36C25719Q0301-0001000.docx

DOCX document 30 KB Posted

Attached to
CTX Temple DUV Shelter Federal contract opportunity
Solicitation number
36C25719Q0301
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25719Q0301 0001 36C25719Q0301 0001.docx

View the file

Other files for this federal contract opportunity

Other files attached to CTX Temple DUV Shelter, newest first.
File Type Posted
36C25719C0170-000.docx DOCX document
36C25719Q0301-0003007.pdf PDF
36C25719Q0301-0003006.docx DOCX document
36C25719Q0301-0003008.pdf PDF
36C25719Q0301-0002001.pdf PDF
36C25719Q0301-0002002.pdf PDF
36C25719Q0301-0002003.pdf PDF
36C25719Q0301-0002000.docx DOCX document
36C25719Q0301-0001001.pdf PDF
36C25719Q0301-001.docx DOCX document
36C25719Q0301-000.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 36C25719Q0301 Amendment No. 0001

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-27-2019 None Department of Veterans Affairs Network Contracting Office NCO17 2002 Scott Blvd Temple TX 76504 Department of Veterans Affairs Network Contracting Office NCO17 2002 Scott Blvd Temple TX 76504 To all Offerors/Bidders

36C25719Q0301 02-06-2019

X X X 4:00 pm CST Thursday, April 30, 2019 Solicitation Amendment No. 0001 is hereby issued to provide responses to the RFIs/Questions received in response to this solicitation, see pages 2 and 3.

This amendment also provides the pre-bid site visit sign-in sheet, see attachment.

The closing date is extended as st ated in Item 11 above to allow additional time for revisions to the SOW.

An amendment to provide the revised SOW shall be issued at a later date

SANDRA K. ARCHULETA

Contracting Officer

Consolidated RFIs/Questions and Answers Solicitation No. 36C25719Q0301 Bus Shelter

1. Given the number of questions about the exact needs for the build, it seems it would be best for the government to prepare a geotechnical report, foundation design, and structural design for this solicitation. It was also stated during the site visit that a nearby structure had to be excavated 20 feet deep to prepare an adequate foundation. Given that this structure is planned to be built in close proximity, and on hauled-in fill, it is very difficult to prepare an accurate bid for the government. Without these parameters, there will be numerous unknowns that bidders will have to contend with. Bids will be wildly different and inaccurate for the government's needs. Will the government prepare and make available a geotechnical report, foundation plan, and structural plan?

A: Yes

1. If the foundation design calls for a 20' excavation, as indicated in the site visit, this would require a registered engineer to design an excavation plan as required by OSHA standards. If the foundation design actually calls for this type of excavation, will the government also provide an engineered excavation plan so that required safety precautions can be accounted for in the bid?

A: Will be provided if a 20’ excavation is deemed necessary

1. The proposed build site has a drainage ditch along the backside that will undermine any foundation. Will the government consider relocating the build site to another area that will allow greater stability for the foundation?

A: Yes

1. The solicitation calls for up to 240' of electrical wire to be laid in the ground to the proposed build site. However, measurements taken during the site visit exceeded this amount. Will the government consider changing this specification to more than 300' if the build site remains the same?

A: Yes

1. What size wire and what type of service (single phase, etc) is supplying power to the breaker panel that will supply power to the build?

A: To be determined

1. Will the government allow a second RFI to clarify additional questions that will generate from this first RFI?

A: Yes

1. Given the number of questions and potential need for additional design specifications, will the government consider extending the bid date?

A: Yes

1. Is this a design build?

A: No

1. Is the VA going to issue a drawing or sketch?

A: Yes

1. How is the structure to be tied into the foundation?

A: To be determined

1. Is there a Geo Technical Report?

A: Refer to answer on question No. 1

1. Is there a lay down area for material, parking? If so, how big will the area be?

A: Yes

1. Is the VA going to layout the actual location of the slab and structure?

A: Yes, drawings will eventually be provided

1. Is there any new paving aside from the new slab?

A: Potentially

1. Is the VA going to provide the elevation at which the new slab is to be built at?

A: New slab shall match the elevation of the existing slab located directly to the south

1. How far past the footprint of the building does excavation & compaction need to extend to?

A: 6’

1. Is there any existing underground utilities in the way of excavation of the slab and trench for the power?

A: Yes

1. Is there onsite water and power available for use during construction or does the contractor need to bring their own temporary facilities?

A: Temporary facilities will need to be provided by the contractor