About this file

This document is an amendment to Solicitation 36C26024Q0513 for switchgear electrical inspection, testing, and maintenance services at the Puget Sound VA Medical Center - American Lake Campus. The amendment answers vendor questions and provides additional attachments, including a single line diagram, main switchyard photos, and transformer nameplate information.

The key details are: This is a total SDVOSB set-aside for the required services, which include inspecting, testing, and maintaining oil-filled transformers, main switchyard equipment, and low and medium voltage electrical components. The VA is estimating a 3-week project schedule, with flexibility for weekday and weekend work, though a specific outage schedule has not been provided. The solicitation does not have an incumbent, and there is no site visit scheduled. Attachments provide technical details on the equipment and electrical system configuration.

View the file

Other files for this federal contract opportunity

Other files attached to H261--SWITCHGEAR ELECTRICAL TESTING, INSPECTION, & MAINTENANCE, newest first.
File Type Posted
36C26024Q0513 0003.docx DOCX document
36C26024Q0513 0002.docx DOCX document
36C26024Q0513_AMENDED.docx DOCX document
Attachment E - MAIN SWITCH YARD PHOTOS.pdf PDF
ATTACHMENT D- AMLK-SINGLE LINE DIAGRAM ELECTRICAL.pdf PDF
Attachment F - Transformer Name Plate.pdf PDF
Attachement A_ELECTRICAL ONE-LINE DRAWINGS.pdf PDF
Attachment C - WAGE DETERMINATIONS PIERCE COUNTY WA.pdf PDF
36C26024Q0513.docx DOCX document
Attachment B- Master Drawing Index.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

05/30/2024

N/A 36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

36C260 Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 To all Offerors/Bidders

36C26024Q0513 05-20-2024

X x

See CONTINUATION Page

The purpose of this amendment is to answer vendor questions and amend solicitation 36C26024Q0513.

1.) ATTACHMENT D- AMLK-SINGLE LINE DIAGRAM ELECTRICAL is hereby added as an attachment.

2.) Attachment E - MAIN SWITCH YARD PHOTOS is hereby added as an attachment.

3.) Attachment F – Transformer Name Plate is hereby added as an attachment.

See Continuation Pages for vendor questions and see new attachments for further details.

All other terms and conditions remain unchanged and in full effect.

Derek Crockett Contracting Officer

1.) In the main Equipment it states 4 oil filled XFMRs -What are name-plates? Can you send photos?

See new attachment, “Attachment F – Transformer Name Plates”

-What kind of oil do they have?

Type II mineral oil

-How many Gallons?

448 Gallons Each

2.) It states " Replace gaskets as needed" How many insulators are on these transformers?

12 Insulators total

3 primary and 3 secondary on each transformer

-How big are they and how many cables need to be disconnected if their leaking?

6 cables, approx. 10 ft long Each

3.) Main switch yard it states to inspect insulators and connections:

-Is there photos of the yard to help determine height of insulators?

See new attachment, “ATTACHMENT E - MAIN SWITCH YARD PHOTOS”

-Approx number of insulators and connections (Main Switchyard)?

12 total 3 Primary and 3 secondary.

-Is there a one-line of the substations Main Switchyard)?

See “Attachment A_ELECTRICAL ONE-LINE DRAWINGS”

4.) The request calls for cleaning and inspection of the entire substation in the Main Switch yard, will there be a scheduled utility outage to perform that task?

The government estimates it will take 4 hours or less for any scheduled utility outages for the Main Switch yard. Switching between feeders while testing is conducted is possible for a significant portion of the Maine Switch Yard- inspection, testing, and maintenance requirements. Note that this is an estimated time frame only, and not a guarantee that only 4 hours of work is required due to electrical shutoff’s.

5.) How many components are in the main Switchyard?

3 generators, above ground storage tank, and a transformer for components.

6.) Time Frame: Could you please provide clarification on the exact time frame for the scheduled work?

Based on similar previous requirements, it is estimated that on-site testing, inspection, and maintenance for the entire scope for this requirement can be completed within a three-week project schedule estimated at 40 hours per week (which includes estimated scheduled weekend outages) or less.

7. Is the work intended to be conducted over three consecutive weekends, or is there flexibility for weekday work as well?

As stated in the solicitation and SOW, the KTR will develop and submit a project schedule to the VHA COTR’s for approval.

Three consecutive weekends of work are not required, and there is flexibility for weekday work. However all project scheduling is required for review and ultimate approval by the VHA COTR’s. Therefore, the amount of weekend work is dependent upon a project schedule that will be ultimately approved by the VHA COTR’s.

8.) Electrical System Diagram: Do you have a single line diagram available for the entire electrical system?

See new attachment, “ATTACHMENT D- AMLK-SINGLE LINE DIAGRAM ELECTRICAL” added under this amendment P0001.

9.) Can you please provide a copy of a single line that shows all the equipment needed to be tested?

See “Attachment B- Master Drawing Index”

10. Can you please provide an updated copy of a coordination study?

There is no updated coordination study available at this time.

11.) Please advise quantity and sizes of “low voltage power circuit breakers” per SOW page 9 that need to be tested if not a typo.

1 M slick 2 D Slick 15 amp

12. Please advise quantity and sizes of “Medium Voltage Air Switches” per SOW page 8 that need to be tested if not a typo.

1 Medium voltage air switch 4160V

13.) Can you please provide nameplate data for the “QTY (4) Oil Filled Transformers” per SOW page 9 that need to be tested if not a typo.

See new attachment, “Attachment F – Transformer Name Plates”

14.) Please provide equipment and quantities of all the equipment in the “Main Switch Yard” per SOW page 7.

See new attachment, “ATTACHMENT D- AMLK-SINGLE LINE DIAGRAM ELECTRICAL”

15.) Is there any known issues with the MV switchgear that is to be tested?

The MV switchgear and equipment is tested monthly by VHA engineers. Currently, there are no known issues identified for the MV switchgear. However, that is not a guarantee that no issues will be identified during the inspection, testing, and maintenance as outlined in this requirement.

16.) Can you please provide the previous contract# for this work effort if it was previously performed?

There are no previous contracts for this requirement involving the inspection, testing, and maintenance of switchgear at the American Lake Campus only and as outline in the SOW. Previous contracts that involved similar inspection, testing, and maintenance included additional requirements.

17.) We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.

This is a new requirement, and a one-time services requirement as outlined in the SOW.

If not brand new, could you please provide the current / previous contract number?

There are no previous contracts for this requirement involving the inspection, testing, and maintenance of switchgear at the American Lake Campus only and as outline in the SOW. Previous contracts that involved similar inspection, testing, and maintenance included additional requirements.

18.) I didn’t see a site visit scheduled prior to bidding. Did I miss that or is this site unseen?

There is no site-visit scheduled for this soliciation.