Questions and Answers.pdf
PDF 74 KB Posted
- Attached to
- Mobile Chiller Tie - In
- Solicitation number
- 36C25725Q0099
About this file
This document contains Questions and Answers related to a federal contract opportunity for a Mobile Chiller Tie-In at Building 202 for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17.
The key details include: There are no specific requirements for the type and size of the tie-ins, a temporary chiller is not included and will not be bid separately, the distance from the chilled water pipe tie-in to the termination point outside the loading dock is to be determined by the vendor during the site visit, the amount of 6-inch pipe to be installed is also to be determined by the vendor during the site visit, the piping is to be installed under the floor in a non-confined space, and the jacketing material for exterior insulation is not specified - any material rated for outside/exterior use is acceptable. No sketches or photos will be provided, as the vendor is expected to determine the details during the site visit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 36C25725Q0099.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: Do you have any specifica ons for the type and size of Tie‐In’s for this bid?
A: This can be answered in the SOW.
Q: Is a temporary chiller included in this bid? If not, will that be bid separately?
A: No and no.
Q: The scope of work does not define the distance from the CH Water Pipe e in to the termina on point outside the loading dock. Can you provide a sketch or as built that shows this rou ng?
A: This can be determined by the vendor during the site visit.
Q: How many feet of 6in. pipe is to be installed?
Q: Since the scope states to run under the floor, please define if the piping is to be installed above the ceiling of the floor below or if this is a space without a ceiling or is the pipe to be run in a crawl space below the floor? If a crawl space, how high is the space? Is it considered a confined space?
A: Under floor; not confined space.
Q: Please provide a sketch or phots of the pump and e in points for the piping.
Q: Please specify the jacke ng material to be used for exterior insula on.
A: Not specific; any material rated for outside/exterior use.
File details come from the government source that posted it. Updated .