The file's text, extracted by GovTribe without its formatting.
Contract Opportunity Combined Synopsis/Solicitation Notice
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice B550 NCA Customer Satisfaction Survey. Base plus 4 years.
22172 36C78621Q0056 01-08-2021 16:00
EASTERN TIME, NEW YORK, USA
N
SDVOSBC
541820 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 Paul Zagaruyka Paul N Zagaruyka Paul.Zagaruyka@va.gov 703-630-9366 Winning vendor will work with the National Cemetery Administration but is not required to be locally established.
https://www.va.gov Department of Veterans Affairs Paul.Zagaruka@va.gov Contracting Specialist
RFQ FOR COMMERCIAL ITEMS
GENERAL INFORMATION
| Document Type: | | Combined Synopsis Solicitation | |
| Solicitation Number: | | 36C78621Q0056 | |
| Post Date: | | | 12/21/2020 |
| Original Response Date: | 01/08/2021 4:00 pm Eastern Standard Time | | |
| Applicable NAICS: | | 541820 | |
| Classification Code: | | B550 | |
| Set Aside Type: | | | SDVOSB |
| Period of Performance: | Date of Award through 365 days with Four Option Years if exercised. | | |
| Issuing Contracting Office: | Department of Veterans Affairs | |
| | National Cemetery Administration, Contract Services |
| | 18434 Joplin Road |
| | Triangle, VA 22172 |
Place of Performance: Virtual. Winning vendor will work with the National Cemetery Administration but is not required to be locally established. Wage rates for Washington DC are attached. However, the wage rates for the area in which the work is ultimately performed will prevail.
| Attachments: | Statement of Work | |
| | Sample NCA2020 MPS English Survey |
| | Sample NCA2020 FD English Survey |
| | Sample NCA2020 State and Tribal English Survey |
| | Sample NCA2020 NOK English Survey |
| | Past Performance Questionnaire |
| | DC Wage Determination (The wage determination provided is for the Washington DC area, but will be amended to the local area of the winning bidder upon issuance of the award.) |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotes (RFQ), solicitation number 36C78621Q0056.
This solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2021-02 Effective 23 Oct 2020.
NORTH AMERICAN INDUSTRIAL CLASSIFICATION SYSTEM (NAICS) CODE:
The (NAICS) code for this procurement is 541820. The business size standard number of employees is $16.5 Million.
This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.
The U.S. Department of Veteran Affairs, National Cemetery Administration, anticipates the award of a Firm Fix Priced Contract for the National Cemetery Administration’s Customer Satisfaction Survey.
RESPONSE TO REQUEST FOR QUOTATION (RFQ): Quotes are due to the Contracting officer no later than January 8, 2021, 4:00 PM EST. Responses to this announcement will result in a Firm-Fixed Priced Contract. The Government intends to make award without discussions. All information submitted in response to this announcement is voluntary and the Government will not pay for information provided nor will it compensate any respondent for any cost incurred in developing information provided for the Government. Offerors are responsible for obtaining any and all amendments or additional information concerning this announcement at beta.sam.gov.
SOLICITATION QUESTIONS:
All questions regarding this solicitation are to be submitted to the Contracting Officer, via email, no later than close of business December 28, 2020. Questions pertaining to this announcement shall be sent by email to: Paul.Zagaruyka@va.gov Telephone inquiries will not be accepted.
PRICE SCHEDULE: Fill in the unit price and total price for each CLIN. See the Statement of Work for additional details for each CLIN. Fill in the total for the base and each option year at the end of each section. Fill in the total for the base and four options at the end of the schedule. Optional tasks 1 and 2 are not mandator but can be provided. Optional Tasks 1 and 2 will not be evaluated for award.
| TASK NUMBER and TITLE |
| Draft |
| Final |
| UI |
| Price per UI |
| Total Price |
The dates provided are subject to change based on the direction of the CO.
BASE YEAR:
| CLIN 0001 TASK 1: DEVELOP PROJECT MANAGEMENT TOOLS |
| JB |
| $ |
| $ |
| Deliverable 1A: Work Plan |
| 14 days after DOA |
| 5 days after receiving NCA comments |
| Deliverable 1B: Monthly Progress Reports |
| 5th day of month |
| 3 days after receiving NCA comments |
| Deliverable 1C.A: Annual Report |
| 30 days before the end of the POP |
| Last Day of POP |
| Deliverable 1C.B: Compilation of Deliverables |
| NA |
| Last Day of POP |
| Deliverable 1D: Weekly Agenda |
| Agendas due 3 business days before meeting |
| Revised agenda due within 24 hours of meeting. |
| Deliverable 1E: Minutes of Weekly Conference Calls |
| 3 days after weekly call |
| 2 days after receiving NCA comments |
| CLIN 0002 TASK 2: KICK-OFF MEETING WITH NCA |
| JB |
| $ |
| $ |
| Deliverable 2A: Kick-Off Agenda |
| NLT 10 days after DOA |
| 2 days after NCA comments |
| Deliverable 2B: Kick-Off Summary Report |
| 5 days after Kick Off |
| 5 days after receiving NCA comments |
| CLIN 0003 TASK 3: TECHNICAL SPECIFICATIONS |
| JB |
| $ |
| $ |
| Deliverable 3A: Review of Technical Specifications |
| 14 days after DOA |
| 3 days after receiving NCA comments |
| Deliverable 3B: Technical Specifications |
| 2/22 |
| 3/31 first version |
Updated version with supplement as directed by COR throughout POP to reflect fielding for 2021 interments
| CLIN 0004 TASK 4: SURVEY INSTRUMENTS |
| JB |
| $ |
| $ |
| Deliverable 4A.1: Survey Review for NOK NC, STVC, and MPS |
| 2/1 |
| 5 days after receiveing NCA comments |
| Deliverable 4A.2: Survey Review for FD |
| 2/15 |
| 3/1 |
| Deliverable 4B: Comprehensive Cemetery Lists |
| 2/22 |
| 2/26 |
| CLIN 0005 TASK 5: SPANISH TRANSLATION |
| JB |
| $ |
| $ |
| Deliverable 5A.1: Spanish Surveys for NOK NC, STVC, and MPS |
| 2/15 |
| 5 days after receiveing NCA comments |
| Deliverable 5.A.2: Spanish Surveys for FD |
| 2/25 |
| 3 days after receiving NCA comments |
| CLIN 0006 TASK 6: WEB SURVEY |
| JB |
| $ |
| $ |
| Deliverable 6A.1: Web Survey Design for NOK NC, STVC, and MPS |
| 3/1 |
| 3/1 |
| Deliverable 6A.2: Web Survey Design for FD |
| 3/15 |
| 3/29 |
Deliverable 6B.1: Survey Demonstration, Testing, and Refinement for NC, STVC, MPS
| NOK 2020 Interments |
| 3/24 |
| 2 days after receiving NCA comments |
| NOK First half of 2021 Interments |
| 9/1 |
| 2 days after receiving NCA comments |
| Deliverable 6B.2: Survey Demonstration, Testing, and Refinement for FD |
| 4/2 |
| 2 days after receiving NCA comments |
| CLIN 0007 TASK 7: SURVEY COORDINATION, PREPARATION, AND PRINTING |
| JB |
| $ |
| $ |
Deliverable 7A: Evidence of Scanning and Data Capture for Interments Years
| NOK Surveys 2020 Interments |
| 3/15 |
| 2 days after receiving NCA comments |
| NOK First half of 2021 Interments |
| 8/20 |
| 2 days after receiving NCA comments |
Deliverable 7B.1: NC, STVC, and MPS NCA Surveys and Documents -Electronic or NOK NC, STVC, and MPS
| NOK 2020 Interments |
| 2/15 |
| 3 days after receiving NCA comments |
| NOK First half of 2021 Interments |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 7B.2: FD Survey and Documents-Electronic for NOK NC, STVC, and MPS |
| 2/25 |
| 3 days after receiving NCA comments |
Deliverable 7C.1: Camera-Ready Surveys and Documents for NOK NC, STVC,and MPS
| NOK 2020 Interments |
| 3/5 |
| 3 days after receiving NCA comments |
| NOK First half of 2021 Interments |
| 8/25 |
| 3 days after receiving NCA comments |
| Deliverable 7C.2: Camera-Ready and Documents for FD |
| 3/8 |
| 3 days after receiving NCA comments |
| CLIN 0008 TASK 8: SAMPLES FOR SURVEYS |
| JB |
| $ |
| $ |
| Deliverable 8A: Sampling Plan |
| 2/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.1: Sampling Frame Preparation for NOK NC, STVC, and MPS |
| Continuous throughout POP |
| Deliverable 8B.2: Sampling Frame Preparation for FD |
| Continuous throughout POP |
Deliverable 8C: Sampling for NOK NC, STVC, and MPS
| 2020 Interment Fielding |
| 3/1 |
| 3 days after receiving NCA comments |
| 2021 Interment first 6 months of 2021 |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 0009 TASK 9: SURVEY ADMINISTRATION |
| JB |
| $ |
| $ |
Deliverable 9A: Master Schedule for Mailing of All Surveys and All Waves for 2020 interments and first half of 2021 interments
| 1/30 |
| 3 days after receiving NCA comments |
The fielding dates of April 15, 2021 for 2020 interments and October 1, 2021 for first half of 2012 interments shall be assumed.
| Deliverable 9B: Respondent File |
| As directed by COR based on Master Schedule |
| CLIN 0010 TASK 10: TECHNICAL ASSISTANCE AND HELP LINE |
| JB |
| $ |
| $ |
| Deliverable 10A: Frequently Asked Questions |
| 2/15 |
| 3 days after receiving NCA comments |
| Deliverable 10B: Log and Breakdown |
| Throughout POP once fielding begins |
| CLIN 0011 TASK 11: WEEKLY FIELDING REPORT |
| JB |
| $ |
| $ |
| Deliverable 11A: Weekly Fielding Report Templates |
| 4/9 |
| 3 days after receiving NCA comments |
| Deliverable 11B: Weekly Fielding Report |
| Throughout data collection period |
| Deliverable 11C: Daily Return Rate |
| Throughout data collection period |
| CLIN 0012 TASK 12: SURVEY ANALYSES |
| JB |
| $ |
| $ |
| Deliverable 12A: Testing Recommendations |
| 5/1 |
| 5 days after receiving NCA comments |
| Deliverable 12B: Testing Results Report |
| 7/30 |
| 5 days after receiving NCA comments |
| CLIN 0013 TASK 13: SEMIANNUAL REPORTS FOR NOK |
| JB |
| $ |
| $ |
| Deliverable 13A: Semiannual Report Templates for for NOK NC, STVC, and MPS |
| 4/152/2021 |
| 5 days after receiving NCA comments |
Deliverable 13B: Semiannual Reports
| First 6 months fielding for 2020 interments |
| TBD |
| 3 days after receiving NCA comments |
| Second 6 months fielding for 2020 interments |
| TBD |
| 3 days after receiving NCA comments |
| First 6 months fielding for 2021 interments |
| See above |
| CLIN 0014 TASK 14: STRATEGIC MEASURES REPORT |
| JB |
| $ |
| $ |
| Deliverable 14A: Strategic Report Templates |
| 4/15 |
| 5 days after receiving NCA comments |
| Deliverable 14B: Strategic Measure Annual Report |
| 8/18 |
| 3 days after receiving NCA comments |
| CLIN 0015 TASK 15: ANNUAL NATIONAL REPORTS |
| JB |
| $ |
| $ |
| Deliverable 15A: Annual Report Templates |
| Indicated below by survey-type |
| National Cemetery Annual Template |
| 4/30 |
| 5 days after receiving NCA comments |
| MPS Annual Template |
| 5/30 |
| 5 days after receiving NCA comments |
| STV Annual Template |
| 6/15 |
| 5 days after receiving NCA comments |
| Deliverable 15B: Preliminary National Reports |
| 8/8 |
| 3 days after receiving NCA comments |
| Deliverable 15C: Final National Reports |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 0016 TASK 16: NC DISTRICT REPORTS |
| JB |
| $ |
| $ |
| Deliverable 16A: NC District Templates |
| 5/30 |
| 5 days after receiving NCA comments |
| Deliverable 16B: Preliminary NC District Reports |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 16C: Final NC District Reports |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 0017 TASK 17: STVC STATE REPORTS |
| JB |
| $ |
| $ |
| Deliverable 17A: STVC State Template |
| 6/30 |
| 5 days after receiving NCA comments |
| Deliverable 17B: Preliminary STVC State Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 17C: Final STVC State Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 0018 TASK 18: ANNUAL NC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 18A: NC Cemetery Report Template |
| 5/15 |
| 5 days after receiving NCA comments |
| Deliverable 18B: Preliminary NC Reports |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 18C Final NC Reports |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 0019 TASK 19 STVC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 19A: STVC Cemetery Report Template |
| 7/10 |
| 5 days after receiving NCA comments |
| Deliverable 19B: Preliminary STVC Cemetery Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 19C: Final STVC Cemetery Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 0020 TASK 20: BRIEFINGS |
| JB |
| $ |
| $ |
| Deliverable 20A: Briefing Templates (NC, MPS, STVC) |
| 10/1 |
| 5 days after receiving NCA comments |
| Deliverable 20B: Briefing Documents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 20C: Virtual Attendnace at Breifings |
| TBD |
| CLIN 0021 TASK 21: ANNUAL REPORT DATA SUBMISSION REQUIREMENTS |
| JB |
| $ |
| $ |
| Deliverable 21A: Annual Report Data Submission Report Table of Contents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 21B: Annual Report Data Submission |
| 10/30 |
| 5 days after receiving NCA comments |
* Days are indicated in calendar days unless otherwise specified. If the due date falls on a weekend or holiday, the deliverable is due on the next business day. Specific dates shall be incorporated in the Work Plan (Task 1A).
Total Base Year:
0.00
OPTION YEAR 1:
| CLIN 1001 TASK 1: DEVELOP PROJECT MANAGEMENT TOOLS |
| JB |
| $ |
| $ |
| Deliverable 1A: Work Plan |
| 10 days after DOA |
| 5 days after receiving NCA comments |
| Deliverable 1B: Monthly Progress Reports |
| 5th day of month |
| 3 days after revisions requested |
| Deliverable 1C.A: Annual Report |
| 30 days before the end of the POP |
| Last Day of POP |
| Deliverable 1C.B: Compilation of Deliverables |
| NA |
| Last Day of POP |
| Deliverable 1D: Weekly Agenda |
| Agendas due 3 business days before meeting |
| Revised agenda due within 24 hours of meeting. |
| Deliverable 1E: Minutes of Weekly Conference Calls |
| 3 days after weekly call |
| 2 days after NCA comments |
| CLIN 1002 TASK 2: KICK-OFF MEETING WITH NCA |
| JB |
| $ |
| $ |
| Deliverable 2A: Kick-Off Agenda |
| NLT 10 days after DOA |
| 2 days after NCA comments |
| Deliverable 2B: Kick-Off Summary Report |
| 5 days after Kick Off |
| 5 days after receiving NCA comments |
| CLIN 1003 TASK 3: UPDATE TECHNICAL SPECIFICATIONS |
| JB |
| $ |
| $ |
| Deliverable 3A.1: Recommendations for NOK, STVC, MPS |
| 6/1 |
| 3 days after receiving NCA comments |
| Deliverable 3A.2: Recommendations for FD** |
| 12/15 |
| 3 days after receiving NCA comments |
| Deliverable 3B: Updated Comprehensive Technical Specifications |
| 6/1 |
| 5 days after receiving NCA comments |
| CLIN 1004 TASK 4: SURVEY INSTRUMENTS |
| JB |
| $ |
| $ |
| Deliverable 4A.1: Survey Review for NOK, STVC, MPS (For October Fielding) |
| 7/1 |
| 3 days after receiving NCA comments |
| Deliverable 4A.2: Survey Review for FD |
| 12/15 |
| 3 days after receiving NCA comments |
| Deliverable 4B: Comprehensive Cemetery Lists |
| 2/1 |
| 3 days after receiving NCA comments |
| CLIN 1005 TASK 5: SPANISH TRANSLATION |
| JB |
| $ |
| $ |
| Deliverable 5A.1: Spanish Surveys for NOK, STVC, MPS |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 5A.2: Spanish Surveys for FD |
| 1/5 |
| 3 days after receiving NCA comments |
| CLIN 1006 TASK 6: WEB SURVEY |
| JB |
| $ |
| $ |
| Deliverable 6A.1: Web Survey Design for NOK Surveys |
| Noted below |
| For April Fielding |
| 3/1 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/30 |
| 3 days after receiving NCA comments |
| Deliverable 6A.2: Web Survey Design for FD |
| 11/15 |
| 3 days after receiving NCA comments |
| Deliverable 6B.1: S Survey Demonstration, Testing, and Refinement for NOK NC, STVC, MP |
| Noted below |
| For April Fielding |
| 8/30 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 9/15 |
| 3 days after receiving NCA comments |
| Deliverable 6B.2: Survey Demonstration, Testing, and Refinement for FD |
| 1/10 |
| 3 days after receiving NCA comments |
| CLIN 1007 TASK 7: SURVEY COORDINATION, PREPARATION, AND PRINTING |
| JB |
| $ |
| $ |
| Deliverable 7A: Evidence of Scanning and Data Capture |
| 2 weeks before every fielding period |
| Deliverable 7B.1: NCA Surveys and Documents -Electronic for NOK NC, MPS, STVC |
| Noted below |
| For April Fielding |
| 2/15 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 7B.2: Survey and Documen-Electronic for FD |
| 1/10 |
| 3 days after receiving NCA comments |
| Deliverable 7C.1: Camera-Ready Surveys and Documents for NOK NC, MPS, STVC |
| Noted below |
| For April Fielding |
| 2/20 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/20 |
| 3 days after receiving NCA comments |
| Deliverable 7C.2: Camera-Ready Surveys and Documents for FD |
| 1/15 |
| 3 days after receiving NCA comments |
| CLIN 1008 TASK 8: SAMPLES FOR SURVEYS |
| JB |
| $ |
| $ |
| Deliverable 8A: Sampling Plan |
| 7/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.1: Sampling Frame Preparation for NOK NC, MPS, STVC |
| Continuous throughout |
| For April Fielding |
| 2/1 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.2: Sampling Frame Preparation for FD |
| Continuous throughout |
| Deliverable 8C: Sampling for NOK NC, STVC, and MPS |
| Noted below |
| For April Fielding |
| 2/15 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 1009 TASK 9: SURVEY ADMINISTRATION |
| JB |
| $ |
| $ |
| Deliverable 9A: Master Schedule for Mailing of All Surveys and All Waves (For new year of interments that begins in October) |
| 6/1 |
| 3 days after receiving NCA comments |
| Deliverable 9B: Respondent File |
| As requested by COR |
| CLIN 1010 TASK 10: TECHNICAL ASSISTANCE AND HELP LINE |
| JB |
| $ |
| $ |
| Deliverable 10A: Frequently Asked Questions |
| 4/1 |
| 3 days after receiving NCA comments |
| Deliverable 10B: Log and Breakdown |
| Throughout POP once fielding begins |
| CLIN 1011 TASK 11: WEEKLY FIELDING REPORT |
| JB |
| $ |
| $ |
| Deliverable 11A: Weekly Fielding Report Templates |
| 2/1 |
| 3 days after receiving NCA comments |
| Deliverable 11B: Weekly Fielding Report |
| Throughout data collection period |
| Deliverable 11C: Daily Return Rate |
| Throughout data collection period |
| CLIN 1012 TASK 12: SURVEY ANALYSES |
| JB |
| $ |
| $ |
| Deliverable 12A: Testing Recommendations |
| 5/1 |
| 5 days after receiving NCA comments |
| Deliverable 12B: Testing Results Report |
| 7/30 |
| 5 days after receiving NCA comments |
| CLIN 1013 TASK 13: SEMIANNUAL REPORTS FOR NOK |
| JB |
| $ |
| $ |
| Deliverable 13A: Semiannual Report Templates |
| 7/1 |
| 5 days after receiving NCA comments |
| Deliverable 13B: Semiannual Reports |
| Noted below |
| First 6 months fielding for NOK |
| TBD |
| 3 days after receiving NCA comments |
| Second 6 months fielding for NOK |
| TBD |
| 3 days after receiving NCA comments |
| CLIN 1014 TASK 14: STRATEGIC MEASURES REPORT |
| JB |
| $ |
| $ |
| Deliverable 14A: Strategic Report Templates |
| 4/15 |
| 5 days after receiving NCA comments |
| Deliverable 14B: Strategic Measure Annual Report |
| 8/18 |
| 3 days after receiving NCA comments |
| CLIN 1015 TASK 15: ANNUAL NATIONAL REPORTS |
| JB |
| $ |
| $ |
| Deliverable 15A: Annual Report Templates |
| Indicated below by survey-type |
| National Cemetery Annual Template |
| 4/30 |
| 5 days after receiving NCA comments |
| MPS Annual Template |
| 5/30 |
| 5 days after receiving NCA comments |
| STV Annual Template |
| 6/15 |
| 5 days after receiving NCA comments |
| Deliverable 15B: Preliminary National Reports |
| 8/8 |
| 3 days after receiving NCA comments |
| Deliverable 15C: Final National Reports |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 1016 TASK 16: NC DISTRICT REPORTS |
| JB |
| $ |
| $ |
| Deliverable 16A: NC, District Template |
| 5/30 |
| 5 days after receiving NCA comments |
| Deliverable 16B: Preliminary NC District State Report |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 16C: Final NC District Report |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 1017 TASK 17: STVC STATE REPORTS |
| JB |
| $ |
| $ |
| Deliverable 17A: STVC State Template |
| 6/30 |
| 5 days after receiving NCA comments |
| Deliverable 17B: Preliminary STVC State Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 17C: Final STVC State Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 1018 TASK 18: ANNUAL NC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 18A: NC Cemetery Report Template |
| 5/15 |
| 5 days after receiving NCA comments |
| Deliverable 18B: Preliminary NC Reports |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 18C: Final NC Cemetery Reports |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 1019 TASK 19 STVC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 19A: STVC Cemetery Report Template |
| 7/10 |
| 5 days after receiving NCA comments |
| Deliverable 19B: Preliminary STVC Cemetery Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 19C: Final STVC Cemetery Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 1020 TASK 20: BRIEFINGS |
| JB |
| $ |
| $ |
| Deliverable 20A: Briefing Templates |
| 10/1 |
| 5 days after receiving NCA comments |
| Deliverable 20B: Briefing Documents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 20C: Virtual Attendance at Breifings |
| TBD |
| CLIN 1021 TASK 21: ANNUAL REPORT DATA SUBMISSION REQUIREMENTS |
| JB |
| $ |
| $ |
| Deliverable 21A: Annual Report Data Submission Report Table of Contents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 21B: Annual Report Data Submission |
| 10/30 |
TOTAL OPTION YEAR 1:
0.00
OPTION YEAR 2:
| CLIN 2001 TASK 1: DEVELOP PROJECT MANAGEMENT TOOLS |
| JB |
| $ |
| $ |
| Deliverable 1A: Work Plan |
| 10 days after DOA |
| 5 days after receiving NCA comments |
| Deliverable 1B: Monthly Progress Reports |
| 5th day of month |
| 3 days after revisions requested |
| Deliverable 1C.A: Annual Report |
| 30 days before the end of the POP |
| Last Day of POP |
| Deliverable 1C.B: Compilation of Deliverables |
| NA |
| Last Day of POP |
| Deliverable 1D: Weekly Agenda |
| Agendas due 3 business days before meeting |
| Revised agenda due within 24 hours of meeting. |
| Deliverable 1E: Minutes of Weekly Conference Calls |
| 3 days after weekly call |
| 2 days after NCA comments |
| CLIN 2002 TASK 2: KICK-OFF MEETING WITH NCA |
| JB |
| $ |
| $ |
| Deliverable 2A: Kick-Off Agenda |
| NLT 10 days after DOA |
| 2 days after NCA comments |
| Deliverable 2B: Kick-Off Summary Report |
| 5 days after Kick Off |
| 5 days after receiving NCA comments |
| CLIN 2003 TASK 3: UPDATE TECHNICAL SPECIFICATIONS |
| JB |
| $ |
| $ |
| Deliverable 3A.1: Recommendations for NOK, STVC, MPS |
| 6/1 |
| 3 days after receiving NCA comments |
| Deliverable 3A.2: Recommendations for FD** |
| 12/15 |
| 3 days after receiving NCA comments |
| Deliverable 3B: Updated Comprehensive Technical Specifications |
| 6/1 |
| 5 days after receiving NCA comments |
| CLIN 2004 TASK 4: SURVEY INSTRUMENTS |
| JB |
| $ |
| $ |
| Deliverable 4A.1: Survey Review for NOK, STVC, MPS (For October Fielding) |
| 7/1 |
| 3 days after receiving NCA comments |
| Deliverable 4A.2: Survey Review for FD |
| 12/15 |
| 3 days after receiving NCA comments |
| Deliverable 4B: Comprehensive Cemetery Lists |
| 2/1 |
| 3 days after receiving NCA comments |
| CLIN 2005 TASK 5: SPANISH TRANSLATION |
| JB |
| $ |
| $ |
| Deliverable 5A.1: Spanish Surveys for NOK, STVC, MPS |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 5A.2: Spanish Surveys for FD |
| 1/5 |
| 3 days after receiving NCA comments |
| CLIN 2006 TASK 6: WEB SURVEY |
| JB |
| $ |
| $ |
| Deliverable 6A.1: Web Survey Design for NOK Surveys |
| Noted below |
| For April Fielding |
| 3/1 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/30 |
| 3 days after receiving NCA comments |
| Deliverable 6A.2: Web Survey Design for FD |
| 11/15 |
| 3 days after receiving NCA comments |
| Deliverable 6B.1: S Survey Demonstration, Testing, and Refinement for NOK NC, STVC, MP |
| Noted below |
| For April Fielding |
| 8/30 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 9/15 |
| 3 days after receiving NCA comments |
| Deliverable 6B.2: Survey Demonstration, Testing, and Refinement for FD |
| 1/10 |
| 3 days after receiving NCA comments |
| CLIN 2007 TASK 7: SURVEY COORDINATION, PREPARATION, AND PRINTING |
| JB |
| $ |
| $ |
| Deliverable 7A: Evidence of Scanning and Data Capture |
| 2 weeks before every fielding period |
| Deliverable 7B.1: NCA Surveys and Documents -Electronic for NOK NC, MPS, STVC |
| Noted below |
| For April Fielding |
| 2/15 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 7B.2: Survey and Documen-Electronic for FD |
| 1/10 |
| 3 days after receiving NCA comments |
| Deliverable 7C.1: Camera-Ready Surveys and Documents for NOK NC, MPS, STVC |
| Noted below |
| For April Fielding |
| 2/20 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/20 |
| 3 days after receiving NCA comments |
| Deliverable 7C.2: Camera-Ready Surveys and Documents for FD |
| 1/15 |
| 3 days after receiving NCA comments |
| CLIN 2008 TASK 8: SAMPLES FOR SURVEYS |
| JB |
| $ |
| $ |
| Deliverable 8A: Sampling Plan |
| 7/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.1: Sampling Frame Preparation for NOK NC, MPS, STVC |
| Continuous throughout |
| For April Fielding |
| 2/1 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.2: Sampling Frame Preparation for FD |
| Continuous throughout |
| Deliverable 8C: Sampling for NOK NC, STVC, and MPS |
| Noted below |
| For April Fielding |
| 2/15 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 2009 TASK 9: SURVEY ADMINISTRATION |
| JB |
| $ |
| $ |
| Deliverable 9A: Master Schedule for Mailing of All Surveys and All Waves (For new year of interments that begins in October) |
| 6/1 |
| 3 days after receiving NCA comments |
| Deliverable 9B: Respondent File |
| As requested by COR |
| CLIN 2010 TASK 10: TECHNICAL ASSISTANCE AND HELP LINE |
| JB |
| $ |
| $ |
| Deliverable 10A: Frequently Asked Questions |
| 4/1 |
| 3 days after receiving NCA comments |
| Deliverable 10B: Log and Breakdown |
| Throughout POP once fielding begins |
| CLIN 2011 TASK 11: WEEKLY FIELDING REPORT |
| JB |
| $ |
| $ |
| Deliverable 11A: Weekly Fielding Report Templates |
| 2/1 |
| 3 days after receiving NCA comments |
| Deliverable 11B: Weekly Fielding Report |
| Throughout data collection period |
| Deliverable 11C: Daily Return Rate |
| Throughout data collection period |
| CLIN 2012 TASK 12: SURVEY ANALYSES |
| JB |
| $ |
| $ |
| Deliverable 12A: Testing Recommendations |
| 5/1 |
| 5 days after receiving NCA comments |
| Deliverable 12B: Testing Results Report |
| 7/30 |
| 5 days after receiving NCA comments |
| CLIN 2013 TASK 13: SEMIANNUAL REPORTS FOR NOK |
| JB |
| $ |
| $ |
| Deliverable 13A: Semiannual Report Templates |
| 7/1 |
| 5 days after receiving NCA comments |
| Deliverable 13B: Semiannual Reports |
| Noted below |
| First 6 months fielding for NOK |
| TBD |
| 3 days after receiving NCA comments |
| Second 6 months fielding for NOK |
| TBD |
| 3 days after receiving NCA comments |
| CLIN 2014 TASK 14: STRATEGIC MEASURES REPORT |
| JB |
| $ |
| $ |
| Deliverable 14A: Strategic Report Templates |
| 4/15 |
| 5 days after receiving NCA comments |
| Deliverable 14B: Strategic Measure Annual Report |
| 8/18 |
| 3 days after receiving NCA comments |
| CLIN 2015 TASK 15: ANNUAL NATIONAL REPORTS |
| JB |
| $ |
| $ |
| Deliverable 15A: Annual Report Templates |
| Indicated below by survey-type |
| National Cemetery Annual Template |
| 4/30 |
| 5 days after receiving NCA comments |
| MPS Annual Template |
| 5/30 |
| 5 days after receiving NCA comments |
| STV Annual Template |
| 6/15 |
| 5 days after receiving NCA comments |
| Deliverable 15B: Preliminary National Reports |
| 8/8 |
| 3 days after receiving NCA comments |
| Deliverable 15C: Final National Reports |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 2016 TASK 16: NC DISTRICT REPORTS |
| JB |
| $ |
| $ |
| Deliverable 16A: NC, District Template |
| 5/30 |
| 5 days after receiving NCA comments |
| Deliverable 16B: Preliminary NC District State Report |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 16C: Final NC District Report |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 2017 TASK 17: STVC STATE REPORTS |
| JB |
| $ |
| $ |
| Deliverable 17A: STVC State Template |
| 6/30 |
| 5 days after receiving NCA comments |
| Deliverable 17B: Preliminary STVC State Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 17C: Final STVC State Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 2018 TASK 18: ANNUAL NC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 18A: NC Cemetery Report Template |
| 5/15 |
| 5 days after receiving NCA comments |
| Deliverable 18B: Preliminary NC Reports |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 18C: Final NC Cemetery Reports |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 2019 TASK 19 STVC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 19A: STVC Cemetery Report Template |
| 7/10 |
| 5 days after receiving NCA comments |
| Deliverable 19B: Preliminary STVC Cemetery Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 19C: Final STVC Cemetery Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 2020 TASK 20: BRIEFINGS |
| JB |
| $ |
| $ |
| Deliverable 20A: Briefing Templates |
| 10/1 |
| 5 days after receiving NCA comments |
| Deliverable 20B: Briefing Documents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 20C: Virtual Attendance at Breifings |
| TBD |
| CLIN 2021 TASK 21: ANNUAL REPORT DATA SUBMISSION REQUIREMENTS |
| JB |
| $ |
| $ |
| Deliverable 21A: Annual Report Data Submission Report Table of Contents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 21B: Annual Report Data Submission |
| 10/30 |
TOTAL OPTION YEAR 2:
0.00
OPTION YEAR 3:
| CLIN 3001 TASK 1: DEVELOP PROJECT MANAGEMENT TOOLS |
| JB |
| $ |
| $ |
| Deliverable 1A: Work Plan |
| 10 days after DOA |
| 5 days after receiving NCA comments |
| Deliverable 1B: Monthly Progress Reports |
| 5th day of month |
| 3 days after revisions requested |
| Deliverable 1C.A: Annual Report |
| 30 days before the end of the POP |
| Last Day of POP |
| Deliverable 1C.B: Compilation of Deliverables |
| NA |
| Last Day of POP |
| Deliverable 1D: Weekly Agenda |
| Agendas due 3 business days before meeting |
| Revised agenda due within 24 hours of meeting. |
| Deliverable 1E: Minutes of Weekly Conference Calls |
| 3 days after weekly call |
| 2 days after NCA comments |
| CLIN 3002 TASK 2: KICK-OFF MEETING WITH NCA |
| JB |
| $ |
| $ |
| Deliverable 2A: Kick-Off Agenda |
| NLT 10 days after DOA |
| 2 days after NCA comments |
| Deliverable 2B: Kick-Off Summary Report |
| 5 days after Kick Off |
| 5 days after receiving NCA comments |
| CLIN 3003 TASK 3: UPDATE TECHNICAL SPECIFICATIONS |
| JB |
| $ |
| $ |
| Deliverable 3A.1: Recommendations for NOK, STVC, MPS |
| 6/1 |
| 3 days after receiving NCA comments |
| Deliverable 3A.2: Recommendations for FD** |
| 12/15 |
| 3 days after receiving NCA comments |
| Deliverable 3B: Updated Comprehensive Technical Specifications |
| 6/1 |
| 5 days after receiving NCA comments |
| CLIN 3004 TASK 4: SURVEY INSTRUMENTS |
| JB |
| $ |
| $ |
| Deliverable 4A.1: Survey Review for NOK, STVC, MPS (For October Fielding) |
| 7/1 |
| 3 days after receiving NCA comments |
| Deliverable 4A.2: Survey Review for FD |
| 12/15 |
| 3 days after receiving NCA comments |
| Deliverable 4B: Comprehensive Cemetery Lists |
| 2/1 |
| 3 days after receiving NCA comments |
| CLIN 3005 TASK 5: SPANISH TRANSLATION |
| JB |
| $ |
| $ |
| Deliverable 5A.1: Spanish Surveys for NOK, STVC, MPS |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 5A.2: Spanish Surveys for FD |
| 1/5 |
| 3 days after receiving NCA comments |
| CLIN 3006 TASK 6: WEB SURVEY |
| JB |
| $ |
| $ |
| Deliverable 6A.1: Web Survey Design for NOK Surveys |
| Noted below |
| For April Fielding |
| 3/1 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/30 |
| 3 days after receiving NCA comments |
| Deliverable 6A.2: Web Survey Design for FD |
| 11/15 |
| 3 days after receiving NCA comments |
| Deliverable 6B.1: S Survey Demonstration, Testing, and Refinement for NOK NC, STVC, MP |
| Noted below |
| For April Fielding |
| 8/30 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 9/15 |
| 3 days after receiving NCA comments |
| Deliverable 6B.2: Survey Demonstration, Testing, and Refinement for FD |
| 1/10 |
| 3 days after receiving NCA comments |
| CLIN 3007 TASK 7: SURVEY COORDINATION, PREPARATION, AND PRINTING |
| JB |
| $ |
| $ |
| Deliverable 7A: Evidence of Scanning and Data Capture |
| 2 weeks before every fielding period |
| Deliverable 7B.1: NCA Surveys and Documents -Electronic for NOK NC, MPS, STVC |
| Noted below |
| For April Fielding |
| 2/15 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 7B.2: Survey and Documen-Electronic for FD |
| 1/10 |
| 3 days after receiving NCA comments |
| Deliverable 7C.1: Camera-Ready Surveys and Documents for NOK NC, MPS, STVC |
| Noted below |
| For April Fielding |
| 2/20 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/20 |
| 3 days after receiving NCA comments |
| Deliverable 7C.2: Camera-Ready Surveys and Documents for FD |
| 1/15 |
| 3 days after receiving NCA comments |
| CLIN 3008 TASK 8: SAMPLES FOR SURVEYS |
| JB |
| $ |
| $ |
| Deliverable 8A: Sampling Plan |
| 7/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.1: Sampling Frame Preparation for NOK NC, MPS, STVC |
| Continuous throughout |
| For April Fielding |
| 2/1 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.2: Sampling Frame Preparation for FD |
| Continuous throughout |
| Deliverable 8C: Sampling for NOK NC, STVC, and MPS |
| Noted below |
| For April Fielding |
| 2/15 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 3009 TASK 9: SURVEY ADMINISTRATION |
| JB |
| $ |
| $ |
| Deliverable 9A: Master Schedule for Mailing of All Surveys and All Waves (For new year of interments that begins in October) |
| 6/1 |
| 3 days after receiving NCA comments |
| Deliverable 9B: Respondent File |
| As requested by COR |
| CLIN 3010 TASK 10: TECHNICAL ASSISTANCE AND HELP LINE |
| JB |
| $ |
| $ |
| Deliverable 10A: Frequently Asked Questions |
| 4/1 |
| 3 days after receiving NCA comments |
| Deliverable 10B: Log and Breakdown |
| Throughout POP once fielding begins |
| CLIN 3011 TASK 11: WEEKLY FIELDING REPORT |
| JB |
| $ |
| $ |
| Deliverable 11A: Weekly Fielding Report Templates |
| 2/1 |
| 3 days after receiving NCA comments |
| Deliverable 11B: Weekly Fielding Report |
| Throughout data collection period |
| Deliverable 11C: Daily Return Rate |
| Throughout data collection period |
| CLIN 3012 TASK 12: SURVEY ANALYSES |
| JB |
| $ |
| $ |
| Deliverable 12A: Testing Recommendations |
| 5/1 |
| 5 days after receiving NCA comments |
| Deliverable 12B: Testing Results Report |
| 7/30 |
| 5 days after receiving NCA comments |
| CLIN 3013 TASK 13: SEMIANNUAL REPORTS FOR NOK |
| JB |
| $ |
| $ |
| Deliverable 13A: Semiannual Report Templates |
| 7/1 |
| 5 days after receiving NCA comments |
| Deliverable 13B: Semiannual Reports |
| Noted below |
| First 6 months fielding for NOK |
| TBD |
| 3 days after receiving NCA comments |
| Second 6 months fielding for NOK |
| TBD |
| 3 days after receiving NCA comments |
| CLIN 3014 TASK 14: STRATEGIC MEASURES REPORT |
| JB |
| $ |
| $ |
| Deliverable 14A: Strategic Report Templates |
| 4/15 |
| 5 days after receiving NCA comments |
| Deliverable 14B: Strategic Measure Annual Report |
| 8/18 |
| 3 days after receiving NCA comments |
| CLIN 3015 TASK 15: ANNUAL NATIONAL REPORTS |
| JB |
| $ |
| $ |
| Deliverable 15A: Annual Report Templates |
| Indicated below by survey-type |
| National Cemetery Annual Template |
| 4/30 |
| 5 days after receiving NCA comments |
| MPS Annual Template |
| 5/30 |
| 5 days after receiving NCA comments |
| STV Annual Template |
| 6/15 |
| 5 days after receiving NCA comments |
| Deliverable 15B: Preliminary National Reports |
| 8/8 |
| 3 days after receiving NCA comments |
| Deliverable 15C: Final National Reports |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 3016 TASK 16: NC DISTRICT REPORTS |
| JB |
| $ |
| $ |
| Deliverable 16A: NC, District Template |
| 5/30 |
| 5 days after receiving NCA comments |
| Deliverable 16B: Preliminary NC District State Report |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 16C: Final NC District Report |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 3017 TASK 17: STVC STATE REPORTS |
| JB |
| $ |
| $ |
| Deliverable 17A: STVC State Template |
| 6/30 |
| 5 days after receiving NCA comments |
| Deliverable 17B: Preliminary STVC State Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 17C: Final STVC State Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 3018 TASK 18: ANNUAL NC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 18A: NC Cemetery Report Template |
| 5/15 |
| 5 days after receiving NCA comments |
| Deliverable 18B: Preliminary NC Reports |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 18C: Final NC Cemetery Reports |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 3019 TASK 19 STVC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 19A: STVC Cemetery Report Template |
| 7/10 |
| 5 days after receiving NCA comments |
| Deliverable 19B: Preliminary STVC Cemetery Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 19C: Final STVC Cemetery Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 3020 TASK 20: BRIEFINGS |
| JB |
| $ |
| $ |
| Deliverable 20A: Briefing Templates |
| 10/1 |
| 5 days after receiving NCA comments |
| Deliverable 20B: Briefing Documents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 20C: Virtual Attendance at Breifings |
| TBD |
| CLIN 3021 TASK 21: ANNUAL REPORT DATA SUBMISSION REQUIREMENTS |
| JB |
| $ |
| $ |
| Deliverable 21A: Annual Report Data Submission Report Table of Contents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 21B: Annual Report Data Submission |
| 10/30 |
TOTAL OPTION YEAR 3:
0.00
OPTION YEAR 4:
| CLIN 4001 TASK 1: DEVELOP PROJECT MANAGEMENT TOOLS |
| JB |
| $ |
| $ |
| Deliverable 1A: Work Plan |
| 10 days after DOA |
| 5 days after receiving NCA comments |
| Deliverable 1B: Monthly Progress Reports |
| 5th day of month |
| 3 days after revisions requested |
| Deliverable 1C.A: Annual Report |
| 30 days before the end of the POP |
| Last Day of POP |
| Deliverable 1C.B: Compilation of Deliverables |
| NA |
| Last Day of POP |
| Deliverable 1D: Weekly Agenda |
| Agendas due 3 business days before meeting |
| Revised agenda due within 24 hours of meeting. |
| Deliverable 1E: Minutes of Weekly Conference Calls |
| 3 days after weekly call |
| 2 days after NCA comments |
| CLIN 4002 TASK 2: KICK-OFF MEETING WITH NCA |
| JB |
| $ |
| $ |
| Deliverable 2A: Kick-Off Agenda |
| NLT 10 days after DOA |
| 2 days after NCA comments |
| Deliverable 2B: Kick-Off Summary Report |
| 5 days after Kick Off |
| 5 days after receiving NCA comments |
| CLIN 4003 TASK 3: UPDATE TECHNICAL SPECIFICATIONS |
| JB |
| $ |
| $ |
| Deliverable 3A.1: Recommendations for NOK, STVC, MPS |
| 6/1 |
| 3 days after receiving NCA comments |
| Deliverable 3A.2: Recommendations for FD** |
| 12/15 |
| 3 days after receiving NCA comments |
| Deliverable 3B: Updated Comprehensive Technical Specifications |
| 6/1 |
| 5 days after receiving NCA comments |
| CLIN 4004 TASK 4: SURVEY INSTRUMENTS |
| JB |
| $ |
| $ |
| Deliverable 4A.1: Survey Review for NOK, STVC, MPS (For October Fielding) |
| 7/1 |
| 3 days after receiving NCA comments |
| Deliverable 4A.2: Survey Review for FD |
| 12/15 |
| 3 days after receiving NCA comments |
| Deliverable 4B: Comprehensive Cemetery Lists |
| 2/1 |
| 3 days after receiving NCA comments |
| CLIN 4005 TASK 5: SPANISH TRANSLATION |
| JB |
| $ |
| $ |
| Deliverable 5A.1: Spanish Surveys for NOK, STVC, MPS |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 5A.2: Spanish Surveys for FD |
| 1/5 |
| 3 days after receiving NCA comments |
| CLIN 4006 TASK 6: WEB SURVEY |
| JB |
| $ |
| $ |
| Deliverable 6A.1: Web Survey Design for NOK Surveys |
| Noted below |
| For April Fielding |
| 3/1 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/30 |
| 3 days after receiving NCA comments |
| Deliverable 6A.2: Web Survey Design for FD |
| 11/15 |
| 3 days after receiving NCA comments |
| Deliverable 6B.1: S Survey Demonstration, Testing, and Refinement for NOK NC, STVC, MP |
| Noted below |
| For April Fielding |
| 8/30 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 9/15 |
| 3 days after receiving NCA comments |
| Deliverable 6B.2: Survey Demonstration, Testing, and Refinement for FD |
| 1/10 |
| 3 days after receiving NCA comments |
| CLIN 4007 TASK 7: SURVEY COORDINATION, PREPARATION, AND PRINTING |
| JB |
| $ |
| $ |
| Deliverable 7A: Evidence of Scanning and Data Capture |
| 2 weeks before every fielding period |
| Deliverable 7B.1: NCA Surveys and Documents -Electronic for NOK NC, MPS, STVC |
| Noted below |
| For April Fielding |
| 2/15 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/15 |
| 3 days after receiving NCA comments |
| Deliverable 7B.2: Survey and Documen-Electronic for FD |
| 1/10 |
| 3 days after receiving NCA comments |
| Deliverable 7C.1: Camera-Ready Surveys and Documents for NOK NC, MPS, STVC |
| Noted below |
| For April Fielding |
| 2/20 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/20 |
| 3 days after receiving NCA comments |
| Deliverable 7C.2: Camera-Ready Surveys and Documents for FD |
| 1/15 |
| 3 days after receiving NCA comments |
| CLIN 4008 TASK 8: SAMPLES FOR SURVEYS |
| JB |
| $ |
| $ |
| Deliverable 8A: Sampling Plan |
| 7/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.1: Sampling Frame Preparation for NOK NC, MPS, STVC |
| Continuous throughout |
| For April Fielding |
| 2/1 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/1 |
| 3 days after receiving NCA comments |
| Deliverable 8B.2: Sampling Frame Preparation for FD |
| Continuous throughout |
| Deliverable 8C: Sampling for NOK NC, STVC, and MPS |
| Noted below |
| For April Fielding |
| 2/15 |
| 3 days after receiving NCA comments |
| For October Fielding |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 4009 TASK 9: SURVEY ADMINISTRATION |
| JB |
| $ |
| $ |
| Deliverable 9A: Master Schedule for Mailing of All Surveys and All Waves (For new year of interments that begins in October) |
| 6/1 |
| 3 days after receiving NCA comments |
| Deliverable 9B: Respondent File |
| As requested by COR |
| CLIN 4010 TASK 10: TECHNICAL ASSISTANCE AND HELP LINE |
| JB |
| $ |
| $ |
| Deliverable 10A: Frequently Asked Questions |
| 4/1 |
| 3 days after receiving NCA comments |
| Deliverable 10B: Log and Breakdown |
| Throughout POP once fielding begins |
| CLIN 4011 TASK 11: WEEKLY FIELDING REPORT |
| JB |
| $ |
| $ |
| Deliverable 11A: Weekly Fielding Report Templates |
| 2/1 |
| 3 days after receiving NCA comments |
| Deliverable 11B: Weekly Fielding Report |
| Throughout data collection period |
| Deliverable 11C: Daily Return Rate |
| Throughout data collection period |
| CLIN 4012 TASK 12: SURVEY ANALYSES |
| JB |
| $ |
| $ |
| Deliverable 12A: Testing Recommendations |
| 5/1 |
| 5 days after receiving NCA comments |
| Deliverable 12B: Testing Results Report |
| 7/30 |
| 5 days after receiving NCA comments |
| CLIN 4013 TASK 13: SEMIANNUAL REPORTS FOR NOK |
| JB |
| $ |
| $ |
| Deliverable 13A: Semiannual Report Templates |
| 7/1 |
| 5 days after receiving NCA comments |
| Deliverable 13B: Semiannual Reports |
| Noted below |
| First 6 months fielding for NOK |
| TBD |
| 3 days after receiving NCA comments |
| Second 6 months fielding for NOK |
| TBD |
| 3 days after receiving NCA comments |
| CLIN 4014 TASK 14: STRATEGIC MEASURES REPORT |
| JB |
| $ |
| $ |
| Deliverable 14A: Strategic Report Templates |
| 4/15 |
| 5 days after receiving NCA comments |
| Deliverable 14B: Strategic Measure Annual Report |
| 8/18 |
| 3 days after receiving NCA comments |
| CLIN 4015 TASK 15: ANNUAL NATIONAL REPORTS |
| JB |
| $ |
| $ |
| Deliverable 15A: Annual Report Templates |
| Indicated below by survey-type |
| National Cemetery Annual Template |
| 4/30 |
| 5 days after receiving NCA comments |
| MPS Annual Template |
| 5/30 |
| 5 days after receiving NCA comments |
| STV Annual Template |
| 6/15 |
| 5 days after receiving NCA comments |
| Deliverable 15B: Preliminary National Reports |
| 8/8 |
| 3 days after receiving NCA comments |
| Deliverable 15C: Final National Reports |
| 8/15 |
| 3 days after receiving NCA comments |
| CLIN 4016 TASK 16: NC DISTRICT REPORTS |
| JB |
| $ |
| $ |
| Deliverable 16A: NC, District Template |
| 5/30 |
| 5 days after receiving NCA comments |
| Deliverable 16B: Preliminary NC District State Report |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 16C: Final NC District Report |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 4017 TASK 17: STVC STATE REPORTS |
| JB |
| $ |
| $ |
| Deliverable 17A: STVC State Template |
| 6/30 |
| 5 days after receiving NCA comments |
| Deliverable 17B: Preliminary STVC State Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 17C: Final STVC State Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 4018 TASK 18: ANNUAL NC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 18A: NC Cemetery Report Template |
| 5/15 |
| 5 days after receiving NCA comments |
| Deliverable 18B: Preliminary NC Reports |
| 8/18 |
| 3 days after receiving NCA comments |
| Deliverable 18C: Final NC Cemetery Reports |
| 8/30 |
| 3 days after receiving NCA comments |
| CLIN 4019 TASK 19 STVC CEMETERY REPORTS |
| JB |
| $ |
| $ |
| Deliverable 19A: STVC Cemetery Report Template |
| 7/10 |
| 5 days after receiving NCA comments |
| Deliverable 19B: Preliminary STVC Cemetery Reports |
| 9/1 |
| 3 days after receiving NCA comments |
| Deliverable 19C: Final STVC Cemetery Reports |
| 9/10 |
| 3 days after receiving NCA comments |
| CLIN 4020 TASK 20: BRIEFINGS |
| JB |
| $ |
| $ |
| Deliverable 20A: Briefing Templates |
| 10/1 |
| 5 days after receiving NCA comments |
| Deliverable 20B: Briefing Documents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 20C: Virtual Attendance at Breifings |
| TBD |
| CLIN 4021 TASK 21: ANNUAL REPORT DATA SUBMISSION REQUIREMENTS |
| JB |
| $ |
| $ |
| Deliverable 21A: Annual Report Data Submission Report Table of Contents |
| 10/15 |
| 3 days after receiving NCA comments |
| Deliverable 21B: Annual Report Data Submission |
| 10/30 |
TOTAL OPTION YEAR 4:
0.00
TOTAL BASE plus 4 OPTION YEARS:
* Days are indicated in calendar days unless otherwise specified. If the due date falls on a weekend or holiday, the deliverable is due on the next business day. Specific dates shall be incorporated in the Work Plan (Task 1A).
NOTE: The first December of the period of performance for the option year is denoted as Dec (1) and the last month of the option year is denoted as Dec (2). All other dates in the SOD are denoted with only month and day and the year is based on the option year as listed below:
OY 1 - December 2021 - December 2022
OY 2 - December 2022 - December 2023
OY 3 - December 2023 - December 2024
OY 4 - December 2024 - December 2025 ** The Funeral Director survey is fielded after the close of the CY and does not require a 90 day mourning period.
| OPTIONAL TASK 1 |
| Draft |
| Final |
| JB |
| $ |
| $ |
Total Optional Task 1:
0.00
| ATTACHMENT 3: SCHEDULE OF DELIVERABLES* |
| JB |
| $ |
| $ |
| OPTIONAL TASK 2: FUNERAL DIRECTOR REDESIGN |
| Draft |
| Final |
| OT 2.2: Abbreveiated Literature Review |
| TBD |
| TBD |
| OT 2.3: Analysis of Existing Historical Data Sources |
| TBD |
| TBD |
| OT 2.4: Options and Recommendation Paper |
| TBD |
| TBD |
| OT 2.5: Survey Analytics and Recommendations for Revisions |
| TBD |
| TBD |
| OT 2.6: Initial Survey Design |
| TBD |
| TBD |
| OT 2.7: Development Plan and Timeline |
| TBD |
| TBD |
| OT 2.8: Development Plan and Timeline |
| TBD |
| TBD |
| OT 2.9: Advanced Cognitive Testing of Survey Ordering, Items and Invitations |
| TBD |
| TBD |
| OT 2.10: Web Survey Prototypes (includes Usability Testing) |
| TBD |
| TBD |
| OT 2.11: Communication and Outreach Planning for FD Redesign |
| TBD |
| TBD |
| OT 2.12: Finalize Survey Instruments and Invitations |
| TBD |
| TBD |
| OT 2.13: Acceptance Testing of Web Survey |
| TBD |
| TBD |
| OT 2.14: Sampling Strategy |
| TBD |
| TBD |
| OT 2.15: Technical Specifications |
| TBD |
| TBD |
| OT 2.16: Template of FD Redesign of Annual Report |
| TBD |
| TBD |
| OT 2.17: Design of Pilot Test |
| TBD |
| TBD |
| OT 2.18: Preparation for Pilot Test |
| TBD |
| TBD |
| OT 2.19: Coordination of Printing of Survey Materials |
| TBD |
| TBD |
| OT 2.20: Recruitment Activities |
| TBD |
| TBD |
| OT 2.21: Implementation and Fielding of Pilot Testing |
| TBD |
| TBD |
| OT 2.22: Analytics of Pilot Test Data |
| TBD |
| TBD |
| OT 2.23: Final Report and Recommendation for the FD Redesign |
| TBD |
| TBD |
TOTAL OPTIONAL TASK 2:
SERVICES TO BE PROVIDED:
Interested Offerors are to review the Statement of Work (SOW) for information concerning the terms of the service. The SOW has been incorporated as an attached PDF document titled SOW.
INSTRUCTIONS TO OFFERORS:
Interested Offerors MUST be registered with the System of Award Management (SAM) at http://www.sam.gov and must compete the Online Representations and Certifications Application (ORCA) at http://www.sam.gov prior to the solicitation closing date. Failure to comply will result in the offeror being considered Non-Responsive.
Service Disabled Veteran Owned Small Business (SDVOSB) and Veteran Owned Small Business (VOSB) socio-economic category concerns MUST have an active/current registration with the Vendor Information Pages (VIP) and the Verification Case Management System (VCMS) via www.vip.vetbiz.gov (VetBiz.Gov). Failure to comply will result in the offeror being considered Non-Responsive.
Interested Offerors who do not have a current/active Sam account registration or whom are not certified in VIP will be considered non-responsive.
REGISTRATION WITH VENDOR PORTAL: All Interested Offerors must be registered with the Department of Veterans Affairs eCMS Vendor Portal at https://www.vendorportal.ecms.va.gov . Offerors who require registration shall proceed to the Vendor Portal’s Login section and shall click on Request a user account to register. In the event an Offeror is unable to submit a Quote/Proposal through the vendor portal domain, prior to the Quote/Proposal closing date, contact the VAAS helpdesk at 1-877-634-3739, or via email at VA.Acquisition.Systems@va.gov. If an Offeror is still having difficulties in submitting a proposal via the Vendor Portal the contracting officer/Specialist may accept an Offeror’s Quote/Proposal via email under the following circumstances:
1. Offeror must provide evidence that an email discussions or verbal discussion with the VAAS helpdesk could not resolve registration issues.
2. Offerors must meet the time constraints as set forth in the solicitation.
Submitted Quotes/proposals via email without set requirements may be considered nonresponsive. All Quote/Proposals transmissions and uploads submitted via the Vendor Portal or via email are due as specified in this solicitation. Late or incomplete Quotes may also be considered nonresponsive.
QUOTATION PREPARATON INSTRUCTIONS: Offerors shall submit their quotes in four (4) separate volumes, Volumes A through D in PDF format. Each volume shall contain the required information as stated below. Failure to comply with these instructions may result in the Offeror being considered non-responsive.
Information (Volume A) The following information shall be included in Volume A:
· Legal Business/Company Name (as listed in www.sam.gov)
· Complete Company Address (No P.O. Boxes)
· Duns Number
· Company Point of Contract Name and Title
· Telephone Number
· Email Address
· Company Capabilities Statement
· One (1) Signed Copy of all Solicitation Amendments
· One (1) Copy of Completed FAR Clause 52.223-3 “Hazardous Material Identification and Material Safety Data” (if applicable).
· One (1) copy of Completed FAR Provisions 52.212-3 “Certifications and Representations” or indicate whether contractor has completed the annual representation and certifications electronically at www.sam.gov (copy of current SAM status)
Technical Proposal (Volume B) The following shall be included as part of the Offeror’s technical submission, Volume B:
1. A narrative that details and demonstrates the Offeror’s experience and understanding of the complexity and magnitude of the requirement. See evaluation factor entitled Technical Approach for additional details.
2. Offeror’s plan on completing the required surveys.
3. Offeror’s Work Plan and Staffing Plan.
Past Performance (Volume C) The following shall be included as part of the Offeror’s Past Performance submission, Volume C:
· Past performance Questionnaire (Attachment D) from at least three (3) references in the last five (5) years. Past Performance information provided must be similar or somewhat similar to the required service(s). Interested Offeror shall list any National Cemetery Administration (NCA) contracts currently working or previously worked first followed by Non-NCA contracts.
Pricing (Volume D) The following information shall be included in Volume D Proposed pricing shall be submitted on the Price/Cost Schedule of Services EVALUATION PROCESS: The Government intends to award a Firm Fix Contract resulting from this Solicitation to the responsible Offeror whose offer provides the best benefit to the Government, price and other factors considered. Offerors will be evaluated by performing a comparative evaluation in accordance with FAR 13.106-2(b)(3) to determine which response represents the “best” as a whole.
Offerors will be evaluated by performing a direct comparison of one Offeror with another in a uniform manner to determine which Offeror provides the Government with its needs, as identified in this RFQ. The Government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the Government. The Government has the discretion to accept other than the lowest priced offer that provides additional benefits. The Government also has the discretion to make an award based on whether the lowest priced offer having the highest past performance rating possible that represents the best benefit to the Government.
TECHNICAL APPROACH: Offers will be considered from interested Contractors who are regular established in the business called for, who are financially responsible, and who have the necessary equipment and personnel to furnish the supplies and services required under this contract. This includes the Offerors level of experience the Offeror has in similar type work. Offerors shall also include the following technical information with their offer:
1. A narrative that details and demonstrates the Offeror’s experience and understanding of the complexity and magnitude of the requirement. This includes:
a. The level of experience, within the last 3 years, in the development and management of a large customer satisfaction survey administration greater than 50,000 total samples sets of respondents.
b. The direct experience with, or experience that can reasonably be expected to transfer to managing surveys which are administered nationally, with option for mail-in (paper) and on-lint (interments).
c. Experience with high-end scanning of surveys (or a reasonable alternative), and development of data collection tool that will be used for the purpose of generating reports.
d. Experience with multiple mail notifications and follow-ups that enhances the response rate, and how this mail stream (except the thank you note) can be…
This is the start of the file's text. The full file is on GovTribe.