36C25919R0010-004.pdf

PDF 9 MB Posted

Attached to
Whole Health Office Construction Federal contract opportunity
Solicitation number
36C25919R0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25919R0010 660-18-252 Whole Health Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Whole Health Office Construction, newest first.
File Type Posted
36C25919C0064_1.docx DOCX document
36C25919R0010-0002000.docx DOCX document
36C25919R0010-0002001.pdf PDF
36C25919R0010-0002002.pdf PDF
36C25919R0010-0001000.docx DOCX document
36C25919R0010-0001001.pdf PDF
36C25919R0010-0001002.pdf PDF
36C25919R0010-005.pdf PDF
36C25919R0010-006.docx DOCX document
36C25919R0010-003.pdf PDF
36C25919R0010-002.docx DOCX document
36C25919R0010-007.docx DOCX document
36C25919R0010-001.docx DOCX document
36C25919R0010-000.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

AERIAL MAP N.T.S. NORTH

GENERAL NOTES

G100 COVER SHEET

G101 B. 14 BASEMENT PLAN

G102 B. 14 FIRST FLOOR PLAN

G103 B. 1 FIRST FLOOR PLAN

D101 B. 14 BASEMENT DEMO

D102 B. 14 FIRST FLOOR DEMO

D103 B. 1 FIRST FLOOR DEMO

A101 B. 14 BASEMENT ARCHITECTURAL

A102 B. 14 FIRST FLOOR ARCHITECTURAL

A103 B. 1 FIRST FLOOR ARCHITECTURAL

A201 DETAILS

E101 B. 14 BASEMENT ELECTRICAL

E102 B. 14 FIRST FLOOR ELECTRICAL

E103 B. 1 FIRST FLOOR ELECTRICAL

RC101 B. 14 BASEMENT REFLECT CEILING

RC102 B. 14 FIRST FLOOR REFLECT CEILING

RC103 B. 1 FIRST FLOOR REFLECT CEILING

ME101 B. 14 FIRST FLOOR MECHANICAL CURRENT

ME102 B. 14 FIRST FLOOR MECHANICAL

F101 B. 14 BASEMENT SPRINKLER

F102 B. 14 FIRST FLOOR SPRINKLER

F103 B. 1 FIRST FLOOR SPRINKLER

SHEET INDEX

1. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL VISIT THE SITE PRIOR TO THE

SUBMITTAL OF BIDS. NO PERSON, OR CORPORATION SHALL ERECT, CONSTRUCT,

ENLARGE, ALTER, REPAIR, MOVE IMPROVE, REMOVE, CONVERT, OR DEMOLISH ANY

BUILDING OR STRUCTURE IN THE SITE, OR CAUSE THE SAME TO BE DONE WITHOUT FIRST

OBTAINING BUILDING PERMIT FOR EACH SUCH BUILDING OR STRUCTURE FROM THE

BUILDING OFFICIAL.

2. THE CONTRACTOR OR SUBCONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY ALL

EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING ANY WORK. ALL

DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT UPON DISCOVERY.

3. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. LARGER

SCALE DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.

4. IT IS THE INTENT OF THESE DRAWINGS TO MEET OR EXCEED ALL APPLICABLE

REGULATIONS OF ALL GOVERNING AUTHORITIES. ALL WORK SHALL CONFORM TO THE

LATEST U.B.C. OR AS AMENDED BY FEDERAL BUILDING CODE AUTHORITY AND TO THE

LATEST EDITIONS OF ALL OTHER APPLICABLE CODES OR REQUIREMENTS OF ALL OTHER

REGULATING AGENCIES HAVE AUTHORITY OVER ANY PORTION OF THE WORK. NOTHING IN

THESE DOCUMENTS SHALL BE CONSTRUED TO PERMIT DEVIATION FROM THE

REQUIREMENTS OF THE GOVERNING CODES.

5. THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL FURNISH ALL MATERIALS, LABOR,

EQUIPMENT, TRANSPORTATION, AND SERVICES NECESSARY TO COMPLETE THE WORK AS

INDICATED ON THE DRAWINGS, AS REQUIRED BY CODE, AND AS SPECIFIED HEREIN,

EXCEPT AS PROVIDED BY THE OWNER OR AS OTHERWISE NOTED. ALL SUBSTITUTIONS

MUST BE APPROVED BY GOVERNMENT.

6. ALL MATERIAL AND EQUIPMENT SHALL BE NEW, FULL WEIGHT AND OF THE BEST QUALITY

AND SHALL BE INSTALLED IN NEAR AND WORKMANLIKE MANNER BY COMPETENT

SPECIALIST FOR EACH SUB-TRADE. ALL ITEMS REQUIRED TO INSURE PROPER

INSTALLATION SHALL BE PROVIDED BY THE CONTRACTOR AND/OR SUBCONTRACTOR EVEN

THOUGH NOT SPECIFIED ON THE DRAWINGS.

7. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL BE RESPONSIBLE FOR THE

APPROPRIATE CONNECTION TO ALL UTILITIES REQUIRED TO SUPPORT THEIR WORK.

WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED, THE DETAILS SHALL BE THE

SAME AS FOR SIMILAR WORK.

8. THE CONTRACTOR SHALL COORDINATE WORK WITH WORK PERFORMED BY OTHER

CONTRACTORS. SUBCONTRACTORS ARE CONSIDERED SPECIALIST IN THEIR FIELD AND

SHALL NOTIFY THE CONTRACTOR OF ANY WORK CALLED OUR ON THE DRAWINGS IN THEIR

TRADE THAT THEY CANNOT FULLY GUARANTEE. ALL DISCREPANCIES SHALL BE BROUGHT

THE ATTENTION OF THE ARCHITECT FOR RESOLUTION PRIOR TO COMMENCEMENT OF

WORK.

9. ALL PROPERTY DAMAGED BY WORK UNDER THIS CONTRACT SHALL BE REPAIRED AND/OR

REPLACED TO THE SATISFACTION OF THE OWNER.

10. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL PROVIDE SUFFICIENT MEANS FOR

PROTECTION OF EXISTING INTERIOR FINISHES AS WELL AS NEW CONSTRUCTION AND

MATERIALS FROM DAMAGE BY WEATHER OR VANDALS DURING THE COURSE OF PROJECT

CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL BARRICADES, FENCES, TO

SCREEN THE PROJECT FROM THE PUBLIC VIEW AND FOR PUBLIC PROTECTIONS AS

REQUIRED BY CODE OR LOCAL ORDINANCES.

11. THE CONTRACTOR SHALL PROVIDE BARRICADES, FENCES, TO SCREEN THE PROJECT

FROM THE PUBLIC VIEW AND FOR PUBLIC PROTECTION AS REQUIRED BY THE CODE OR

OTHER LOCAL ORDINANCE.

12. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE OF RUBBISH AND

WASTE MATERIALS BY THE WORK.

13. UPON COMPLETION OF THE WORK, ALL WORK AREAS SHALL BE THOROUGHLY CLEANED

TO THE APPROVAL OF THE OWNER.

14. ALL EXISTING EQUIPMENT REMOVED DURING DEMOLITION OR REHABILITATION SHALL BE

DISPOSED OF AS DIRECTED BY THE OWNER.

15. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S LATEST PRINTED

SPECIFICATIONS AND RECOMMENDATIONS.

16. BRACING AND TEMPORARY SUPPORTS SHALL BE PROVIDED AS REQUIRED TO HOLD THE

WORK SECURED IN PLACE, AND TO SUSTAIN ALL LOADS THAT MAY OCCUR DURING

ERECTION AND UNTIL SUBSEQUENT CONSTRUCTION IN ADEQUATE TO REPLACE

TEMPORARY BRACING.

17. ALL SHORING AND BRACING SHALL BE IN ACCORDANCE WITH CURRENT STATE

REQUIREMENTS AND OTHER PUBLIC AGENCIES HAVING JURISDICTION.

18. SHOULD ANY CONDITIONS ARISE WHERE WHERE THE INTENT OF THE DRAWINGS IS IN

DOUBT, OR WHERE THERE IS A DISCREPANCY OR APPEARS TO BE AN ERROR ON THE

DRAWINGS OR BETWEEN THE DRAWINGS AND FIELD CONDITIONS. THE ARCHITECT AND

STRUCTURAL ENGINEER SHALL BE NOTIFIED AS SOON AS REASONABLE POSSIBLE TO BE

FOR THE PROCEDURE TO BE FOLLOWED. NO STRUCTURAL CHANGES SHALL BE WITHOUT

PRIOR WRITTEN DIRECTION AND APPROVAL OF THE STRUCTURAL ENGINEERING.

19. THE CONTRACTOR SHALL FURNISH AND MAINTAIN TEMPORARY SANITATION FACILITIES AS

REQUIRED DURING CONSTRUCTION

20. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY AND SHALL PROVIDE PEDESTRIAN

PROTECTION BARRICADES, LIGHTING, ETC. AS REQUIRED BY LOCAL AUTHORITIES.

21. OBTAIN PERMITS FROM STATE AND LOCAL JURISDICTION FOR ALL EXCAVATION FIVE FEET

AND GREATER IN DEPTH IN WHICH A PERSON IS REQUIRED TO DESCEND.

22. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION

AND SHALL OBTAIN REQUIRED APPROVALS AND PERMITS.

23. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA FREE OF ALL DEBRIS AND

BROOM CLEAN TO THE SATISFACTION OF THE OWNER AND THE ARCHITECT.

24. THE CONTRACTOR SHALL VERIFY THE LOCATION, SIZE, AND DEPTH OF ALL UTILITIES

PRIOR TO START OF CONSTRUCTION AND IS RESPONSIBLE FOR REPAIR TO THE

STANDARDS OF UTILITY COMPANIES ANY DAMAGE TO EXISTING UTILITIES.

25. THE CONTRACTOR SHALL CARRY LIABILITY INSURANCE AND WORKMEN'S COMPENSATION

INSURANCE AS REQUIRED BY THE STATE AND GOVERNING AUTHORITIES.

26. THE GENERAL CONTRACTOR IS RESPONSIBLE TO PROVIDE OPENING, PENETRATIONS, ETC.

REBURIED BY NOR SPECIALLY SHOWN FOR COMPLETIONS OF PLUMBING ELECTRICAL AND

MECHANICAL INSTALLATION.

27. THE CONTRACTOR OR SUBCONTRACTOR IS RESPONSIBLE TO REPAIR OR REPLACE ALL

DAMAGED WORK CAUSED BY THE CONTRACTOR OR SUBCONTRACTOR.

28. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL TRADES UNTIL COMPLETION

OF WORK.

29. THE CONTRACTOR SHALL ENSURE THAT ALL NECESSARY BLOCKING AND BACKING FOR

ALL WALL MOUNTED ACCESSORIES, FIXTURES, ETC. IS INSTALLED PROPERLY.

30. ALL DETAILS, SECTIONS, AND NOTES SHOWN ARE INTENDED TO BE TYPICAL AND SHALL

APPLY TO SIMILAR CONDITION UNLESS NOTED OTHERWISE. DETAILS ARE USUALLY KEYED

AND NOTED "TYPICAL" ONLY WHEN THEY FIRST OCCUR.

31. CONTRACTOR SHALL MAINTAIN 1-HOUR CONSTRUCTION BARRIER DURING THE DURATION

ON CONSTRUCTION.

WHOLE HEALTH

GEORGE E. WAHLEN MEDICAL CENTER

PROJECT# 660-18-252

500 FOOTHILL BOULEVARD SALT LAKE CITY, UT 84148

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

COVER SHEET

WHOLE HEALTH

5/14/2018

SLC VA HOSPITAL

G100

660-18-252

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

RISK ASSESSMENTS

WHOLE HEALTH

5/14/2018

SLC VA HOSPITAL

G100

660-18-252

FE

FE

FE

FE

C O

P I E

R

COPIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

B.14 BASEMENT FLOOR PLAN

WHOLE HEALTH

5/14/2018

B.14 - BASEMENT

G101

660-18-252

SCALE: NTS

AutoCAD SHX Text

DF

AutoCAD SHX Text

BB03D

AutoCAD SHX Text

BA11

AutoCAD SHX Text

TRUE N

SAFE

REF

1C01 1C03 1C05

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

B.14 1ST FLOOR PLAN

WHOLE HEALTH

5/14/2018

B.14 - FIRST FLOOR G102

660-18-252

SCALE: NTS

AutoCAD SHX Text

TRUE N

MREF

MREF

TV

CABLE

WAY

TV

TV

TV

TV

TV

TV

COPIER

MREF

B.1, 1st Floor rm 1H01 CT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

B.1 1ST FLOOR PLAN

WHOLE HEALTH

5/14/2018

B.1 - FIRST FLOOR

G103

660-18-252

SCALE: NTS

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DF

AutoCAD SHX Text

UP

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

ESTCODE

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DOWN

AutoCAD SHX Text

TRUE N

2 3 4

2 3 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. SEE PRE-CONSTRUCTION ASBESTOS SURVEY.

2. CONTRACTOR SHALL MAINTAIN 1-HOUR

CONSTRUCTION BARRIER OR UPRIGHT

SPRINKLERS THROUGHOUT DURATION ON

CONSTRUCTION ACTIVITIES.

KEYED NOTES

1. REMOVE EXISTING DOOR AND FRAME.

2. DEMO EXISTING CEILING GRID, TILES, AND

DIFFUSERS. REUSE EXISTING LIGHTS.

3. REMOVE AND DISPOSE OF ALL CABINETRY AND

MILLWORK.

4. REMOVE EXISTING COVE BASE, CARPET, AND

FLOOR TILE.

DEMO PLAN

WHOLE HEALTH

5/14/2018

B.14 - BASEMENT

D101

660-18-252

BA11 BB03D

SCALE: 12" = 1'

AutoCAD SHX Text

TRUE N

HVAC

1 2 4

5 6

2 3 1 2 4

9 10

10 11

1111 12

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. SEE PRE-CONSTRUCTION ASBESTOS SURVEY.

2. CONTRACTOR SHALL MAINTAIN 1-HOUR

CONSTRUCTION BARRIER OR UPRIGHT SPRINKLERS

THROUGHOUT DURATION ON CONSTRUCTION

ACTIVITIES.

KEYED NOTES

1. DEMOLISH DOOR, FRAME, AND HARDWARE. INFILL

WALL WITH 3-5

8" METAL STUDS AND 58" DRYWALL.

2. DEMOLISH EXISTING BLACK WINDOW SILL, INFILL TO

MATCH EXISTING WALL WITH 3-5

8" METAL STUDS AND

8" DRYWALL.

3. REMOVE EXISTING SINK, CUT AND CAP WATERLINES

TO CODE.

4. REMOVE EXISTING FUME HOOD.

5. DEMOLISH EXISTING EXHAUST DUCT CHASE.

6. DEMOLISH WALL MOUNTED ELECTRICAL POWER

STRIPS.

7. DEMOLISH ARCHITECTURAL SHEET METAL SILL FOR

NEW WORK.

8. REMOVE AND DISPOSE OF ALL CABINETRY AND

MILLWORK.

9. DEMO EXISTING CEILING GRID, CEILING TILES,

DIFFUSERS, AND LIGHTS.

10. REMOVE EXISTING COVE BASE AND FLOOR TILE.

11. REMOVE WALLS

12. DEMOLISH TWO ELECTRICAL OUTLET - 240V.

13. DEMO EXISTING LIGHT FIXTURES.

DEMO PLAN WHOLE HEALTH

5/14/2018

B.14 - FIRST FLOOR

D102

660-18-252

SCALE: 14" = 1'SCALE: 14" = 1'

AutoCAD SHX Text

TRUE N

1 2

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. SEE PRE-CONSTRUCTION ASBESTOS SURVEY.

2. CONTRACTOR SHALL MAINTAIN 1-HOUR

CONSTRUCTION BARRIER OR UPRIGHT SPRINKLERS

THROUGHOUT DURATION ON CONSTRUCTION

ACTIVITIES.

KEYED NOTES

1. DEMO EXISTING CEILING GRID, CEILING TILES, AND

DIFFUSERS.

2. REMOVE EXISTING COVE BASE, CARPET, AND FLOOR

TILE. MAY CONTAIN ASBESTOS - SEE

PRE-CONSTRUCTION ASBESTOS SURVEY.

DEMO PLAN

WHOLE HEALTH

5/14/2018

B.1 - FIRST FLOOR

D103

660-18-252

SCALE: 12" = 1'

AutoCAD SHX Text

TRUE N

2 31

11 2 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. PATCH AND REPAIR EXISTING WALLS AS NEEDED.

PAINT PER FINISH SCHEDULE.

KEYED NOTES

1. 5

8" GYPSUM BOARD EACH SIDE OF 3-5

8" METAL STUD

16" O.C. WITH 3" SOUND ATTENUATION BATT.

EXTEND WALL TO STRUCTURAL DECK ABOVE.

SOUND CAULK HEAD AND FLOOR TRACK.

2. PATCH, LEVEL AND PREP FLOOR SLAB FOR NEW

FLOORING.

3. PAINT DOOR FRAME - SEE FINISH SCHEDULE.

ARCHITECTURAL PLAN

WHOLE HEALTH

5/14/2018

B.14 - BASEMENT

A101

660-18-252

SCALE: 12" = 1'

AutoCAD SHX Text

BA11

AutoCAD SHX Text

BB03D

AutoCAD SHX Text

TRUE N

1 2

1 2

1 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. PATCH AND REPAIR EXISTING WALLS AS NEEDED.

PAINT PER FINISH SCHEDULE.

KEYED NOTES

1. 5

8" GYPSUM BOARD EACH SIDE OF 3-5

8" METAL STUD

16" O.C. WITH 3" SOUND ATTENUATION BATT.

EXTEND WALL TO STRUCTURAL DECK ABOVE. SOUND

CAULK HEAD AND FLOOR TRACK.

2. INSTALL NEW DOOR AND HARDWARE - SEE DOOR

SCHEDULE.

3. PAINT EXISTING DOOR AND FRAME - SEE FINISH

SCHEDULE.

4. PATCH, LEVEL, AND PREP FLOOR SLAB FOR NEW

FLOORING.

5. NEW 12" SOLID SURFACE WINDOW SILL WITH 1"

BULLNOSE EDGE.

6. TAKE EXISTING CORRIDOR WALL TO THE STURCTUAL

DECK ABOVE. REPAIR CEILINGS AS NEEDED.

ARCHITECTURAL PLAN WHOLE HEALTH

5/14/2018

B.14 - FIRST FLOOR

A102

660-18-252

SCALE: 14" = 1'

AutoCAD SHX Text

TRUE N

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. PATCH AND REPAIR WALLS AS NEEDED FOR NEW

FINISH.

2. PATCH, LEVEL, AND PREP FLOOR SLAB FOR NEW

FLOORING.

ARCHITECTURAL PLAN

WHOLE HEALTH

5/14/2018

B.1 - FIRST FLOOR

A103

660-18-252

SCALE: 12" = 1'

AutoCAD SHX Text

TRUE N

A-115

A-115 A-115 A-115

1'-0 1/2"

3 1/8"

EQ

EQ

PA

RT

IT

IO

N W

ID

TH

1"

F

IE

LD

V

ER

IF

Y W

AL

L W

ID

TH

(E) WALL - FIELD

VERIFY

WALL THICKNESS(E) 5/8" GYP BD. PROVIDE

(N)

GYP. BD. AS REQUIRED -

PATCH

AND REPAIR(N) DOUBLE STUDS AT

DOOR

JAMB - EXTEND STUDS

TO

DECK/STRUCTURE

ABOVE

(N) DOOR &

HARDWARE -

SEE SCHEDULE(N) FRAME

ANCHORS -

PROVIDE AT 12"

O.C.

(N) HOLLOW METAL

FRAME - SEE

SCHEDULE

A-114

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ARCHITECTURAL PLAN

WHOLE HEALTH

5/14/2018

B.14 - BASEMENT

A101

660-18-252

AutoCAD SHX Text

%%UDOOR DETAILS

AutoCAD SHX Text A

AutoCAD SHX Text

CROSS RUNNER

AutoCAD SHX Text

MAIN RUNNER

AutoCAD SHX Text

12'-0" MAX.

AutoCAD SHX Text

6'-0" MAX.

AutoCAD SHX Text

12'-0" MAX.

AutoCAD SHX Text

6'-0" MAX.

AutoCAD SHX Text

12'-0" MAX.

AutoCAD SHX Text

12'-0" MAX.

AutoCAD SHX Text

12'-0" MAX.

AutoCAD SHX Text

6'-0" MAX.

AutoCAD SHX Text

6'-0" MAX.

AutoCAD SHX Text

4'-0'' MAX.

AutoCAD SHX Text

VERTICAL WIRES 12 GA. GALV. @ 4'-0" O.C. @ EA. ACH RUNNER

AutoCAD SHX Text

SPLAY WIRES 12 GA. GALV. @ 12'-0" IN PLANE OF EA. COMPONENT

AutoCAD SHX Text

45° MAX.

AutoCAD SHX Text

45° MAX.

AutoCAD SHX Text

45° MAX.

AutoCAD SHX Text

45° MAX.

AutoCAD SHX Text PRE-ENGINEERED RIGID VERTICAL STRUT OR 2 " 20 GA. MTL. STUD 12" 20 GA. MTL. STUD ADJACENT TO VERT. HANGING WIRE

AutoCAD SHX Text

2" MIN.

AutoCAD SHX Text

2" MIN.

AutoCAD SHX Text ALL CEILING MOUNTED LIGHT FIXTURES SHALL BE ATTACHED TO SUSPENDED CEILING GRID, IN ADDITION 12 GA. HANGER WIRES SHALL BE ATTACHED TO THE GRID WITHIN 3" OF EACH CORNER OF THE FIXTURE. TWO ADDITIONAL WIRES SHALL BE CONNECTED TO THE LIGHT HOUSING AND TO THE STRUCTURE ABOVE (THESE WIRES MAY BE SLACK). WIRES SHALL NOT ATTACH TO OR BEND AROUND INTERFERING MATERIAL OR EQUIPMENT, NOR SHALL THEY BE CLOSER THAN 6" FROM ANY UN-BRACED HORIZONTAL PIPING OR DUCTWORK. A TRAPEZE OR SIMILAR DEVICE SHALL BE USED WHERE OBSTRUCTIONS OCCUR.

AutoCAD SHX Text

CROSS RUNNERS

AutoCAD SHX Text

MAIN RUNNERS

AutoCAD SHX Text

1. ALL SPLAY WIRES TO BE IN-LINE WITH ATTACHED COMPONENT. ALL SPLAY WIRES TO BE IN-LINE WITH ATTACHED COMPONENT. 2. ALL SPLAY TO BE TAUT AND TIED BOTH ENDS W/ MIN. OF 3 TURNS IN 1" OF RUN. ALL SPLAY TO BE TAUT AND TIED BOTH ENDS W/ MIN. OF 3 TURNS IN 1" OF RUN. 3. FIRST LINE OF BRACING 4'-0" OR LESS FROM WALL OR BOUNDARY. FIRST LINE OF BRACING 4'-0" OR LESS FROM WALL OR BOUNDARY. 4. INSTALLATION SHALL BE IN ACCORDANCE W/ IBC 2009INSTALLATION SHALL BE IN ACCORDANCE W/ IBC 2009

AutoCAD SHX Text

GRID SUSPENSION SYSTEM SHALL BE HEAVY-DUTY RATED

AutoCAD SHX Text AREAS SMALLER THAN 1000 SQ. FT. W/ WALLS ON FOUR SIDES DO NOT REQUIRE HORIZONTAL RESTRAINT WIRE OR RIGID BRACING

AutoCAD SHX Text

2" WALL ANGLE ONE END FASTENED TO T-GRID, ONE END CUT " SHORT 34" SHORT TO FLOAT

AutoCAD SHX Text

HEAVY DUTY T-BAR GRID SUSPENSION SYSTEM

AutoCAD SHX Text

VERTICAL SURFACE

AutoCAD SHX Text

SUSPENDED ACOUSTICAL CEILING TILE

AutoCAD SHX Text

ROOF STRUCTURE

AutoCAD SHX Text

SCALE: NO SCALE

AutoCAD SHX Text

TYP. SUSPENDED CEILING DETAIL

AutoCAD SHX Text

SCALE: NO SCALE

AutoCAD SHX Text

TYP. SEISMIC BRACING DETAIL

AutoCAD SHX Text

SCALE: NO SCALE

AutoCAD SHX Text

TYP. SUSPENDED CEILING SUPPORT

AutoCAD SHX Text

SCALE: NO SCALE

AutoCAD SHX Text

TYP. SUSPENDED CEILING SUPPORT

AutoCAD SHX Text

SCALE: NO SCALE

AutoCAD SHX Text

TYP. DOOR FRAME DETAIL

AutoCAD SHX Text

1. DOOR DOOR 1 HINGE SET - 3 HINGE 1 LOCKSET - BEST LOCKSET LOCKSET 93K7AB 15D-S3-626 1 WALL STOP - L02101 CONVEX OR EQUAL OR EQUAL 1 KICK PLATE - 12" KICK PLATE

AutoCAD SHX Text

DOOR HARDWARE

AutoCAD SHX Text

TRUE N

JJ SP

A

J SP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. VERIFY ALL ELECTRICAL AND DATA LOCATIONS WITH

VA REPRESENTATIVE PRIOR TO ROUGH-IN.

2. DATA JACK TO INCLUDE NEW 2"X4" J-BOX AND NEW

CONDUIT TO ABOVE CEILING

TELECOMMUNICATIONS WIRING. TERMINATE

THREE CABLES; RED, WHITE AND BLUE.

3. LABEL ALL EXISTING AND NEW ELECTRICAL AND

DATA CIRCUITS.

ELECTRICAL PLAN

WHOLE HEALTH

5/14/2018

B.14 - BASEMENT

E101

660-18-252

2x2 LAY-IN TROFFER LIGHT FIXTURE

OCCUPANCY SENSOR

JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION

RECEPTACLE, QUADPLEX

DUPLEX OUTLET

COMBINATION DATA/TELEPHONE COMMUNCATION

SCALE: 12" = 1'

AutoCAD SHX Text

BA11

AutoCAD SHX Text

BB03D

AutoCAD SHX Text

TRUE N

J SP J SP J SP J SP J SP

JJ SP

JJ SP

JJ SP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. VERIFY ALL ELECTRICAL AND DATA LOCATIONS WITH

VA REPRESENTATIVE PRIOR TO ROUGH-IN.

2. DATA JACK TO INCLUDE NEW 2"X4" J-BOX AND NEW

CONDUIT TO ABOVE CEILING

TELECOMMUNICATIONS WIRING. TERMINATE THREE

CABLES; RED, WHITE AND BLUE.

3. INSTALL FIVE NEW 2"X4" J-BOX AND CONDUIT ABOVE

FOR POWER.

4. LABEL ALL EXISTING AND NEW ELECTRICAL AND

DATA CIRCUITS.

ELECTRICAL PLAN

WHOLE HEALTH

5/14/2018

B.14 - FIRST FLOOR

E102

660-18-252

2x2 LAY-IN TROFFER LIGHT FIXTURE

OCCUPANCY SENSOR

JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION

RECEPTACLE, QUADPLEX

DUPLEX OUTLET

COMBINATION DATA/TELEPHONE COMMUNCATION

A

J SP

SCALE: 14" = 1'

AutoCAD SHX Text

TRUE N

JJ

S P

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. VERIFY ALL ELECTRICAL AND DATA LOCATIONS WITH

VA REPRESENTATIVE PRIOR TO ROUGH-IN.

2. DATA JACK TO INCLUDE NEW 2"X4" J-BOX AND NEW

CONDUIT TO ABOVE CEILING TELECOMMUNICATIONS

WIRING. TERMINATE THREE CABLES; RED, WHITE AND

BLUE.

ELECTRICAL PLAN

WHOLE HEALTH

5/14/2018

B.1 - FIRST FLOOR

E103

660-18-252

2x2 LAY-IN TROFFER LIGHT FIXTURE

OCCUPANCY SENSOR

JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION

RECEPTACLE, QUADPLEX

DUPLEX OUTLET

COMBINATION DATA/TELEPHONE COMMUNCATION

A

J SP

SCALE: 12" = 1'

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

AutoCAD SHX Text

TRUE N

A A A

A

A

A A

A A

A

J SP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

REFLECTED CEILING PLAN

WHOLE HEALTH

5/14/2018

B.14 - BASEMENT

RC101

GENERAL NOTES

1. REUSE EXISTING LIGHTING CIRCUITS. NOT TO EXCEED

1700 WATTS PER CIRCUIT.

2. CENTER ALL CEILING MOUNTED LIGHT FIXTURES AND

DEVICES IN CEILING TILE, UNLESS OTHERWISE NOTED.

3. REUSE EXISTING OCCUPANCY SENSORS. ALL

VACANCY/OCCUPANCY SENSORS MINIMUM OF 6

FEET FROM SUPPLY AIR DIFFUSERS AND 3 FEET FROM

RETURN AIR DIFFUSERS.

4. REUSE EXISTING WALL SWITCH WITH DIMMER..

660-18-252

2x2 LAY-IN TROFFER LIGHT FIXTURE

OCCUPANCY SENSOR

JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION

RECEPTACLE, QUADPLEX

DUPLEX OUTLET

COMBINATION DATA/TELEPHONE COMMUNICATION

SCALE: 12" = 1'

SWITCH, DIMMER

AutoCAD SHX Text

BA11

AutoCAD SHX Text

BB03D

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

D

A A A A A

A A

AA

AAAAA

AA

A A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. REUSE EXISTING LIGHTING CIRCUITS. NOT TO EXCEED

1700 WATTS PER CIRCUIT.

2. CENTER ALL CEILING MOUNTED LIGHT FIXTURES AND

DEVICES IN CEILING TILE, UNLESS OTHERWISE NOTED.

3. LOCATE ALL VACANCY/OCCUPANCY SENSORS

MINIMUM OF 6 FEET FROM SUPPLY AIR DIFFUSERS

AND 3 FEET FROM RETURN AIR DIFFUSERS.

REFLECTED CEILING PLAN

WHOLE HEALTH

5/14/2018

B.14 - FIRST FLOOR

RC102

2x2 LAY-IN TROFFER LIGHT FIXTURE

OCCUPANCY SENSOR

JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION

RECEPTACLE, QUADPLEX

DUPLEX OUTLET

COMBINATION DATA/TELEPHONE COMMUNICATION

A

J SP

SCALE: 14" = 1'

SWITCH, DIMMER

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

A

A A

A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

REFLECTED CEILING

WHOLE HEALTH

5/14/2018

B.1 - FIRST FLOOR

RC103

660-18-252

GENERAL NOTES

1. REUSE EXISTING LIGHTING CIRCUITS. NOT

TO EXCEED 1700 WATTS PER CIRCUIT.

2. CENTER ALL CEILING MOUNTED LIGHT

FIXTURES AND DEVICES IN CEILING TILE,

UNLESS OTHERWISE NOTED.

3. LOCATE ALLVACANCY/OCCUPANCY

SENSORS MINIMUM OF 6 FEET FROM

SUPPLY AIR DIFFUSERS AND 3 FEET FROM

RETURN AIR DIFFUSERS.

2x2 LAY-IN TROFFER LIGHT FIXTURE

OCCUPANCY SENSOR

JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION

RECEPTACLE, QUADPLEX

DUPLEX OUTLET

COMBINATION DATA/TELEPHONE COMMUNICATION

A

J SP

SCALE: 12" = 1'

SWITCH, DIMMER

AutoCAD SHX Text D

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

VHASLCBaptiD Rectangle

T

T

T

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

GENERAL NOTES

1. REUSE EXISTING PNEUMATIC THERMOSTATS AND

TUBING.

2. EXTEND EXISTING SUPPLY DUCTWORK, MAINTAINED

FROM DEMOLITION AND RECONNECT AT NEW

DIFFUSER LOCATION, MATCH EXISTING SIZE FOR

SERVICE.

3. EXTEND EXISTING RETURN DUCTWORK, MAINTAINED

FROM DEMOLITION AND RECONNECT AT NEW

DIFFUSER LOCATION.

4. REINSTALL EXISTING THERMOSTAT IN APPROXIMATE

LOCATION. COORDINATE EXACT LOCATION WITH

OWNER AND FURNITURE. EXTEND EXISTING

PNEUMATIC TUBING MAINTAINED FROM

DEMOLITION, AND RECONNECT TO THERMOSTAT.

5. SEE ME101 FOR EXISTING HVAC CONFIGURATIONS..

KEYED NOTES

1. SEE TABLE FOR DIFFUSER (D1) SCHEDULE.

2. SEE TABLE FOR RETURN GRILLE SCHEDULE (R1).

HVAC PLAN

WHOLE HEALTH

5/14/2018

B.14 - FIRST FLOOR

ME102

1. PROVIDE TRANSITION AS NECESSARY.

2. FACTORY WHITE FINISH.

3. ACCEPTABLE MANUFACTURERS: PRICE, KRUEGER, TITUS, OR APPROVED EQUAL.

SCALE: 14" = 1'

AutoCAD SHX Text

TRUE N

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

REFLECTED CEILING PLAN

WHOLE HEALTH

5/14/2018

B.14 - BASEMENT

RC101

660-18-252

SCALE: 12" = 1'

2-HOUR FIRE RATE WALL

GENERAL NOTES

1. CONTRACTOR SHALL REPAIR AND/OR FIRE STOP

ALL PENETRATIONS TO MAINTAIN PROPER FIRE

RATING, PER DRAWING.

AutoCAD SHX Text

BA11

AutoCAD SHX Text

BB03D

AutoCAD SHX Text

TRUE N

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

FIRE SUPPRESION PLAN

WHOLE HEALTH

5/14/2018

B.14 - FIRST FLOOR

F102

SCALE: 14" = 1'

2-HOUR FIRE RATE WALL

GENERAL NOTES

1. CONTRACTOR SHALL REPAIR AND/OR FIRE STOP

ALL PENETRATIONS TO MAINTAIN PROPER FIRE

RATING, PER DRAWING.

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

AutoCAD SHX Text

TRUE N

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

REFLECTED CEILING

WHOLE HEALTH

5/14/2018

B.1 - FIRST FLOOR

RC103

660-18-252

SCALE: 12" = 1'

2-HOUR FIRE RATE WALL

GENERAL NOTES

1. CONTRACTOR SHALL REPAIR AND/OR FIRE STOP

ALL PENETRATIONS TO MAINTAIN PROPER FIRE

RATING, PER DRAWING.

AutoCAD SHX Text

TRUE N

AutoCAD SHX Text

REF N

AutoCAD SHX Text

TRUE N

File details come from the government source that posted it.