36C25722B0002 A00001.docx

DOCX document 26 KB Posted

Attached to
7320--674A4-20-008 Replace Kitchen Hoods Bldg. 202
Solicitation number
36C25722B0002
Issued by

About this file

This document provides clarification responses to contractor questions on a federal solicitation for kitchen hood replacement services. The solicitation seeks bids to replace two commercial kitchen hoods measuring approximately 11' x 18' each in Building 202 at the Central Texas Veterans Health Care System campus in Waco, Texas. Contractors must submit bids by November 23, 2021 at 1:00 PM CST. The work includes demolition of existing hoods, installation of new hood systems including fire suppression, and related mechanical, electrical, and plumbing work. Clarification was provided on hood specifications, scope of work, responsibility for fire and power disconnection during demolition, delivery location, and working hour availability. The plastic barrier requirement from floor to roof deck in the phasing notes was also addressed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A00001 36C25722B0002 674A4-20-008 36C257 Network Contracting Office NCO17 Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.

Temple TX 76504 ATTN: Gaila P. Lowe Temple, TX 76504 Network Contracting Office NCO17 Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.

Temple TX 76504 To all Offerors/Bidders

36C25722B0002 10-21-2021

X X X

TUESDAY, 11-23-2021, 1:00 PM, CST

X 1 (one) AMENDMENT A00001 is hereby issued to provide clarification responses to timely submitted RFI and directed within the IFB Solicitation in 'Block 10'. Refer to the 'contunuation page' for the consolidated clarifications from VA Engineering and A&E addressing timely submitted RFI concerns and issues.

Gaila P. Lowe Contracting Officer

CONTINUATION PAGE

PROJECT NAME: PROJECT #674A4-20-008 REPLACE KITCHEN HOODS, BLDG. 202 – WACO, VAMC (RFIs Due 11-5-21 By 4:00 p.m.)

SOLICITATION NUMBER: #36C25722B0002/36C257-22-B-0002

BIDs DUE: TUESDAY, NOVEMBER 23, 2021 @ 1:00 P.M., CDT

SUBMITTED: DATE & TIME ENTERED - 11/2/2021, 9:06 a.m. CDT; BY: JAPORT KITCHEN EXHAUST SERVICES, Bill Huff

1. What is the Kitchen Hood size That is being Demolished and removed and how many? Reply by A&E: 2 each, 11’w x 18’ l (+/-) each.

2. What are the specifications associated with the kitchen hood replacement? Please provide the specifications and weight for the vent hood, exhaust fan, make up air, duct size.

Reply by A&E: See Contract Documents, M8.1 for equipment schedules and M9.2 for hood detail. Also see spec. section 233813 COMMERCIAL KITCHEN HOODS.

3. What does this package provide? (example Backsplash, Trim, grease duct, fire wrap.)

Reply by A&E: See Contract Documents, spec. section 233813 COMMERCIAL KITCHEN HOODS and drawings including M2.1, M8.1 and M9.2. The hood package includes the hoods, fire suppression system and utility distribution system. All ancillary components such as fire wrap insulation shall be provided by the contractor.

4. Who is providing the fire System? Reply by A&E: General Contractor to provide.

5. Who is in charge of disconnecting the fire System and electricity before demo?

Reply by A&E: Means and Methods. It is the Contractor’s responsibility to plan out how to disconnect the Fire System and Electricity during construction.

6. Where is the Hood package going to be delivered? Reply by A&E: Means and Methods. It is the Contractor’s responsibility to coordinate with the VA’s Contracting Officer’s Representative (COR) regarding where Hood packages should be delivered.

7. Do we have a chase that the grease duct and fresh air need to go in? if so how many floors up and the size of the chase. Reply by A&E: See Contract Documents, sheets M2.1, M2.2 and M2.3. Building is single story. There is no chase.

8. What is the availability for working hours? (regular or after hours)? Reply by A&E: See Contract Documents, reference Sheet AE-0.01 Phasing Notes.

9. Is there any restrictions for the crane and the location. Reply by A&E: Yes, location of crane to be determined by COR.

SUBMITTED: DATE & TIME ENTERED - 11/4/2021, 3:59 p.m. CDT; BY: FHC CONTRACTING, INC., Chanel Boston:

10. Are there drawings of hood size? Reply by A&E: See Contract Documents, sheets M8.1 for hood schedule and M9.2 for hood detail.

11. What is the duct sizing? Reply by A&E: See Contract Documents, sheet M2.1.

12. Is there equipment under hood? Reply by A&E: All existing equipment under hoods will be removed by selected VAMC Employee.

13. Does the fire alarm to tie into Gas? Reply by A&E: No.

SUBMITTED: DATE & TIME ENTERED - 11/2/2021, 9:06 a.m. CDT; BY: VENERGY GROUP, RFI #1, Tyler Sullivan:

14. Drawings AE-0.01 states that the dust barrier is to extend from the roof decking to the floor. Is it the intent to have the plastic barrier extend from the floor to then pass the drop ceiling and continue to the roof deck? Reply by VA-COR: Yes. If so, could this be amended as this would be a very time consuming and expensive process? Reply by VA-COR: No, this will not be amended.

15. Would it be permissible to have the panel relocated to the same room as the MCC? There are issues with accessibility and space in its current configuration. Reply by VA-COR: Requirement for a new Fire Alarm Panel is formerly ‘deleted’.

SUBMITTED: DATE & TIME ENTERED - 11/5/2021, 3:24 p.m. CDT; BY: FHC CONTRACTING, INC., Chanel Boston:

16. Will there be a new housekeeping pad installed after the existing pad is demoed? Reply by VA-COR:: No, new housekeeping pad installed.

17. Will Fire Alarm Panel be replaced with new Panel? Reply by VA-COR: Requirement for a new Fire Alarm Panel is ‘deleted’ (refer to #15). All needed Active F.A. Devices for coverage where existing hoods are removed will be provided by Prime Contractor.

NOTE: The New Hood Fire Suppression System remains required under this project. The Contractor shall provide a new and completely functional Hood Fire Protection System including all conduits, piping, wiring, connection to Fire Alarm Panel and other items required for an operational system.

File details come from the government source that posted it. Updated .