The file is a Price Breakdown attachment for Solicitation 36C26125R0049, a project to correct MCC B98 Split Unit System for the Department of Veterans Affairs Veterans Health Administration (VA VHA) in Veterans Integrated Service Network 21. The comprehensive price breakdown document details costs across multiple construction divisions, including:
Key divisions encompass General Requirements, Existing Conditions, Wood/Plastics, Thermal/Moisture Protection, Openings, Finishes, Specialties, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, Communications, and Electronic Safety and Security systems. The spreadsheet includes line-item cost allocations for materials, equipment, and labor across project management, mobilization, and various technical subdisciplines. The breakdown provides a granular view of anticipated project expenses, suggesting a complex medical facility renovation or upgrade involving multiple building system modifications and improvements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Attachment Wage Determination CA20250007 March 21 2025.pdf | ||
| Solicitation Attachment RFI form.docx | DOCX document | |
| 36C26125R0049 Correct MCC B98 Split Unit System.docx | DOCX document | |
| Solicitation Attachment SOW 612A4-25-003 Correct MCC B98 Split Unit System.pdf | ||
| Solicitation Attachment Specifications - 612A4-25-003 Correct MCC B98 Split Unit System DRAFT.pdf | ||
| Specifications - 612A4-25-003 Correct MCC B98 Split Unit System DRAFT.pdf | ||
| SOW 612A4-25-003 Correct MCC B98 Split Unit System.pdf | ||
| 36C26125R0049_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A - Price Breakdown 36C26125R0049 - Project # 612A-25-003 Correct MCC B98 Split Unit System Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total
| Project Manager/QC |
| Superintendent/Safety |
| Mobilization |
| Division 01 - General Requirements |
| Project Schedules |
| Shop Drawings, Product Data, and Samples |
| Safety Requirements |
| Reference Standards |
| Quality Control |
| Construction Waste Management |
| General Commissioning Requirements |
| Division 02 - Existing Conditions |
| Demolition |
| Division 06- Wood, Plastics and Composites |
| Rough Carpentry |
| Division 07- Thermal and Moisture Protection |
| Firestopping |
| Joint Sealants |
| Division 08- Openings |
| Hollow Metal Doors and Frames |
| Interior Wood Doors |
| Integrated Door Assemblies |
| Access Doors and Frames |
| ICU Sliding Glass Doors |
| Door Hardware |
| Division 09- Finishes |
| Subsurface Preparation for Floor Finishes |
| Schedule for Finishes |
| Non-Structural Metal Framing |
| Gypsum Board |
| Ceramic/Porcelain Tiling |
| Acoustical Ceilings |
| Resilient Base and Accessories |
| Resilient Tile Flooring |
| Static Dissipative Sealer for Concrete Substrates |
| Painting |
| Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W-1, RES-W2) |
| Division 10- Specialties |
| Signage |
| Wall and Door Protection |
| Division 13- Special Construction |
| Seismic Restraint Requirements for Non-Strutural Components |
| Division 21- Fire Supression |
| Wet-Pipe Sprinkler Systems |
| Division 22- Plumbing |
| Common Work Reesults for Plumbing |
| Plumbing Insulations |
| Division 23- Heating, Ventilating, and Air Conditioning (HVAC) |
| Common Work Results for HVAC |
| Noise and Vibration Control for HVAC Piping and Equipment |
| Testing, Adjusting, and Balancing for HVAC |
| HVAC and Boiler Plant Insulation |
| Commissioning of HVAC Systems |
| Direct-Digital Control System for HVAC |
| Hydronic Piping |
| HVAC Ducts and Casing |
| Air Terminal Units |
| Air Outlets and Inlets |
| Division 26- Electrical |
| Requirements for Electrical Installations |
| Low-Voltage Electrical Power Conductors and Cables |
| Grounding and Bonding for Electrical Systems |
| Raceway and Boxes for Electrical Systems |
| Commissioning of Electrical Systems |
| Wiring Devices |
| Interior Lighting |
| Division 27- Communications |
| Control, Communication and Signal Wiring |
| Division 28- Electronic Safety and Security |
| Commissioning of Electronic Safety and Security Systems |
| Fire Detectiona and Alarm |
| Bonds |
| Insurance |
| Home Office Overhead |
| Profit |
SUB-TOTAL
PROJECT GRAND TOTAL