36C78618R0094-00003000.docx
DOCX document 20 KB Posted
- Attached to
- Great Lakes NC D/B 2000 Pre Placed Crypts Federal contract opportunity
- Solicitation number
- 36C78618R0094
About this file
36C78618R0094 00003 36C78618R0094 00003.docx
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00003 03-08-2018
923CM3008
Department of Veteran's Affairs NCA Contracting Service 425 I Street, NW Washington
DC
20001
To all Offerors/Bidders
36C78618R0094 02-20-2018
X x x x
This Amendment provides responses to the final RFI's with revised proposal instructions.
The proposal due date remains the same. See continuation page.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Elizabeth Monohan
CONTINUATION PAGE
Amendment A00003 for 36C78618R0094 Great Lakes National Cemetery DB 2,000
RFI Responses
| Question 2: | For the Solicitation Great Lakes NC, it was not specified whether or not to submit our completed PPQ’s within our Volume 2 proposal OR to have the completed PPQ’s submitted directly to the C.O. Can you please clarify? |
| Response 2: | Either method is acceptable for this solicitation. |
| Question 3: | What is the anticipated time frame between the Phase I proposal submission date and the date that contractors receive notice of the 3 most highly qualified proposals from Phase I? |
Response 3: An exact timeframe is not known; approximately 30 – 60 calendar days from receipt of Phase I proposals.
Question 4: What is the anticipated date of the Phase II award?
Response 4: An exact timeframe is not known; approximately 30- 45 calendar days after the receipt of Phase II proposals.
Question 5: Is a bid guarantee required to be submitted in the Phase I proposal?
Response 5: No, the bid guarantee is to be submitted in Phase II.
Question 6: Are we required to submit the SF 1442 with our Phase I proposal submission?
Response 6: Yes
0. If so, which Volume are we to include these in?
Response 6a: Volume I. Revisions to instructions are noted below in red.
A4. Phase I Submission Requirements 2 a. is hereby amended to read:
“a. Volume 1 shall be the technical management proposal (maximum 30 pages) and include the SF 1442 and amendments if any; . . .”
0. If we are to include these in a Volume, will the pages count against the page limitations for that Volume?
Response 6b: No, see revisions to the Proposal Page Limitations below:
The Phase 1 Technical Proposal Page Limitations are amended as follows:
| Tab |
| Description |
| Total Page Limit** |
Volume I
| Factor 1 |
| Technical Approach – Design/Build Narrative |
| 15 |
| Factor 2 |
| Technical Qualifications |
| 15 |
| Factor 3 |
| CPARs/Past Performance |
**NOTE: Cover pages, index pages, SF 1442, CPARS evaluations, and PPQ’s do not count towards page limitations. The Government will not review any information that exceeds the page limitation, including attachments, enclosures, charts, etc. For instance, if the total page limitation is 10 pages, the Government will only review 10 pages. Information submitted on the 11th page and beyond will not be reviewed.
Question 7: Are we required to submit Representations and Certifications with our Phase I proposal submission?
Response 7: No, see B.1 (8), page 11 of 65.
0. If so, which Volume are we to include these in?
Response 7a: NA
0. If we are to include these in a Volume, will the pages count against the page limitations for that Volume?
Response 7b: NA
Questions 8: Is there a specific PPQ form to be used for contracts in which no CPAR exists? I did not find one included in the solicitation documents.
Response 8: Yes, see Amendment A00002 for the proper form.
Question 9: For factor 2, technical qualifications, responses are to be limited to 15 pages total to list 5 relevant projects. That comes to 3 pages per project. A “Past Projects” form was also included with the solicitation (there is no reference to this form in the Instructions for Proposal Submission) with instructions to include 1 form for each project. This form is 1 page long and appears to address everything requested for factor 2, technical qualifications. Is the contractor to submit just 5 “Past Projects” forms for factor 2, technical qualifications, or is the government wanting additional pages about each project along with the “Past Projects” forms?
Response 9: The Past Projects form is required for each of the five past projects being submitted under Factor 2. See C.2 Phase I Individual Evaluation, Factor 2: Technical Qualifications on page 14 of 65 for reference to the Past Project work sheet. The Offeror may provide additional information to demonstrate their strength for Factor 2 as they see relevant.
END OF AMENDMENT A00003