36C26021Q0624 0001.docx
DOCX document 22 KB Posted
- Attached to
- Z2DA--463-21-111 Concrete Repair
- Solicitation number
- 36C26021Q0624
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Concrete Repair Drawings amendment.pdf | ||
| 36C26021Q0624.pdf | ||
| Specifications.pdf | ||
| Concrete Repair Drawings.pdf | ||
| 36C26021Q0624.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 6-9-2021 463-21-3-777-0138 36C260 Department of Veterans Affairs Network Contracting Office 20 1495 Wilmington Drive, Suite 360 DuPont
WA
98327 36C260 Department of Veterans Affairs Network Contracting Office 20 1495 Wilmington Drive, Suite 360 DuPont
WA
98327 To all Offerors/Bidders
36C26021Q0624 05-25-2021
X X
463-3610162-777-853300-2542 0100501X8 The purpose of amendment 0001 of Solicitation 36C26021Q0624 is to revise the SOW - attached.
Amendment 0001 also revises attachment - Concrete Repair Drawings.
The statement of work is hereby changed to the below. Changes are in red.
STATEMENT OF WORK
The Alaska Veterans Affairs Healthcare System (AVAHS) seeks a contractor to provide all labor, materials, equipment, supervision, and all other resources necessary to perform services Concrete Repair, Project 463-21-109, at 1201 N Muldoon Rd, 932/944 E 12th Ave, and 3001 C St, Anchorage, AK. following:
This project is to repair approximately 100 SF of sidewalk and to raise 5,000 SF of sidewalk at 1201 N Muldoon Rd (Muldoon Clinic), repair approximately 150 SF of sidewalk at 932/944 E 12th Ave, and to repair concrete steps at 3001 C St (Domiciliary) Anchorage, AK.
Project will include repair of concrete sidewalk and raise sidewalk so that it is level with the asphalt pavement.
Commencement, Prosecution, and Completion of Work The contractor shall be required to:
1. Commence work within 10 calendar days after receiving Notice To Proceed (NTP).
2. Provide a complete and fully functioning project which meets the design intent, and in accordance with the requirements of the construction specifications and drawings.
3. Prosecute the work diligently, and
4. Complete the entire work ready for use not later than 90 calendar days after receipt of NTP.
General
1. Site investigation. A pre-bid walk through is scheduled for May xx, 2021.
2. There is no known asbestos or lead based paint present in the designated work area.
3. The contractor shall be responsible for repairs to the existing flooring, ceiling, walls, sheetrock, texturing, and painting, etc. and return to existing condition. If existing conditions cannot be matched, the contractor will submit a closely matched alternative for approval.
4. The Contractor will notify the Government, in writing, no less than 14 days in advance of scheduled utility outages.
5. Construction progress meetings will be conducted weekly.
6. The Contractor will be required to perform work that produces excessive noise and for durations of greater than 15 minutes outside of normal hours of operation (8:00 AM to 4:30 PM).
7. The contractor shall remove all excess material and debris from the site. Disposal is the responsibility of the Contractor and will be disposed of offsite.
8. Fire protection system shall be fully operational at the end of each business day. Under no circumstances is any portion of the fire protection system to be left non-functional after normal hours of operation (8:00 AM to 4:30 PM).
9. All penetrations through fire or smoke barriers shall be sealed in compliance with NFPA 101 standards and recommendations.
10. Work will be performed in an administrative area and is considered Type C construction in a Low Risk Patient Risk Group – Class II. A Class II classification requires the following Infection Control Precautions:
Government responsibilities
1. No government furnished property (GFP) will be provided.
2. The Government will provide access to areas and an escort as necessary to complete work.
Other considerations
1. Hours of operation: work hours, 8:00 a.m. to 4:30 p.m. Monday-Friday; Government holidays and closures are excluded.
2. Security: the contractor will be responsible for ensuring compliance by its employees with all VA procedures governing building access and security. The contractor will be responsible for ensuring compliance by its employees with the security regulations of VA, Veterans Healthcare Administrative (VHA) and other government installations where work is performed under this contract.
3. Commitment to protect sensitive information: the contractor shall not release, publish, or disclose sensitive information to unauthorized personnel, and shall protect such information in accordance with provisions of the following laws and any other pertinent laws and regulations governing the confidentiality of sensitive information. All personnel assigned to this contract are required to take proper precautions to protect privacy information from disclosure in the case that such disclosures are made.
4. There is limited parking on site.
5. There is no space for a job trailer.
6. There is no space for material laydown and storage.
AMENDED ATTACHMENTS
Updated first drawing in drawing set and removed page 4 of original drawings.
See attached document: Concrete Repair Drawings amendment.
Page 1 of