36C25919R0010-004.pdf
PDF 9 MB Posted
- Attached to
- Whole Health Office Construction Federal contract opportunity
- Solicitation number
- 36C25919R0010
About this file
36C25919R0010 660-18-252 Whole Health Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25919C0064_1.docx | DOCX document | |
| 36C25919R0010-0002000.docx | DOCX document | |
| 36C25919R0010-0002001.pdf | ||
| 36C25919R0010-0002002.pdf | ||
| 36C25919R0010-0001000.docx | DOCX document | |
| 36C25919R0010-0001001.pdf | ||
| 36C25919R0010-0001002.pdf | ||
| 36C25919R0010-005.pdf | ||
| 36C25919R0010-006.docx | DOCX document | |
| 36C25919R0010-003.pdf | ||
| 36C25919R0010-002.docx | DOCX document | |
| 36C25919R0010-007.docx | DOCX document | |
| 36C25919R0010-001.docx | DOCX document | |
| 36C25919R0010-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
AERIAL MAP N.T.S. NORTH
GENERAL NOTES
G100 COVER SHEET
G101 B. 14 BASEMENT PLAN
G102 B. 14 FIRST FLOOR PLAN
G103 B. 1 FIRST FLOOR PLAN
D101 B. 14 BASEMENT DEMO
D102 B. 14 FIRST FLOOR DEMO
D103 B. 1 FIRST FLOOR DEMO
A101 B. 14 BASEMENT ARCHITECTURAL
A102 B. 14 FIRST FLOOR ARCHITECTURAL
A103 B. 1 FIRST FLOOR ARCHITECTURAL
A201 DETAILS
E101 B. 14 BASEMENT ELECTRICAL
E102 B. 14 FIRST FLOOR ELECTRICAL
E103 B. 1 FIRST FLOOR ELECTRICAL
RC101 B. 14 BASEMENT REFLECT CEILING
RC102 B. 14 FIRST FLOOR REFLECT CEILING
RC103 B. 1 FIRST FLOOR REFLECT CEILING
ME101 B. 14 FIRST FLOOR MECHANICAL CURRENT
ME102 B. 14 FIRST FLOOR MECHANICAL
F101 B. 14 BASEMENT SPRINKLER
F102 B. 14 FIRST FLOOR SPRINKLER
F103 B. 1 FIRST FLOOR SPRINKLER
SHEET INDEX
1. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL VISIT THE SITE PRIOR TO THE
SUBMITTAL OF BIDS. NO PERSON, OR CORPORATION SHALL ERECT, CONSTRUCT,
ENLARGE, ALTER, REPAIR, MOVE IMPROVE, REMOVE, CONVERT, OR DEMOLISH ANY
BUILDING OR STRUCTURE IN THE SITE, OR CAUSE THE SAME TO BE DONE WITHOUT FIRST
OBTAINING BUILDING PERMIT FOR EACH SUCH BUILDING OR STRUCTURE FROM THE
BUILDING OFFICIAL.
2. THE CONTRACTOR OR SUBCONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY ALL
EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING ANY WORK. ALL
DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT UPON DISCOVERY.
3. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. LARGER
SCALE DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
4. IT IS THE INTENT OF THESE DRAWINGS TO MEET OR EXCEED ALL APPLICABLE
REGULATIONS OF ALL GOVERNING AUTHORITIES. ALL WORK SHALL CONFORM TO THE
LATEST U.B.C. OR AS AMENDED BY FEDERAL BUILDING CODE AUTHORITY AND TO THE
LATEST EDITIONS OF ALL OTHER APPLICABLE CODES OR REQUIREMENTS OF ALL OTHER
REGULATING AGENCIES HAVE AUTHORITY OVER ANY PORTION OF THE WORK. NOTHING IN
THESE DOCUMENTS SHALL BE CONSTRUED TO PERMIT DEVIATION FROM THE
REQUIREMENTS OF THE GOVERNING CODES.
5. THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL FURNISH ALL MATERIALS, LABOR,
EQUIPMENT, TRANSPORTATION, AND SERVICES NECESSARY TO COMPLETE THE WORK AS
INDICATED ON THE DRAWINGS, AS REQUIRED BY CODE, AND AS SPECIFIED HEREIN,
EXCEPT AS PROVIDED BY THE OWNER OR AS OTHERWISE NOTED. ALL SUBSTITUTIONS
MUST BE APPROVED BY GOVERNMENT.
6. ALL MATERIAL AND EQUIPMENT SHALL BE NEW, FULL WEIGHT AND OF THE BEST QUALITY
AND SHALL BE INSTALLED IN NEAR AND WORKMANLIKE MANNER BY COMPETENT
SPECIALIST FOR EACH SUB-TRADE. ALL ITEMS REQUIRED TO INSURE PROPER
INSTALLATION SHALL BE PROVIDED BY THE CONTRACTOR AND/OR SUBCONTRACTOR EVEN
THOUGH NOT SPECIFIED ON THE DRAWINGS.
7. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL BE RESPONSIBLE FOR THE
APPROPRIATE CONNECTION TO ALL UTILITIES REQUIRED TO SUPPORT THEIR WORK.
WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED, THE DETAILS SHALL BE THE
SAME AS FOR SIMILAR WORK.
8. THE CONTRACTOR SHALL COORDINATE WORK WITH WORK PERFORMED BY OTHER
CONTRACTORS. SUBCONTRACTORS ARE CONSIDERED SPECIALIST IN THEIR FIELD AND
SHALL NOTIFY THE CONTRACTOR OF ANY WORK CALLED OUR ON THE DRAWINGS IN THEIR
TRADE THAT THEY CANNOT FULLY GUARANTEE. ALL DISCREPANCIES SHALL BE BROUGHT
THE ATTENTION OF THE ARCHITECT FOR RESOLUTION PRIOR TO COMMENCEMENT OF
WORK.
9. ALL PROPERTY DAMAGED BY WORK UNDER THIS CONTRACT SHALL BE REPAIRED AND/OR
REPLACED TO THE SATISFACTION OF THE OWNER.
10. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL PROVIDE SUFFICIENT MEANS FOR
PROTECTION OF EXISTING INTERIOR FINISHES AS WELL AS NEW CONSTRUCTION AND
MATERIALS FROM DAMAGE BY WEATHER OR VANDALS DURING THE COURSE OF PROJECT
CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL BARRICADES, FENCES, TO
SCREEN THE PROJECT FROM THE PUBLIC VIEW AND FOR PUBLIC PROTECTIONS AS
REQUIRED BY CODE OR LOCAL ORDINANCES.
11. THE CONTRACTOR SHALL PROVIDE BARRICADES, FENCES, TO SCREEN THE PROJECT
FROM THE PUBLIC VIEW AND FOR PUBLIC PROTECTION AS REQUIRED BY THE CODE OR
OTHER LOCAL ORDINANCE.
12. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE PREMISES FREE OF RUBBISH AND
WASTE MATERIALS BY THE WORK.
13. UPON COMPLETION OF THE WORK, ALL WORK AREAS SHALL BE THOROUGHLY CLEANED
TO THE APPROVAL OF THE OWNER.
14. ALL EXISTING EQUIPMENT REMOVED DURING DEMOLITION OR REHABILITATION SHALL BE
DISPOSED OF AS DIRECTED BY THE OWNER.
15. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S LATEST PRINTED
SPECIFICATIONS AND RECOMMENDATIONS.
16. BRACING AND TEMPORARY SUPPORTS SHALL BE PROVIDED AS REQUIRED TO HOLD THE
WORK SECURED IN PLACE, AND TO SUSTAIN ALL LOADS THAT MAY OCCUR DURING
ERECTION AND UNTIL SUBSEQUENT CONSTRUCTION IN ADEQUATE TO REPLACE
TEMPORARY BRACING.
17. ALL SHORING AND BRACING SHALL BE IN ACCORDANCE WITH CURRENT STATE
REQUIREMENTS AND OTHER PUBLIC AGENCIES HAVING JURISDICTION.
18. SHOULD ANY CONDITIONS ARISE WHERE WHERE THE INTENT OF THE DRAWINGS IS IN
DOUBT, OR WHERE THERE IS A DISCREPANCY OR APPEARS TO BE AN ERROR ON THE
DRAWINGS OR BETWEEN THE DRAWINGS AND FIELD CONDITIONS. THE ARCHITECT AND
STRUCTURAL ENGINEER SHALL BE NOTIFIED AS SOON AS REASONABLE POSSIBLE TO BE
FOR THE PROCEDURE TO BE FOLLOWED. NO STRUCTURAL CHANGES SHALL BE WITHOUT
PRIOR WRITTEN DIRECTION AND APPROVAL OF THE STRUCTURAL ENGINEERING.
19. THE CONTRACTOR SHALL FURNISH AND MAINTAIN TEMPORARY SANITATION FACILITIES AS
REQUIRED DURING CONSTRUCTION
20. THE CONTRACTOR IS RESPONSIBLE FOR SAFETY AND SHALL PROVIDE PEDESTRIAN
PROTECTION BARRICADES, LIGHTING, ETC. AS REQUIRED BY LOCAL AUTHORITIES.
21. OBTAIN PERMITS FROM STATE AND LOCAL JURISDICTION FOR ALL EXCAVATION FIVE FEET
AND GREATER IN DEPTH IN WHICH A PERSON IS REQUIRED TO DESCEND.
22. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION
AND SHALL OBTAIN REQUIRED APPROVALS AND PERMITS.
23. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA FREE OF ALL DEBRIS AND
BROOM CLEAN TO THE SATISFACTION OF THE OWNER AND THE ARCHITECT.
24. THE CONTRACTOR SHALL VERIFY THE LOCATION, SIZE, AND DEPTH OF ALL UTILITIES
PRIOR TO START OF CONSTRUCTION AND IS RESPONSIBLE FOR REPAIR TO THE
STANDARDS OF UTILITY COMPANIES ANY DAMAGE TO EXISTING UTILITIES.
25. THE CONTRACTOR SHALL CARRY LIABILITY INSURANCE AND WORKMEN'S COMPENSATION
INSURANCE AS REQUIRED BY THE STATE AND GOVERNING AUTHORITIES.
26. THE GENERAL CONTRACTOR IS RESPONSIBLE TO PROVIDE OPENING, PENETRATIONS, ETC.
REBURIED BY NOR SPECIALLY SHOWN FOR COMPLETIONS OF PLUMBING ELECTRICAL AND
MECHANICAL INSTALLATION.
27. THE CONTRACTOR OR SUBCONTRACTOR IS RESPONSIBLE TO REPAIR OR REPLACE ALL
DAMAGED WORK CAUSED BY THE CONTRACTOR OR SUBCONTRACTOR.
28. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL TRADES UNTIL COMPLETION
OF WORK.
29. THE CONTRACTOR SHALL ENSURE THAT ALL NECESSARY BLOCKING AND BACKING FOR
ALL WALL MOUNTED ACCESSORIES, FIXTURES, ETC. IS INSTALLED PROPERLY.
30. ALL DETAILS, SECTIONS, AND NOTES SHOWN ARE INTENDED TO BE TYPICAL AND SHALL
APPLY TO SIMILAR CONDITION UNLESS NOTED OTHERWISE. DETAILS ARE USUALLY KEYED
AND NOTED "TYPICAL" ONLY WHEN THEY FIRST OCCUR.
31. CONTRACTOR SHALL MAINTAIN 1-HOUR CONSTRUCTION BARRIER DURING THE DURATION
ON CONSTRUCTION.
WHOLE HEALTH
GEORGE E. WAHLEN MEDICAL CENTER
PROJECT# 660-18-252
500 FOOTHILL BOULEVARD SALT LAKE CITY, UT 84148
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
COVER SHEET
WHOLE HEALTH
5/14/2018
SLC VA HOSPITAL
G100
660-18-252
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
RISK ASSESSMENTS
WHOLE HEALTH
5/14/2018
SLC VA HOSPITAL
G100
660-18-252
FE
FE
FE
FE
C O
P I E
R
COPIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
B.14 BASEMENT FLOOR PLAN
WHOLE HEALTH
5/14/2018
B.14 - BASEMENT
G101
660-18-252
SCALE: NTS
AutoCAD SHX Text
DF
AutoCAD SHX Text
BB03D
AutoCAD SHX Text
BA11
AutoCAD SHX Text
TRUE N
SAFE
REF
1C01 1C03 1C05
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
B.14 1ST FLOOR PLAN
WHOLE HEALTH
5/14/2018
B.14 - FIRST FLOOR G102
660-18-252
SCALE: NTS
AutoCAD SHX Text
TRUE N
MREF
MREF
TV
CABLE
WAY
TV
TV
TV
TV
TV
TV
COPIER
MREF
B.1, 1st Floor rm 1H01 CT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
B.1 1ST FLOOR PLAN
WHOLE HEALTH
5/14/2018
B.1 - FIRST FLOOR
G103
660-18-252
SCALE: NTS
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DF
AutoCAD SHX Text
UP
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
TRUE N
2 3 4
2 3 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. SEE PRE-CONSTRUCTION ASBESTOS SURVEY.
2. CONTRACTOR SHALL MAINTAIN 1-HOUR
CONSTRUCTION BARRIER OR UPRIGHT
SPRINKLERS THROUGHOUT DURATION ON
CONSTRUCTION ACTIVITIES.
KEYED NOTES
1. REMOVE EXISTING DOOR AND FRAME.
2. DEMO EXISTING CEILING GRID, TILES, AND
DIFFUSERS. REUSE EXISTING LIGHTS.
3. REMOVE AND DISPOSE OF ALL CABINETRY AND
MILLWORK.
4. REMOVE EXISTING COVE BASE, CARPET, AND
FLOOR TILE.
DEMO PLAN
WHOLE HEALTH
5/14/2018
B.14 - BASEMENT
D101
660-18-252
BA11 BB03D
SCALE: 12" = 1'
AutoCAD SHX Text
TRUE N
HVAC
1 2 4
5 6
2 3 1 2 4
9 10
10 11
1111 12
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. SEE PRE-CONSTRUCTION ASBESTOS SURVEY.
2. CONTRACTOR SHALL MAINTAIN 1-HOUR
CONSTRUCTION BARRIER OR UPRIGHT SPRINKLERS
THROUGHOUT DURATION ON CONSTRUCTION
ACTIVITIES.
KEYED NOTES
1. DEMOLISH DOOR, FRAME, AND HARDWARE. INFILL
WALL WITH 3-5
8" METAL STUDS AND 58" DRYWALL.
2. DEMOLISH EXISTING BLACK WINDOW SILL, INFILL TO
MATCH EXISTING WALL WITH 3-5
8" METAL STUDS AND
8" DRYWALL.
3. REMOVE EXISTING SINK, CUT AND CAP WATERLINES
TO CODE.
4. REMOVE EXISTING FUME HOOD.
5. DEMOLISH EXISTING EXHAUST DUCT CHASE.
6. DEMOLISH WALL MOUNTED ELECTRICAL POWER
STRIPS.
7. DEMOLISH ARCHITECTURAL SHEET METAL SILL FOR
NEW WORK.
8. REMOVE AND DISPOSE OF ALL CABINETRY AND
MILLWORK.
9. DEMO EXISTING CEILING GRID, CEILING TILES,
DIFFUSERS, AND LIGHTS.
10. REMOVE EXISTING COVE BASE AND FLOOR TILE.
11. REMOVE WALLS
12. DEMOLISH TWO ELECTRICAL OUTLET - 240V.
13. DEMO EXISTING LIGHT FIXTURES.
DEMO PLAN WHOLE HEALTH
5/14/2018
B.14 - FIRST FLOOR
D102
660-18-252
SCALE: 14" = 1'SCALE: 14" = 1'
AutoCAD SHX Text
TRUE N
1 2
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. SEE PRE-CONSTRUCTION ASBESTOS SURVEY.
2. CONTRACTOR SHALL MAINTAIN 1-HOUR
CONSTRUCTION BARRIER OR UPRIGHT SPRINKLERS
THROUGHOUT DURATION ON CONSTRUCTION
ACTIVITIES.
KEYED NOTES
1. DEMO EXISTING CEILING GRID, CEILING TILES, AND
DIFFUSERS.
2. REMOVE EXISTING COVE BASE, CARPET, AND FLOOR
TILE. MAY CONTAIN ASBESTOS - SEE
PRE-CONSTRUCTION ASBESTOS SURVEY.
DEMO PLAN
WHOLE HEALTH
5/14/2018
B.1 - FIRST FLOOR
D103
660-18-252
SCALE: 12" = 1'
AutoCAD SHX Text
TRUE N
2 31
11 2 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. PATCH AND REPAIR EXISTING WALLS AS NEEDED.
PAINT PER FINISH SCHEDULE.
KEYED NOTES
1. 5
8" GYPSUM BOARD EACH SIDE OF 3-5
8" METAL STUD
16" O.C. WITH 3" SOUND ATTENUATION BATT.
EXTEND WALL TO STRUCTURAL DECK ABOVE.
SOUND CAULK HEAD AND FLOOR TRACK.
2. PATCH, LEVEL AND PREP FLOOR SLAB FOR NEW
FLOORING.
3. PAINT DOOR FRAME - SEE FINISH SCHEDULE.
ARCHITECTURAL PLAN
WHOLE HEALTH
5/14/2018
B.14 - BASEMENT
A101
660-18-252
SCALE: 12" = 1'
AutoCAD SHX Text
BA11
AutoCAD SHX Text
BB03D
AutoCAD SHX Text
TRUE N
1 2
1 2
1 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. PATCH AND REPAIR EXISTING WALLS AS NEEDED.
PAINT PER FINISH SCHEDULE.
KEYED NOTES
1. 5
8" GYPSUM BOARD EACH SIDE OF 3-5
8" METAL STUD
16" O.C. WITH 3" SOUND ATTENUATION BATT.
EXTEND WALL TO STRUCTURAL DECK ABOVE. SOUND
CAULK HEAD AND FLOOR TRACK.
2. INSTALL NEW DOOR AND HARDWARE - SEE DOOR
SCHEDULE.
3. PAINT EXISTING DOOR AND FRAME - SEE FINISH
SCHEDULE.
4. PATCH, LEVEL, AND PREP FLOOR SLAB FOR NEW
FLOORING.
5. NEW 12" SOLID SURFACE WINDOW SILL WITH 1"
BULLNOSE EDGE.
6. TAKE EXISTING CORRIDOR WALL TO THE STURCTUAL
DECK ABOVE. REPAIR CEILINGS AS NEEDED.
ARCHITECTURAL PLAN WHOLE HEALTH
5/14/2018
B.14 - FIRST FLOOR
A102
660-18-252
SCALE: 14" = 1'
AutoCAD SHX Text
TRUE N
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. PATCH AND REPAIR WALLS AS NEEDED FOR NEW
FINISH.
2. PATCH, LEVEL, AND PREP FLOOR SLAB FOR NEW
FLOORING.
ARCHITECTURAL PLAN
WHOLE HEALTH
5/14/2018
B.1 - FIRST FLOOR
A103
660-18-252
SCALE: 12" = 1'
AutoCAD SHX Text
TRUE N
A-115
A-115 A-115 A-115
1'-0 1/2"
3 1/8"
EQ
EQ
PA
RT
IT
IO
N W
ID
TH
1"
F
IE
LD
V
ER
IF
Y W
AL
L W
ID
TH
(E) WALL - FIELD
VERIFY
WALL THICKNESS(E) 5/8" GYP BD. PROVIDE
(N)
GYP. BD. AS REQUIRED -
PATCH
AND REPAIR(N) DOUBLE STUDS AT
DOOR
JAMB - EXTEND STUDS
TO
DECK/STRUCTURE
ABOVE
(N) DOOR &
HARDWARE -
SEE SCHEDULE(N) FRAME
ANCHORS -
PROVIDE AT 12"
O.C.
(N) HOLLOW METAL
FRAME - SEE
SCHEDULE
A-114
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ARCHITECTURAL PLAN
WHOLE HEALTH
5/14/2018
B.14 - BASEMENT
A101
660-18-252
AutoCAD SHX Text
%%UDOOR DETAILS
AutoCAD SHX Text A
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
12'-0" MAX.
AutoCAD SHX Text
6'-0" MAX.
AutoCAD SHX Text
12'-0" MAX.
AutoCAD SHX Text
6'-0" MAX.
AutoCAD SHX Text
12'-0" MAX.
AutoCAD SHX Text
12'-0" MAX.
AutoCAD SHX Text
12'-0" MAX.
AutoCAD SHX Text
6'-0" MAX.
AutoCAD SHX Text
6'-0" MAX.
AutoCAD SHX Text
4'-0'' MAX.
AutoCAD SHX Text
VERTICAL WIRES 12 GA. GALV. @ 4'-0" O.C. @ EA. ACH RUNNER
AutoCAD SHX Text
SPLAY WIRES 12 GA. GALV. @ 12'-0" IN PLANE OF EA. COMPONENT
AutoCAD SHX Text
45° MAX.
AutoCAD SHX Text
45° MAX.
AutoCAD SHX Text
45° MAX.
AutoCAD SHX Text
45° MAX.
AutoCAD SHX Text PRE-ENGINEERED RIGID VERTICAL STRUT OR 2 " 20 GA. MTL. STUD 12" 20 GA. MTL. STUD ADJACENT TO VERT. HANGING WIRE
AutoCAD SHX Text
2" MIN.
AutoCAD SHX Text
2" MIN.
AutoCAD SHX Text ALL CEILING MOUNTED LIGHT FIXTURES SHALL BE ATTACHED TO SUSPENDED CEILING GRID, IN ADDITION 12 GA. HANGER WIRES SHALL BE ATTACHED TO THE GRID WITHIN 3" OF EACH CORNER OF THE FIXTURE. TWO ADDITIONAL WIRES SHALL BE CONNECTED TO THE LIGHT HOUSING AND TO THE STRUCTURE ABOVE (THESE WIRES MAY BE SLACK). WIRES SHALL NOT ATTACH TO OR BEND AROUND INTERFERING MATERIAL OR EQUIPMENT, NOR SHALL THEY BE CLOSER THAN 6" FROM ANY UN-BRACED HORIZONTAL PIPING OR DUCTWORK. A TRAPEZE OR SIMILAR DEVICE SHALL BE USED WHERE OBSTRUCTIONS OCCUR.
AutoCAD SHX Text
CROSS RUNNERS
AutoCAD SHX Text
MAIN RUNNERS
AutoCAD SHX Text
1. ALL SPLAY WIRES TO BE IN-LINE WITH ATTACHED COMPONENT. ALL SPLAY WIRES TO BE IN-LINE WITH ATTACHED COMPONENT. 2. ALL SPLAY TO BE TAUT AND TIED BOTH ENDS W/ MIN. OF 3 TURNS IN 1" OF RUN. ALL SPLAY TO BE TAUT AND TIED BOTH ENDS W/ MIN. OF 3 TURNS IN 1" OF RUN. 3. FIRST LINE OF BRACING 4'-0" OR LESS FROM WALL OR BOUNDARY. FIRST LINE OF BRACING 4'-0" OR LESS FROM WALL OR BOUNDARY. 4. INSTALLATION SHALL BE IN ACCORDANCE W/ IBC 2009INSTALLATION SHALL BE IN ACCORDANCE W/ IBC 2009
AutoCAD SHX Text
GRID SUSPENSION SYSTEM SHALL BE HEAVY-DUTY RATED
AutoCAD SHX Text AREAS SMALLER THAN 1000 SQ. FT. W/ WALLS ON FOUR SIDES DO NOT REQUIRE HORIZONTAL RESTRAINT WIRE OR RIGID BRACING
AutoCAD SHX Text
2" WALL ANGLE ONE END FASTENED TO T-GRID, ONE END CUT " SHORT 34" SHORT TO FLOAT
AutoCAD SHX Text
HEAVY DUTY T-BAR GRID SUSPENSION SYSTEM
AutoCAD SHX Text
VERTICAL SURFACE
AutoCAD SHX Text
SUSPENDED ACOUSTICAL CEILING TILE
AutoCAD SHX Text
ROOF STRUCTURE
AutoCAD SHX Text
SCALE: NO SCALE
AutoCAD SHX Text
TYP. SUSPENDED CEILING DETAIL
AutoCAD SHX Text
SCALE: NO SCALE
AutoCAD SHX Text
TYP. SEISMIC BRACING DETAIL
AutoCAD SHX Text
SCALE: NO SCALE
AutoCAD SHX Text
TYP. SUSPENDED CEILING SUPPORT
AutoCAD SHX Text
SCALE: NO SCALE
AutoCAD SHX Text
TYP. SUSPENDED CEILING SUPPORT
AutoCAD SHX Text
SCALE: NO SCALE
AutoCAD SHX Text
TYP. DOOR FRAME DETAIL
AutoCAD SHX Text
1. DOOR DOOR 1 HINGE SET - 3 HINGE 1 LOCKSET - BEST LOCKSET LOCKSET 93K7AB 15D-S3-626 1 WALL STOP - L02101 CONVEX OR EQUAL OR EQUAL 1 KICK PLATE - 12" KICK PLATE
AutoCAD SHX Text
DOOR HARDWARE
AutoCAD SHX Text
TRUE N
JJ SP
A
J SP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. VERIFY ALL ELECTRICAL AND DATA LOCATIONS WITH
VA REPRESENTATIVE PRIOR TO ROUGH-IN.
2. DATA JACK TO INCLUDE NEW 2"X4" J-BOX AND NEW
CONDUIT TO ABOVE CEILING
TELECOMMUNICATIONS WIRING. TERMINATE
THREE CABLES; RED, WHITE AND BLUE.
3. LABEL ALL EXISTING AND NEW ELECTRICAL AND
DATA CIRCUITS.
ELECTRICAL PLAN
WHOLE HEALTH
5/14/2018
B.14 - BASEMENT
E101
660-18-252
2x2 LAY-IN TROFFER LIGHT FIXTURE
OCCUPANCY SENSOR
JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION
RECEPTACLE, QUADPLEX
DUPLEX OUTLET
COMBINATION DATA/TELEPHONE COMMUNCATION
SCALE: 12" = 1'
AutoCAD SHX Text
BA11
AutoCAD SHX Text
BB03D
AutoCAD SHX Text
TRUE N
J SP J SP J SP J SP J SP
JJ SP
JJ SP
JJ SP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. VERIFY ALL ELECTRICAL AND DATA LOCATIONS WITH
VA REPRESENTATIVE PRIOR TO ROUGH-IN.
2. DATA JACK TO INCLUDE NEW 2"X4" J-BOX AND NEW
CONDUIT TO ABOVE CEILING
TELECOMMUNICATIONS WIRING. TERMINATE THREE
CABLES; RED, WHITE AND BLUE.
3. INSTALL FIVE NEW 2"X4" J-BOX AND CONDUIT ABOVE
FOR POWER.
4. LABEL ALL EXISTING AND NEW ELECTRICAL AND
DATA CIRCUITS.
ELECTRICAL PLAN
WHOLE HEALTH
5/14/2018
B.14 - FIRST FLOOR
E102
660-18-252
2x2 LAY-IN TROFFER LIGHT FIXTURE
OCCUPANCY SENSOR
JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION
RECEPTACLE, QUADPLEX
DUPLEX OUTLET
COMBINATION DATA/TELEPHONE COMMUNCATION
A
J SP
SCALE: 14" = 1'
AutoCAD SHX Text
TRUE N
JJ
S P
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. VERIFY ALL ELECTRICAL AND DATA LOCATIONS WITH
VA REPRESENTATIVE PRIOR TO ROUGH-IN.
2. DATA JACK TO INCLUDE NEW 2"X4" J-BOX AND NEW
CONDUIT TO ABOVE CEILING TELECOMMUNICATIONS
WIRING. TERMINATE THREE CABLES; RED, WHITE AND
BLUE.
ELECTRICAL PLAN
WHOLE HEALTH
5/14/2018
B.1 - FIRST FLOOR
E103
660-18-252
2x2 LAY-IN TROFFER LIGHT FIXTURE
OCCUPANCY SENSOR
JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION
RECEPTACLE, QUADPLEX
DUPLEX OUTLET
COMBINATION DATA/TELEPHONE COMMUNCATION
A
J SP
SCALE: 12" = 1'
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
AutoCAD SHX Text
TRUE N
A A A
A
A
A A
A A
A
J SP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
REFLECTED CEILING PLAN
WHOLE HEALTH
5/14/2018
B.14 - BASEMENT
RC101
GENERAL NOTES
1. REUSE EXISTING LIGHTING CIRCUITS. NOT TO EXCEED
1700 WATTS PER CIRCUIT.
2. CENTER ALL CEILING MOUNTED LIGHT FIXTURES AND
DEVICES IN CEILING TILE, UNLESS OTHERWISE NOTED.
3. REUSE EXISTING OCCUPANCY SENSORS. ALL
VACANCY/OCCUPANCY SENSORS MINIMUM OF 6
FEET FROM SUPPLY AIR DIFFUSERS AND 3 FEET FROM
RETURN AIR DIFFUSERS.
4. REUSE EXISTING WALL SWITCH WITH DIMMER..
660-18-252
2x2 LAY-IN TROFFER LIGHT FIXTURE
OCCUPANCY SENSOR
JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION
RECEPTACLE, QUADPLEX
DUPLEX OUTLET
COMBINATION DATA/TELEPHONE COMMUNICATION
SCALE: 12" = 1'
SWITCH, DIMMER
AutoCAD SHX Text
BA11
AutoCAD SHX Text
BB03D
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
D
A A A A A
A A
AA
AAAAA
AA
A A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. REUSE EXISTING LIGHTING CIRCUITS. NOT TO EXCEED
1700 WATTS PER CIRCUIT.
2. CENTER ALL CEILING MOUNTED LIGHT FIXTURES AND
DEVICES IN CEILING TILE, UNLESS OTHERWISE NOTED.
3. LOCATE ALL VACANCY/OCCUPANCY SENSORS
MINIMUM OF 6 FEET FROM SUPPLY AIR DIFFUSERS
AND 3 FEET FROM RETURN AIR DIFFUSERS.
REFLECTED CEILING PLAN
WHOLE HEALTH
5/14/2018
B.14 - FIRST FLOOR
RC102
2x2 LAY-IN TROFFER LIGHT FIXTURE
OCCUPANCY SENSOR
JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION
RECEPTACLE, QUADPLEX
DUPLEX OUTLET
COMBINATION DATA/TELEPHONE COMMUNICATION
A
J SP
SCALE: 14" = 1'
SWITCH, DIMMER
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
A
A A
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
REFLECTED CEILING
WHOLE HEALTH
5/14/2018
B.1 - FIRST FLOOR
RC103
660-18-252
GENERAL NOTES
1. REUSE EXISTING LIGHTING CIRCUITS. NOT
TO EXCEED 1700 WATTS PER CIRCUIT.
2. CENTER ALL CEILING MOUNTED LIGHT
FIXTURES AND DEVICES IN CEILING TILE,
UNLESS OTHERWISE NOTED.
3. LOCATE ALLVACANCY/OCCUPANCY
SENSORS MINIMUM OF 6 FEET FROM
SUPPLY AIR DIFFUSERS AND 3 FEET FROM
RETURN AIR DIFFUSERS.
2x2 LAY-IN TROFFER LIGHT FIXTURE
OCCUPANCY SENSOR
JUNCTION BOX, SYSTEM FURNITURE POWER CONNECTION
RECEPTACLE, QUADPLEX
DUPLEX OUTLET
COMBINATION DATA/TELEPHONE COMMUNICATION
A
J SP
SCALE: 12" = 1'
SWITCH, DIMMER
AutoCAD SHX Text D
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
VHASLCBaptiD Rectangle
T
T
T
D-1
D-1
D-1
D-1
D-1
D-1
D-1
D-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
GENERAL NOTES
1. REUSE EXISTING PNEUMATIC THERMOSTATS AND
TUBING.
2. EXTEND EXISTING SUPPLY DUCTWORK, MAINTAINED
FROM DEMOLITION AND RECONNECT AT NEW
DIFFUSER LOCATION, MATCH EXISTING SIZE FOR
SERVICE.
3. EXTEND EXISTING RETURN DUCTWORK, MAINTAINED
FROM DEMOLITION AND RECONNECT AT NEW
DIFFUSER LOCATION.
4. REINSTALL EXISTING THERMOSTAT IN APPROXIMATE
LOCATION. COORDINATE EXACT LOCATION WITH
OWNER AND FURNITURE. EXTEND EXISTING
PNEUMATIC TUBING MAINTAINED FROM
DEMOLITION, AND RECONNECT TO THERMOSTAT.
5. SEE ME101 FOR EXISTING HVAC CONFIGURATIONS..
KEYED NOTES
1. SEE TABLE FOR DIFFUSER (D1) SCHEDULE.
2. SEE TABLE FOR RETURN GRILLE SCHEDULE (R1).
HVAC PLAN
WHOLE HEALTH
5/14/2018
B.14 - FIRST FLOOR
ME102
1. PROVIDE TRANSITION AS NECESSARY.
2. FACTORY WHITE FINISH.
3. ACCEPTABLE MANUFACTURERS: PRICE, KRUEGER, TITUS, OR APPROVED EQUAL.
SCALE: 14" = 1'
AutoCAD SHX Text
TRUE N
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
REFLECTED CEILING PLAN
WHOLE HEALTH
5/14/2018
B.14 - BASEMENT
RC101
660-18-252
SCALE: 12" = 1'
2-HOUR FIRE RATE WALL
GENERAL NOTES
1. CONTRACTOR SHALL REPAIR AND/OR FIRE STOP
ALL PENETRATIONS TO MAINTAIN PROPER FIRE
RATING, PER DRAWING.
AutoCAD SHX Text
BA11
AutoCAD SHX Text
BB03D
AutoCAD SHX Text
TRUE N
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
FIRE SUPPRESION PLAN
WHOLE HEALTH
5/14/2018
B.14 - FIRST FLOOR
F102
SCALE: 14" = 1'
2-HOUR FIRE RATE WALL
GENERAL NOTES
1. CONTRACTOR SHALL REPAIR AND/OR FIRE STOP
ALL PENETRATIONS TO MAINTAIN PROPER FIRE
RATING, PER DRAWING.
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
AutoCAD SHX Text
TRUE N
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
REFLECTED CEILING
WHOLE HEALTH
5/14/2018
B.1 - FIRST FLOOR
RC103
660-18-252
SCALE: 12" = 1'
2-HOUR FIRE RATE WALL
GENERAL NOTES
1. CONTRACTOR SHALL REPAIR AND/OR FIRE STOP
ALL PENETRATIONS TO MAINTAIN PROPER FIRE
RATING, PER DRAWING.
AutoCAD SHX Text
TRUE N
AutoCAD SHX Text
REF N
AutoCAD SHX Text
TRUE N
File details come from the government source that posted it.