36C26120Q0381-002.docx
DOCX document Posted
- Attached to
- F103--Water Sampling and Testing Services Federal contract opportunity
- Solicitation number
- 36C26120Q0381
About this file
This sources sought announcement requests capability statements for quarterly water sampling and testing services. The contractor will be responsible for collecting samples from 92 outlets across four buildings on the VA Central California Health Care System campus quarterly, testing samples for Legionella and heterotrophic plate counts, and shipping qualified samples to a CDC-certified laboratory within 24 hours of collection. The contract period of performance is from May 1, 2020 to April 30, 2025. Responses are due by March 3, 2020 and must include company information, experience, and socio-economic qualifications. This requirement has been determined to be a service-disabled veteran-owned small business set-aside.
36C26120Q0381 Attachment #1 Quarterly Water Sampling and Testing.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26120Q0381-0001000.docx | DOCX document | |
| 36C26120Q0381-003.docx | DOCX document | |
| 36C26120Q0381-001.docx | DOCX document | |
| 36C26120Q0381-004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #1: Quarterly Water Sampling and Testing
| Building Number |
| Area Name |
| Sample Location |
| Sample Total |
| 1 |
| 5 West-Special Care Unit (ICU) |
| 2 sink outlets within patient rooms |
1 hemodialysis water connection 1 ice machine (5B3B-1)
| 1 |
| 5 West-Step Down Unit (SDU) |
| 1 shower head located in palliative care room (5B13A-1) |
1 hemodialysis water connection 2 sink outlets within patient rooms 1 ice machine (5B46-1)
| 1 |
| 5 East-Medical / Surgical Ward |
| 2 shower heads within patient rooms |
1 hemodialysis water connection 2 sink outlets within patient rooms 2 sink outlets within patient restrooms 1 ice machine
| 1 |
| 6 East-Inpatient Psychiatry |
| 2 shower head within patient restroom |
2 sink outlets within patient restroom 1 ice machine (E624 / 6A30)
Total
| 31 (CLC) |
| Aspen Hall |
| 2 sink outlets within patient rooms |
2 sink outlets within patient restroom
| 31 (CLC) |
| Boon Hall |
| 4 shower heads in patient communal shower (1B01) |
2 sink outlets within patient room 2 sink outlets within patient restrooms 2 shower heads within patient rooms
| 31 (CLC) |
| Cedar Hall |
| 2 sink outlets within patient rooms |
2 sink outlets within patient restrooms 2 shower heads within patient rooms 1 ice machine (1C01)
| 31 (CLC) |
| Dining Room |
| 1 ice machine (1A10) |
| 1 |
Total
| OPC |
| Outpatient Clinic-Emergency Department |
| 1 ice machine (SO-G19) |
1 outlet SOG COR 1A 1 outlet SOG COR 1B 1 outlet SO-G4 1 outlet SO-G5 6 sink outlets SO-G7 thru SO-G12 (one outlet per a room) 1 shower outlet SO-G13C 5 sink outlets SO-G14 thru SO-G18 (one outlet per a room) 1 sink outlet SO-G46 (Public Rest Room) 1 sink outlet public restroom SO-G47 (Public Rest Room) 1 sink outlet at Nurse’s station
| OPC |
| Outpatient Clinic-Post Anesthesia Care Unit |
| 1 ice machine (SO-345 /3C17J.2) |
1 sink outlets within patient restroom
Total
| 28 (CLC) |
| Dogwood Hall |
| 6 shower heads within patient rooms |
1 ice machine 1 sink outlet in kitchenette 1 sink outlet in laundry room 1 sink in staff use restroom sink 10 sink outlets in patient rooms
Total
| 22A |
| Central Chiller Plant |
| 4 cooling tower basins |
| 4 |
| 27 |
| Independence Building |
| 2 cooling tower basins |
| 2 |
Total
Quarterly Legionella Total
File details come from the government source that posted it. Updated .