36C25923Q0164 0003.docx
DOCX document 37 KB Posted
- Attached to
- H959--3 Year Switch Gear Maintenance Federal contract opportunity
- Solicitation number
- 36C25923Q0164
About this file
This amendment to a solicitation modifies the performance work statement and price schedule for a requirements contract to provide 3-year switchgear preventative maintenance, inspection, and testing services at multiple Department of Veterans Affairs medical facility locations in Oklahoma. The contractor will clean, inspect, test, and adjust all major electrical distribution equipment at various substations and an animal research facility, executing the work with minimal disruption and scheduling outages in advance. The amendment adds primary substation maintenance to the performance work statement and adjusts line item one of the price schedule. The contractor must submit qualifications for technicians and comply with all applicable codes and safety standards in performing the services between the start and end dates provided on a firm-fixed-price basis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25923Q0164 0004.docx | DOCX document | |
| 36C25923Q0164 0002.docx | DOCX document | |
| sub 3 swtchgear list - Copy.xlsx | XLSX spreadsheet | |
| primary substation.xlsx | XLSX spreadsheet | |
| 36C25923Q0164 0001.docx | DOCX document | |
| Switchgear Inventory List.xlsx | XLSX spreadsheet | |
| 36C25923Q0164.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25923Q0164
X X X
See CONTINUATION Page This amendment 0003 is issued to include Primary Substation to the Performance Work Statement (PWS) and to line item 0001 of the Price/Cost Schedule. (See PWS and Price/Cost Schedule below).
All other terms and conditions remain unchanged.
CONTINUATION PAGE
A.1 PERFORMANCE WORK STATEMENT (PWS)
3 Year Switchgear Maintenance Department of Veterans Affairs (VA) Veterans’ Health Administration (VHA) Oklahoma City VA Health Care System
PURPOSE: Oklahoma City VA Health Care system requires the contractor to provide required 3-year switchgear preventative maintenance inspection, and testing on all circuit breakers, in accordance with the Performance Work Statement (PWS), in an efficient and cost-effective manner, supporting the VA mission.
This is a non-personal services contract. The Contractor, its employees, agents and subcontractors shall not be considered VA employees for any purpose of fulfilling the PWS and shall be considered employees of the Contractor. Contractor shall furnish all labor, materials, parts, equipment, tools, shipping, transportation, insurances, licenses, certifications and supervision necessary to provide services in accordance with this Performance Work Statement (PWS). For a contract of this size, scope and complexity, the successful Contractor must perform in a professional manner as recognized by commercial industry standards as good to excellent.
TASKS and REQUIREMENTS:
· The switch gear is required to be serviced every 3 years for preventative maintenance.
· Vendors must submit NETA (National Electrical Testing Association) certification/licenses for technician(s) intended to be used in the performance of services.
SWITCHGEAR:
A. Clean, inspect, test and adjust all major electrical distribution equipment. This shall include the electrical distribution equipment and transformers in the following locations: See attached Switchgear Inventory List to be serviced.
1. Sub-Stations: Primary, No. 1, No. 2, No. 2.5, No. 3 & No. 4.
2. Animal Research Facility.
B. Execute work to interfere as little as possible with normal functioning of the medical center. All outages shall be scheduled and approved in writing at least two weeks in advance.
REPORT:
A. The contractor shall provide a complete comprehensive report on the results of the services rendered. The report shall provide for listings of all equipment tested and scanned including complete nameplate data, age, maximum loading in amperes, the conduction as found, and modifications made. In addition, the contractor shall make recommendations including any major defects or deviations in the electrical system detected during the test and inspection and any violations of national or local codes that may affect the safety of personnel and/or continuity of service. Complete a check- list for each piece of equipment. The check- list shall have a line item for each test and inspection to be performed. All critical conditions, including recommendations for corrective action shall be submitted in writing.
INSPECTION, TEST, MAINTENANCE AND REPAIR:
A. Testing shall be performed in compliance with applicable NEMA, ANSI, ASTM, ASA, NFPA and VA standards. The following equipment shall be inspected, tested and/or repaired in this project:
B. ENCLOSURES AND CUBICLES: The inside of the enclosures housing electrical switchgear shall be cleaned with a vacuum cleaner with insulated attachments. Keep generally free from dust, lint, dirt, and abrasive material. Clean all buses, supports, etc. Buses and connections should be inspected for signs of overheating and weakening of insulation. Buses shall be inspected for adequate support spacing and bracing in accordance with the NEMA Standards for bus bar bracing. All structure supports will be checked for “Tracking” and anchor bolts will be checked for tightness. All control connections, screws, lug, bolts, solderless connectors, etc. will be checked for tightness to ensure good electrical continuity and mechanical condition. Inspect the ground for a solid, continuous, and adequate ground. The connections shall be cleaned and tightened. All raceway systems entering the switchboard shall be inspected to determine that they are properly bonded with lock nuts, etc. Service entrance equipment shall be checked to see that it is grounded in accordance with current NEC requirements. All switch gear compartments shall have the backs removed to allow complete cleaning. All front compartments shall be cleaned and lubricated as necessary, following manufacturer specifications.
C. CIRCUIT BREAKERS: Electrical test shall be made on all circuit breakers by subjecting them to actual operating current to ensure that they will operate within the same limits after service as when new. Adjustments shall not be attempted by anyone other than trained service personnel having the necessary tools and test equipment. The breaker shall be beggared at no greater than 10 percent of its rated voltage. The megger readings must be taken with the breaker closed and latched. Megger readings must be taken from each pole to the breaker frame and from each pole to each of the other poles. The interlock mechanisms should be inspected and tested to ascertain that they are functioning as designed. On a breaker with a 240-volt control, the minimum Megger reading should be one meg-ohm.
D. All circuit breakers shall be removed from service and inspected for loose, broken, or defective parts. All current contacts shall be inspected, cleaned, and polished as required. All bolts, cutter pins, rollers, and bearings shall be examined to determine if any defect, looseness, or unusual conditions exist. All linkages shall be examined and lubricated as required. All arc chutes, barriers and insulation shall be examined for broken or burned areas. All parts shall be cleaned as required. The circuit breaker shall be reassembled. The circuit breaker shall then be tested for electrical tripping using approved low voltage, high current test equipment or trip tested by stimulated CT current through the time over-current relay devices in accordance with the manufacturer’s specifications and published standards.
E. No change in trip device setting from “as found” shall be made by the contractor without expressed approval.
F. SWITCHES-DISCONNECT, TRANSFER SWITCHES, SWITCHGEAR, ATS’S AND GENERATOR SWITCHGEAR: Where possible, the main contacts of the switch can be cleaned, adjusted and a thin film of lubricant placed on them. The fuse clips, connections to the bus or cable, mounting in switchboard, and handles shall be checked for tightness and proper alignment. When applicable, the tension on the contacts may be checked with signs of -discoloration caused by heating are noted. After exercising the switch several times, cleaning and making any adjustments necessary, with a conductor test set, the resistance drop across each phase shall be measured. If the drop has greater than + 20% variation between phases, part replacement should be recommended. Generator switchgear, where possible, shall meet -maintenance requirements per manufacturer’s specifications.
G. RELAYS: Relays shall be checked with a current and accurate timing device. If a relay does not give the desired operating time for a given current, the desired time can usually be obtained by cleaning and adjustment. Only qualified personnel, properly trained and properly equipped with test equipment, manufacturer’s data, and necessary special tools, should work on this equipment.
H. INFRARED SURVEY: Thermo-vision equipment shall be utilized to scan all electrical equipment and terminations in the locations previously specified. All “hot spot”, those which measure greater than 8 degrees (Celsius) higher than die reference temperature (ambient) shall be photographically recorded and included in the Engineering Report to be submitted.
The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. The contractor shall initiate a detailed inspection of the project site to determine the needs and conditions for this project. Copies of drawings will be made available for the contractor to use.
The contractor shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of this project.
The areas adjacent to the proposed addition shall be continuously occupied by the OKCVAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC’s mission to care to the Veterans.
The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses.
Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station.
The C&A requirements do not apply, and that a Security Accreditation Package is not required.
Task Management. Engineering shall identify a Contracting Officer’s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment
CODES, STANDARDS AND EXECUTIVE ORDERS
VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects:
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
| PG-18-1 | Master Construction Specifications |
| PG-18-3 | Design and Construction Procedures |
| PG-18-4 | Standard Details and CAD Standards |
VA BIM Manual V2.2
| PG-18-5 | Equipment Guide List |
| H-18-8 | VA Seismic Design Handbook |
| PG-18-9 | Space Planning Criteria |
| PG-18-10 | Design Manuals (by discipline) |
| PG-18-12 | Design Guides (graphical, by function) |
| PG-18-13 | Barrier Free Design Guides |
| PG-18-14 | Room Finishes, Door, and Hardware Schedules (consult COR for local standards) |
| PG-18-15 | Minimum Requirements for A/E Submissions |
| PG-18-17 | Environmental Compliance Manual |
| H-7545 | VA Cultural Resource Management |
VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides.
Occupational, Safety and Health Administration (OSHA) Standards.
National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification.
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2013.
Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.
SCHEDULING ARRANGEMENTS: Upon contract award, the contractor shall coordinate with the local VA POC to schedule services to occur at the location mentioned above. Contractor shall confirm all scheduling agreements in writing with the local VA POC; preferably by email. The contractor is responsible for performing services during standard business hours, unless authorized by the local VA POC, and at no additional charge to the government.
STANDARD BUSINESS HOURS: Standard business hours at this location occur between 8:00am to 4:30pm, Monday through Friday, unless prior arrangements are requested and approved by the Contracting Officer Representative. Excluding Federal holidays.
SAFETY STANDARDS: The contractor shall perform electrical safety measurements on all equipment under this contract in accordance with manufacturer’s specifications. All equipment will be subject to inspection by VA Engineering personnel to verify compliance with these standards.
FEDERAL HOLIDAYS: Federal holidays are any calendar days designated by statute or executive order as federal holidays, and as presented on the OPM website for the respective year in which services are to be performed. Refer to U.S. Office of Personnel Management, at OPM.gov. Federal holidays consist of New Year's Day, Martin Luther King Jr's birthday, President's Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas. Holidays that fall on Saturday are observed on the preceding Friday. Holidays that fall on Sunday are observed on the following Monday. In addition to the days designated as holidays, the Government observes the following days:
· Any other day designated by Federal Statute
· Any other day designated by Executive Order
· Any other day designated by the President of the United States to be a Federal Holiday.
CHECK IN/OUT PROCEDURES: Prior to commencement of and immediately after each service visit the Contractor or Contractor’s authorized representative must check in and out with the local VA POC. Only individual VA Engineering Services staff, as delegated by the local VA POC, can coordinate check in and check out procedures for the Contractor in the absence of the local VA POC. Due to heightened security requirements, the Contractor or Contractor’s authorized service representative will be required to wear an ID Badge which will be signed for upon arrival and turned in when leaving. All Badges must be worn at or above the waist and facing forward. This badge must be turned in before leaving the premises; otherwise, the person signing for it will be required to pay for the unreturned ID badge. When at the location, all contractor personnel must be accompanied by the local VA POC, or those VA Engineering Services staff, as delegated by the local VA POC.
Contractor Point of Contact (POC) Upon contract award, the Contractor shall specify an individual who shall serve as a single point of contact (POC) for all Contract related business. Contractor must provide the local VA POC and Contracting Office with the POC contact details, to include cell phone and email, as a minimum. The POC must be easily accessible by phone.
Acceptance Signature - local VA POC’s signature; indicates local VA POC accepts work status as stated in Service Report.
ANSI - American National Standards Institute CFR - Code of Federal Regulations CO – Contracting Officer Contractor Employees – has the same meaning as Contractor Personnel Contractor Personnel - has the same meaning as Contractor Employees COR – Contracting Officer’s Representative Labor – refer to Technically Trained Personnel, also Field Technician NFPA – National Fire Protection Association Original Equipment Manufacturer - OEM OSHA - Occupational Safety and Health Administration POC – Point of Contact SDS - Safety Data Sheet Service Report - a documentation of the services rendered for each incidence of work performance under the terms and conditions of the contract.
Services – includes for equipment and components listed in this PWS and in accordance with this PWS SR –Service Report Technically Trained Personnel – are personnel and/or employees who shall be suitably knowledgeable, and have a background with appropriate use of chemicals, in order to satisfactorily perform services in accordance with the PWS. Also known as Contractor Personnel or Contractor Employees or Technicians.
UL – Underwriters Laboratories US FDA – US Food and Drug Administration VA Mission - To fulfill President Lincoln's promise "To care for him who shall have borne the battle, and for his widow, and his orphan" by serving and honoring the men and women who are America's veterans.
A.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Clean, inspect, test, and adjust all major electrical distribution equipment. This shall include the electrical distribution equipment in the following location:
Sub-Stations: Primary, No. l, No. 2, No. 2.5, No. 3 and No. 4, in accordance with the PWS.
Contract Period: Base POP Begin: 02-01-2023 POP End: 04-30-2023 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: H959 - Other Quality Control, Testing, and Inspection - Electrical and Electronic Equipment Components
| 1.00 |
| JB |
| __________________ |
| __________________ |
Clean, inspect, test, and adjust all major electrical distribution equipment. This shall include the electrical distribution equipment in the following location:
Animal Research Facility (ARF), in accordance with the PWS.
Contract Period: Base POP Begin: 02-01-2023 POP End: 04-30-2023 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: H959 - Other Quality Control, Testing, and Inspection - Electrical and Electronic Equipment Components