36C26119Q0918-008.docx

DOCX document 15 KB Posted

Attached to
VAPAHCS Generator Maintenance PO_36C26119P1558 - 640 C99364 Federal contract opportunity
Solicitation number
36C26119Q0918
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

36C26119Q0918 G- QASP 03.docx

View the file

Other files for this federal contract opportunity

Other files attached to VAPAHCS Generator Maintenance PO_36C26119P1558 - 640 C99364, newest first.
File Type Posted
-18042.docx DOCX document
36C26119Q0918-0003000.docx DOCX document
36C26119Q0918-0003001.pdf PDF
36C26119Q0918-0002000.docx DOCX document
36C26119Q0918-0001000.docx DOCX document
36C26119Q0918-005.docx DOCX document
36C26119Q0918-003.docx DOCX document
36C26119Q0918-002.xlsx XLSX spreadsheet
36C26119Q0918-000.docx DOCX document
36C26119Q0918-007.docx DOCX document
36C26119Q0918-004.docx DOCX document
36C26119Q0918-006.docx DOCX document
36C26119Q0918-001.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

1. Purpose This quality assurance surveillance plan (QASP) is a government-developed and applied document used to make systematic quality assurance methods used in the administration of the performance-based service acquisition (PBSA) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the government receives the quality of services called for in the contract, and that the government only pays for the acceptable level of services received.

2. Authority Authority to issue this QASP is provided under Federal Acquisition Clause (FAR) 52.212-4(a) Inspection and Acceptance, which provided for inspections and acceptance of the articles, services, and documentation called for in the contract to be accomplished by the contracting officer or a duly appointed representative.

3 Scope The contractor, and not the government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract. The QASP is put in place to provide government surveillance oversight of the contractor’s quality control efforts to assure that they are timely, effective, and delivering the results specified in the contract. The QASP is not a part of the contract, nor is it intended to duplicate the contractor’s quality control plan.

4. Government Resources The following definitions for government resources are applicable to this plan:

Contracting Officer A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the government.

Contracting officer’s Representative (COR) An individual designated in writing by the contracting officer to act as his or her authorized representative to assist in administering a contract. The source and authority for a COR is from the contracting officer. COR limitations are contained in the written letter of designation.

5. Responsibilities The government resources shall have responsibilities for the implementation of this QASP as follows:

Contracting Officer The contracting officer ensures performance of all necessary actions for effective contracting and ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the contracting officer who assures that the contractor receives impartial, fair, and equitable treatment under the contract. The contracting officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

COR

The COR is responsible for technical administration of the contract and assures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the contracting officer for action.

6. Methods of Surveillance The below listed methods of surveillance shall be used in the administration of this QASP.

Periodic Surveillance by the COR The COR reserve the right to inspect contractor performance in random inspections.

7. Identified QA Surveillance Tasks The following PBSA items are identified within the contract performance work statement and will be monitored under this QASP.

The following Performance Requirement Services Summary identifies the performance objective and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. The Performance Requirements Summary shall not take the place of the PWS. These thresholds are critical to mission success.

Performance Objectives
Standard
PWS Paragraph
Performance Threshold Maximum Allowable Degree of deviation

requirement Method of Surveillance

1. Basic
Maintenance of generators, best battery system and load bank
Paragraph 5 and sub paragraphs
No deviations. All requirements mandated by law or regulation must be 100% compliant
100 %

inspection to ensure that all Government specific requirements are achieved

2. Reports
Weekly Progress Reports, Safety Reports,

Final Reports Paragraph 6, 16 and sub Paragraphs 5.7, 5.16, 5.20, 5.21; 7.5, 7.1;

11.5, 12.1, 13.5, 16.4.1

100 % of the time. No discrepancies are allowed.
100% inspection to ensure that all Government specific requirements are achieved
3. Emergency / Call back services
Response time within the time frame
Paragraph

11 and sub paragraphs

100 % of the time. No discrepancies are allowed.
100% inspection to ensure that all Government specific requirements are achieved

8. Documentation The COR will, in addition to providing documentation to the contracting officer, maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the government’s performance of the quality assurance function, including the originals of all surveillance activity checklists. All such records will be retained for the life of this contract. The COR shall forward these records to the contracting officer at termination or completion of the contract.

File details come from the government source that posted it.