.
· Fixing blocks for Philips ceiling rails (clip rails) are designed to be installed in P1001 Unistrut.
· The inside of the Unistrut must be clear of obstructions (including paint).
· Unistrut elements must be rigid and comply with the ceiling structure requirements. See SN sheet, item #4 "Ceiling Support
Apparatus".
Tube Crane Support Forces
Tension Forces
Compressive Forces
CS III
956 lbs/support 192 lbs/support
(Support = 2 screws into each Fixing Block)
(Seismic area forces - consult seismic calculation documents)
5 8 m m
Front View Front View Side View
4"
[101mm]
Fixing Block
CSRUNI
Side View
(13.0)
1'-1
[348mm]
[278mm]
[126mm]
[48mm] m m m m m m
H e i g h t p e r c u s t o m e r p r e f e r e n c m m a f f r e c o m m e n d e d
EEC Base
Front View
Finished Floor
Wall Support Options
The customer's architect/engineer of record shall specify a wall support sufficient for the bolt forces specified. Anchors will be provided by Philips, and the wall support is the sole responsibility of the customer/contractor. Below are Philips' pre-evaluated and approved methods of providing support:
Option
Anchor Style
(Provided by Philips)
Anchor Size
Anchor
Quantity
Wall Support Size & Material
(Provided & installed by customer/contractor)
A
SPAX Multipurpose Flat Head Screw
#10 x 1
"L 4
Drywall with minimum
" plywood backing
B
Toggler Snaptoggle with Round Head
Screw and flat fender washers and nuts
#BA with #10-24 x 2
"L 4
Drywall (
"D minimum)
Bolt Forces
Tmax (Tension) = 14 lbs/bolt
Vmax (Shear) = 19 lbs/bolt
(Seismic area forces - consult seismic calculation documents)
Elevation View of Bolt Locations and Cable Outlet
Detail - Eleva Examination Control - Wall Mounted
(Not to scale)
Cable Outlet
ELW
SD4
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
Detail - BuckyDiagnost VS Digital
(Not to scale)
(13.0) m m m m m m
" ± 3/4"
[120mm ± 20mm] m m m m
Wall Support
(see options at right) anchoring at wall
(see detail to right)
Connection Box
(see details below) anchoring at floor
(see detail to right)
Elevation View of Bolt Locations finished floor
Wall Support Options
The customer's architect/engineer of record shall specify a wall support sufficient for the bolt forces specified. Anchors will be provided by Philips, and the wall support is the sole responsibility of the customer/contractor. Below are Philips' pre-evaluated and approved methods of providing support:
Option
Anchor Style
(Provided by Philips)
Anchor Size
Anchor
Quantity
Wall Support Size & Material
(Provided & installed by customer/contractor)
Through Bolt
" diameter 4
Minimum 10 Gauge Steel Plate
, or Douglas Fir #2
Grade (minimum 4" x 4")
B
Self Drilling Tek Screw
#14 4
Minimum 10 Gauge Steel Plate
C
Lag Screw
" 4
Douglas Fir #2 Grade (minimum 4" x 4")
D
Toggler Snaptoggle Anchor
" diameter expansion screw
Minimum 10 Gauge Steel Plate
Unistrut, angle, or c-chanel material is preferred.
[93mm]
3 4 m m
Top
Front Side wall
Wall Holder / Bracket Details
Bolt Forces
Wall mounting points must be suitable to tensile strength Fs ≥ 1500N (338 lbf) each anchor.
(Seismic area forces - consult seismic calculation documents)
Wall Anchoring Example
Illustration of Wall Support with Steel Plate and Toggler Anchor
Isometric wall studs drywall
Bucky VS Wall Holder
4" x 2" 10 gauge steel angle
Side drywall
4" x 2" 10 gauge steel angle
3/8" Toggler Brand
Snaptoggle Anchors (x4)
Bucky VS Wall Holder
Floor Anchoring Details m m m m
1'-4"
[406mm] m m
[60mm] mounting holes at floor wall
Top
[120mm] m m
1 8 m m m m
[160mm]
[20mm] cable outlet
(preferred) cable outlet
(alternate)
(13.0)
Detail - BuckyDiagnost VS Advanced Connection Box
(Not to scale)
Wall Support Options
The customer's architect/engineer of record shall specify a wall support sufficient for the bolt forces specified. Anchors will be provided by Philips, and the wall support is the sole responsibility of the customer/contractor. Below are Philips' pre-evaluated and approved methods of providing support:
Option
Anchor Style
(Provided by Philips)
Anchor Size
Anchor
Quantity
Wall Support Size & Material
(Provided & installed by customer/contractor)
A
SPAX Multipurpose Flat Head Screw #10 x 1
"L 4
Drywall with wood backing
B
Round Phillips Head Self Drilling Screw
#10-16 x 1
"L 4
Drywall with minimum 10 gauge steel backing
C
Toggler SnapToggle with Round Head
Screw
#BA with #10-24 x 2
"L 4
Drywall (
"D min.)
D
Round Phillips Head Self Drilling Screw
#10-16 x 1
"L 4
Metal junction box or raceway
Elevation View of Connection Box
Weight = 36 lbs
Bolt Forces
Tmax (Tension) = 39 lbs/bolt
Vmax (Shear) = 36 lbs/bolt
(Seismic area forces - consult seismic calculation documents) m m
VSC
DVS
[60mm]
[190mm] m m
[3mm] typical electrical box location
(see sheet E1) m m
SD5
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
(13.0)
Support Options
The customer's architect/engineer of record shall specify a support sufficient for the bolt forces specified. Anchors will be provided by Philips, and the support is the sole responsibility of the customer/contractor. Below are Philips' pre-evaluated and approved methods of providing support:
Option
Anchor Style
(Provided by Philips)
Anchor Size
Anchor
Quantity
Support Size & Material
(Provided & installed by customer/contractor)
A
Simpson or Hilti drop-in with Stainless Steel
Phillips oval-head screw with dress washer
" x 1"L 4 Concrete Slab
B
Hex Head Lag Bolt with flat washer
#14 x 1"L 4 Wood Frame Floor
Details and Bolt Locations
Detail - Patient Support Floor Fixing Plates (Qty = 2)
(Not to scale)
Front View
Top View
[27mm]
2"
[51mm]
[100mm]
[100mm]
[9mm]
Side View
1 2 m m m m
[30mm] finished floor
PS
EN
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N E
A S
A
D a t e
D r a w
Q u o t e
O r d e r
C h e s t
R o o m
D i g i t a l D i a g n o s t
V
S
2.6.17
A
Q A
R
R e v
T H
E
D
R A
W I N
L A
T E
D
I N
S T
R U
C T
I O
O
V I D
P
H I L I P
S
A
C
E P
T A
B
T
S
P I T
A L
C
H I T
E C
T
O
R
E
N G
I N
E E
R
T
O
U
V
E L O
P M
E N
T
O
F
C O
N S
T R
U C
T I O
N
D
O C
U M
E N
T S d i c a l
C e n t e r
T o g u s
A u g u s t a
M
E
R o o m
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
W a y n e
E r w i n w a y n e e r w i n p h i l i p s c o m
D r a
A n t o n o s
General Electrical Information
1. General
The customer shall be solely responsible, at its expense, for preparation of the site, including any required electrical alterations. The site preparation shall be in accordance with this plan and specifications, the architectural/construction drawings and in compliance with all safety and electrical codes, the customer shall be solely responsible for obtaining all electrical permits from jurisdictional authority.
2. Materials and Labor
The customer shall be solely responsible, at its expense, to provide and install all electrical ducts, boxes, conduit, cables, wires, fittings, bushing, etc., as separately specified herein.
3. Electrical Ducts and Boxes
Electrical ducts and boxes shall be accessible and have removable covers. Floor ducts and boxes shall have watertight covers. Ducts shall be divided into as many as three separate channels by metal dividers, separately specified herein, to separate wiring and/or cables into groups as follows: Group A: power wiring and/or cables, Group B: signal and/or data and protective ground wiring and/or cables, Group C: x-ray high voltage cables. The use of 90 degree ells is not acceptable. On ceiling duct and wall duct use 45 degree bends at all corners. All intersecting points in duct to have cross over tunnels supplied and installed by contractor to maintain separation of cables.
4. Conduit
Conduit point-to-point runs shall be as direct as possible. Empty conduit runs used for cables may require pull boxes located along the run. Consult with Philips. A pull wire or cord shall be installed in each conduit run. All conduits which enter duct prior to their termination point must maintain separation from other cables via use of dividers, cross over tunnels, or conduit supplied and installed by contractor from entrance into duct to exit from duct. Do not use flex conduit unless approved by Philips Service.
5. Conductors
All conductors, separately specified, shall be 75°C stranded copper, rung out and marked.
6. Disconnecting Means
A disconnecting means shall be provided as separately specified.
7. Warning Lights and Door Switches
"X-ray on" warning lights and x-ray termination door switches should be provided at all entrances to x-ray rooms as required by code.
8. Dimmer Switches
X-ray room lights should be provided with dimmer switches.
(13.0)
Electrical Notes
1. The contractor will supply & install all breakers, shunt trip and incoming power to the breakers. The exact location of the breakers and shunt trips will be determined by the architect or contractor.
2. The contractor shall supply & install all pull boxes, raceways, conduit runs, stainless steel covers, etc. Conduit/raceways must be free from burrs and sharp edges over its entire length. A Greenlee pull string/measuring tape (part no. 435, or equivalent) shall be provided with conduit runs.
3. All pre-terminated, cut-to-length cables will be supplied and installed by Philips. See
Conduit List for information regarding all other cables (e.g. cables to breakers, etc.).
4. Provide and install 4 - 2"(50mm) diameter chase nipples between adjacent wall boxes
(not required if raceway installed above and below wall boxes).
5. Electrical raceway shall be installed with removable covers. The raceway should be accessible for the entire length. In case of non - accessible floors, walls and ceilings, an adequate number of access hatches should be supplied to enable installation of cabling.
Approved conduits may be substituted. All raceways will be designed in a manner that will not allow cables to fall out of the raceway when the covers are removed. In most cases, this will require above-ceiling raceway to be installed with the covers removable from the top. Raceway system as illustrated on this drawing are based upon length of furnished cables. Any changes in routing of raceway system could exceed maximum allowable length of furnished cables. Conduit or raceway above-ceiling must be kept as near to finished ceiling as possible.
6. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or National Electrical Codes, whichever governs.
7. Convenience outlets are not illustrated. Their number and location are to be specified by the customer/architect.
8. All sections of raceway and conduit shall be grounded with an independent #6AWG green wire that is to be attached using solderless lugs All ceiling mounted structural support members and ceiling plates shall also be grounded. All grounding connections, terminals, etc. shall be installed in a manner to provide accessibility for inspection, maintenance, repair, etc.
(13.0)
Electrical Requirements
Electrical power distribution at the…