Amendment 0001 RFI Questions and Answers ETO Sterilizer Removal.pdf
PDF 140 KB Posted
- Attached to
- Z2DA--ETO Sterilizer Removal-FMS
- Solicitation number
- 36C26220Q1471
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 36C26220Q1471.pdf | ||
| Solicitation 36C26220Q1471 Attachment 1 SPS Life Safety Drawing.pdf | ||
| Solicitation 36C26220Q1471.pdf | ||
| 36C26220Q1471.docx | DOCX document | |
| 36C26220Q1471.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Questions & Answers
Project Name: ETO Sterilizer Removal
Solicitation Number: 36C26220Q1471
Question 1
Q: What license classification does the bidder must possess at the time of bidding/contracting?
A: The bidder must possess a C21 demolition license, or class B, or class C prefereably.
Question 2
Q: Please let me know if we can schedule for another site visit before the RFI/bidding time
A: All parties were provided the opportunity to conduct a site visit on October 27th, a secondary site walk has not been planned or deemed necessary.
Question 3
Q: How much is the engineers’ estimation for this project?
A: The work is primarily demolition, there is not a significant work for engineering to be done.
Question 4
Q: Does the bidder require a prequalification before bidding?
A: No prequalifications are being required.
Question 5
Q: What is the estimated price value for the project in the subject line?
A:Less than 100,000.00
Question 6
Q: When is the anticipated construction start date for this project?
A: Anticipated start date would be December 2020 or January 2021 dependent on the solicitation process.
Question 7
Q: Please provide further scope details and technical specifications for the Test and Balance scope component of this project?
A: Section 2.1 on the SOW states, 1. Testing and balance of the hvac system will be required and relocation of the thermostat will occur to the adjacent wall once the demoed wall is removed.
The nature of this is to ensure the proper amount of airflow is being provided in the space once the wall is removed and area becomes one large room.
Question 8
Q: Please provide the name and point of contact for the electrical control systems provider at VA Loma Linda?
A: Is this question related to the HVAC control systems or to VA electrical staff? The HVAC controls system is operated by Siemens. VA medical center staff contact information will be provided upon award in relation to the electrical department and system.
Question 9
Q:
A:
Question 10
Q:
A: