36C25719Q1320 QUESTIONS AND ANSWERS.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Lifts EER, newest first.
File Type Posted
36C25719Q1320-0001000.docx DOCX document
36C25719Q1320-004.pdf PDF
36C25719Q1320-006.pdf PDF
36C25719Q1320-002.pdf PDF
36C25719Q1320-001.pdf PDF
36C25719Q1320-000.docx DOCX document
36C25719Q1320-003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALSO: SICU and MICU will require removal of existing track.

Question under item number 0003

• Is a two-point or four-point carry bar being requested?

• 2 Point Bar

Questions under item number 0004 What style of lift rail configuration is being requested:

Length of Tracks: H Track. 118” x 130”- 18 Rooms- Linear Systems being converted to XY Systems Length of Tracks: H Track. 118” x 120”- 4 Rooms

Questions under item number 0006 In order to energize the rail systems for in-rail-charging, electrical power is required. This is typically accomplished through a power outlet located on the ceiling near the head of one of the fixed rails through a dedicated or nondedicated circuit:

• VA will run power within 3 meters of charging station/connection.

In order to accurately quote installation this offeror needs to know what the rail system will be mounting to above ceiling:

• Steel Beam is what is being mounted on for the rail

• What are the elevations from floor to ceiling and ceiling to deck/or ceiling to beam?

• Floor to Ceiling is 108”, Ceiling to Beam is 65”

After conferring with the manufacturer, we are going to need 21 hardware kits for the install of 21 lifts.

Also are the Kwiktrak that you are requesting requires free standing posts ( either 2 point, three point, or 4 point), are the posts already on site?

They will be Ceiling Mounted, so no Gantry or Free Standing Systems