63516102-Bid_Documents-Drawings-050418.pdf
PDF 7 MB Posted
- Attached to
- Increase Electrical Capacity to 9th Floor Server Room Federal contract opportunity
- Solicitation number
- 36C25919R0031
About this file
36C25919R0031 63516102-Bid Documents-Drawings-050418.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25919C0088-000.docx | DOCX document | |
| 36C25919R0031-0004000.docx | DOCX document | |
| 36C25919R0031-0004001.pdf | ||
| 36C25919R0031_0003.docx | DOCX document | |
| 36C25919R0031_0002.docx | DOCX document | |
| RFI__1.pdf | ||
| 36C25919R0031_0001.docx | DOCX document | |
| 63516102-Bid_Documents-Specifications-050418-3.pdf | ||
| S02_Past_Performance_Questionnaire.docx | DOCX document | |
| 36C25919R0031_2.docx | DOCX document | |
| S02_Calculation_of_Self-Performed_and_Subcontracted_Work.docx | DOCX document | |
| 63516102-Bid_Documents-Specifications-050418-2.pdf | ||
| 63516102-Bid_Documents-Specifications-050418-1.pdf | ||
| 36C25919R0031-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NE 13th STREET
NE 13th STREET
N
K
E L L Y
S
T R
E E
T
E
F
A
C
G
B
D
N
M c M
E C
H A
N
S
T R
E E
T
PROJECT LOCATION:
PROJECT TITLE:
BUILDING NUMBER: A
DRAWING INDEX
DRAWING
NUMBER
PDF PAGE
NUMBER
DRAWING TITLE
GENERAL
G-001 1 COVER SHEET
G-002 2 INFECTION CONTROL NOTES, CONSTRUCTION PHASING NOTES
E-101
E-103
E-104
ELECTRICAL
PARTIAL FIRST FLOOR - ELECTRICAL CONSTRUCTION PLAN
PARTIAL NINTH FLOOR - ELECTRICAL CONSTRUCTION PLAN
TENTH FLOOR - ELECTRICAL CONSTRUCTION PLAN
E-107
E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND DETAIL
E-102 PARTIAL SECOND FLOOR - ELECTRICAL CONSTRUCTION PLAN
E-105 ELEVENTH FLOOR / PENTHOUSE - ELECTRICAL CONSTRUCTION PLAN
E-106 PARTIAL NINTH FLOOR - ELECTRICAL SERVER ROOM CONSTRUCTION PLAN
ARCHITECTURAL
A-201 3 EXTERIOR ELEVATION
A-501 4 ARCHITECTURAL DETAILS
A-502 5 ARCHITECTURAL DETAILS
E-601 ELECTRICAL RISER DIAGRAM15
TENTH FLOOR REFLECTED CEILING - ELECTRICAL CONSTRUCTION PLAN
A-503 6 ARCHITECTURAL DETAILS
NORTH
X
A-501
A-502
NORTH
GENERAL NOTES
KEY NOTES
1. EXISTING EXIT DOOR AND PASSAGE WAY TO REMAIN CLEAR
AT ALL TIMES. CONTRACTOR WILL PROVIDE TEMPORARY
ENCLOSURE DURING ALL CONSTRUCTION ACTIVITIES.
2. REFER TO DRAWING E-101 FOR EXISTING ELECTRICAL
SWITCHGEAR (ELECTRICAL SUBSTATION - 1G137) AND
RELATED WORK.
3. EXISTING ROOF DECK. REFER TO DRAWING E-102 FOR
CONDUIT PENETRATIONS AND RELATED WORK.
4. EXISTING EXTERIOR BUILDING WALL PROFILE LINE.
5. CONTRACTOR WILL PROTECT ALL EXISTING WINDOW UNITS
ADJACENT TO PROJECT AREA DURING CONSTRUCTION
ACTIVITIES. REFER TO NOTES ON DRAWING A-502 FOR FINAL
CLEANING OF WINDOW SYSTEMS AT PROJECT COMPLETION
PHASE.
6. EXISTING FACE BRICK EXTERIOR WALL.
7. EXISTING ROOF DECK. NO CONSTRUCTION STAGING OR
MATERIAL STORAGE WILL BE ALLOWED AT THIS ROOF AREA.
8. PROVIDE ALUMINUM SCREENWALL SYSTEM AND
ASSOCIATED STEEL SUPPORT/FRAMING SYSTEM. REFER TO
DETAIL SECTIONS AND PLANS FOR REQUIRED WORK.
9. EXISTING THROUGH-WALL SCUPPER IS SCHEDULED TO
REMAIN.
10. EXISTING LIMESTONE COPING IS SCHEDULED TO REMAIN.
11. REFER TO DRAWING E-105 FOR CONDUIT ROUTING AT THIS
ROOF DECK LEVEL.
12. REFER TO DRAWING E-102 FOR CONDUIT ROUTING AT THIS
ROOF DECK LEVEL.
13. INDICATES EXISTING FINISH FLOOR ELEVATION.
CONTRACTOR WILL VERIFY ALL FLOOR-TO-FLOOR
ELEVATION DIMENSIONS PRIOR TO FABRICATION OF STEEL
FRAMING/SUPPORT SYSTEM.
14. BOTTOM ELEVATION OF STEEL FRAMING SYSTEM WILL BE
APPROXIMATELY 3-FEET ABOVE EXISTING ROOF DECK.
15. CONTRACTOR WILL PROVIDE SURVEY DOCUMENTATION OF
EXTERIOR BUILDING FACADE FOR FLOOR-TO-FLOOR
ELEVATIONS AND FOR VERTICAL ALIGNMENT OF EXTERIOR
MASONRY WALL FROM SECOND FLOOR LEVEL ROOF DECK
UP TO ELEVENTH FLOOR LEVEL. SUBMIT FIELD
DOCUMENTATION TO VA AND ARCHITECT FOR REVIEW AND
RECORD.
TYPICAL
1. REFER TO DRAWING G-002 FOR INFECTION CONTROL NOTES
AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL
NOTES, ELECTRICAL SYMBOLS LIST AND BASIS OF DESIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A AND B
FOR PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-601 FOR ELECTRICAL RISER
DIAGRAM.
A-502
A-502
A-502
A-502
NORTH
GENERAL NOTES
KEY NOTES
1. EXISTING CONCRETE FLOOR SLAB/DECK.
2. EXISTING CONCRETE ENCASEMENT AT EXISTING STEEL
FRAMING MEMBERS.
3. EXISTING INTERIOR MASONRY WALL CONSTRUCTION.
4. EXISTING EXTERIOR FACE BRICK WALL CONSTRUCTION.
5. EXISTING STEEL ANGLE ATTACHED TO CONCRETE
ENCASEMENT.
6. PROVIDE STEEL SUPPORT BRACKET. REFER TO DETAIL A-502
FOR ADDITIONAL INFORMATION.
7. PROVIDE WEDGE/EXPANSION ANCHORS AT STEEL BRACKET
TOP AND SLEEVE ANCHOR AT STEEL BRACKET BOTTOM.
WEDGE/EXPANSION ANCHORS WILL BE INSTALLED INTO
EXISTING CONCRETE ENCASEMENT. SLEEVE ANCHOR WILL BE
INSTALLED INTO FACE BRICK UNITS. REFER TO SPECIFICATION
APPENDIX A AND B FOR EXISTING CONSTRUCTION DETAILS.
8. PROVIDE HORIZONTAL STEEL ANGLE. REFER TO DETAIL ON
A-502 FOR ADDITIONAL INFORMATION. STEEL ANGLE WILL BE
8x4x1/2.
9. PROVIDE VERTICAL STEEL ANGLE HANGER MEMBERS. REFER
TO DETAIL ON A-502 FOR ADDITIONAL INFORMATION.
10. PROVIDE ALUMINUM SCREENWALL SYSTEM. REFER TO
DETAILS ON DRAWING A-502 FOR ADDITIONAL INFORMATION.
11. REFER TO ELECTRICAL DRAWINGS FOR VERTICAL CONDUITS
AND ASSOCIATED WORK TIMES.
12. PROVIDE HORIZONTAL STEEL ANGLE FRAMING. REFER TO
DRAWINGS A-502 FOR ADDITIONAL INFORMATION.
13. PROVIDE STEEL ANGLE MEMBERS ANCHORED INTO EXISTING
FACE BRICK UNITS WITH SLEEVE TYPE ANCHORS. REFER TO
DRAWING A-502 FOR ADDITIONAL INFORMATION.
1. REFER TO DRAWING G-002 FOR INFECTION CONTROL NOTES
AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL
NOTES, ELECTRICAL SYMBOLS LIST AND BASIS OF DESIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A AND B
FOR PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-601 FOR ELECTRICAL RISER
A-502
A-502
A-502
NORTH
GENERAL NOTES
KEY NOTES
1. EXISTING EXTERIOR MASONRY WALL CONSTRUCTION.
2. EXISTING WINDOW UNITS. CONTRACTOR WILL PROVIDE
TEMPORARY PROTECTION AT ALL UNITS DURING ALL
CONSTRUCTION ACTIVITIES. AT PROJECT COMPLETION
PHASE OF WORK CONTRACTOR WILL CLEAN ALL WINDOW
UNITS ADJACENT TO WORK AREA.
3. PROVIDE STEEL ANGLE FRAMING SYSTEM. ALL EXPOSED
STEEL FRAMING MEMBERS WILL BE GALVANIZED. REFER TO
MATERIAL SPECIFICATION NOTES ON DRAWING A-503.
4. PROVIDE ALUMINUM SCREENWALL SYSTEM.
5. PROVIDE THREE 5-INCH CONDUITS. REFER TO ELECTRICAL
DRAWINGS FOR FEEDER CABLE SIZES AND QUANTITIES.
6. PROVIDE HORIZONTAL STEEL ANGLE FRAMING MEMBER,
ANCHOR TO STEEL BRACKET. REFER TO ENLARGED DETAIL.
7. PROVIDE STEEL OFFSET BRACKETS AT EACH CONDUIT.
REFER TO ENLARGED DETAIL ON THIS DRAWING FOR
ADDITIONAL INFORMATION.
8. PROVIDE VERTICAL STEEL ANGLE HANGERS. REFER TO
ENLARGED DETAIL FOR ASSOCIATED STEEL CLIP ANGLES.
9. PROVIDE TWO STEEL BRACKETS AT EACH FLOOR LINE
ELEVATION. STEEL BRACKETS WILL BE ANCHORED INTO
EXISTING CONCRETE BEAM. PROVIDE SEALANT SYSTEM AT
ALL WEDGE ANCHORS/HOLES AT EXISTING FACE BRICK
UNITS. REFER TO PARTIAL BUILDING ELEVATION ON
DRAWING A-501 FOR FLOOR-TO-FLOOR DIMENSIONS. REFER
TO ENLARGED DETAIL FOR ANCHORING REQUIREMENTS.
1. REFER TO DRAWING G-OO2 FOR INFECTION CONTROL
NOTES AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL
NOTES, ELECTRICAL SYMBOLS LIST AND BASIS OF DESIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A FOR
PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-610 FOR ELECTRICAL RISER
MATERIAL SPECIFICATIONS
1. ALUMINUM SCREENWALL SYSTEM WILL BE AS MANUFACTURED
BY CONSTRUCTION SPECIALTIES INC. OR VA APPROVED
EQUAL. PROVIDE VERT-A-CADE 1100 SCREEN SYSTEM
INCLUDING SUPPORTS, ANCHORAGE AND ACCESSORIES
REQUIRED FOR COMPLETE ASSEMBLY. BLADES TO BE
FABRICATED FROM EXTRUDED ALUMINUM SECTIONS IN
6063-T5 ALLOY, MINIMUM 0.081-INCH THICK AND SPACED
APPROXIMATELY 5-1 / 4 INCH ON CENTER. BLADES TO BE
NOMINAL 2-5/16 INCH DEEP. ALL FASTENERS WILL BE
STAINLESS STEEL. REFER TO PROJECT SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
2. MEDIUM WELDED STEEL BRACKET WILL BE AS
MANUFACTURED BY ANVIL OR VA APPROVED EQUAL. BRACKET
NUMBER 1. WEIGHT 51.8, 18-INCH WIDE BY 24-INCH HIGH.
MATERIAL WILL BE CARBON STEEL, FINISH HOT-DIP
GALVANIZED. COMPLY WITH FEDERAL SPECIFICATION
A-A-1192A. MAXIMUM LOAD 1,500 POUNDS.
3. STAINLESS STEEL OFFSET PIPE CLAMP WILL BE AS
MANUFACTURED BY FM STAINLESS STEEL, LLC OR VA
APPROVED EQUAL. ITEM # 63-5, MATERIAL WILL BE 304
STAINLESS STEEL, CONDUIT SIZE IS 5-INCH I.D. PROVIDE ALL
ACCESSORIES FOR ATTACHMENT. ITEM # HHB - 1/2, STAINLESS
STEEL HEAVY HEX BOLTS WITH UNC THREADS 1 / 2 -INCH
DIAMETER BOLT BY LENGTH REQUIRED, ITEM # HHN - 1/2
STAINLESS STEEL HEAVY HEX NUTS.
4. WEDGE ANCHORS WILL BE AS MANUFACTURED BY FM
STAINLESS STEEL, LLC OR VA APPROVED EQUAL. SIZE OF
ANCHOR 3/4-INCH DIAMETER. ANCHOR MATERIAL
COMPOSITION BODY 304 STAINLESS STEEL, CLIP 304
STAINLESS STEEL, NUT 18-8, WASHER 18-8, PLATING TYPE 4,
CLASS 1 PASSIVATED. LENGTH OF BODY 8-INCH FOR 3-INCH
EMBEDMENT.
5. SLEEVE ANCHORS WILL BE AS MANUFACTURED BY FM
STAINLESS STEEL, LLC OR VA APPROVED EQUAL. SIZE OF
ANCHOR 5/8-INCH DIAMETER. ANCHOR MATERIAL
COMPOSITION BODY 304 STAINLESS STEEL, CLIP 304
STAINLESS STEEL, NUT 18-8, WASHER 18-8, PLATING TYPE 4,
CLASS 1 PASSIVATED. LENGTH OF BODY +/- 5-INCH FOR 2-INCH
MINIMUM EMBEDMENT.
STRUCTURAL NOTES
1. ALL STRUCTURAL STEEL WORK WILL CONFORM TO THE
MOST CURRENT PUBLISHED EDITIONS OF AISC:
A. “SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS”
B. “SPECIFICATIONS FOR STRUCTURAL JOINTS USING
ASTM A325 BOLTS”
2. CONTRACTOR WILL PROVIDE STRUCTURAL STEEL ERECTION
AND SHOP DRAWINGS IN ACCORDANCE WITH THE
GUIDELINES AND GOOD PRACTICES NOTED IN THE AISC
“DETAILING FOR STEEL CONSTRUCTION”.
3. ALL STEEL FRAMING CONNECTIONS WILL BE BOLTED. NO
FIELD WELDING WILL BE ALLOWED.
4. STEEL SHOP DRAWINGS WILL BE SUBMITTED FOR REVIEW
AND COMMENT FOR ALL STEEL FRAMING SYSTEMS AND
DETAILS SPECIFIED ON DRAWINGS.
5. CONTRACTOR WILL BE REQUIRED TO FIELD MEASURE
EXISTING BUILDING COMPONENTS AS IT RELATES TO
DIMENSIONS OF STEEL FRAMING SYSTEMS.
6. ALL STEEL MEMBERS WILL BE GALVANIZED MATERIAL
CONFORMING TO ASTM A123.
7. ALL WEDGE AND SLEEVE ANCHOR LOCATIONS WILL BE
INSPECTED. PROVIDE SPECIAL INSPECTION UNDER THE IBC
IN ACCORDANCE WITH SECTION 1704 AND 1705 OF THE IBC.
ADDITIONAL REQUIREMENTS AS SET FORTH IN SECTIONS
1705 AND 1706 MUST BE OBSERVED, WHERE APPLICABLE.
PROVIDE WRITTEN REPORT FROM INDEPENDENT
INSPECTION AGENCY THAT INCLUDES THE FOLLOWING
DETAILS :
A. ANCHOR DESCRIPTION, INCLUDING THE ANCHOR
PRODUCT NAME, NOMINAL ANCHOR AND BOLT
DIAMETERS, AND ANCHOR LENGTH.
B. HOLE DESCRIPTION, INCLUDING VERIFICATION OF
DRILL BIT COMPLIANCE WITH ANSI B212.15-1994.
C. INSTALLATION DESCRIPTION, INCLUDING VERIFICATION
OF MASONRY COMPRESSIVE STRENGTH AND
VERIFICATION OF ANCHOR INSTALLATION AND
LOCATION (SPACING AND EDGE DISTANCE).
ABBREVIATION DESCRIPTIONSYMBOL
ELEVATOR
P-1
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
ELEVATOR
P-6
TOILET
MALE
1B117
ELECTRICAL
SUBSTATION
1G137
STAFF
WORK AREA
OFFICE
INTERN/
EXECUTIVE
ASSISTANT
1A105F
OFFICE
PRIVACY
OFFICER
1A105G
OFFICE
DEPUTY
DIRECTOR
1A105E
OFFICE
PUBLIC
AFFAIRS
1A105D
STORAGE
1A101
ELEC
1A102
ELEC
1A100
ELECTRICAL
1A103
STAIR 1
TOILET
FEMALE
1B116
DN UP
MEDS
1G134
EXAM 6
1G124
EXAM 4
1G122
EXAM 2
1G120
OPEN TO DECK
NORTH
GENERAL NOTES
1. REFER TO DRAWING G-002 FOR INFECTION CONTROL NOTES
AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL
NOTES, ELECTRICAL SYMBOLS LIST AND BASIS OF DESIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A AND B
FOR PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-601 FOR ELECTRICAL RISER
DIAGRAM.
KEY NOTES
NORTH
1. EXISTING FEEDER CIRCUIT BREAKER 600AF/200AT, 3P TO BE
REUSED. INCREASE THE TAP SETTING TO 400 AMPHERES.
2. PROVIDE FEEDER CONDUIT FOR NEW UPS "10AUPS-SR" WITH
TWO (2) SETS 4 #300 KCMIL & ONE (1) #2 GRD IN 5" CONDUIT.
3. PROVIDE FEEDER CONDUIT FOR EXISTING "PANELBOARD
10AC1-2-SR" WITH 4 #500 KCMIL & 1 #3 GRD IN 5" CONDUIT.
4. PROVIDE ONE (1) 5" CONDUIT SPARE.
5. CONTRACTOR WILL PROVIDE WRITTEN NOTIFICATION TO
VA/COR PRIOR TO DE-ENERGIZING EXISTING EMERGENCY
SWITCHGEAR. REFER TO SPECIFICATION SECTIONS 01 00 00
GENERAL REQUIREMENTS 1.6 OPERATIONS AND STORAGE
AREAS, 01 35 26 SAFETY REQUIREMENTS 1.15 ELECTRICAL
AND 26 05 11 REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS 1.9 WORK PERFORMANCE.
6. ROUTE THREE (3) 5-INCH CONDUITS UP THROUGH METAL
ROOF DECK. EXISTING ROOF STRUCTURE IS A CONCRETE
AND METAL DECK ASSEMBLY. THE UNDERSIDE/EXPOSED
METAL ROOF DECK HAS A SPRAYED ON FIRE PROOFING
SYSTEM. AFTER ROOF DECK PENETRATIONS ARE
COMPLETED FOR CONDUIT INSTALLATION PROVIDE ALL
WATER STOPPING SYSTEMS AT DECK OPENINGS. PROVIDE
SPRAYED ON FIRE PROOFING FOR A 2 HOUR U.L. RATED
ASSEMBLY AT CONDUIT PENETRATIONS.
7. REFER TO DRAWING E-102, E-103, E-104 AND E-105 FOR
CONTINUATION.
8. ROOF SYSTEMS ARE UNDER A ROOFING SYSTEM
WARRANTY. CONTRACTOR WILL UTILIZE A CERTIFIED
ROOFING CONTRACTOR APPROVED BY ROOF MEMBRANE
MANUFACTURER FOR ALL ROOF SYSTEM RENOVATIONS AND
MODIFICATIONS. VA/COR WILL PROVIDE COPY OF WARRANTY
INFORMATION TO CONTRACTOR AWARDED THE PROJECT.
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
ELEVATOR
P-6
ELECTRICAL
SUBSTATION
1G137
[BELOW]
STORAGE
TELE/
DATA
2A101
ELEC
2A100
ELECTRICAL
2A102
STAIR 1
DN UP
RD RDODOD
TOILET
SHOWER
2A104A
PATIENT
ROOM
2A104
TOILET
SHOWER
2A103A
PATIENT
ROOM
2A103
MECHANICAL
ROOM
2G100
TOILET
2B129
OFFICE
2B128
ROOF
ROOF
NORTH
GENERAL NOTES
1. REFER TO DRAWING G-002 FOR INFECTION CONTROL NOTES
AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL
NOTES, ELECTRICAL SYMBOLS LIST AND BASIS OF DESIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A AND B FOR
PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-601 FOR ELECTRICAL RISER DIAGRAM.
KEY NOTES
1. EXISTING ROOF MOUNTED EXHAUST FAN SCHEDULED TO
REMAIN.
2. EXISTING OVER FLOW ROOF DRAIN SCHEDULED TO
REMAIN.
3. EXISTING ROOF DRAIN SCHEDULED TO REMAIN.
4. EXISTING LOW ROOF AREA OVER ENTRY EXIT VESTIBULE.
5. EXISTING STEEL PIPING SCHEDULED TO REMAIN.
6. EXISTING ROOF MOUNT FRESH AIR INTAKE SCHEDULED TO
REMAIN.
7. EXISTING WINDOW UNITS SCHEDULED TO REMAIN.
8. INDICATES LOCATION OF CONDUITS ROUTED THROUGH
EXISTING ROOF DECK FROM EXISTING ELECTRICAL
SWITCHGEAR ROOM BELOW. ROUTE CONDUITS ALONG
EXISTING MASONRY WALL CONSTRUCTION TO POINT
INDICATED.
9. INDICATES LOCATION OF CONDUITS ROUTED VERTICALLY
UP TO ELEVENTH FLOOR LEVEL/ROOF DECK. CONDUIT
STEEL SUPPORT SYSTEM WILL BE CENTERED BETWEEN
THE TWO EXISTING WINDOW UNITS.
10. PROVIDE TEMPORARY ROOF PROTECTION DURING ALL
CONSTRUCTION ACTIVITIES. CLEAN ROOF AREA AT THE
COMPLETION OF EACH WORK DAY.
11. PROVIDE NEMA TYPE 3R PULL BOX AS REQUIRED.
12. PROVIDE 3-5" CONDUITS AND SPECIFIED POWER
WIRING/CABLES, REFER TO DRAWING E-601.
13. ROOF SYSTEMS ARE UNDER A ROOFING SYSTEM
WARRANTY. CONTRACTOR WILL UTILIZE A CERTIFIED
ROOFING CONTRACTOR APPROVED BY ROOF MEMBRANE
MANUFACTURER FOR ALL ROOF SYSTEM RENOVATIONS
AND MODIFICATIONS. VA/COR WILL PROVIDE COPY OF
WARRANTY INFORMATION TO CONTRACTOR AWARDED THE
PROJECT.
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
ELEVATOR
P-6
ELEC
CLOSET
9A100
TELE/
DATA
9A101
ELECTRICAL
CLOSET
9A102
STAIR 1
OFFICE
INTERIOR
DESIGN
OFFICE
CHIEF
ENGINEER
IRM
CLASSROOM
9A103
H.A.C.
9A125
H.A.C.
9A126
DN UP
SERVER
ROOM
9A123a
OFFICE
TECHNICIAN
9A123
TOILET
FEMALE
9A122
TOILET
MALE
9A121
OFFICE
TECHNICIAN
9A120
OFFICE
TECHNICIAN
9A120A
TELE /
DATA
9A118
OFFICE
COMPUTER
LAB
9A123M
OFFICE
9A124A
OFFICE
IT SERVICE DESK
9A124
OFFICE
INDUSTRIAL
HYGIENIST
9B100A
SAFETY
MANAGER
9B100B
LAB
9B100C
STORAGE
9B100D
OFFICE
SECRETARY
ENGINEERING
RECEPTION/PURCHASING
9B100
NORTH
NORTH
GENERAL NOTES
1. REFER TO DRAWING G-OO2 FOR INFECTION CONTROL
NOTES AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL
NOTES, ELECTRICAL SYMBOLS LIST AND BASIS OF DESIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A FOR
PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-610 FOR ELECTRICAL RISER
DIAGRAM.
KEY NOTES
1. REMOVE SECTIONS OF EXISTING SUSPENDED CEILING
SYSTEM AS REQUIRED TO PERFORM SPECIFIED WORK.
2. PROVIDE CONDUITS UP THROUGH CONCRETE ROOF DECK.
3. INDICATES EXISTING SPRINKLER HEAD AT SUSPENDED
CEILING SYSTEM.
4. INDICATES EXISTING VENT STACK SCHEDULED TO REMAIN.
5. ROUTE CONDUITS VERTICALLY UP TO ELEVENTH FLOOR
LEVEL/ROOF DECK.
6. LOCATE STEEL SUPPORT SYSTEM AT CENTER POINT
BETWEEN THE TWO EXISTING WINDOW OPENINGS.
7. PROVIDE STEEL CONDUIT SUPPORT SYSTEM MOUNTING
BRACKETS AT EACH EXISTING FLOOR LEVEL/ELEVATION.
STEEL SUPPORT BRACKETS ARE LOCATED
APPROXIMATELY AT EVERY 11'-6" VERTICALLY.
8. PROVIDE ALUMINUM SCREENWALL SYSTEM.
9. REFER TO TYPICAL STEEL CONDUIT SUPPORT BRACKET
DETAIL ON DRAWINGS A-501, A-502 AND A-503 FOR
ADDITIONAL INFORMATION.
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
ELEVATOR
P-6
STAIR 1
10A103
DN
ROOF LEVEL
[ABOVE NINTH FLOOR]
A-503
TELEPHONE
ROOM
10A100
MECHANICAL
ROOM
10A102
10A101
A-503
NORTH
NORTH
GENERAL NOTES
1. REFER TO DRAWING G-002 FOR INFECTION CONTROL NOTES
AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL NOTES,
ELECTRICAL SYMBOL LIST AND BASIS OF DEIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A AND B FOR
PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-601 FOR ELECTRICAL RISER DIAGRAM.
KEY NOTES
1. PROVIDE THREE (3) CONDUITS ON STEEL SUPPORT
SYSTEM. CONDUITS EXTEND UP TO ELEVENTH FLOOR
LEVEL/ROOF DECK. REFER TO DRAWING E-105. PROVIDE
STEEL SUPPORT SYSTEM AND ALUMINUM SCREENWALL
SYSTEM. REFER TO ARCHITECTURAL DRAWINGS A-201
AND A-501, A-502 AND A-503 FOR ADDITIONAL INFORMATION
AND REQUIREMENTS.
2. PROVIDE UPS SYSTEM. REFER TO DRAWING E-601 AND
SPECIFICATIONS, SECTION 26 33 53 STATIC
UNINTERRUPTIBLE POWER SUPPLY FOR PRODUCT
DESCRIPTION AND REQUIREMENTS.
3. PROVIDE ELECTRIC PANELBOARD - 10AC1-2-SR, SURFACE
MOUNTED.
4. ROUTE OF CONDUITS UP TO ELEVENTH FLOOR
LEVEL/ROOF DECK.
5. PROVIDE HORIZONTAL CONDUIT ROUTING ON EXISTING
EXTERIOR MASONRY WALL. LOCATE CONDUITS
APPROXIMATELY 2'-0" ABOVE EXISTING DOOR OPENING.
6. EXTEND CONDUITS DOWN EXISTING MASONRY WALL AND
CONTINUE OVER EXISTING ROOF AREA TO POINT OF
PENETRATION TO NINTH FLOOR LEVEL SERVER ROOM.
7. PROVIDE INSULATED EQUIPMENT CURB FOR CONDUIT
INSTALLATION. CORE DRILL EXISTING CONCRETE ROOF
DECK FOR CONDUIT INSTALLATION. REFER TO TYPICAL
DETAIL ON DRAWING A-503.
8. EXISTING VENT STACK SCHEDULED TO REMAIN.
9. DISCONNECT AND REMOVE EXISTING DISCONNECT
SWITCH, POWER WIRING AND RELATED CONDUIT
SYSTEMS. REMOVE POWER WIRING BACK TO RESPECTIVE
PANELBOARD AT NINTH FLOOR SERVER ROOM. PROVIDE
DISCONNECT SWITCH AT ROOF MOUNTED EXISTING AC-1
AND AC-2 UNITS. PROVIDE CONDUITS AND POWER WIRING
BACK TO PANELBOARD 10AC1-2-SR. ROUTE CONDUITS ON
ROOF DECK, REFER TO PIPE MOUNTING PEDESTAL DETAIL
ON DRAWING A-503. REFER TO APPENDIX A FOR PHOTO
VIEWS AT EXISTING CONDENSING UNITS.
10. REMOVE EXISTING WALL MOUNTED FURNITURE SYSTEM.
RETURN TO VA AND MOVE/TANSPORT TO STORAGE ROOM
AS DIRECTED BY VA/COR. REMOVE WALL MOUNTED
DUPLEX OUTLET, POWER WIRING AND VOICE DATA
OUTLET. REMOVE POWER WIRING BACK TO RESPECTIVE
ELECTRIC PANELBOARD. REMOVE VOICE/DATA CABLING
BACK TO RESPECTIVE DATA COMPONENT.
11. EXISTING STEEL VERTICAL CABLE RACK TO REMAIN.
12. EXISTING BATTERY RACK TO REMAIN.
13. EXISTING FLOOR MOUNTED AC UNIT TO REMAIN.
14. EXISTING FLOOR MOUNTED EQUIPMENT STORAGE UNITS
TO REMAIN.
15. ROOF SYSTEMS ARE UNDER A ROOFING SYSTEM
WARRANTY. CONTRACTOR WILL UTILIZE A CERTIFIED
ROOFING CONTRACTOR APPROVED BY ROOF MEMBRANE
MANUFACTURER FOR ALL ROOF SYSTEM RENOVATIONS
AND MODIFICATIONS. VA/COR WILL PROVIDE COPY OF
WARRANTY INFORMATION TO CONTRACTOR AWARDED
THE PROJECT.
ROOF LEVEL
[ABOVE TENTH
FLOOR]
ROOF LEVEL
[ABOVE TENTH FLOOR]
DN
DN
ELEVATOR
PENTHOUSE
NORTH
NORTH
GENERAL NOTES
1. REFER TO DRAWING G-002 FOR INFECTION CONTROL NOTES
AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL
NOTES, ELECTRICAL SYMBOLS LIST AND BASIS OF DESIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A AND B FOR
PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-601 FOR ELECTRICAL RISER DIAGRAM.
KEY NOTES
1. EXTEND CONDUITS OVER EXISTING PARAPET WALL AND
ROUTE ALONG EXISTING STEEL ANGLE FRAMING SYSTEM.
2. EXISTING PARAPET COPING AT ELEVENTH FLOOR LEVEL.
3. INDICATES EXISTING STEEL BRACING SYSTEM AT PARAPET
WALL SYSTEM.
4. PROVIDE CONDUIT SUPPORT SYSTEM ON ROOF DECK FOR
HORIZONTAL LENGTH INDICATED. REFER TO DETAIL ON
DRAWING A-503.
5. PROVIDE INSULATED EQUIPMENT CURB FOR CONDUIT
PENETRATIONS DOWN THROUGH ROOF SYSTEM AND
CONCRETE DECK. REFER TO DETAIL ON A-503 FOR
EQUIPMENT CURB AND ROOF MEMBRANE FLASHING
REQUIREMENTS.
6. LOCATION OF CONDUITS AND FEEDER CABLES/WIRES
FROM TENTH FLOOR UPS UNIT AND PANELBOARD
10AC1-2-SR. ROUTE CONDUIT SYSTEM TO SOUTH POINT OF
THIS ROOF DECK LEVEL.
7. EXTEND CONDUITS OVER EXISTING PARAPET WALL AND
DOWN EXISTING EXTERIOR MASONRY WALL.
8. PROVIDE CONDUIT DOWN TO ROOF LEVEL AT TENTH FLOOR
LEVEL/ROOF DECK.
10. PROVIDE THREE (3) 5" CONDUITS.
11. PROVIDE TWO (2) 4" CONDUITS AND FOUR (4) 2" CONDUITS
RIGID GALVANIZED STEEL (RGS), PVC COATED.
12. PROVIDE NEMA TYPE 3R PULL BOX.
13. ROOF SYSTEMS ARE UNDER A ROOFING SYSTEM
WARRANTY. CONTRACTOR WILL UTILIZE A CERTIFIED
ROOFING CONTRACTOR APPROVED BY ROOF MEMBRANE
MANUFACTURER FOR ALL ROOF SYSTEM RENOVATIONS
AND MODIFICATIONS. VA/COR WILL PROVIDE COPY OF
WARRANTY INFORMATION TO CONTRACTOR AWARDED THE
PROJECT.
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
ELEVATOR
P-6
OFFICE
COMPUTER
LAB
OFFICE
COMPUTER
LAB
OFFICE
TECHNICIAN
OFFICE
TECHNICIAN
OFFICE
TECHNICIAN
OFFICE
TECHNICIAN
TOILET
FEMALE
OFFICE
OFFICE
IT
SERVICE DESK
NORTH
GENERAL NOTES
KEY NOTES
0 2' 4' 8'
NORTH
1. REFER TO DRAWING G-002 FOR INFECTION CONTROL NOTES
AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL NOTES,
ELECTRICAL SYMBOLS LIST AND BASIS OF DESIGN.
3. REFER TO SPECIFICATIONS APPENDIX SECTION A AND B FOR
PHOTO DOCUMENTATION OF EXISTING CONDITIONS.
4. REFER TO DRAWING E-601 FOR ELECTRICAL RISER DIAGRAM.
5. SERVER ROOM AND TELEPHONE ROOM ARE BOTH
CONTROLLED ACCESS ROOMS THAT REQUIRE A FULLTIME
ESCORT FOR THE DURATION OF ALL ACTIVITIES WITHIN
THESE SPACES.
1. PROVIDE COMPUTER PANELBOARD "9AC4". 400A MCB WITH
4-50A/3P: 2-50A/3P SPARES
2. EXISTING AIR COOLED UNITS (ACU'S) TO BE RECONNECTED
FROM NORMAL TO EMERGENCY POWER. DISCONNECT AND
REMOVE EXISTING POWER WIRING AND TERMINATE AT
EXISTING ELECTRIC PANELBOARD. REMOVE EXISTING
CONDUIT BACK TO RESPECTIVE ELECTRIC PANELBOARD.
REMOVE ALL ASSOCIATED HANGER SYSTEMS. PROVIDE A
NEW PANELBOARD DESCRIPTION CARD AT RESPECTIVE
PANEL.
3. EXISTING AIR COOLED UNITS (ACU & AHU) NOT IN
CONTRACT (NIC).
4. REFER TO DRAWING E-104 FOR CONDUIT ROUTING AT
ROOF DECK LEVEL.
5. PROVIDE CONDUIT AND POWER WIRING FOR AIR COOLING
UNITS TO BE ROUTED ABOVE EXISTING SUSPENDED
CEILING SYSTEM.
6. PROVIDE DISCONNECT SWITCHES FOR ACU-1 AND ACU-2.
7. PROVIDE 3 #14 IN 3/4" CONDUIT, ROUTE ABOVE EXISTING
SUSPENDED CEILING SYSTEM.
ELEVATOR
P-2
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
ELEVATOR
P-6
STAIR 1
ROOF LEVEL
[ABOVE 9TH
FLOOR]
10A103
TELEPHONE
ROOM
10A100
ROOF LEVEL
[ABOVE 9TH
FLOOR]
DN
SD
SD
F1 F1 F1
F1F1
F1 F1
F1
10A101
PANELBOARD
ID: 10AC1-2-SR
MECHANICAL
ROOM
10A102
NORTH
NORTH
GENERAL NOTES
1. REFER TO DRAWING G-002 FOR INFECTION CONTROL NOTES
AND CONSTRUCTION PHASING NOTES.
2. REFER TO DRAWING E-001 FOR ELECTRICAL GENERAL NOTES,
ELECTRICAL SYMBOL LIST AND BASIS OF DEIGN.
3. REFER TO DRAWING E-601 FOR ELECTRICAL RISER DIAGRAM.
4. SERVER ROOM 9A123a AND TELEPHONE ROOM 10A100 ARE
BOTH CONTROLLED ACCESS ROOMS THAT REQUIRE A
FULLTIME ESCORT FOR THE DURATION OF ALL ACTIVITIES
WITHIN THESE SPACES.
KEY NOTES
1. CONTRACTOR WILL PROVIDE ALL TEMPORARY BARRIERS
DURING ALL CONSTRUCTION ACTIVITIES.
2. REMOVE AND TEMPORALLY RELOCATE LAY-IN LIGHT
FIXTURES AND ASSOCIATED CONDUIT AND WIRES AS
REQUIRED TO INSTALL PULLBOXES AND RELATED
CONDUITS AND WIRES.
3. CONTRACTOR WILL REMOVE SECTIONS OF EXISTING
SUSPENDED CEILING SYSTEM AS REQUIRED TO INSTALL
ABOVE CEILING COMPONENTS. SALVAGE CEILING TILES
AND SUSPENSION SYSTEM FOR REINSTALLATION.
4. EXISTING SUPPLY AIR DIFFUSERS ARE SCHEDULED TO
REMAIN. CONTRACTOR WILL VERIFY EXISTING SUPPLY
DUCT WHICH SERVICE THESE DIFFUSERS.
5. INDICATES EXISTING FIRE PROTECTION SPRINKLER HEADS
SCHEDULED TO REMAIN.
6. CEILING FINISH WITHIN ROOM 10A 102 IS EXPOSED
CONSTRUCTION.
7. INDICATES PROPOSED LOCATIONS FOR METAL PULLBOXES.
CONTRACTOR WILL DETERMINE FINAL LOCATION IN FIELD
AFTER COMPLETING A SITE SURVEY OF ABOVE CEILING
COMPONENTS.
8. INDICATES CEILING MOUNTED SMOKE DETECTORS.
CONTRACTOR WILL PROVIDE TEMPORARY COVERS DURING
CONSTRUCTION ACTIVITIES.
9. REFER TO DRAWING E-105 FOR LOCATION OF CONDUITS
AND ROUTING REQUIREMENTS.
10. REFER TO DRAWING E-104 FOR UPS UNIT.
11. REFER TO DRAWING E-104 FOR PANELBOARD.
12. PROPOSED ROUTING OF CONDUIT FROM METAL PULLBOX
TO UPS UNIT.
13. PROPOSED ROUTING OF CONDUITS AT SURFACE MOUNTED
PANELBOARD.
14. INDICATES CONDUITS UP TO ELEVENTH FLOOR/ROOF DECK
ELEVATION. REFER TO DRAWING E-105 FOR CONTINUATION.
15. INDICATES CONDUITS MOUNTED AT EXTERIOR MASONRY
WALL.
16. INDICATES CONDUITS ROUTED ALONG ROOF DECK. REFER
TO DRAWING E-104 FOR CONTINUATION OF ROOF PLAN AND
RELATED WORK.
17. REFER TO DRAWINGS A-501, A-502 AND A-503 FOR STEEL
SUPPORT SYSTEM AND RELATED ALUMINUM SCREENWALL
SYSTEM.
1. PROVIDE UPS UNIT "10UPS-SR" 90KW/100KVA, 90% POWER
FACTOR. 208V-208Y/120V, 3 PHASE, 4W, 60HZ, WITH 20
MINUTES BATTERY CAPACITY AT FULL LOAD.
2. PROVIDE POWER PANEL "10AC1-2".
3. PROVIDE COMPUTER PANEL "9AC4", 400A MCB WITH 4-50A/3P;
2-50A/3P SPARE.
4. PROVIDE SERVER RACK 50A, 208 VOLTS, 3 PHASE, 4 WIRES, 60
HZ. SHALL BE PROVIDED BY VA IT COMMUNICATION
DEPARTMENT.
5. EXISTING AIR-COOL UNITS TO BE RECONNECTED FROM
NORMAL POWER TO EMERGENCY POWER.
6. EXISTING CONDENSER UNITS TO BE RECONNECTED FROM
NORMAL POWER TO EMERGENCY POWER.
7. EXISTING FEEDER CIRCUIT BREAKER 600AF/200AT, 3P TO BE
REUSED AND INCREASE THE TAP SETTING TO 450 AMPERES.
8. EXISTING FEEDER CIRCUIT BREAKER 600AF / 200AT, 3 PHASE
TO BE REUSED AND INCREASE THE TAP SETTING TO 400
AMPHERES.
9. PROVIDE FEEDER CONDUIT FOR NEW UPS "10AUPS-SR" WITH
2 SETS 4 #300 KCMIL & 1 #2 GRD IN 5" CONDUIT.
10. PROVIDE FEEDER CONDUIT FOR NEW "PANEL 10AC1-2-SR"
WITH 4# 600 KCML & 1 #3 GRD IN 5" CONDUIT.
11. PROVIDE FEEDER CONDUIT FOR COMPUTER PANEL "9AC4" 5
#500 KCM & 1-4" SPARE CONDUIT. PROVIDE CONTROL WIRES
3 #14 FROM "10UPS-SR" TO EPO (EMERGENCY POWER OFF)
SWITCH IN COMPUTER ROOM AS SHOWN ON DRAWING E-106.
PROVIDE ONE (1) 5" CONDUIT SPARE.
12. PROVIDE ONE (1) 5" CONDUIT SPARE.
13. CONTRACTOR WILL PROVIDE INSULATED ROOF CURB FOR
CONDUIT PENETRATIONS. PROVIDE ALL ROOF MEMBRANE
FLASHING. LOCATE ROOF CURB A MINIMUM OF 12-INCHES
AWAY FROM ADJACENT MASONRY WALL FACE.
14. CONTRACTOR WILL PROVIDE WRITTEN NOTIFICATION TO
VA/COR PRIOR TO DE-ENERGIZING EXISTING EMERGENCY
SWITCHGEAR. REFER TO SPECIFICATION SECTIONS 01 00 00
GENERAL REQUIREMENTS 1.6 OPERATIONS AND STORAGE
AREAS, 01 35 26 SAFETY REQUIREMENTS 1.15 ELECTRICAL
AND 26 05 11 REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS 1.9 WORK PERFORMANCE.
ELECTRICAL KEY NOTES
NOTES:
1. FURNISH AND INSTALL IN ACCORDANCE WITH NATIONAL
AND LOCAL ELECTRICAL CODES.
2. INPUT AND BYPASS MUST SHARE THE SAME SINGLE
SOURCE.
3. PROVIDE A NEUTRAL FROM THE SYSTEM AC INPUT
SOURCE. PROVIDE A FULL CAPACITY NEUTRAL
CONDUCTOR. PROVIDE GROUNDING CONDUCTORS.
4. PROVIDE UPS SYSTEM INPUT AND OUTPUT CABLES
ROUTED IN SEPARATE CONDUITS.
5. PROVIDE CONTROL WIRING ROUTED IN SEPARATE
CONDUITS.
6. PROVIDE INTERNAL BATTERY BREAKER ON UPS WITH
INTERNAL BATTERIES; BATTERY BREAKER IS
FACTORY-SUPPLIED WITH EXTERNAL LIEBERT BATTERY
CABINETS.
SEE NOTE 6
BATTERY
UPS CABINET
STATIC BYPASS
* SYSTEM
AC INPUT
4 WIRE+GRD
BIB MIB
BYPASS DISTRIBUTION CABINET
MBB
OUTPUT
BUSBAR
AC OUTPUT
208V
4 WIRE+GRD
BIB-BYPASS ISOLATION BREAKER
MBB-MAINTENANCE BYPASS
BREAKER
MIB-MAINTENANCE ISOLATION
BREAKER
*EXTERNAL OVERCURRENT
PROTECTION BY OTHERS
FIELD SUPPLIED WIRING
| 01 G001.pdf (p.1) |
| 02 G002.pdf (p.2) |
| 03 A201.pdf (p.3) |
| 04 A501.pdf (p.4) |
| 05 A502.pdf (p.5) |
| 06 A503.pdf (p.6) |
| 07 E001.pdf (p.7) |
| 08 E101.pdf (p.8) |
| 09 E102.pdf (p.9) |
| 10 E103.pdf (p.10) |
| 11 E104.pdf (p.11) |
| 12 E105.pdf (p.12) |
| 13 E106.pdf (p.13) |
| 14 E107.pdf (p.14) |
| 15 E601.pdf (p.15) |
File details come from the government source that posted it.