36C78618R0094-00005000.docx
DOCX document 23 KB Posted
- Attached to
- Great Lakes NC D/B 2000 Pre Placed Crypts Federal contract opportunity
- Solicitation number
- 36C78618R0094
About this file
36C78618R0094 00005 36C78618R0094 00005.docx
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00005 05-10-2018
923CM3008
Department of Veterans Affairs NCA Contracting Service 425 I Street, NW Washington
DC
20001 Department of Veterans Affairs NCA Contracting Service 425 I Street, NW Washington
DC
20001 To all Offerors/Bidders
36C78618R0094 02-20-2018
X x X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
May 25, 2018 by 4:00 PM ET x
This Amendment answers the final RFI's.
The due date for Phase II Technical and Price proposals has been extended to May 25, 2018 by 4:00 PM ET.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Elizabeth Monohan Contracting Officer
CONTINUATION PAGE
Amendment A00005 for 36C78618R0094 Great Lakes National Cemetery DB 2,000 Phase II RFI Responses Question 1: Will Licenses and Registrations included in Factor 3, Key Personnel, be included in the total page count (15) for this section?
| Response 1: | No. |
| Question 2: | Please clarify p17 Factor 3, Key Personnel references professional licensing in the state of Alaska…, assumed certifications and licensing should be in the state of Michigan. |
Response 2: Yes, Key Staff professional licensing should be for the state of Michigan.
Question 3: Key personnel listed on p17 and p18 of solicitation may not apply to this scope of work. Please confirm all of these positions listed (ie. Mechanical Engineer, Electrical Engineer, etc.) will not need to be staffed.
Response 3: The revised key personnel list is as follows:
· Prime Contractor’s Project Manager
· Design Project Manager.
· Landscape Architect
· Civil Engineer
· Irrigation Specialist
· Construction Project Manager
· Construction Superintendent
Question 4: Subfactors for Factor 4 are listed differently on p13 and p18. Please confirm which we should follow.
Response 4: The sub-factors listed on page 18 are correct and are repeated here:
Factor 4: Technical Solution for performance schedule: Provide project design and construction schedule. The Contractor’s understanding of project specific schedule parameters shall be evaluated. A complete and comprehensive schedule that includes design submission milestones and detailed construction task milestones per construction specifications institute (CSI) division will receive a higher rating.
Project Progress Schedule - The progress schedule will be in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. All schedule items will show a start date and a completion date. The detailed schedule will indicate specific tasks with dates for each step of the process including:
Sub Factor A: Design Period: Include pre-design site survey work, each design/construction document submittal milestone, and indicate government review periods. State all assumptions.
Sub Factor B: Construction Period: Include permitting as applicable, mobilization, site prep, staging, long lead items, start and completion of construction scope items, etc. State all assumptions.
Sub Factor C: Narrative of Schedule Parameters: Provide written commitment as to the time frame for project completion. Specify how much allowance has been made for anticipated weather delays and potential delays due to cemetery operations and events. State all assumptions.
Question 5: Are there as-built drawings available indicating the storm sewer structures invert elevations within Northwest Road, near the project location?
Response 5: Storm sewer structure as-built information is not available. Storm sewer structure design information is available.
0. If so, can you please provide those drawings?
| Response 5a: | Design drawings are attached. Contractor must field verify. |
| Question 6: | What is the anticipated project award date? |
Response 6: Mid June to mid-July 2018
Questions 7: What is the anticipated project completion date (2018 or 2019?)
Response 7: 2019
Questions 8: Will the contractor have access to the project location from the maintenance entrance off of Belford Road?
Response 8: Yes
Question 9: Can the area south of the project location be available for construction staging?
Response 9: Yes
Question 10: How many construction document submittals are anticipated for this project?
| Response 10: | Three design review submission: combined DD1/DD2, CD2, and final construction documents. |
| Question 11: | Will the contractor be able to start work prior to 100% completed plans and specifications? |
Response 11: It is a possibility; while there are no guarantees, specifics will be discussed after project award.
Question 12: Factor 3, Key Personnel states that “Key staff professional licensing in the state of Alaska will result in higher evaluation rating.” We assume that the state listed is intended to be Michigan and not Alaska. Please confirm.
Response 12: See response to Question 2, above.
Question 13: Can we submit our Phase II Proposal Submission via the Vendor Portal (electronically) in lieu of delivering originals, hard copies and a CD to Washington DC?
Response 13: No, follow the instructions contained in the solicitation.
| Question 14: | Can the page limit be increased from 15 pages to 30 pages each of Factor 2 and Factor 3? |
| Response 14: | No. |
| Question 15: | The RFP drawings show the maintenance road being re-graded as part of this project. If achievable through the design solution, can the road be saved, or is the intent to drain the road to the west as part of this project? |
Response 15: See note 1 on RFP drawing sheet 3. The limit of construction is generally delineated by the bold dash line. The re-grading the maintenance road is not included in the scope of work.
Question 16: Will this project allow the use of precast quad pre-placed Crypts?
Response 16: Yes
Question 17: The scope of work states to include two (2) flower watering stations for this project. It appears that most of the existing burial sections at this cemetery utilize one flower watering station per section, or share one between the two sections. Is the two flower watering stations for this project to be located at the 2,000 pre-placed crypt burial section?
| Response 17: | Provide one flower watering station to service the burial section. | |
| Question 18: | The existing documents provided with the RFP (dwg L-305A) show the layout for the existing storm sewer located in the area of the project. However, no inverts (or profiles) are shown to determine if the connection of the crypt field underdrain system is possible. Can this information be provided? | |
| Response 18: | See response to Question 5. | |
| Question 19: | Existing irrigation piping is shown on the existing drawings provided with the RFP (Sheet I-7). Can we assume there is capacity in the existing 2 1/2” and 3” irrigation lines adjacent to the new crypt field to provide the water for the irrigation system? | |
| Response 19: | Assume that irrigation capacity exists; but verification will be required during the design stage. | |
| Question 20: | Glen Madderom’s e-mail to design firms several years ago stated the identification sand layer on top of the crypts was not required unless desired by the Cemetery. The bridging documents call out a 2” identification sand layer on one detail (sheet RFP-4 detail 2, end view) but not the other section details. Can you confirm the Cemetery wants an identification sand layer over the crypts? | |
| Response 20: | The 2” sand indicator layer is required at this location. | |
| Question 21: | In the Phase II Request For Proposal Paragraph C.4, Factor 3, Key Personnel, please confirm the State of Registration (Alaska) is a typo and it should read “Michigan”. In addition , biographical data is not required for disciplines (such as Architect, Plumbing Engineer, Mechanical Engineer) that are not required for a crypt field project but a Civil Engineer should be included. | |
| Response 21: | See response to Question 2 and Question 3. | |
| Question 22: | Please provide information on the signing that will be required for the new crypt field (will the contract require modifying or replacing all directional signage within the Cemetery to add the new burial section to the signs?). | |
| Response 22: | Assume at least two standard directional sign and one “You Are Here” sign. | |
| Question 23: | Will the NCA have an A/E providing a peer review of construction document submittals and construction submittals? | |
| Response 23: | This question is not relevant to this design build solicitation. | |
| Question 24: | The existing condition documents provided with the RFP indicate there was extensive undercutting (2’) in the crypt field adjacent to the project (Crypt field #10). We can ask the question if we should assume undercutting will be required or state in our narrative that we noted the undercutting in the adjacent section but our price does not include any undercutting. | |
| Response 24: | See note 1 on RFP drawing sheet 3, these are not existing conditions. | |
| Question 25: | We can ask the question if construction access will be allowed through the maintenance facility or state in our narrative we have based our bid on construction access through the maintenance facility drive to minimize construction traffic impacts on the Cemetery operations. | |
| Response 25: | See response to Question 8. |
The due date for the Phase II proposals has been extended to no later than May 25, 2018 at 4:00 PM ET.
**ACKNOWLEDGMENT OF THIS AMENDMENT IS REQUIRED WITH PHASE II SUBMISSION OF PROPOSALS - BID ACCORDINGLY**
END OF AMENDMENT