36C25920Q0582 0001.docx

DOCX document 27 KB Posted

Attached to
J039--Pneumatic Tube Preventative Maintenance Services - 554
Solicitation number
36C25920Q0582
Issued by

View the file

Other files

File Type Posted
36C25920Q0582.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK – Swisslog Pneumatic Tube Preventative Maintenance

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

NA

36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 To all Offerors/Bidders

36C25920Q0582 08-27-2020

X

X The purpose of this modification is to correct the statement of work from services performed annually to semi-annually.

Mary Good Contracting Officer

1.0 The contractor shall furnish labor, parts, supplies and equipment necessary to provide scheduled maintenance, and periodic preventive maintenance inspections for the equipment listed below. Equipment is located at the Rocky Mountain Regional VA Medical Center, 1700 N Wheeling Street, Aurora, CO 80045.

SPECIFIC SERVICE FOR

1.1 SwissLog Pneumatic Tube System

1.1.1 Model: PTS 630/Nexus 6.0

1.1.2 Stations: 33 total stations

1.1.3 Transfer Units: 19 total TU’s

1.1.4 Blowers: 6 total blowers

2.0 HOURS OF COVERAGE

2.1 Normal hours of coverage are Monday through Friday from 8:00 a.m. to 5:00 p.m., excluding the federal holidays listed as follows:

Federal Holidays:

New Year’s DayDr. Martin Luther King Jr’s BirthdayPresidents’ Day
Memorial DayIndependence DayLabor Day
Columbus DayVeteran’s DayThanksgiving Day
Christmas Day

Any other day specifically declared a National Holiday by the President of the United States

2.2 When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday by US Government Agencies.

3.0 PARTS

3.1 The contractor shall furnish all spare and replacement parts needed to service the equipment. The price of all parts used to perform all scheduled preventive and unscheduled maintenance shall be included in the coverage. The Government will not pay for any parts provided (during either scheduled or unscheduled maintenance), by the contractor during the period of the medical equipment being covered. Only new standard parts (manufactured by the maker of the equipment, or equal) shall be furnished to maintain the equipment.

4.0 SERVICE MANUALS/TOOLS/EQUIPMENT

4.1 The contractor shall provide tools, (test) equipment, service manuals or service diagnostic software. The contractor shall obtain, have on file, and make available to its FSE's all operational and technical documentation (such as; operational and service manuals, schematics, and parts list) necessary to meet the performance requirements and repair of the medical equipment. A reference list of applicable service manuals and their respective locations shall be provided to the Biomedical Engineer upon request.

5.0 SCHEDULED MAINTENANCE

5.1 The Contractor shall perform PM Service to ensure that the equipment listed performs in accordance with the original manufacturer’s specifications. Semi-Annual PM Service must be completed by December 31st of each year. An outline of the PM schedule and procedures shall be provided to the Biomedical Engineer.

The contractor shall provide a written description of the Preventive Maintenance Inspections (PMI). This description shall include an itemized list of the procedures performed, including electrical safety. PM services shall include, but need not be limited to, the following:

a. Cleaning of equipment.

b. Reviewing operating system software diagnostics to ensure that the system is operating in accordance with the manufacturer's specifications.

c. Calibrating and lubricating the equipment.

d. Performing remedial, non-emergent maintenance.

e. Testing and replacing faulty and worn parts and/or parts likely to fail or become faulty or worn.

f. Inspection and replacement of worn or frayed electrical wiring and cables.

g. Returning the equipment to the operating condition and mode

h. Providing documentation of services performed.

5.2 All service/repairs shall be performed during normal hours of coverage unless requested or approved by the Biomedical Engineer. The only exception is hardware/software update/upgrade installations which shall be scheduled and performed outside normal hours of coverage at no additional charge to the Government (unless it would be detrimental to equipment up-time; to be determined by the Biomedical Engineer). The contractor shall provide software/hardware updates at no charge.

5.3 All exceptions to the PM schedule shall be arranged and approved in advance with the Point of Contact, or Biomedical Engineer. The Contractor shall provide and utilize procedures and checklists with worksheet originals indicating work performed and actual values obtained (as applicable). This documentation shall be provided to the Point of Contact at the completion of the PM.

5.4 Work performed outside the normal hours of coverage, at the request of FSE, shall be considered service during normal hours of coverage and shall be exempt from an extra labor hour charge.

6.0 DOCUMENTATION/REPORTS

6.1 The documentation shall include detailed descriptions of the scheduled and unscheduled maintenance procedures performed, including replaced parts and prices (for outside normal working hour services) required to maintain the equipment in accordance with the specifications Each ESR must, at a minimum, document the following data legibly and in complete detail:

a. Name of contractor and contract number

b. Name of FSE who performed services

c. Contractor service ESR number/log number

d. Date, time (starting and ending), equipment downtime and hours on-site for service call.

e. VA purchase order number(s) covering the call if outside normal working hours.

f. Description of problems reported by the POC/user (if applicable).

g. Identification of equipment to be serviced:

· Inventory ID number,

· Manufacturer's name, device name, model number & serial number,

· Any other manufacturer's identification numbers.

h. Itemized Description of Service Performed (including, if applicable, costs associated with after normal working hour services) including:

· Labor and Travel,

· Parts (with part numbers),

· Materials and Circuit Location of problem/corrective action.

· Total Cost to be billed (if applicable - i.e., part(s) not covered or service rendered after normal hours of coverage).

i. Signatures:

· FSE performing services described.

· Authorized VA Employee who witnessed service described.

NOTE: - Any additional charges claimed must be approved by the COR or CO before service is completed

6.2 The Contractor shall log in with Biomedical Engineering prior to performing any services. When the service is completed, the FSE shall document services rendered on a legible ESR(s). The FSE shall log out with Biomedical Engineering and submit the ESR(s) to the Biomedical Engineer, or Point of Contact. All ESRs shall be submitted to the equipment user for an “acceptance signature” and then to the POC for an “authorization signature”. If the POC is unavailable, a signed, authorized copy of the ESR shall be sent to the contractor after the work can be reviewed (if requested or noted on the ESR).

7.0 REPORTING REQUIRED SERVICES BEYOND SERVICE SCOPE

7.1 The contractor shall immediately, but no later than 24 consecutive hours after discovery, notify the COR or POC, in writing, of the existence or development of any defects in, or repairs required, to the scheduled equipment which, the contractor does not consider his/her responsibility due to “abuse” or “damage” to the equipment. The contractor shall furnish the Government with a written estimate of the cost to make the necessary repairs.

8.0 ACCEPTANCE OF CONDITION OF EQUIPMENT

8.1 The contractor accepts responsibility for the equipment covered under this equipment in an “as is” condition. Inspection of the equipment by the contractor shall be done prior to coverage, if required by the contractor.

9.0 COMPETENCY AND CERTIFICATION OF PERSONNEL SERVICING EQUIPMENT

9.1 Each respondent must have an established business, with an office and full time staff. The staff shall include a fully qualified FSE and fully qualified alternate FSE.

9.2 “Fully Qualified” is based on successful completion of factory training and experience in the field. For training, the FSE shall have successfully completed a formalized training program for the equipment identified in the schedule. For field experience, the FSE(s) shall have a minimum of two years of experience (with the exception of equipment on the market less than two years) with respect to scheduled and unscheduled preventive and remedial maintenance, on the covered equipment.

9.3 The FSEs shall be authorized by the contractor to perform the maintenance services. All work shall be performed by fully qualified competent FSEs. The contractor shall provide copies of all factory certificates for FSEs showing types of equipment and dates of training for all equipment identified to be covered. When deemed appropriate, the COR or Contracting Office Representative reserve the right to prohibit contractor personnel from working on VAMC equipment.

10.0 CONTRACTOR TEST EQUIPMENT

10.1 The contractor shall ensure all contractor supplied test equipment is properly calibrated, and certified. If requested by the COR or POC, the contract shall be able to supply any certificates tied to the quality of the test equipment. Test equipment calibration shall be traceable to a national standard.

11.0 ADDITIONAL COVERAGE – SPARE PARTS

11.1 Contractor shall provide $2000.00 of spare parts that can be used by onsite technicians to conduct repairs. VA technicians can order and stock up to $2000.00 of spare parts semi-annually, at no additional cost. Request contractor to help evaluate what spare parts should be considered for stocking.

12.0 ADDITIONAL COVERAGE – EMERGENCY SERVICES

12.1 Contractor shall provide onsite emergency services for the Pneumatic Tube System for up to two (2), four (4) hour visits. These visits can be during normal business hours, and not during after-hour emergencies. Travel time shall also be included during emergency response during business hours. If afterhours, VA will need to provide additional purchase order for after hours labor.