This solicitation is for HVAC controller upgrades at the Sheridan VA Medical Center in Sheridan, Wyoming. The selected contractor will remove existing heat pump temperature control equipment in Building 1 and integrate the controllers with existing radiator temperature sensors. Bids are due by January 29, 2024 with a bid price to include all work indicated in the plans and specifications. The period of performance is 60 calendar days from notice to proceed. The contractor must comply with all applicable federal, state and local regulations including Davis Bacon wage rates and OSHA standards. The selected contractor must submit qualifications and certifications for all personnel, a site-specific safety plan, and conduct the work in a manner to minimize disruption to facility operations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25924Q0013 0002.docx | DOCX document | |
| S04 - B1 HVAC Site walk Sign in Sheet.pdf | ||
| 36C25924Q0013 0001.docx | DOCX document | |
| S22- 852.219-75 LOS Certificate - GC.docx | DOCX document | |
| S02 - Specifications 11 01 2023 B1 HVAC Control.pdf | ||
| 36C25924Q0013.docx | DOCX document | |
| S02 - Past Performance Questionnaire.docx | DOCX document | |
| S02 - 6 Drawings B1 HVAC Controllers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Meeting
FOR
666-24-120 B1 HVAC Controllers Upgrades
Services are required at the Sheridan VA Medical Center to remove existing heat pump temperature control equipment in Building 1 and integrate them with the existing radiator temperature sensors. This project is located at the Sheridan VA Medical Center Campus at 1898 Fort Road., Sheridan, WY, 82801. All local and federal standards and requirements shall be met.
Upon starting the project, the successful contractor shall confer with the Sheridan VA engineering staff to ensure that all aspects of the project are clearly understood prior to implementation.
Location: Sheridan VA Medical Center
Introductions: Jason Rankin CS and Rodney Lindberg COR Site Visit:
· The pre-bid meeting/site walk is not mandatory.
· Questions during site visit must be written down and submitted to the Contracting Officer to provide answers in an amendment to all interested parties.
Pertinent Dates:
· Questions are due by 10:00 AM MT January 22, 2024. Any questions submitted after this time will not be reviewed or answered. Please submit to Jason.Rankin@va.gov.
· Bids are due on January 29, 2024, no later than 10:00 AM MT. Submit via email to Jason.Rankin@va.gov.
Site Visit Guidelines:
· Prospective bidders are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.
· Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer.
· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.
Solicitation Information:
· Confirmation of construction range: between $25,000 and $100,000.
· Bid Guarantee & Payment/Performance Bonds: are required as outlined in the solicitation.
· Special Standards of Responsibility: Please note solicitation requirements for submittal of OSHA and EMR ratings.
· VAAR clause 852.219-75 Limitation on Subcontracting: please ensure you provide a signed copy of this clause with your bid package. Please provide the complete signed clause, not just the signature page.
· Contractor shall begin performance within 10 days after Notice to Proceed (NTP) and complete within 60 calendar days.
Post Award Compliance:
· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor shall submit their weekly certified payrolls with their monthly invoice.