36C26118Q0428 Attach 1 - Room Schedule 570-18-2-141-0235 Air Test and Balance REV04132018.pdf

View the file

Other files

File Type Posted
36C26118C0081-000.docx DOCX document
36C26118Q0428-00003001.pdf PDF
36C26118Q0428-00003000.docx DOCX document
36C26118Q0428-00002000.docx DOCX document
36C26118Q0428-00001001.pdf PDF
36C26118Q0428-00001000.docx DOCX document
36C26118Q0428-008.pdf PDF
36C26118Q0428-002.docx DOCX document
36C26118Q0428-006.pdf PDF
36C26118Q0428-007.pdf PDF
36C26118Q0428-005.pdf PDF
36C26118Q0428-004.pdf PDF
36C26118Q0428-001.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Central California Healthcare System Air Testing, Adjusting and Balancing (TAB) Room Schedule

570-16-2-141-0177 May 10, 2016

Line Item Building Floor Room Local Identifier Type (VAV /

CV)

Air Handler Min ACH

Desired

ACH

Differential Pressure

Frequency

1 1 2 2A09C Sterile Supply Room (Imaging) VAV AHU-9 4 5 + S 2 1 2 2A13B Special Procedures (SPL) VAV AHU-SPL 20 24 (++) Q 3 1 3 3A014 Sterile Supply Room (GI Cabinet) CA AHU-9 4 5 + S 4 1 3 3A02E Clean Storage East CV AHU-9 4 5 (+) S 5 1 3 3A02E Clean Storage West CV AHU-9 4 5 (+) S 6 1 3 3A02F Preparation, Assembly and Sterilization Area CV AHU-9 4 5 (++) Q 7 1 3 3A04A GI Procedure-1 (EDG) CV AHU-9 10 12 (-) S 8 1 3 3A04B GI Procedure-2 (EDG) CV AHU-9 10 12 (-) S 9 1 3 3A04D Sterile Supply Room (GI) CA AHU-9 4 5 + S

10 1 3 3A04G GI Procedure-3 (Bronch Room) CV AHU-9 12 14 (-) S 11 1 3 3A15 Decontamination Area CV AHU-9 6 7 (--) Q 12 1 3 3A15.1 Scope Processing CV AHU-9 10 12 (-) Q 13 1 3 3A15A House Keeping CV AHU-9 10 12 (--) Q 14 1 3 3A15B Rest Room CV AHU-9 10 12 (--) Q

15 1 3 3B10A OR 1 CV AHU-OR 20 24 (++) S

16 1 3 3B10D OR 2 CV AHU-OR 20 24 (++) S

17 1 3 3B10I OR Sterile Supply CV AHU-OR 4 5 (+) S 18 1 3 3B10J OR Equip Storage CV AHU-OR 4 5 (+) S

19 1 3 3B10K OR 4 CV AHU-OR 20 24 (++) S

20 1 3 3B10M OR 3 CV AHU-OR 20 24 (++) S

21 1 4 4A22 Sterile Supply Room (ENT) VAV 4E AHU 4 5 + S 22 1 4 4A26 Sterile Supply Room (Urology) VAV 4E AHU 4 5 + S 23 1 4 4A27 Sterile Supply Room (Surgical Clinic) VAV 4E AHU 4 5 + S 24 1 4 4A55 Sterile Supply Room (Podiatry) VAV 4E AHU 4 5 + S 25 1 4 4B36 Sterile Supply Room (Dermatology) VAV 4W AHU 4 5 + S 26 1 4 4B46E Sterile Supply Room (Womens Clinic) VAV 4W AHU 4 5 + S 27 1 5 5A28 Isolation Room CV AHU-10 12 14 (--) S 28 1 5 5A29 Ante Room CV AHU-10 10 12 Note-1 S 29 1 5 5A30 Isolation Room CV AHU-10 12 14 (--) S 30 1 5 5B19 Isolation Room CV AHU-ICU 12 14 (--) S 31 1 5 5B19.1 Ante Room CV AHU-ICU 10 12 Note-1 S 32 1 5 5B20 Isolation Room CV AHU-ICU 12 14 (--) S 33 1 5 5B20.1 Ante Room CV AHU-ICU 10 12 Note-1 S 34 1 B B1B04 Gross Specimen Holding Area CV AHU-Morgue 6 7 (-) S 35 1 B B1B04A Autopsy CV AHU-Morgue 12 14 (-) S 36 1 B B1B05 Soiled Laundry Receiving and Sorting Room CV AHU-8 6 7 (-) S 37 1 B B1B1 Clean Laundry Storage Room CV AHU-8 4 5 (+) S 38 1 B B1B16 Laundry Room-Clean Side CV AHU-8 4 5 (+) S 39 OPC 2 2C06K Infusion Clinic VAV OPC AHU-1 6 7 (-) S 40 OPC 2 2C08E Sterile Supply Room (Cardiology) VAV OPC-AHU-1 4 5 + S 41 OPC 2 2C15F Sterile Supply Room (Eye Clinic) VAV AHU-9 4 5 + S

VA Central California Healthcare System Air Testing, Adjusting and Balancing (TAB) Room Schedule

570-16-2-141-0177 May 10, 2016

Line Item Building Floor Room Local Identifier Type (VAV /

CV)

Air Handler Min ACH

Desired

ACH

Differential Pressure

Frequency

42 OPC 3 3C10W Sterile Supply Room (Dental) VAV OPC-AHU-2 4 5 + S 43 OPC 3 3C17G Same Day Procedure Room-2 VAV OPC-AHU-2 15 18 (+) A 44 OPC 3 3C17H Same Day Procedure Room-1 VAV OPC-AHU-2 15 18 (+) A 45 OPC 3 3C17J PACU (Post Surgical Recovery Unit) VAV OPC-AHU-2 6 7 0 A 46 OPC B B1B-1 Emergency Department Waiting Area VAV OPC-AHU-3 12 14 (-) A 47 OPC B B1C03 Emergency Department Exam Room VAV OPC-AHU-3 6 7 0 A 48 OPC B B1C04 Emergency Department Exam Room VAV OPC-AHU-3 6 7 0 A 49 OPC B B1C05 Emergency Department Procedure Room VAV OPC-AHU-3 15 18 (+) A 50 OPC B B1C06 Trauma (Small) VAV OPC-AHU-3 6 7 (-) A 51 OPC B B1C07 Trauma (Large) VAV OPC-AHU-3 6 7 (-) A 52 OPC B B1C09 Observation / Treatment VAV OPC-AHU-3 6 7 0 A 53 OPC B B1C10 Isolation Room CV OPC-AHU-3 12 14 (--) S 54 OPC B B1C11 Isolation Room CV OPC-AHU-3 12 14 (--) S 55 OPC B B1C12 Observation / Treatment VAV OPC-AHU-3 6 7 0 A 56 OPC B B1C13 Observation / Treatment VAV OPC-AHU-3 6 7 0 A 57 OPC B B1C14 Observation / Treatment VAV OPC-AHU-3 6 7 0 A 58 OPC B B1C22 Observation / Treatment VAV OPC-AHU-3 6 7 0 A 59 OPC B B1C23 Observation / Treatment VAV OPC-AHU-3 6 7 0 A 60 OPC B B1C25 Observation / Treatment VAV OPC-AHU-3 6 7 0 A 61 OPC B B1C26 Observation / Treatment VAV OPC-AHU-3 6 7 0 A 62 OPC B B1C31 Triage VAV OPC-AHU-3 6 7 0 A

OPC AHU-3: Variable speed, water cooled, supplies Basement of OPC Bldg., Circa 2000

AHU-ICU: Constant speed, water cooled, dedicated to 5 West (ICU / SDU / RT), Circa 1985 AHU-Morgue: Constant speed, direct expansion, dedicated to Morgue, Circa 1975 AHU-8: Constant speed, direct expansion, supplies SB, B, 1 and portion of 2nd floor Laboratory of Bldg.1, Circa 1947 OPC AHU-1: Variable speed, water cooled, supplies 2nd floor of OPC Bldg., Circa 1985 OPC AHU-2: Variable speed, water cooled, supplies 3rd floor of OPC Bldg., Circa 1985

Air Handler:

AHU-SPL: Constant speed, direct expanision, dedicated to the Special Procedures Suite, Circa-2008 AHU-9: Constant speed, water cooled, supplies floors 2 and 3 of Bldg. 1, Circa 1947 AHU-Surgical: Variable speed, direct expansion / chilled water, supports all Circa 2009 AHU-10: Constant speed, water cooled, supplies 5E and 6 of Bldg.1, Circa 1947

(+) Supply air volume exceeds the return and/or exhaust air volumes by 15% (--) Supply air volume is 30% less than the return and/or exhaust volumes (-) Supply air volume is 15% less than the return and/or exhaust volumes

Note-1: The Ante Room is positive with respect to the isolation room and negative with respect to the corridor.

Frequency: S = Semi-Annual / A = Annual

Differential Pressure:

(++) Supply air volume exceeds the return and/or exhaust air volumes by 30%