This document is an invitation for bid for installation services. The Department of Veterans Affairs is seeking a contractor to purchase and install a Dimplex chiller at the Audie L. Murphy Veterans Medical Center in San Antonio, Texas. The project involves removing an existing heat exchanger and replacing it with the specified Dimplex model. The contractor must provide all labor, materials, equipment, and supervision to complete the project in accordance with the statement of work and specifications. The solicitation is set aside 100% for service-disabled veteran-owned small businesses. Bids are due by October 26, 2022 and the project duration is 270 calendar days from notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre Bid Sign in Sheet 10-14-22.pdf | ||
| 36C25723B0010 0003.docx | DOCX document | |
| Pre Bid Sign in Sheet 10-6-22.pdf | ||
| RFI Questions.docx | DOCX document | |
| 36C25723B0010 0002.docx | DOCX document | |
| 36C25723B0010 0001.docx | DOCX document | |
| Install-Guideline-Chiller.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25723B0010 X 09- -2022
TBD
671-23-100 Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building #171 Temple TX 76504 Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 Eileen Myers 254-987-0201 Acquisition Title: Install Dimplex Chiller on ground level, Project No. 671-23-100 Contractor shall provide all necessary labor, materials, equipment, and supervision to complete all required project work in accordance with the provided SOW, Specifications, and Drawings. Project is located at the Audie L. Murphy VAMC.
This is a "Competitive" requirement Set Aside 100% Service Disabled Veteran Owned Small Business (SDVOSB).
Method of this procurement will be Invitation for Bid (IFB).
The applicable North American Industry Classification System (NAICS) code for this project is 238210 ($16.5 Mil)
Magnitude of the Construction Project: $250,000.00 and $500,000.00
Pre-Bid Site Visit shall be held on October 06, 2022 @ 09:00am CDT. All interested Contractors shall meet at Bldg #1, Main Hospital, ground level, Engineering Service, Room E006, Audie L. Murphy 7400 Merton Minter Blvd San Antonio, Tx.
All Contractors attending the Pre-Bid Site Visit may be required to be COVID Screened to enter the facility. Please ensure you arrive early to allow enough time to go through screening. Face Masks and picture ID is required.
Cut off for submission of RFI(s)/Questions shall be October 12, 2022 @ 1000am CDT. All RFI(s)/Questions must be emailed to the following email: eileen.myers@va.gov. Please include the solicitation No. 36C25723B0010 on the subject line. RFI(s)/Questions must be submitted in word format.
All Bidders must submit a Bid Guarantee as part of their Bid Package. Additionally, the Awardee must be able to obtain the necessary level of Performance and Payment Bonds.
SUBMISSION OF BIDS: All bids shall be submitted via email to the following email address: eileen.myers@va.gov by the date and time as stated in Block 13a below. Please include the solicitation No. 36C25723B0010 on the subject line of your email when submitting your bid package.
Note: All Bidders must comply with submission of the required documentation as stated on Page 16, Standard of Responsibility.
Funds are not currently available for this solicitation. Award of a contract as a result of this solicitation is contingent upon the availability of appropriated funds from which payment of this contract may be made.
There shall be no legal liability on the part of the Government for contract purposes until funds are made available to the Contracting Officer. The Contracting Officer will confirm availability of funds prior to award of a contract.
X X 52.211-10 X 0 (zero)
10AM
CDT
10-2 -2022 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs Network Contracting Office NCO17 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 This is accomplished through the Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
(877) 353-9791
(512) 460-5540 X
JOYCE M. MILLS
CONTRACTING OFFICER
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| SECTION B – SCHEDULE OF PRICES/DESCRIPTION | 6 |
| STATEMENT OF WORK | 7 |
| Bid Submission Instructions | 13 |
| VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors | 14 |
| SPECIAL STANDARD OF RESPONSIBILITY | 16 |
| OSHA -EMR Requirement | 17 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 19 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 19 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 19 |
| 2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 19 |
| 2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 20 |
| 2.5 52.228-1 BID GUARANTEE (SEP 1996) | 21 |
| 2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 22 |
| 2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 23 |
| 2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 23 |
| 2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 23 |
| 2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 24 |
| 2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 24 |
| REPRESENTATIONS AND CERTIFICATIONS | 25 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022) | 25 |
| 3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 29 |
| GENERAL CONDITIONS | 32 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 32 |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021) | 32 |
| 4.3 52.210-1 MARKET RESEARCH (NOV 2021) | 33 |
| 4.4 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) | 34 |
| 4.5 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) | 34 |
| 4.6 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) | 34 |
| 4.7 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021) | 35 |
| 4.8 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 38 |
| 4.9 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 39 |
| 4.10 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (NOV 2021) | 40 |
| 4.11 52.236-4 PHYSICAL DATA (APR 1984) | 44 |
| 4.12 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE II (APR 1984) | 44 |
| 4.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 45 |
| 4.14 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 48 |
| 4.15 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 50 |
| 4.16 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) | 51 |
| 4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 52 |
| 4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 54 |
| 4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 55 |
| 4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 55 |
| 4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 55 |
| 4.22 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 56 |
| 4.23 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 57 |
| 4.24 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018) | 58 |
| 4.25 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 59 |
| 4.26 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 59 |
| 4.27 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 59 |
| 4.28 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 59 |
| "General Decision Number: TX20220231 08/05/2022 | 63 |
| Attachments: | 70 |
| Solicitation Description: | 71 |
SECTION B – SCHEDULE OF PRICES/DESCRIPTION
Install Dimplex Chiller on Ground Level Project No. 671-23-100
DESCRIPTION: The Contractor shall provide all labor, supervision, materials, and equipment to complete all required project work in strict accordance with the SOW, Install Dimplex Chiller on Ground Level Project No. 674-23-100, located at the Audie L Murphy, VAMC, San Antonio, TX. .
BID ITEM(s):
| ITEM | UNIT | TOTAL | |||
| NO. | DESCRIPTION OF SERVICE | QTY | PRICE | AMOUNT |
0001 PROVIDE ALL NECESSARY LABOR, 1 JB $____________ $___________
MATERIALS, SUPPLIES, TOOLS,
| EQUIPMENT, AND SUPERVISION |
| NECESSARY TO INSTALL CHILLER |
| ON GROUND LEVEL, LOCATED |
| AT AUDIE L.MURPHY, SAN ANTONIO, TX |
| IN ACCORDANCE WITH THE SOW. |
| 0002 | COST OF PERFORMANCE AND | 1 EA | $____________ $___________ |
| PAYMENT BONDS |
BASE BID TOTAL (Line Items 0001 & 0002) $_____________
| TOTAL PROJECT DURATION for Base Bid: 270 Calendar days from issuance of the Notice |
| to Proceed to complete the project work. |
STATEMENT OF WORK
Project Number: 671-23-100
Purchase & Install Dimplex Chiller on Ground Level
South Texas Veterans Healthcare System (STVHCS)
7400 Merton Minter Blvd
SAN ANTONIO, TX 78229
Project Number: 671-23-100
PROJECT OVERVIEW
Purpose The purpose of this project is to replace the current Heat Exchanger located in the mechanical room # Z104.4 first floor of the main hospital and replace it with a Dimplex Model: WO2-2-7500-2P-NF-L-M-407C 120 AMB 460V 802581, Part # 802581, purchase by the vendor. See attached quote.
1.2 Background
Currently the GE MRI is using a heat exchanger that gets its chilled water from the University Hospital. The filters for the heat exchanger are constantly being replace so we are replacing the heat exchanger with a Dimplex Chiller.
SCOPE OF WORK
2.1 General
Provide all labor, materials, supplies, tools and equipment, supervision, and construction services necessary for site preparation, demolition, alterations, of the existing Spinal Cord Injury Center (SCIC) canopy and certain other items necessary for installation of a new Dimplex Chiller.
Strict noise and infection control measures shall be followed. Existing life safety systems within the Main Hospital, building 1 shall not be impaired at any time during the performance of the work.
2.1.1 Work Shall Include:
General Construction: The contractor will determine if the Spinal Cord Injury Center canopy is structurally sound to hold the weight of the Dimplex Chiller. If the canopy will not support the weight, then reinforcement of the canopy will be required.
The contractor will de-install the heat exchanger located in the Z104.4 Mechanical room. This will include removing conduit and chilled water lines back to the source. The Contractor cannot remove said heat exchanger until all connections for the Dimplex Chiller are in place and fully tested and operational. At this time the deinstallation of the heat exchanger can begin.
The Contractor shall haul demoed items off to a dumpster which will be located on site.
Field verifying all circuits and panels used to power the Dimplex Chiller.
2.1.2. Subcontractors
The Contractor shall be responsible for obtaining and coordinating the services of any and all third-party Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely delivery, and documented final product. O&M Manuals, As-Built drawings in CAD and PDF, applicable permits, installation, testing, are also required.
2.1.3 Hours of Operation
Normal hours of operation for VA sites are 7:00AM to 3:30PM Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturday, Sunday, holidays, or outside the project site’s normal working hours the contractor must submit a written request for approval to the VA-COR at least five (5) working days prior to the proposed start of such work.
2.2 Description of Work
2.2.1 Existing Conditions
| 2.2.1.1 | Contractor shall be responsible for complying with ALL construction documents and applicable | Department of Veterans Affairs Master Specifications as part of this project. Specifications, | Designs, Procedures, Standards, etc. can be found at https://www.cfm.va.gov/til/dManual.asp, | and/or https://www.cfm.va.gov/til/index.asp | |||||||||||
| 2.2.1.2 | Contractor will coordinate all work with existing work to remain and existing conditions. | ||||||||||||||
| 2.2.1.3 | Contractor shall be responsible for complying with all the construction documents and | applicable Department of Veterans Affairs Master Specifications as part of this project. | |||||||||||||
| 2.2.1.4 | Contractor must also comply with all applicable city, county, state, and federal regulations | codes and applicable OSHA standards project. Construction shall also comply with | Infection Control Risk Assessment (ICRA), attached, and IC standards delineated in the | specifications. | |||||||||||
| 2.2.1.5 | On-site staging WILL NOT be provided in VA premises. | ||||||||||||||
| 2.2.1.6 | There will be NO contractor parking allowed on the VA campus. | ||||||||||||||
| 2.2.1.7 | Demolition and renovation shall take place with minimal disruption to adjacent workspaces. | ||||||||||||||
| 2.2.1.8 | Any item damage during removal is the contractor’s responsibility to replace with no | additional cost to the government. | |||||||||||||
| 2.2.2 | Additional Requirements | ||||||||||||||
| 2.2.2.1 | Housekeeping - Accumulation of trash, paper, wood shavings, sawdust, excelsior, boxes, | and other packing materials will be cleaned up as often as necessary and at the end of each | workday. | ||||||||||||
| 2.2.2.2 | Smoking is strictly prohibited in all VA facilities. | ||||||||||||||
| 2.2.2.3 | Security – Contractors will wear security badge in plain sight above the waist at all times. | Contractors found without a badge will be immediately removed from VA property by VA | Police. | ||||||||||||
| 2.2.2.4 | Parking – Contractor vehicles found parked in VA parking lots will be issued a United States | District Court Violation Notice and immediately removed and banned from VA property. | |||||||||||||
| 2.2.2.5 | Tuberculosis (TB) – Contractor is responsible for ensuring that if contracted construction | worker(s) have been determined to be at risk for transmission of TB based upon the TB pre- | construction risk assessment. The contractor must provide written certification, within 24 | hours upon request, to the COR that all contract employees assigned to the work site have | had a pre-placement tuberculin screening within 90 days prior to assignment to the work | site and been found to be free of active TB. Refer to the contract documents for this | requirement. | ||||||||
| 2.2.2.6 | OSHA 10 & 30 -Hour Training Course – All construction workers are required to have the | OSHA 10-hour Construction Safety training certification. The construction safety manager | and/or superintendent shall have the 30-hour Construction Safety course certification. Proof | of certification shall be on site at all times. | |||||||||||
| 2.2.2.7 | Infection Control (IC) and Safety– All contractors, construction workers and COR’s must | attend the Infection Prevention training every fiscal year. All construction workers shall | have a current IC training sticker attached to their badges at all times. If this requirement is | not met, workers will be removed from construction site. Refer to construction documents | for additional information. | ||||||||||
| 2.2.2.8 | Construction sign and copy of IC permit (attached) shall be posted in project site at all times. | All IC and dust control measures shall be implemented at all times. | |||||||||||||
| 2.2.2.9 | All fire and smoke wall penetrations shall be fireproofed according to corresponding wall | rating. These shall be through a sleeve and sealed with fire barrier compound to be approved | by VA. | ||||||||||||
| 2.2.2.10 | All construction and installation work shall comply with VA specifications for material and | workmanship, NEC, NFPA and all applicable city, county, state, and federal regulations and | codes and OSHA standards. Refer construction drawings and specs for requirements. | ||||||||||||
| 2.2.2.11 | All incidental work associated with the installation and construction works in the exterior | and interior of the building shall be included in the base bid. | |||||||||||||
| 2.2.2.12 | Conduct work as to interfere as least as possible with facility operations. All coordination | for utilities shutdown shall be coordinated at least 72 hours prior to event with COR. For | major utility system shutdowns, coordination shall be done at least 2 weeks in advance | ||||||||||||
| 3. | OTHER DELIVERABLES | ||||||||||||||
| A. | Period of Performance: 270 Calendar days after Notice to Proceed. | ||||||||||||||
| B. | Performance and Payment Bonds: Due 10 Calendar days after Notice of Award | ||||||||||||||
| C. | Proof of Insurance: Due 10 Calendar days after Notice of Award | ||||||||||||||
| D. | Contractor Quality Control Plan (CQCP): The contractor shall develop a quality control plan and | shall furnish to VA for review no later than 30 calendar days after the receipt of Notice to Proceed. | The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be | used. VA will consider an interim plan for the first 45 calendar days of operation. Installation will | be allowed to begin only after acceptance of the CQCP or acceptance of an interim plan applicable | to the particular feature of the work to be started. Work outside of the features of the work | included in an accepted interim plan will not be permitted to begin until acceptance of a CQCP or | another | interim plan containing the additional features of the work to be started. After acceptance | of the CQCP, the Contractor shall notify the Contracting Officer Representative (COR) in writing | of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer. | ||||
| E. Safety Plan: Contractor shall develop and implement a Comprehensive safety plan to eliminate | injuries occurring relative to providing the design and installation services for this project. | Contractor shall furnish to VA for review no later than 15 calendar days after the receipt of notice | to proceed. The plan shall also describe how final system installation will meet all applicable | requirements of NFPA30 and NFPA30A. Construction/Renovation work will be allowed to begin | only after VA’s acceptance of the Safety Plan. Contractor is responsible for providing enough | project lead time to allow for VA review of Safety Plan before acceptance. The Department of | Labor OSHA requires that all Contractors involved in installation on VA owned or leased property | comply with the Incorporation of General Industry Safety and Health Standards applicable to | Installation Work and Technical Amendments, Final Rule 29 CFR Parts 1910 and 1926 as | published in the Federal Register Volume 58, No. 124, June 30, 1993. In addition, any Contractor | that performs construction type work on any VA project as defined by the Scope of the referenced | regulation is required to; (1) Provide and maintain his own protective equipment and devices, etc. | and (2) Require all sub-contractors used on site to follow these same provisions in the regulation. | Contractor shall provide OSHA 10 hr. and OSHA 30 hr. training certificates. | |
| F. | Progress Reports: Shall be submitted electronically every week to the Contracting Officers | Representative (COR) and address, at a minimum, the status of deliverables, project schedule, | price, and technical performance as they relate to the planned and actual work performed during | the past two weeks, work planned for the following two weeks and address any open critical | issues. | ||||||||||
| G. | Permits: Contractor shall submit all permits associated with this project to the COR. This shall | include permits necessary with City of San Antonio and local Fire departments. The contractor | shall be responsible for coordination with these offices. | ||||||||||||
| H. | Operations and Maintenance Manuals (O&M): The Contractor shall provide three (2) complete | sets of O&M manuals including a recommended spare parts list identifying components adequate | for competitive supply procurement for operation and maintenance of the system. The O&M | Manuals shall include maintenance and inspection for all equipment. A three-ring binder | containing all of the O&M and electronic files on CD-ROM shall be provided within the binder. | ||||||||||
| 4. | ACCEPTANCE | ||||||||||||||
| 4.1 | For the purposes of Warranty and payment for the work performed at a location, government | “Acceptance” will be provided by the VA upon the completion of all of the following: | |||||||||||||
| 4.1.1 | The Contractor has demonstrated/ verified that the Dimplex Chiller is fully functional | according to manufacturing specifications. All punch list items identified during the start -up | procedures have been resolved. | ||||||||||||
| 4.1.2 | The Contractor has provided O&M manuals. | ||||||||||||||
| 4.1.3 | The Contractor has provided drawings to include a CD with all as builds CAD files, | one full set, and one Mylar 30 by 42 full set. | |||||||||||||
| 4.1.4 | Contractor shall provide a minimum one (1) year warranty, unless specified otherwise in the specs, | from both the manufacturer and installer including parts and labor to include normal, premium or | holidays hours. The Warranty period shall start on the date of Substantial Completion. | ||||||||||||
| 5. | CONFIDENTIALITY AND NONDISCLOSURE | ||||||||||||||
| 5.1 | The preliminary and final deliverables and all associated working papers, application source | code, and other material deemed relevant by the VA which has been generated by the | contractor in the performance of this Order are the exclusive property of the U.S. | Government and shall be submitted to the VA-COR at the conclusion of the contract. | |||||||||||
| 5.2 | The Contracting Officer will be the sole authorized official to release verbally or in writing, | any data, the draft deliverables, the final deliverables, or any other written or printed | materials pertaining to this contract. No information shall be released by the contractor. | Any request for information relating to this contract presented to the contractor shall be | submitted to the CO for response. | ||||||||||
| 5.3 | Press releases, marketing material or any other printed or electronic documentation related to this | project, shall not be publicized without the written approval of the CO. | |||||||||||||
| 5.4 | To the extent that the work under this contract requires that the contractor be given access to | proprietary business, technical or financial information belonging to the Government or other | companies, the contractor shall treat such information as proprietary business sensitive and agrees | not to appropriate such information to its own use or to disclose such information to third parties | unless specifically authorized by the CO in writing. A mutually agreed to agreement for exchange | of sensitive information or nondisclosure agreement may be required. |
End of Statement
Bid Submission Instructions
A. All bid packages shall be submitted via email to the following email address Eileen.Myers@va.gov , by the specified Bid Closing date and time as stated on the SF1442, Page 1, Block 13a. The applicable Solicitation Number for this IFB must be included on the subject line of the email.
B. A public Bid Opening will not be held. Bids shall be opened by the Contracting Officer and Contract Specialist, witnessed and recorded on an official Bid Abstract. Bid Abstracts will be available upon request via email.
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors
1. Contractor employees who work in or travel to VHA locations must comply with the following:
a. Documentation requirements:
1) If fully vaccinated, shall show proof of vaccination.
i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.
2) If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.
3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.
a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.
SPECIAL STANDARD OF RESPONSIBILITY
Solicitation Submittal Requirements:
The Offeror shall submit the following information as part of your Bid Package: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself., EMR shall not be submitted for subcontractors.)
1. OSHA or EPA Violation(s): Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years.
2. Experience Modification Rate (EMR): Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0.
3. Limitation on Subcontracting:
IAW VAAR 852.219-77 each offeror will review the clause and complete the certificate included in the clause. This certificate will be complete prior to solicitation closing and submitted with the proposal, bid, or quote documents. Failure to comply with this requirement will result in removal from consideration for award.
OSHA -EMR Requirement OSHA or EPA Violation(s):
(1) Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the
(2) Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years Experience Modification Rate (EMR):
(1) Offerors shall provide documentation to show that the offeror has an Experience Modification Rate (EMR) of equal to or less than 1.0.
Page 1 of
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Cost of Materials $ __________
c) Total excluding materials (a-b) $ __________
d) Amount projected to be paid to non-VIP listed SDVOSBs: $ __________
e) Offeror’s percentage of estimated Non VIP work (d/c X 100 = %) __________%
f) Offeror’s percentage of estimated self-performed work (100 – e = %) __________%
A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.
General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 6.9 % |
| 47.8 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is San Antonio, Texas
(End of Provision)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.5 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00 whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Hand-Carried Address:
Department of Veterans Affairs Network Contracting Office NCO17
1901 Veterans Memorial Drive Temple TX 76504 Mailing Address:
Department of Veterans Affairs Network Contracting Office NCO17
1901 Veterans Memorial Drive Temple TX 76504
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— October 6, 2022 @ 09:00 am CST
(c) Participants will meet at— Bldg. #1, Main Hospital, Ground Level, Engineering, Rm E006.
(End of Provision)
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.214-18 |
| PREPARATION OF BIDS—CONSTRUCTION |
| APR 1984 |
| 52.214-19 |
| CONTRACT AWARD—SEALED BIDDING—CONSTRUCTION |
| AUG 1996 |
| 52.214-34 |
| SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE |
| APR 1991 |
| 52.214-35 |
| SUBMISSION OF OFFERS IN U.S. CURRENCY |
| APR 1991 |
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.
(End of Clause)
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.
(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.
(End of Provision)
2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
(a) Any protest filed by an interested party shall—
(1) Include the name, address, fax number, email and telephone number of the protester;
(2) Identify the solicitation and/or contract number;
(3) Include an original signed by the protester or the protester’s representative and at least one copy;
(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;
(5) Specifically request a ruling of the individual upon whom the protest is served;
(6) State the form of relief requested; and
(7) Provide all information establishing the timeliness of the protest.
(b) Failure to comply with the above may result in dismissal of the protest without further consideration.
(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.
(End of Provision)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210.
(2) The small business size standard is $16.5 Million.
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition—
(i) Is set aside for small business and has a value above the simplified acquisition threshold;
(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services—Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .