36C26218R0220-00002001.pdf

PDF 248 KB Posted

Attached to
36C26218C0051 SERVICE to PERFORM Annual HVAC Systems Preventative Maintenance
Solicitation number
36C26218R0220
Issued by

About this file

36C26218R0220 00002 S05 RFI001 with VA response.pdf

View the file

Other files

File Type Posted
36C26218C0051-000.docx DOCX document
36C26218R0220-00002002.pdf PDF
36C26218R0220-00002004.pdf PDF
36C26218R0220-00002009.pdf PDF
36C26218R0220-00002007.pdf PDF
36C26218R0220-00002011.pdf PDF
36C26218R0220-00002003.pdf PDF
36C26218R0220-00002008.pdf PDF
36C26218R0220-00002006.pdf PDF
36C26218R0220-00002012.xlsx XLSX spreadsheet
36C26218R0220-00002000.docx DOCX document
36C26218R0220-00002005.pdf PDF
36C26218R0220-00002010.pdf PDF
36C26218R0220-00001000.docx DOCX document
36C26218R0220-00001001.pdf PDF
36C26218R0220-002.pdf PDF
36C26218R0220-000.docx DOCX document
36C26218R0220-001.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI FORM

Contractor Name:

Address:

Phone/Fax:

Send to: cecil.nichols@va.gov

RFI

(REQUEST FOR INFORMATION)

PROJECT NO.:

RFI NO.:

PROJECT NAME:

SERVICE to PERFORM Annual HVAC Systems Preventative Maint.

DATE REQUESTED:

01/08/2018

SOLICITATION NO.:

36C26218R0220

REFERENCE:

DRAWING:

SPECIFICATION

SECTION:

DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED

Please be specific as possible:

1) Would the Government accept the California A license in lieu of the C license?

2) Would the Government accept a subcontractor to hold the “Andover authorized representative” or allow the prime time [to] get the authorization from Andover?

PROJECT MANAGER’S RESPONSE

1) Yes; license requirements are outlined in solicitation SOW item VI. Licensing

Requirements, paragraph a.

2) As outlined in solicitation SOW item VI. Licensing Requirements, paragraph d, actual service provider (prime, sub, etc.) must be an Andover authorized representative. All requirements of the solicitation must be met at time of proposal submission.

TRACKING NO.: AMENDMENT NO.:

VA PROJECT ENGINEER/MANAGER:

CECIL S. NICHOLS, Contract Specialist

DATE:

1/8/2018 mailto:cecil.nichols@va.gov