36C77623R0004_2.docx

DOCX document 14 KB Posted

Attached to
C1DZ--EHRM Training and Admin Support Space Design - Bay Pines 516-22-703
Solicitation number
36C77623R0004
Issued by

View the file

Other files

File Type Posted
SF330 36C77623R0004.pdf PDF
36C77623R0004.docx DOCX document
SOW - EHRM Trng and Admin Space Trailer Site Prep - 12-14-22.pdf PDF
PPQ - Bay Pines EHRM TR.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modification to a Previous Notice Modification to a Previous Notice

SUBJECT*
EHRM Training and Admin Support Space Design - Bay Pines 516-22-703

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
44131
SOLICITATION NUMBER*
36C77623R0004
BASE NOTICE TYPE
P
RESPONSE DATE/TIME/ZONE
01-19-2023 2PM EASTERN TIME, NEW YORK, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
C1DZ
NAICS CODE*
541330
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

POINT OF CONTACT*

Contract Specialist Jason Phillip jason.phillip@va.gov 216-447-8300

PLACE OF PERFORMANCE

ADDRESS
Bay Pines VA Healthcare System

1000 Bay Pines Blvd

Bay Pines FL

POSTAL CODE
33744
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

The purpose of this modification is to answer the following technical question:

Question:

Under 1. Professional Qualifications the following is stated “Key positions and disciplines required for this project include, but are not limited to: Project Manager, Electrical Engineer, Cost Estimator, Civil Engineer, and knowledgeable designer(s) for the locates for utility/comm/Security hook ups.” The last itemed mentioned, “knowledgeable designer(s) for the locates for utility/comm/Security hook ups”. Are you looking for us to identify someone who can support Subsurface Utility Engineering (SUE)? Or can you clarify what a ‘designer for the locates’ means?

Answer:

This design is for site prep only. The civil engineer can double as the project manager since this will be mostly civil work. There is minimal electrical/utilities design beyond determining electrical/utility sizing a transformer (if needed), utility hook-ups and piping runs, and telecom runs. And yes, a SUE is a must.