36C25723B0010 0002.docx
DOCX document 188 KB Posted
- Attached to
- Y1DA--671-23-100 NRM Install Dimplex Chiller on ground level Federal contract opportunity
- Solicitation number
- 36C25723B0010
About this file
This statement of work outlines requirements for a construction project to replace an existing heat exchanger with a new Dimplex chiller at the South Texas Veterans Healthcare System facility in San Antonio, Texas. The project involves procuring and installing a Dimplex Model WO2-2-7500-2P-NF-L-M-407C chiller, running electrical and control cabling, installing new chilled water lines, demolishing the existing heat exchanger, constructing a concrete pad, and other associated work. The contractor must meet performance periods, insurance, and reporting requirements and obtain necessary permits. The Department of Veterans Affairs is the contracting agency, with a projected period of performance of 270 calendar days from notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre Bid Sign in Sheet 10-14-22.pdf | ||
| 36C25723B0010 0003.docx | DOCX document | |
| RFI Questions.docx | DOCX document | |
| Pre Bid Sign in Sheet 10-6-22.pdf | ||
| 36C25723B0010 0001.docx | DOCX document | |
| Install-Guideline-Chiller.pdf | ||
| 36C25723B0010_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 671-23-100 Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building #171 Temple TX 76504 Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 To all Offerors/Bidders
36C25723B0010 09-27-2022
X x X
X Amendment 0002 is issued to provide the following:
A. Revised Statement of work (SOW) that rescinds and replaces the original SOW, as well as the one that was inserted in Amend ment 0001.
Please see the following revised Statement of Work.
All other terms and c onditions remain unchanged.
Joyce M. Mills Contracting Officer
STATEMENT OF WORK
Project Number: 671-23-100
Purchase & Install Dimplex Chiller on Ground Level
South Texas Veterans Healthcare System (STVHCS)
7400 Merton Minter Blvd
SAN ANTONIO, TX 78229
Project Number: 671-23-100
PROJECT OVERVIEW
Purpose The purpose of this project is to replace the current Heat Exchanger located in the mechanical room # Z104.4 first floor of the main hospital and replace it with a Dimplex Model: WO2-2-7500-2P-NF-L-M-407C 120 AMB 460V 802581, Part # 802581, purchase by the vendor.
1.2 Background
Currently the GE MRI is using a heat exchanger that gets its chilled water from the University Hospital. The filters for the heat exchanger are constantly being replace so we are replacing the heat exchanger with a Dimplex Chiller.
SCOPE OF WORK
2.1 General
Provide all labor, materials, supplies, tools and equipment, supervision, and construction services necessary for site preparation, demolition, alterations, and installation of a new Dimplex Chiller adjacent to the existing Dimplex chiller outside of the Spinal Cord Injury Center (SCIC) area.
Strict noise and infection control measures shall be followed. Existing life safety systems within the Main Hospital, building 1 shall not be impaired at any time during the performance of the work.
2.1.1 Work Shall Include:
General Construction: The contractor will procure and install 1 EA Koolant Kooler Chiller, See above (Purpose) for model # and part number.
Contractor will use the latest installation manual and any additional documentation necessary to install said chiller. Contractor will procure from the manufacture.
Provide power to new chiller with electrical disconnect.
Install low voltage cable from chiller to the control room. This will tie into the chiller control panel and runs through a conduit up the exterior of the building wall and into the control room. Cable is tied into energy management by Entech.
Install new chilled water lines to and from the chiller and heat exchanger, which is currently in the equipment room.
Demo the old, chilled water lines back to the source.
Install a new concrete pad for chiller. Contractor can measure adjacent existing pad for size duplication.
Install new wrought iron fence, which can connect to adjacent fence, for security.
Install a new sheet metal gutter to protect conduit and chilled water lines ran along exterior of the hospital. Contractor will match existing paint on the gutter.
Conduct Chiller start-up, which will include a 50/50 water/propylene glycol. Contractor will provide 2ea 50-gallon drum premix glycol. Contractor will also provide the start-up plus 2-year extended warranty.
Contractor will field verify all circuits and panels used to power the Dimplex Chiller to include mechanical, electrical & plumbing (MEP) as well as integration into the hospital controls front end. (Entech) All services will be checked back to the source.
The contractor will de-install the heat exchanger located in the Z104.4 Mechanical room. This will include removing conduit and chilled water lines back to the source. The Contractor cannot remove said heat exchanger until all connections for the Dimplex Chiller are in place and fully tested and operational. At this time the deinstallation of the heat exchanger can begin. Depending on Radiology’s schedule this may require weekend work.
The Contractor shall haul demoed items off to a dumpster which will be located on site.
2.1.2. Subcontractors
The Contractor shall be responsible for obtaining and coordinating the services of any and all third-party Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely delivery, and documented final product. O&M Manuals, As-Built drawings in CAD and PDF, applicable permits, installation, testing, are also required.
2.1.3 Hours of Operation
Normal hours of operation for VA sites are 7:00AM to 3:30PM Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturday, Sunday, holidays, or outside the project site’s normal working hours the contractor must submit a written request for approval to the VA-COR at least five (5) working days prior to the proposed start of such work.
2.2 Description of Work
2.2.1 Existing Conditions
| 2.2.1.1 | Contractor shall be responsible for complying with ALL construction documents and applicable | Department of Veterans Affairs Master Specifications as part of this project. Specifications, | Designs, Procedures, Standards, etc. can be found at https://www.cfm.va.gov/til/dManual.asp, | and/or https://www.cfm.va.gov/til/index.asp | ||||||||||||
| 2.2.1.2 | Contractor will coordinate all work with existing work to remain and existing conditions. | |||||||||||||||
| 2.2.1.3 | Contractor shall be responsible for complying with all the construction documents and | applicable Department of Veterans Affairs Master Specifications as part of this project. | ||||||||||||||
| 2.2.1.4 | Contractor must also comply with all applicable city, county, state, and federal regulations | codes and applicable OSHA standards project. Construction shall also comply with | Infection Control Risk Assessment (ICRA), attached, and IC standards delineated in the | specifications. | ||||||||||||
| 2.2.1.5 | On-site staging WILL NOT be provided in VA premises. | |||||||||||||||
| 2.2.1.6 | There will be NO contractor parking allowed on the VA campus. | |||||||||||||||
| 2.2.1.7 | Demolition and renovation shall take place with minimal disruption to adjacent workspaces. | |||||||||||||||
| 2.2.1.8 | Any item damage during removal is the contractor’s responsibility to replace with no | additional cost to the government. | ||||||||||||||
| 2.2.2 | Additional Requirements | |||||||||||||||
| 2.2.2.1 | Housekeeping - Accumulation of trash, paper, wood shavings, sawdust, excelsior, boxes, | and other packing materials will be cleaned up as often as necessary and at the end of each | workday. | |||||||||||||
| 2.2.2.2 | Smoking or vaping is strictly prohibited in all VA facilities. | |||||||||||||||
| 2.2.2.3 | Security – Contractors will wear security badge in plain sight above the waist at all times. | Contractors found without a badge will be immediately removed from VA property by VA | Police. | |||||||||||||
| 2.2.2.4 | Parking – Contractor vehicles found parked in VA parking lots will be issued a United States | District Court Violation Notice and immediately removed and banned from VA property. | ||||||||||||||
| 2.2.2.5 | Tuberculosis (TB) – Contractor is responsible for ensuring that if contracted construction | worker(s) have been determined to be at risk for transmission of TB based upon the TB pre- | construction risk assessment. The contractor must provide written certification, within 24 | hours upon request, to the COR that all contract employees assigned to the work site have | had a pre-placement tuberculin screening within 90 days prior to assignment to the work | site and been found to be free of active TB. Refer to the contract documents for this | requirement. | |||||||||
| 2.2.2.6 | OSHA 10 & 30 -Hour Training Course – All construction workers are required to have the | OSHA 10-hour Construction Safety training certification. The construction safety manager | and/or superintendent shall have the 30-hour Construction Safety course certification. Proof | of certification shall be on site at all times. | ||||||||||||
| 2.2.2.7 | Infection Control (IC) and Safety– All contractors, construction workers and COR’s must | attend the Infection Prevention training every fiscal year. All construction workers shall | have a current IC training sticker attached to their badges at all times. If this requirement is | not met, workers will be removed from construction site. Refer to construction documents | for additional information. | |||||||||||
| 2.2.2.8 | Construction sign and copy of IC permit (attached) shall be posted in project site at all times. | All IC and dust control measures shall be implemented at all times. | ||||||||||||||
| 2.2.2.9 | All fire and smoke wall penetrations shall be fireproofed according to corresponding wall | rating. These shall be through a sleeve and sealed with fire barrier compound to be approved | by VA. | |||||||||||||
| 2.2.2.10 | All construction and installation work shall comply with VA specifications for material and | workmanship, NEC, NFPA and all applicable city, county, state, and federal regulations and | codes and OSHA standards. Refer construction drawings and specs for requirements. | |||||||||||||
| 2.2.2.11 | All incidental work associated with the installation and construction works in the exterior | and interior of the building shall be included in the base bid. | ||||||||||||||
| 2.2.2.12 | Conduct work as to interfere as least as possible with facility operations. All coordination | for utilities shutdown shall be coordinated at least 72 hours prior to event with COR. For | major utility system shutdowns, coordination shall be done at least 2 weeks in advance | |||||||||||||
| 3. | OTHER DELIVERABLES | |||||||||||||||
| A. | Period of Performance: 270 Calendar days after Notice to Proceed. | |||||||||||||||
| B. | Performance and Payment Bonds: Due 10 Calendar days after Notice of Award | |||||||||||||||
| C. | Proof of Insurance: Due 10 Calendar days after Notice of Award | |||||||||||||||
| D. | Contractor Quality Control Plan (CQCP): The contractor shall develop a quality control plan and | shall furnish to VA for review no later than 30 calendar days after the receipt of Notice to | Proceed. The plan shall identify personnel, procedures, control, instructions, tests, records, | and forms to be | used. VA will consider an interim plan for the first 45 calendar days of operation. | Installation will be allowed to begin only after acceptance of the CQCP or acceptance of | an | interim plan applicable to the particular feature of the work to be started. Work outside | of the | features of the work included in an accepted interim plan will not be permitted to begin until | acceptance of a CQCP or another interim plan containing the additional features of the work to | be started. After acceptance of the CQCP, the Contractor shall notify the Contracting Officer | Representative (COR) in writing of any proposed change. Proposed changes are subject to | acceptance by the Contracting Officer. | ||
| E. Safety Plan: Contractor shall develop and implement a Comprehensive safety plan to eliminate | injuries occurring relative to providing the design and installation services for this project. | Contractor shall furnish to VA for review no later than 15 calendar days after the receipt of notice | to proceed. The plan shall also describe how final system installation will meet all applicable | requirements of NFPA30 and NFPA30A. Construction/Renovation work will be allowed to begin | only after VA’s acceptance of the Safety Plan. Contractor is responsible for providing enough | project lead time to allow for VA review of Safety Plan before acceptance. The Department of | Labor OSHA requires that all Contractors involved in installation on VA owned or leased | property comply with the Incorporation of General Industry Safety and Health Standards | applicable to Installation Work and Technical Amendments, Final Rule 29 CFR Parts 1910 | and 1926 as published in the Federal Register Volume 58, No. 124, June 30, 1993. In | addition, any Contractor that performs construction type work on any VA project as defined by | the Scope of the referenced regulation is required to; (1) Provide and maintain his own protective | equipment and devices, etc. and (2) Require all sub-contractors used on site to follow these same | provisions in the regulation. Contractor shall provide OSHA 10 hr. and OSHA 30 hr. training | certificates. | |
| F. | Progress Reports: Shall be submitted electronically every week to the Contracting Officers | Representative (COR) and address, at a minimum, the status of deliverables, project schedule, | price, and technical performance as they relate to the planned and actual work performed during | the past two weeks, work planned for the following two weeks and address any open critical | issues. | |||||||||||
| G. | Permits: Contractor shall submit all permits associated with this project to the COR. This shall | include permits necessary with City of San Antonio and local Fire departments. The contractor | shall be responsible for coordination with these offices. | |||||||||||||
| H. | Operations and Maintenance Manuals (O&M): The Contractor shall provide three (2) complete | sets of O&M manuals including a recommended spare parts list identifying components adequate | for competitive supply procurement for operation and maintenance of the system. The O&M | Manuals shall include maintenance and inspection for all equipment. A three-ring binder | containing all of the O&M and electronic files on CD-ROM shall be provided within the binder. | |||||||||||
| 4. | ACCEPTANCE | |||||||||||||||
| 4.1 | For the purposes of Warranty and payment for the work performed at a location, government | “Acceptance” will be provided by the VA upon the completion of all of the following: | ||||||||||||||
| 4.1.1 | The Contractor has demonstrated/ verified that the Dimplex Chiller is fully functional | according to manufacturing specifications. All punch list items identified during the start -up | procedures have been resolved. | |||||||||||||
| 4.1.2 | The Contractor has provided O&M manuals. | |||||||||||||||
| 4.1.3 | The Contractor has provided drawings to include a CD with all as builds CAD files, | one full set, and one Mylar 30 by 42 full set. | ||||||||||||||
| 4.1.4 | Contractor shall provide a minimum one (1) year warranty, unless specified otherwise in the specs, | from both the manufacturer and installer including parts and labor to include normal, premium or | holidays hours. The Warranty period shall start on the date of Substantial Completion. | |||||||||||||
| 5. | CONFIDENTIALITY AND NONDISCLOSURE | |||||||||||||||
| 5.1 | The preliminary and final deliverables and all associated working papers, application source | code, and other material deemed relevant by the VA which has been generated by the | contractor in the performance of this Order are the exclusive property of the U.S. | Government and shall be submitted to the VA-COR at the conclusion of the contract. | ||||||||||||
| 5.2 | The Contracting Officer will be the sole authorized official to release verbally or in writing, | any data, the draft deliverables, the final deliverables, or any other written or printed | materials pertaining to this contract. No information shall be released by the contractor. | Any request for information relating to this contract presented to the contractor shall be | submitted to the CO for response. | |||||||||||
| 5.3 | Press releases, marketing material or any other printed or electronic documentation related to this | project, shall not be publicized without the written approval of the CO. | ||||||||||||||
| 5.4 | To the extent that the work under this contract requires that the contractor be given access to | proprietary business, technical or financial information belonging to the Government or other | companies, the contractor shall treat such information as proprietary business sensitive and agrees | not to appropriate such information to its own use or to disclose such information to third parties | unless specifically authorized by the CO in writing. A mutually agreed to agreement for | exchange of sensitive information or nondisclosure agreement may be required. |
End of Statement