36C25718B0682-0001001.pdf
PDF 9 MB Posted
- Attached to
- 671A4-15-131 Replace Elevators P1 through P4 Federal contract opportunity
- Solicitation number
- 36C25718B0682
About this file
36C25718B0682 0001 S02-C27 Drawings-REPL.ELEVATORS 671A4-15-131.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25718B0682-0003000.docx | DOCX document | |
| 36C25718B0682-0003001.docx | DOCX document | |
| 36C25718B0682-0002000.docx | DOCX document | |
| 36C25718B0682-0001000.docx | DOCX document | |
| 36C25718B0682-003.pdf | ||
| 36C25718B0682-002.pdf | ||
| 36C25718B0682-001.docx | DOCX document | |
| 36C25718B0682-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhasePROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
11 & 96
INTERIORS
Austin, Texas 78746
ARCHITECTURE
5121 Bee Caves Road, Suite 203
T:512 - 327 - 4149
COX DESIGN ASSOCIATES
PLANNING
F:512 - 327 - 7679
Austin bcox@coxdesignassociates.com
COR
01/02/2018
BI
M
VA
K
ER
R
VI
LL
E
R
EP
LA
C
E
EL
EV
AT
O R
S/ R
EP
LA
C E
EL
EV
AT
O
R S
P1 -P
KE
R R
VI
LL
E_
AR
C H
_0
7.
rv t 1/
2/
1:
:4
AM
GI-000
100% CONSTRUCTION
DOCUMENTS
COVER SHEET REPLACE ELEVATORS P1
THRU P4 - KERRVILLE
3600 MEMORIAL BLVD.
KERRVILLE, TX. 78028
01/02/2018 RHC MAG
671A4-15-131
VETERANS HOSPITAL KERRVILLE
3600 MEMORIAL BLVD. KERRVILLE, TEXAS 78028
REPLACE ELEVATORS P1 THRU P4 - KERRVILLE
PROJECT # 671A4-15-131
INTERIORS
Austin, Texas 78746
ARCHITECTURE
5121 Bee Caves Road, Suite 203
T:512 - 327 - 4149
COX DESIGN ASSOCIATES
PLANNING
F:512 - 327 - 7679
Austin bcox@coxdesignassociates.com
ARCHITECTURE MEP ELEVATORPROJECT MANAGEMENT
AI-001 ARCHITECTURAL ABBREVIATIONS
AD-100 BUILDING 11 ELEVATOR P3 & P4 DEMOLITION PLANS
AD-101 BUILDING 96 ELEVATOR P1 & P2 DEMOLITION PLANS
AS-100 BUILDING 11 ELEVATOR P3 & P4 FLOOR PLANS
AS-101 BUILDING 96 ELEVATOR P1 & P2 FLOOR PLANS
AS-200 BUILDING 11 ELEVATOR P3 & P4 ELEVATIONS AND SECTIONS
AS-201 BUILDING 96 ELEVATOR P1 & P2 ELEVATIONS AND SECTIONS
AS-300 MATERIAL FINISH SCHEDULE AND 3D VIEWS
ES0.0 ELECTRICAL SYMBOLS & ABBREVIATIONS
ES1.1 ELECTRICAL OVERALL ELEVATORS P3 & P4 POWER BLDG. 11
ES1.2 ELECTRICAL DEMOLITION & NEW WORK BASEMENT LEVEL FLOOR PLANS BLDG.11
ES1.3 ELECTRICAL DEMOLITION & NEW WORK FIRST AND SECOND LEVEL FLOOR PLANS BLDG.11
ES1.4 ELECTRICAL OVERALL ELEVATORS P1 & P2 POWER BLDG. 96
ES1.5 ELECTRICAL DEMOLITION & NEW WORK FIRST AND SECOND LEVEL FLOOR PLANS BLDG.96
ES2.1 ELECTRICAL ONE-LINE DIAGRAM & SCHEDULE BLDG.11
ES2.2 ELECTRICAL ONE-LINE DIAGRAM & SCHEDULE BLDG.96
GI-000 COVER SHEET
GI-001 LOCATION MAPS, KEY PLAN, SYMBOLS AND GENERAL NOTES
GI-002 CODE ANALYSIS / LIFE SAFETY
GI-003 ACCESSIBILITY STANDARDS
GI-100 INFECTION CONTROL / PHASING PLANS - PHASE 1
GI-101 INFECTION CONTROL / PHASING PLANS - PHASE 2
GI-200 ELEVATOR MACHINE ROOM FLOOR PLANS
MH0.0 MECHANICAL SYMBOLS & ABBREVIATIONS
MH1.1 BUILDING 11 MECHANICAL DEMOLITION & NEW WORK FLOOR PLANS
MH1.2 BUILDING 96 MECHANICAL DEMOLITION & NEW WORK FLOOR PLANS
MH2.1 MECHANICAL SCHEDULES & DETAILS
PL0.0 PLUMBING SYMBOLS & ABBREVIATIONS
PL1.1 BUILDING 11 & 96 PLUMBING DEMOLITION & NEW WORK FLOOR PLANS
ELEVATOR P1 ELEVATOR P2 ELEVATOR P3 ELEVATOR P4
GENERAL ARCHITECTURAL MECHANICAL ELECTRICAL
PLUMBING
Revisions: Date:
UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT, MANUFACTURED
ITEMS AND ASSEMBLIES INCORPORATED INTO THE WORK SHALL BE NEW.
1.
UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL EXISTING ITEMS ARE TO
REMAIN. THEY SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION
ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT BECOME DAMAGED DUE TO
CONSTRUCTION ACTIVITIES SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AT NO ADDITIONAL COST TO THE OWNER..
2.
NOTATIONS FOR ITEMS OF WORK APPLY TO EACH AND EVERY GRAPHICAL
INDICATION SHOWN ON THE DRAWINGS, WHETHER OR NOT NOTED.
3.
ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE THOROUGHLY CLEANED AND
PROPERLY PREPARED IN ACCORDANCE WITH THE SPECIFICATIONS PRIOR TO
THE APPLICATION OF PRIMER AND PAINT.
4.
THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE
MECHANICAL, ELECTRICAL, AND PLUMBING WORK AND SATISFY THE
REQUIREMENTS FOR SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS
AND CURBS ETC. THE ARCHITECT SHALL BE NOTIFIED OF CONFLICTS OR
DISCREPANCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION.
5.
CONTRACTOR TO REPLACE & ACCURATELY LOCATE ALL EXISTING SIGNAGE
AND LABELS NOTING RATED WALL ASSEMBLIES AND SMOKE PARTITIONS
6.
THE GENERAL CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD CONDITIONS
AND CAREFULLY COMPARE SUCH FIELD CONDITIONS AND OTHER INFORMATION
KNOWN TO THE CONTRACTOR WITH CONTRACT DOCUMENTS.
7.
THE GENERAL CONTRACTOR SHALL REPORT ANY UNFORESEEN FIELD
CONDITIONS, ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED AT ANY
TIME DURING THE WORK, UPON SUCH DISCOVERY, THE CONTRACTOR SHALL
IMMEDIATELY CONTACT THE CONTRACT OFFICER FOR CLARIFICATION BEFORE
PROCEEDING OR CONTINUING WITH THAT PORTION OF THE WORK OR ANY
PORTION RELATED THERE TO.
8.
ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES AND STANDARDS
INCLUDING THE INTERNATIONAL BUILDING CODE 2015 EDITION, VA MASTER
SPECIFICATIONS, AND NFPA 101 2015 EDITION.
9.
THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACT OFFICER,
CONTRACTING OFFICER'S REPRESENTATIVE, AND ARCHITECT OF ANY
DISCREPANCIES BETWEEN THE DRAWINGS, NOTES AND ACTUAL FIELD
CONDITIONS BEFORE BIDDING AND COMMENCING ANY WORK, AND REQUEST
CLARIFICATION IN WRITING.
10.
WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS
THAT CONFLICT WITH THE INTENDED FUNCTION OR DESIGN ARE
ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE AND EXTENT OF THE
CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO THE CONTRACT
OFFICER.
11.
WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL COMPONENTS USING
MANUFACTURER'S OR INDUSTRY STANDARDS. WHERE STANDARDS DO NOT
EXIST, NOTIFY THE ARCHITECT FOR CLARIFICATION.
12.
CONTRACTOR SHALL NOT BARRICADE / BARRIER EMERGENCY EGRESS TO OR
FROM THIS AREA. CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING
THE WORK PROCESS
PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE C.O.R. SECURE ACCESS
POINT AS SPECIFIED AND DIRECTED BY THE COR PROJECT ENGINEER. PROVIDE
WALK-OFF MATS TO MEET FACILITY INFECTION CONTROL GUIDELINES AT EACH
ACCESS POINT.
13.
14.
KERRVILLE VA
MEDICAL CENTER
BUILDING 11
VETERANS H
W
Y - H W
Y 53
MEMORIAL BLVD - HW
Y 27
BUILDING 96
KERRVILLE LAKE
POTENTIAL TRAILER SITE
(SUBJECT TO AVAILABILITY)
CONTRACTOR PARKING
CONTRACTOR CONTAINERS
DUMPSTER & STAGING LOCATION -
COORDINATE WITH C.O.R.
BUILDING 11
BUILDING 96ELEVATORS P3 & P4
& ELEVATOR
MACHINE ROOM
SEE SHEETS GI-100
& GI-101 FOR LIMITS
OF CONSTRUCTION ELEVATORS P1 & P2
& ELEVATOR
MACHINE ROOM
SEE SHEETS GI-100
& GI-101 FOR LIMITS
OF CONSTRUCTION
15. CONTRACTOR TO NOTIFY VA 2 WEEKS IN ADVANCE PRIOR TO ANY
MAJOR UTILITY DISRUPTIONS OR OUTAGES.
16. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG
THE CONTRACT DOCUMENTS, THE BETTER QUALITY, MORE STRINGENT
REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY
THE GOVERNMENT, SHALL BE PROVIDED.
ALL WORK SHALL COMPLY WITH ALL LAWS, RULES, REGULATIONS,
ORDINANCES AND CODES OF THE CITY OF KERRVILLE, THE STATE OF
TEXAS AND THE FEDERAL GOVERNMENT
1.
ALL DIMENSIONS, ANGLES, ELEVATIONS, CONDITIONS AND PHYSICAL
CONFIGURATIONS RELATIVE TO EXISTING CONDITIONS AT THE SITE
SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO
COMMENCING CONSTRUCTION. BEFORE ORDERING ANY MATERIAL OR
DOING WORK THE CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AT
THE SITE AND SHALL BE RESPONSIBLE FOR THE CORRECTNESS OF
SAME. NO ALLOWANCE SHALL BE MADE ON ACCOUNT OF DIFFERENCES
BETWEEN ACTUAL DIMENSIONS/MEASUREMENTS AND THOSE
INDICATED ON THE DRAWINGS. ANY DIFFERENCES FOUND BETWEEN
ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON DRAWINGS
SHALL BE SUBMITTED TO THE COR AND ARCHITECT-ENGINEER (AE) FOR
CONSIDERATION BEFORE PROCEEDING WITH THE AFFECTED WORK.
THE CONTRACTOR IS FULLY RESPONSIBLE FOR COORDINATION OF NEW
WORK WITH EXISTING AND TO REPAIR ANY PART OF THE EXISTING
BUILDINGS DAMAGED DUE TO THIS PROJECT WITH MATERIALS TO
MATCH EXISTING.
ALL HVAC WORK SHALL CONFORM TO THE CURRENT EDITIONS OF THE
INTERNATIONAL MECHANICAL CODE AND NFPA 90A AND SHALL BE
ACCOMPLISHED UNDER THE DIRECT SUPERVISION OF LICENSED
COMMERCIAL HVAC TECHNICIANS.
2.
3.
4. ALL PLUMBING WORK SHALL CONFORM TO THE CURRENT EDITIONS OF
THE TEXAS PLUMBING CODE AND THE STATE SANITARY CODE. ALL
PLUMBING WORK SHALL BE PERFORMED UNDER THE DIRECT
SUPERVISION OF A PLUMBER LICENSED TO DO COMMERCIAL PLUMBING
WORK IN THE STATE OF TEXAS.
5. ALL ELECTRICAL WORK SHALL CONFORM TO THE CURRENT EDITION OF
THE ICC ELECTRIC CODE, NFPA 70 AND SHALL BE PERFORMED UNDER
THE DIRECT SUPERVISION OF AN ELECTRICIAN LICENSED TO PERFORM
COMMERCIAL ELECTRICAL WORK IN THE STATE OF TEXAS.
6. ALL ELEVATOR WORK SHALL CONFORM TO ALL APPLICABLE CODES
AND STANDARDS INCLUDING THE CURRENT EDITION OF VA ELEVATOR
DESIGN MANUAL AND SHALL BE PERFORMED UNDER THE DIRECT
SUPERVISION OF AN ELEVATOR TECHNICIAN LICENSED TO PERFORM
COMMERCIAL ELEVATOR WORK IN THE STATE OF TEXAS.
7. THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE ALL EXISTING
CONDITIONS PRIOR TO SUBMITTING PROPOSAL. HE SHALL FAMILIARIZE
HIMSELF COMPLETELY WITH THE DIFFICULTIES AND RESTRICTIONS
AFFECTING THE EXECUTION OF THE CONTRACT.
8. ALL PRODUCTS, MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN
STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED
INSTRUCTIONS AND SPECIFICATIONS, IN COMPLIANCE WITH ALL
APPLICABLE CODES, AND WITHIN THE HIGHEST ACCEPTED
COMMERCIAL TRADE STANDARDS BY SKILLED, EXPERIENCED, TRAINED,
LICENSED AND COMPETENT CRAFTSMEN. USE ONLY NEW MATERIALS
AND MATERIALS SHALL BE USED ONLY FOR THE PURPOSE FOR WHICH
THEY ARE DESIGNED OR INTENDED.
9. ALL ASPECTS OF JOB SITE SAFETY ARE COMPLETELY THE
RESPONSIBILITY OF THE CONTRACTOR. THE AE WILL NOT HAVE
CONTROL OR CHARGE OF AND WILL NOT BE RESPONSIBLE FOR
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR
PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN
CONNECTION WITH THE WORK. CONTRACTOR SHALL PERFORM ALL
WORK IN A SAFE AND ORDERLY MANNER AVOIDING HAZARDOUS
CONDITION. PROVIDE ALL NECESSARY TEMPORARY SHORING,
BRACING, BARRICADES AND PROTECTIVE BARRIERS AS REQUIRED TO
ENSURE SAFE EXECUTION OF CONSTRUCTION.
10. THE AE HAS NOT BEEN RETAINED OR COMPENSATED TO PROVIDE
DESIGN OR CONSTRUCTION REVIEW SERVICES RELATED TO JOBSITE
SAFETY AND CONTRACTOR'S SAFETY PRECAUTIONS AND PROGRAMS
OR RELATING TO MEANS, METHODS, TECHNIQUES, SEQUENCES OR
PROCEDURES REQUIRED FOR THE CONTRACTOR TO PERFORM HIS
WORK. HENCE, THE AE IS NOT RESPONSIBLE OR LIABLE IN ANY WAY
FOR MATTERS ASSOCIATED WITH JOBSITE SAFETY OR SCHEDULING OF
CONSTRUCTION WORK. OMITTED SERVICES INCLUDE BUT ARE NOT
LIMITED TO SHORING, BRACING, SCAFFOLDING, TEMPORARY
RETAINMENT OF EXCAVATIONS AND ANY ERECTION METHODS AND
TEMPORARY BRACING AND GUYS. CONTRACTOR SHALL
CONTINUOUSLY AND CONSTANTLY MAINTAIN SAFETY OF THE
STRUCTURE, WORKERS AND THE GENERAL PUBLIC. NO STRUCTURAL
MEMBER SHALL BE CUT OR MANIPULATED IN ANY WAY WITHOUT PRIOR
APPROVAL OF THE COR. THE CONTRACTOR SHALL TAKE ALL ACTIONS
REQUIRED AND SHALL BE FULLY RESPONSIBLE FOR THE STABILITY OF
THE STRUCTURE UNDER CONSTRUCTION AND FOR THE SAFETY OF THE
WORKERS AND THE GENERAL PUBLIC.
11. WORK AREAS SHALL BE KEPT NEAT, CLEAN AND SAFE AT ALL TIMES BY
THE CONTRACTOR. TRASH OR DEBRIS SHALL NOT BE ALLOWED TO
ACCUMULATE ON THE SITE. PREMISES SHALL BE KEPT NEAT, CLEAN,
ORDERLY, AND SAFE AT ALL TIMES. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING SUITABLE TRASH CONTAINERS AND
TRASH REMOVAL FOR THE PROPERTY. ALL WASTE SHALL BE
PROPERLY AND LEGALLY DISPOSED OF. REMOVE TRASH DAILY.
12. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND
NOTES AND SECURE FROM THE ARCHITECT ANY ADDITIONAL
INFORMATION, IF NECESSARY, THAT MAY BE REQUIRED FOR A
COMPLETE, CLEAR AND FULL UNDERSTANDING OF THE WORK. TO
ESTABLISH THE COMPLETE SCOPE OF WORK AND TO ACHIEVE CLOSE
COORDINATION BETWEEN ALL TRADES, EACH TRADE SHALL
COMPLETELY REVIEW ALL DRAWINGS AND THE ENTIRE PROJECT
MANUAL, NOT ONLY THE DRAWINGS AND SPECS FOR HIS RESPECTIVE
TRADE, BUT ALSO FOR THE WORK OF ALL OTHER TRADES AS WELL.
NO TRADE SHALL PROCEED WITH ORDERING OR INSTALLATION OF ANY
MATERIALS AND/OR EQUIPMENT WITHOUT FIRST COORDINATING WITH
ALL OTHER TRADES. CONTRACTOR SHALL COORDINATE
SUBCONTRACTOR'S WORK REQUIREMENTS TO ENSURE THAT WORK
CAN PROCEED CONTINUOUSLY AND EXPEDITIOUSLY AND WILL PROVIDE
THE BEST RESULTS FOR THE COMPLETED WORK. TITLES AND NAMES
ON DRAWINGS ARE PROVIDED MERELY FOR CONVENIENCE AND SHALL
NOT BE CONSTRUED AS A SEGREGATION OF THE UNITS OF MATERIALS
AND/OR LABOR INTO TRADES.
THE DRAWINGS ARE INTENDED TO DEFINE THE GENERAL DESIGN AND
SCOPE OF THE WORK REQUIRED TO COMPLETE THE PROJECT. IT IS
THE INTENT OF THESE DOCUMENTS TO PROVIDE FOR COMPLETE AND
FINISHED WORK AND COMPLETE AND OPERATING SYSTEMS. ANY
OMISSIONS IN THESE NOTES OR IN THE DRAWINGS SHALL NOT BE
CONSIDERED AS RELIEVING THE CONTRACTOR OF SUCH
RESPONSIBILITIES IMPLIED BY THE SCOPE OF WORK EXCEPT FOR
ITEMS SPECIFICALLY NOTED AS NOT IN THE CONTRACT. THE
CONTRACTOR SHALL CAREFULLY EXAMINE THE CONSTRUCTION
DOCUMENTS AND SECURE FROM THE AE ADDITIONAL INFORMATION, IF
NECESSARY, THAT MAY BE REQUISITE TO A CLEAR AND FULL
UNDERSTANDING OF THE WORK. ALL MISCELLANEOUS COMPONENTS,
PARTS, ANCHORS, AND ACCESSORIES, MEANS OF INSTALLATION AND
OTHER INCIDENTAL ITEMS REQUIRED FOR COMPLETE
ASSEMBLY/INSTALLATION OF AN ITEM OR SYSTEM SHALL BE PROVIDED,
WHETHER OR NOT SPECIFICALLY NOTED OR SPECIFIED. THE
CONTRACTOR SHALL INCLUDE ALL COMPONENTS WHICH ARE
NORMALLY INCIDENTAL TO THE WORK, THOSE COMPONENTS
REQUIRED AS AN ESSENTIAL AESTHETIC, FUNCTIONAL, OR CODE
REQUIRED ELEMENT OF THE WORK ARE TO BE INCLUDED. ANY WORK
OR MATERIAL THAT IS NOT DIRECTLY OR INDIRECTLY NOTED ON THE
DRAWINGS BUT IS NECESSARY FOR THE CARRYING OUT OF THE
OBVIOUS INTENTION IS TO BE UNDERSTOOD AS "IMPLIED" AND IS TO BE
PROVIDED BY THE CONTRACTOR AS FULLY AS IF SPECIFICALLY
DESCRIBED OR DELINEATED HEREIN. ANY DISCREPANCIES IN THE
DRAWINGS SHALL BE REPORTED TO THE ARCHITECT FOR
INTERPRETATION OR CORRECTION BEFORE WORK IS EXECUTED.
13.
ALL WORK SHALL BE SUBJECT TO THE REVIEW, INSPECTION, AND ACCEPTANCE
OF THE OWNER (AND THE ARCHITECT AT THE DISCRETION OF THE OWNER.
UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL NOTIFY THE
OWNER AND THE CONTRACTOR SHALL PREPARE AND SUBMIT A LIST OF
DEFICIENCIES ("PUNCH LIST") OF ALL NEEDED CORRECTIONS, UNSATISFACTORY
WORK AND INCOMPLETE WORK.
14.
ALL PERMITS, LICENSES, APPROVALS, REVIEWS, AND INSPECTIONS NECESSARY
FOR THE PROPER AND LEGAL EXECUTION OF THE WORK SHALL BE SECURED BY
AND PAID FOR BY THE CONTRACTOR. CONTRACTOR SHALL GIVE ALL NOTICES
TO ALL AUTHORITIES AND AGENCIES HAVING JURISDICTION OVER THE WORK.
CONTRACTOR SHALL MAKE CERTAIN THAT ALL REQUIRED PERMITS AND
APPROVALS HAVE BEEN OBTAINED PRIOR TO THE START OF ANY WORK. NO
CONSTRUCTION OR FABRICATIONS SHALL BEGIN UNTIL THE CONTRACTOR HAS
RECEIVED AND THOROUGHLY REVIEWED ALL DRAWINGS AND OTHER
DOCUMENTS AS APPROVED BY ALL PERMITTING AUTHORITIES.
15.
DURING THE CONSTRUCTION PERIOD, ANY DISCREPANCIES, CONFLICTS, AND/OR
QUESTIONS OF INTERPRETATIONS IN THE DRAWING TO THE ARCHITECT
PROMPTLY FOR CLARIFICATION. THE ARCHITECT WILL ISSUE WRITTEN
INSTRUCTIONS TO THE CONTRACTOR CLARIFYING SUCH MATTERS. THE
ARCHITECT WILL NOT BE RESPONSIBLE FOR VERBAL INSTRUCTIONS. NO
ALLOWANCE SHALL BE MADE AFTER THE START OF CONSTRUCTION FOR
MISUNDERSTANDINGS ON THE PART OF THE CONTRACTOR. IT SHALL BE HELD
THAT THE CONTRACTOR AND HIS SUBCONTRACTORS/MATERIAL SUPPLIERS
HAVE EXAMINED ALL DRAWINGS/ DOCUMENTS AND THE SITE FOR PROPER
COMPREHENSION OF THE WORK.
16.
CONTRACTOR SHALL EMPLOY EXPERIENCED, FULLY QUALIFIED AND LICENSED
SUBCONTRACTORS AND MAINTAIN COOPERATION AMONG ALL TRADES.
17.
THE FOLLOWING SYSTEMS SHALL BE DEMONSTRATED BY THE INSTALLING
CONTRACTOR IN THE PRESENCE OF THE COR (WITH THE CONTRACTOR'S
SUPERINTENDENT PRESENT ALSO): ELEVATOR SYSTEM (MUST PROVIDE
MATERIALS AND TEST CERTIFICATE).
18.
PRECAUTIONS AND PROTECTIVE MEASURES SHALL BE USED AS NECESSARY TO
PROTECT WORKERS, GUESTS, VISITORS, STAFF AND THE GENERAL PUBLIC.
ERECT TEMPORARY BARRIERS AT HAZARDOUS AREAS TO DETOUR PEDESTRIAN
TRAFFIC AND TO PREVENT NORMAL ACCESS TO SUCH AREAS BY UNAUTHORIZED
PERSONS.
19.
CONTRACTOR SHALL COMPLY WITH NFPA 101:4.6.10.2 IN BUILDINGS UNDER
CONSTRUCTION, ADEQUATE ESCAPE FACILITIES SHALL BE MAINTAINED AT ALL
TIMES FOR USE OF CONSTRUCTION WORKERS. ESCAPE FACILITIES SHALL
CONSIST OF DOORS, WALKWAYS, STAIRS, RAMPS, FIRE ESCAPES, LADDERS OR
OTHER APPROVED MEANS OR DEVICES ARRANGED IN ACCORDANCE WITH THE
GENERAL PRINCIPLES OF NFPA 101 INSOFAR AS THEY CAN REASONABLY BE
APPLIED TO BUILDINGS UNDER CONSTRUCTION AS INTERPRETED BY THE STATE
FIRE MARSHAL. ALSO CONFORM TO NFPA 241 STANDARD FOR SAFEGUARDING
CONSTRUCTION ALTERATION AND DEMOLITION OPERATIONS.
20.
PROVIDE UL LISTED FIRESTOPPING SYSTEMS AT WALLS, PARTITIONS, CEILINGS
AND FLOORS AS REQUIRED BY THE CURRENT IBC, AND NFPA CODES AND AS
INDICATED IN THE CONTRACT DOCUMENTS.
21.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhasePROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
11 & 96
INTERIORS
Austin, Texas 78746
ARCHITECTURE
5121 Bee Caves Road, Suite 203
T:512 - 327 - 4149
COX DESIGN ASSOCIATES
PLANNING
F:512 - 327 - 7679
Austin bcox@coxdesignassociates.com
COR
01/24/2018
BI
M
VA
K
ER
R
VI
LL
E
R
EP
LA
C
E
EL
EV
AT
O R
S/ R
EP
LA
C E
EL
EV
AT
O
R S
P1 -P
KE
R R
VI
LL
E_
AR
C H
_0
7.
rv t 1/
/2
9:
:2
AM
GI-001
100% CONSTRUCTION
DOCUMENTS
LOCATION MAPS, KEY PLAN,
SYMBOLS AND GENERAL NOTES
REPLACE ELEVATORS P1
THRU P4 - KERRVILLE
3600 MEMORIAL BLVD.
KERRVILLE, TX. 78028
01/24/2018 RHC MAG
671A4-15-131
DRAWINGS FOR THE FOLLOWING DISCIPLINES ARE
CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE
IDENTIFIED BY THE REFERENCE WHICH IS
INCORPORATED INTO THE SHEET TITLE.
EACH DRAWING IS NUMBERED ACCORDING TO IT'S
LOCATION ON THE SHEET. THE DRAWING TITLE
APPEARS ABOVE THE DEMARCATION LINE AND, APPROPRIATE THE
SCALE IS LOCATED BELOW THE DEMARCATION LINE IN THE LOWER
LEFT-HAND QUADRANT OF THE KEY. THE DRAWING CAN BE
REFERENCED BACK TO IT'S ORIGINAL SHEET AND
DRAWING BY THE DRAWING REFERENCE LOCATION IN
THE LOWER RIGHT-HAND QUADRANT.
SHEET NUMBER
DRAWING NUMBER ON SHEET BY LOCATION
REFERENCE
EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE
"APPROXIMATE LOCATION SHOWN." DO NOT SCALE DRAWINGS FOR
DIMENSIONAL INFORMATION
1.
ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN TO EXACT SCALE.
ALL DIMENSIONS REQUESTED ARE SHOWN (OR MAY BE DERIVED FROM THOSE
SHOWN OR NOTED) ON THE FLOOR PLANS. DETAIL PLANS, ELEVATIONS,
SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND SPECIFICATIONS. SEE
THE NOTES BELOW AND SYMBOLS FOR DIMENSIONING CONVENTIONS USED
ON THIS PROJECT.
2.
EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL DIMENSIONS
SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO THE FOLLOWING
CONVENTIONS.
3.
DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE MEASURED TO:
· CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH
WALLS) AT PARTITIONS FRAMED WITH METAL STUDS. REFER TO
"PARTITION SCHEDULE" TO DETERMINE THICKNESS OF EACH
PARTITION TYPE.
· CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.
· CENTERLINE OF OTHER FEATURES AS INDICATED.
A.
DIMENSIONS UTILIZING THE "FACE OF" SYMBOL ARE MEASURED TO:
· FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED
FINISHES HAVING THICKNESS WHICH MAY BE ADDED TO SUCH WALL)
AS DEFINED BY THE PARTITION SCHEDULE. UNLESS NOTED AS A
"FACE OF FINISH" OR "CLEAR" DIMENSION (SEE NOTE "E" BELOW),
DIMENSIONS ARE NOT MEASURED TO THE FACE OF APPLIED FINISH.
REFER TO THE "PARTITION SCHEDULE" TO DETERMINE THE
THICKNESS OF EACH PARTITION TYPE.
B.
WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED CEILING PLANS TO
LOCATE CEILING GRID WORK POINTS, MEASURE DIMENSIONS TO:
· EDGE OF THE INDICATED CEILING AT THE FACE OF THE ADJACENT
APPLIED FINISH MEASURED AT THE PLANE OF THE CEILING.
· CAUTION: DUE TO THE POSSIBLE APPLICATION OF APPLIED FINISHES -
THICKNESS OF WHICH MAY VARY BETWEEN FLOOR AND CEILING AND
IS NOT ACCOUNTED FOR (EXCEPT AS INDICATED BY "FOF" OR
"CLEAR") BY THE DIMENSION SHOWN ON THE FLOOR PLANS - THE
CONTRACTOR MUST ADJUST AS NECESSARY, THE FLOOR PLAN
DIMENSIONS TO REFLECT THE ACTUAL DIMENSIONS FOUND AT PLANE
OF THE CEILING.
C.
WHERE WALLS AND/OR PARTITIONS OF UNEQUAL THICKNESS ABUT,
ALIGN EXPOSED FACES, UNLESS OTHERWISE NOTED.
4.
ALIGN
DIMENSION, WHEN OCCURS
WHERE OPENINGS IN WALLS (SUCH AS INTERIOR WINDOWS OR DOORS) ARE
NOT DIMENSIONED BUT SHOWN AS BEING IN THE CENTER OF A GIVEN WALL
SURFACE, LOCATE OPENINGS AS GRAPHICALLY REPRESENTED.
5.
DISCIPLINE REFERENCES
DRAWING NUMBERING
DRAWING REFERENCE
GENERAL NOTES
REF. 1/1-A1
BUILDING SECTION
RE: 1/AS-126
SHEET NUMBER
DIMENSIONING CONVENTIONS
ARCHITECTURAL FLOOR PLAN SYMBOLS
A
COLUMN GRID
NORTH ARROW
REVISION NUMBER AND EXTENT
KEYED NOTE MARK
-SEE CORRESPONDING
NUMBERED KEY NOTE ON SHEET WHERE
REFERENCE OCCURS
REVISION NUMBER - SEE
REVISION HISTORY ON THE
TITLE BLOCK OF EACH SHEET
EXTENT OF CURRENT REVISION
1-A26
1-A26
CL
DEMOLITION LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DETAIL INDICATOR
DETAIL INDICATOR
DIMENSION LINE
CENTER LINE
GI GENERAL INFORMATION
A ARCHITECTURAL
FP FIRE PROTECTION
P PLUMBING
M MECHANICAL
E ELECTRICAL
T TECHNOLOGY
AS-100
DISCIPLINE SHEET NUMBER
LOCATION MAP - NTS
CONSTRUCTION LIMITS
N
EXISTING TO REMAIN
CONCRETE
MASONRY
BUILDING INTERIOR
MATERIAL GRAPHICS
GYP BD RIGID INSULATION
WOOD EARTH
BATT INSULATION
DESIGN MANUALS:
- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
- PG-18-5 EQUIPMENT LIST GUIDES
- PG-18-8 SEISMIC DESIGN HANDBOOK
- PG-18-10 DESIGN MANUALS
- VA PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES
- VA DESIGN GUIDELINES FOR ELEVATORS
- VA ARCHITECTURAL DESIGN MANUAL
- VA MECHANICAL DESIGN MANUAL
- VA ELECTRICAL DESIGN MANUAL
- VA PLUMBING DESIGN MANUAL
- VA FIRE PROTECTION DESIGN MANUAL
APPLICABLE CODES AND REGULATIONS:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS.
IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE OF TEXAS AND THE DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARD FOR
FEDERAL FACILITIES.
APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:
- ABA ACCESSIBILITY STANDARDS
- NFPA 101, "LIFE SAFETY CODE"
- NFPA 10, "PORTABLE FIRE EXTINGUISHERS"
- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"
- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"
- NFPA 72, "NATIONAL FIRE ALARM CODE"
- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS"
- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"
- NFPA 220, "TYPES OF BUILDING CONSTRUCTION"
- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS"
- INTERNATIONAL BUILDING CODE (IBC)
- INTERNATIONAL MECHANICAL CODE (IMC)
- INTERNATIONAL PLUMBING CODE (IPC)
- INTERNATIONAL ENERGY CONSERVATION CODE
N
CLOSED CELL SPRAY
FOAM INSULATION
N
KEY PLAN - NTS
GENERAL NOTES - CONTINUED
VA DIRECTIVE GENERAL NOTES
VA DIRECTIVE GENERAL NOTES - CONTINUED
PROJECT SUMMARY
BID ALTERNATES
IN ADDITION TO THE WORK OUTLINED IN PARAGRAPH 1.3A OF SPECIFICATION
01 00 00 PERFORM THE FOLLOWING:
A. BASE BID: REFURBISH EXISTING STAINLESS STEEL FINISHES FOR THE
ELEVATOR HOISTWAY ENTRANCE FRAMES (LOBBY-SIDE) DOOR PANELS.
USE EXISTING ELECTRIC DISTRIBUTION SYSTEM.
B. ADDITIVE ALTERNATE #1: IN LIEU OF REFURBISHMENT OF THE ELEVATOR
HOISTWAY ENTRANCE (LOBBY-SIDE) FRAMES AT EACH ELEVATOR
OPENING, REPLACE FRAMES WITH NEW STAINLESS STEEL.
C. ADDITIVE ALTERNATE #2: PROVIDE NEW ELECTRIC DISTRIBUTION SYSTEM
TO THE ELEVATOR MACHINE ROOMS PER DRAWINGS ES1.1.
BASEMENT
ELEVATOR
LOBBY
CORRIDOR
ELEVATOR P3
ELEVATOR P4
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
ELEVATOR
MACHINE ROOM
FIRST FLOOR
ELEVATOR
LOBBY
CORRIDOR
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
SECOND FLOOR
ELEVATOR
LOBBY
CORRIDOR
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
FIRST FLOOR
ELEVATOR
LOBBY
ELEVATOR
MACHINE ROOM
ELEVATOR P1
ELEVATOR P2
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
SECOND FLOOR
ELEVATOR
LOBBY
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
GRAPHIC LEGEND
NEW WALLS
1HR RATED WALL
EXISTING WALL
SCALE: 1/4" = 1'-0"5 BLDG. 11 BASEMENT LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"4 BLDG. 11 FIRST FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"3 BLDG. 11 SECOND FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"2 BLDG. 96 FIRST FLOOR LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"1 BLDG. 96 SECOND FLOOR LIFE SAFETY PLAN
N N
N N N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhasePROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
11 & 96
INTERIORS
Austin, Texas 78746
ARCHITECTURE
5121 Bee Caves Road, Suite 203
T:512 - 327 - 4149
COX DESIGN ASSOCIATES
PLANNING
F:512 - 327 - 7679
Austin bcox@coxdesignassociates.com
COR
01/02/2018
BI
M
VA
K
ER
R
VI
LL
E
R
EP
LA
C
E
EL
EV
AT
O R
S/ R
EP
LA
C E
EL
EV
AT
O
R S
P1 -P
KE
R R
VI
LL
E_
AR
C H
_0
7.
rv t 1/
2/
1:
:4
AM
GI-002
100% CONSTRUCTION
DOCUMENTS
CODE ANALYSIS / LIFE SAFETY REPLACE ELEVATORS P1
THRU P4 - KERRVILLE
3600 MEMORIAL BLVD.
KERRVILLE, TX. 78028
01/02/2018 RHC MAG
671A4-15-131
DESIGN MANUALS:
- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
- PG-18-5 EQUIPMENT LIST GUIDES
- PG-18-8 SEISMIC DESIGN HANDBOOK
- PG-18-10 DESIGN MANUALS
- VA PHYSICAL SECURITY DESIGN MANUAL FOR MISSION CRITICAL FACILITIES
- VA DESIGN GUIDELINES FOR ELEVATORS
- VA ARCHITECTURAL DESIGN MANUAL
- VA MECHANICAL DESIGN MANUAL
- VA ELECTRICAL DESIGN MANUAL
- VA PLUMBING DESIGN MANUAL
- VA FIRE PROTECTION DESIGN MANUAL
APPLICABLE CODES AND REGULATIONS:
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LISTED APPLICABLE CODES
IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, LOCAL, AND STATE CODES, ALL WORK
SHALL COMPLY WITH THE ACCESSIBILITY REQUIREMENTS OF THE STATE OF TEXAS AND THE
DEPARTMENT OF VETERANS AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT)
ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES.
APPLICABLE CODES (LATEST EDITIONS):
- ABA ACCESSIBILITY STANDARDS
- NFPA 101, "LIFE SAFETY CODE"
- NFPA 10, "PORTABLE FIRE EXTINGUISHERS"
- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"
- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"
- NFPA 72, "NATIONAL FIRE ALARM CODE"
- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS"
- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"
- NFPA 220, "TYPES OF BUILDING CONSTRUCTION"
- INTERNATIONAL BUILDING CODE (IBC)
- INTERNATIONAL MECHANICAL CODE (IMC)
- INTERNATIONAL PLUMBING CODE (IPC)
- INTERNATIONAL ENERGY CONSERVATION CODE
CODE ANALYSIS
60" MIN
60" MIN
SPACE NEEDED TO TURN A WHEELCHAIR
48" MIN
42" MIN
42" MIN
54" MIN 56" MIN
24" MIN
32" MIN CLR 32" MIN CLR
PATIENT BEDROOM DOOR
46" MIN CLR
A. FRONT APPROACH B. SIDE APPROACH C. LATCH SIDE APPROACH
PATIENT BEDROOM DOOR
46" MIN CLR
32" MIN CLR
PATIENT BEDROOM DOOR
36" MIN CLR
48" MIN
30" MIN
5' - 0" MIN.
base
1' - 0" MIN.
3' - 0" MIN.
1' - 0" MIN.
24" MIN.
3' - 0" MIN.
arm arm
5' - 0" MIN.
1 1/2" MIN
CLEARANCE DIMENSION:
1 1/2" MIN
NOTE:
ALLOWABLE
STRESSES SHALL
NOT BE
EXCEEDED FOR
MATERIALS USED
WHERE A
VERTICAL OR
HORIZONTAL
FORCE OF 250
LBS. IS APPLIED
AT ANY POINT ON
THE GRAB BAR,
FASTENER
MOUNTING
DEVICE OR
SUPPORTING
STRUCTURE.
PROVIDE 1 1/2"
MIN CLEAR
ACCESS AROUND
THE PERIMETER
OF THE GRAB BAR
1.5" MIN.
15"
A. PROJECTING OBJECTS B. RECESSED OBJECTS
LEVERS PUSH/PULL PANIC BAR EXIT DEVICE
NOTE: DOOR HARDWARE IS MOUNTED 30" MIN - 44" MAX FROM FINISH FLOOR TO TOP OF THE DEVICE.
LATCHING & LOCKING DOORS THAT ARE HAND OPERATED AND WHICH ARE IN A PATH OF TRAVEL ARE OPERABLE WITH A SINGLE EFFORT (LEVER, PUSH/PULL, PANIC BAR OR OTHER HARDWARE ASSIGNED TO
PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE)
MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 LBF, WHEN FIRE DOORS ARE REQUIRED THE
MAX EFFORT TO OPERATE THE DOOR MAY BE INCREASED TO THE MINIMUM ALLOWABLE BY THE
APPROPRIATE AUTHORITY , NOT TO EXCEED 15 LBF.
1/4" 1/4"
1/2"
1/4" MAX.
(A) (B)
2' - 10" MAX.
4' - 0" MAX. 2' - 10" MAX.
3' - 10" MAX.
1' - 3" MIN.
4' - 0" MAX.
24" MAX. 48" MIN. 24" MAX.
48" MIN.
2.5" MIN.
72" MIN.
2.5" MIN.
CODE CARD
FIRE ALARM STATION
DIGITAL
ALARM
SYSTEM
WALL
MOUNTED
COAT HOOK
DOOR
MOUNTED
COAT HOOKS
(4 '-0
" F O
R A
D A
IN
ST
AL
LA
TI
O
N S
CONTINUOUS FLOOR TO
CEILING CORNER
GUARD
MOP AND
BROOM
HOLDER
FIRE
EXTINGUISHER
CABINET
SWITCHES
FIRE
ALARM
PULL
ELECTRICAL &
TELEPHONE
RECEPTACLES TV / CABLE OUTLET
THERMOSTATS
MASTER
PAGE
INTERCOM
MASTER
STATION
DUTY STATION
STAFF STATION
FOR REFERENCE ONLY - THIS DOES NOT INDICATE EQUIPMENT OR FIXTURES PROVIDED
FINISH CEILING
FINISH FLOOR
4'
6"
4'
0"
1' - 6"
1'
0"
5'
6"
3"
EX
IS
TI
N
G
M
AT
C H
M
AX
3'
6"
3'
1' - 0"
3'
6"
M
AX
4'
0"
1'
6"
9"
6"
9"
4'
6"
EQ EQ EQ
5'
0"
ROOM SIGNAGE
SEE SHEET AS-721
ACCESS CONTROL HARDWARE
DOOR PUSH
PLATE, 4'-0" MIN.
AWAY FROM DOOR
STRIKE IF LOCATED
ON AN ADJACENT
WALL
2'
MIN.
1' - 3"
6'
0"
1' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhasePROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
11 & 96
INTERIORS
Austin, Texas 78746
ARCHITECTURE
5121 Bee Caves Road, Suite 203
T:512 - 327 - 4149
COX DESIGN ASSOCIATES
PLANNING
F:512 - 327 - 7679
Austin bcox@coxdesignassociates.com
COR
01/02/2018
BI
M
VA
K
ER
R
VI
LL
E
R
EP
LA
C
E
EL
EV
AT
O R
S/ R
EP
LA
C E
EL
EV
AT
O
R S
P1 -P
KE
R R
VI
LL
E_
AR
C H
_0
7.
rv t 1/
2/
1:
:5
AM
GI-003
100% CONSTRUCTION
DOCUMENTS
ACCESSIBILITY STANDARDS REPLACE ELEVATORS P1
THRU P4 - KERRVILLE
3600 MEMORIAL BLVD.
KERRVILLE, TX. 78028
01/02/2018 RHC MAG
671A4-15-131
SCALE: 12" = 1'-0"11 WHEELCHAIR TURNING RADIUS
SCALE: 12" = 1'-0"5 SLIDING FOLDING DOOR APPROACH
SCALE: 12" = 1'-0"12 CLEAR FLOOR GROUND SPACE
SCALE: 12" = 1'-0"13 T-SHAPED TURNING SPACE
SCALE: 12" = 1'-0"2 HANDRAIL PROFILES
SCALE: 12" = 1'-0"3 SPACING OF GRAB BARS
SCALE: 12" = 1'-0"4 DOOR HARDWARE
SCALE: 12" = 1'-0"7 BEVELED CHANGE IN LEVEL
SCALE: 12" = 1'-0"8 VERTICAL CHANGE IN LEVEL
SCALE: 12" = 1'-0"9 OBSTRUCTED HIGH SIDE REACH
SCALE: 12" = 1'-0"10 UNOBSTRUCTED SIDE REACH
SCALE: 12" = 1'-0"6 CLEAR WIDTH OF AN ACCESSIBLE ROUTE
SCALE: 12" = 1'-0"1 VISIBLE HALL SIGNALS
SCALE: 1/4" = 1'-0"14 TYPICAL MOUNTING HEIGHTS
LOBBY
CORRIDOR
ELEVATOR
MACHINE ROOM
ELEVATOR P4 ELEVATOR P3
FIRST FLOOR
ELEVATOR
LOBBY
CORRIDOR
ELEVATOR P4 ELEVATOR P3
SECOND FLOOR
ELEVATOR
LOBBY
CORRIDOR
ELEVATOR P4 ELEVATOR P3
INFECTION CONTROL - GENERAL SHEET NOTES
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED IN SPECIFICATIONS.
B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN PHASES (i.e. NO TWO ELEVATORS IN THE SAME HOISTWAY
SHALL BE INOPERABLE AT ONE TIME); REFERENCE SPECIFICATION 01 00 00 PART 1.10G.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD VERIFICATION.
CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE CEILING WORK REQUIRED ABOVE AND
BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION
AND INFECTION CONTROL MEASURES WITH COR.
F. PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH TEMPORARY DOOR
LOCATION.
G. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC, MULTIPURPOSE SPILL
CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS.
H. NEW MATERIAL MOVED THROUGH FACILITY SHALL BE COVERED WITH 4 MIL. POLY SHEET.
I. DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY THROUGH THE
FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED DUMPSTER CART DESIGNED
FOR SUCH PURPOSE WITH A LID.
J. MATERIAL AND DEBRIS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND APPROVED
CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE FACILITY.
K. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT BOUNDARY.
L. MAINTAIN CLEAR PATH TO EXIT STAIRS AS REQUIRED.
M. PROVIDE LOCKABLE TEMPORARY DOOR TO BE USED TO ACCESS CONSTRUCTION AREAS BY
AUTHORIZED PERSONNEL.
A. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
B. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
C. SEAL UNUSED DOORS WITH DUCT TAPE.
D. BLOCK OFF AND SEAL AIR VENTS.
E. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY WALK OFF MAT AND
HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED
AS NECESSARY.
F. REMOVED OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
G. COVER HEAT AND SMOKE DETECTORS IN WORK AREA DURING ALL DUST PRODUCING ACTIVITIES.
H. EMPTY TRASH DAILY
I. NO STANDING WATER LEFT AT THE END OF THE DAY
INFECTION CONTROL - DURING CONSTRUCTION
INFECTION CONTROL - UPON COMPLETION
A. WIPE WORK SURFACES WITH DISINFECTANT.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
C. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
D. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
E. TERMINAL CLEANING AS NEEDED AND/OR PROJECT COMPLETION.
1. PROVIDE INFECTION CONTROL TEMPORARY BARRIER WALL CONSTRUCTION. VERIFY LOCATION
IN FIELD, CALL BUTTONS SHALL BE OPERATIONAL DURING ALL PHASES.
2. PROVIDE INFECTION CONTROL TEMPORARY DOOR, REUSE DOOR IN SUBSEQUENT PHASES.
3. CONTRACTOR TO COORDINATE WITH VA C.O.R. FOR LOCATION OF TEMPORARY WALLS AND
DOORS IN THIS LOCATION
SHEET KEY NOTES
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NORMAL BUSINESS HOURS. COORDINATE WITH COR.
C. REFER TO SPECIFICATON 01 00 00 FOR INFORMATION ON WORK DURATION FOR EACH PHASE AND
AREA OF WORK.
D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR AND STAFF BEFORE
CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE
CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW FLOOR
PLATE OF THE PROJECT BOUNDARY.
E. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED.
DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED BY THE CONTRACTOR.
F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING NORMAL
BUSINESS HOURS.
G. EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
PHASING GENERAL NOTES
KEY PLAN
GRAPHIC LEGEND
TEMPORARY
CONSTRUCTION
ACCESS DOOR
TEMPORARY 1HR RATED
WALLS
1HR RATED WALL
LIMITS OF CONSTRUCTION
COORDINATE WITH EXISTING CEILING
CONSTRUCTION
SIDE
PUBLIC
SIDE
3 5/8" METAL STUD @ 16" O.C. WITH RUNNER
CHANNELS ALONG TOP AND BOTTOM
TWO LAYERS 5/8" TYPE X GYPSUM BOARD
APPLIED TO ONE SIDE OF STEEL STUDS W/
DUCT TAPE APPLIED TO SCREW HEADS
UL LISTING: V497
CONTINUOUS FIRE SAFE SEALANT
TOP AND BOTTOM
SEAL ALL EDGES WITH DUCT TAPE
REQUIRED TEMPORARY SIGNAGE
1 HOUR FIRE RATED METAL DOOR
ASSEMBLY AND FRAME WITH SEALS,
CARD READER, HARDWARE AND
TEMPORARY SIGNAGE
HAND SANITIZER
TRIATEK MONITOR
SEAL ALL EDGES WITH DUCT TAPE
UL LISTING: U465
PUBLIC
SIDE
FIRST FLOOR
ELEVATOR
LOBBY
ELEVATOR
MACHINE ROOM
STAIRS
ELEVATOR P1
ELEVATOR P2
MIN.
4' - 0"
SECOND FLOOR
ELEVATOR
LOBBY
STAIRS
ELEVATOR P1
ELEVATOR P2
BUILDING 11
BUILDING 96
ELEVATORS P3 & P4
& ELEVATOR
MACHINE ROOM
ELEVATORS P1 & P2
& ELEVATOR
MACHINE ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhasePROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
11 & 96
INTERIORS
Austin, Texas 78746
ARCHITECTURE
5121 Bee Caves Road, Suite 203
T:512 - 327 - 4149
COX DESIGN ASSOCIATES
PLANNING
F:512 - 327 - 7679
Austin bcox@coxdesignassociates.com
COR
01/02/2018
BI
M
VA
K
ER
R
VI
LL
E
R
EP
LA
C
E
EL
EV
AT
O R
S/ R
EP
LA
C E
EL
EV
AT
O
R S
P1 -P
KE
R R
VI
LL
E_
AR
C H
_0
7.
rv t 1/
2/
1:
:5
AM
GI-100
100% CONSTRUCTION
DOCUMENTS
INFECTION CONTROL / PHASING
PLANS - PHASE 1
REPLACE ELEVATORS P1
THRU P4 - KERRVILLE
3600 MEMORIAL BLVD.
KERRVILLE, TX. 78028
01/02/2018 RHC MAG
671A4-15-131
SCALE: 1/4" = 1'-0"1 BLDG. 11 BASEMENT FLOOR - INFECTION CONTROL/PHASE 1
N
SCALE: 1/4" = 1'-0"2 BLDG. 11 FIRST FLOOR - INFECTION CONTROL/PHASE 1
N
SCALE: 1/4" = 1'-0"3 BLDG. 11 SECOND FLOOR - INFECTION CONTROL/PHASE 1
N
SCALE: 1 1/2" = 1'-0"7 TEMPORARY 1-HR BARRIER WALL CONSTRUCTION - V497
SCALE: 1/4" = 1'-0"6 TEMPORARY 1-HR BARRIER WALL CONSTRUCTION ELEVATION NFPA 241
SCALE: 1/4" = 1'-0"4 BLDG. 96 FIRST FLOOR - INFECTION CONTROL/PHASE 1
SCALE: 1/4" = 1'-0"5 BLDG. 96 SECOND FLOOR - INFECTION CONTROL/PHASE 1
NN
INFECTION CONTROL - GENERAL SHEET NOTES
INFECTION CONTROL - DURING CONSTRUCTION
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED IN SPECIFICATIONS.
B. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN PHASES (i.e. NO TWO ELEVATORS IN THE SAME HOISTWAY
SHALL BE INOPERABLE AT ONE TIME); REFERENCE SPECIFICATION 01 00 00 PART 1.10G.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD VERIFICATION.
CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE CEILING WORK REQUIRED ABOVE AND
BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION
AND INFECTION CONTROL MEASURES WITH COR.
F. PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH TEMPORARY DOOR
LOCATION.
G. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC, MULTIPURPOSE SPILL
CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS.
H. NEW MATERIAL MOVED THROUGH FACILITY SHALL BE COVERED WITH 4 MIL. POLY SHEET.
I. DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY THROUGH THE
FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN ENCLOSED DUMPSTER CART DESIGNED
FOR SUCH PURPOSE WITH A LID.
J. MATERIAL AND DEBRIS SHALL BE PROPERLY STORED IN DESIGNATED AREAS AND APPROVED
CONTAINERS. FLAMMABLE MATERIALS SHALL NOT BE STORED IN THE FACILITY.
K. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT BOUNDARY.
L. MAINTAIN CLEAR PATH TO EXIT STAIRS AS REQUIRED.
M. PROVIDE LOCKABLE TEMPORARY DOOR TO BE USED TO ACCESS CONSTRUCTION AREAS BY
AUTHORIZED PERSONNEL.
A. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
B. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
C. SEAL UNUSED DOORS WITH DUCT TAPE.
D. BLOCK OFF AND SEAL AIR VENTS.
E. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY WALK OFF MAT AND
HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED
AS NECESSARY.
F. REMOVED OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
G. COVER HEAT AND SMOKE DETECTORS IN WORK AREA DURING ALL DUST PRODUCING ACTIVITIES.
H. EMPTY TRASH DAILY
I. NO STANDING WATER LEFT AT THE END OF THE DAY
INFECTION CONTROL - UPON COMPLETION
A. WIPE WORK SURFACES WITH DISINFECTANT.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
C. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
D. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
E. TERMINAL CLEANING AS NEEDED AND/OR PROJECT COMPLETION.
SHEET KEY NOTES
1. PROVIDE INFECTION CONTROL TEMPORARY BARRIER WALL CONSTRUCTION. VERIFY LOCATION
IN FIELD, CALL BUTTONS SHALL BE OPERATIONAL DURING ALL PHASES.
2. PROVIDE INFECTION CONTROL TEMPORARY DOOR, REUSE DOOR IN SUBSEQUENT PHASES.
3. CONTRACTOR TO COORDINATE WITH VA C.O.R. FOR LOCATION OF TEMPORARY WALLS AND
DOORS IN THIS LOCATION
GRAPHIC LEGEND
TEMPORARY
CONSTRUCTION
ACCESS DOOR
TEMPORARY 1HR RATED
WALLS
1HR RATED WALL
LIMITS OF CONSTRUCTION
KEY PLAN
PHASING GENERAL NOTES
A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING NORMAL BUSINESS HOURS. COORDINATE WITH COR.
C. REFER TO SPECIFICATON 01 00 00 FOR INFORMATION ON WORK DURATION FOR EACH PHASE AND
AREA OF WORK.
D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR AND STAFF BEFORE
CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE
CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW FLOOR
PLATE OF THE PROJECT BOUNDARY.
E. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED.
DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED BY THE CONTRACTOR.
F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING NORMAL
BUSINESS HOURS.
G. EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
SEAL ALL EDGES WITH DUCT TAPE
REQUIRED TEMPORARY SIGNAGE
1 HOUR FIRE RATED METAL DOOR
ASSEMBLY AND FRAME WITH SEALS,
CARD READER, HARDWARE AND
TEMPORARY SIGNAGE
HAND SANITIZER
TRIATEK MONITOR
SEAL ALL EDGES WITH DUCT TAPE
UL LISTING: U465
PUBLIC
SIDE
REQUIRED AUTO-CLOSE MECHANISM
BASEMENT
ELEVATOR
LOBBY
CORRIDOR
ELEVATOR
MACHINE ROOM
M
IN
4'
0"
ELEVATOR P4 ELEVATOR P3
FIRST FLOOR
ELEVATOR
LOBBY
CORRIDOR
M
IN
4'
0"
ELEVATOR P4 ELEVATOR P3
SECOND FLOOR
ELEVATOR
LOBBY
CORRIDOR
M
IN
4'
0"
ELEVATOR P4 ELEVATOR P3
FIRST FLOOR
ELEVATOR
LOBBY
ELEVATOR
MACHINE ROOM
2 1
STAIRS
MIN.
4' - 0"
ELEVATOR P1
ELEVATOR P2
SECOND FLOOR
ELEVATOR
LOBBY
STAIRS
2 1
MIN.
4' - 0"
ELEVATOR P1
ELEVATOR P2
BUILDING 11
BUILDING 96
ELEVATORS P3 & P4
& ELEVATOR
MACHINE ROOM
ELEVATORS P1 & P2
& ELEVATOR
MACHINE ROOM
COORDINATE WITH EXISTING CEILING
CONSTRUCTION
SIDE
PUBLIC
SIDE
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP AND
BOTTOM
TWO LAYERS 5/8" TYPE X GYPSUM
BOARD APPLIED TO ONE SIDE OF
STEEL STUDS W/ TAPED JOINTS
UL LISTING: V497
CONTINUOUS FIRE SAFE SEALANT
TOP AND BOTTOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhasePROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
11 & 96
INTERIORS
Austin, Texas 78746
ARCHITECTURE
5121 Bee Caves Road, Suite 203
T:512 - 327 - 4149
COX DESIGN ASSOCIATES
PLANNING
F:512 - 327 - 7679
Austin bcox@coxdesignassociates.com
COR
01/02/2018
BI
M
VA
K
ER
R
VI
LL
E
R
EP
LA
C
E
EL
EV
AT
O R
S/ R
EP
LA
C E
EL
EV
AT
O
R S
P1 -P
KE
R R
VI
LL
E_
AR
C H
_0
7.
rv t 1/
2/
1:
:5
AM
GI-101
100% CONSTRUCTION
DOCUMENTS
INFECTION CONTROL / PHASING
PLANS - PHASE 2
REPLACE ELEVATORS P1
THRU P4 - KERRVILLE
3600 MEMORIAL BLVD.
KERRVILLE, TX. 78028
01/02/2018 RHC MAG
671A4-15-131
NN
SCALE: 1/4" = 1'-0"6 TEMPORARY 1-HR BARRIER WALL CONSTRUCTION NFPA 241 ELEVATION
SCALE: 1/4" = 1'-0"1 BLDG. 11 BASEMENT FLOOR - INFECTION CONTROL/PHASE 2
SCALE: 1/4" = 1'-0"2 BLDG. 11 FIRST FLOOR - INFECTION CONTROL/PHASE 2
SCALE: 1/4" = 1'-0"3 BLDG. 11 SECOND FLOOR - INFECTION CONTROL/PHASE 2
N
SCALE: 1/4" = 1'-0"4 BLDG. 96 FIRST FLOOR - INFECTION CONTROL/PHASE 2
SCALE: 1/4" = 1'-0"5 BLDG. 96 SECOND FLOOR - INFECTION CONTROL/PHASE 2
NN
SCALE: 1 1/2" = 1'-0"7 TEMPORARY 1-HR BARRIER WALL CONSTRUCTION - V497
MACHINE ROOM
BASEMENT
ELEVATOR
LOBBY
CORRIDOR
SEE NOTE #5
ELEVATOR
MACHINE ROOM
BASEMENT
ELEVATOR
LOBBY
CORRIDOR
SEE NOTE #3, #4
FIRST FLOOR
ELEVATOR
LOBBY
ELEVATOR
MACHINE ROOM
STAIRS
SEE NOTE
#5
FIRST FLOOR
ELEVATOR
LOBBY
ELEVATOR
MACHINE ROOM
STAIRS
SEE NOTE
#3, #4
G1-200
ELEVATOR MACHINE ROOM
FLOOR PLANS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhasePROJECT MANAGEMENT STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
11 & 96
COR
P
M
REPLACE ELEVATORS
3600 MEMORIAL BLVD.
KERRVILLE, TX. 78028
12/15/2017
HG AAI
671A4-15-131
Revisions: Date:
100% CONSTRUCTION DOCUMENTS
ELEVATORS P3 & P4
& ELEVATOR
MACHINE ROOM
ELEVATORS P1 & P2
& ELEVATOR
MACHINE ROOM
P1 THRU P4 - KERRVILLE
GENERAL NOTES:
1. DEMOLITION DOCUMENTATION WAS OBTAINED
FROM EXISTING BUILDING RECORD DRAWINGS AND
SURVEY OF THE FACILITY. PRIOR TO
CONSTRUCTION, THE CONTRACTOR SHALL VISIT
THE PROJECT SITE AND SHALL FIELD VERIFY ALL
EXISTING CONDITIONS.
2. SCOPE OF DEMOLITION OF EXISTING HYDRAULIC
ELEVATOR EQUIPMENT AND REPLACEMENT WITH
NEW ELEVATOR EQUIPMENT, AND AN EXPLANATION
OF THE BASE AND ADDITIVE BID ITEMS ARE
SPECIFIED IN SPECIFICATIONS SECTIONS
“GENERAL REQUIREMENTS” SECTION 01 00 00 AND
“ELECTRIC HYDRAULIC ELEVATOR RENOVATION”
SECTION 14 24 00. DEMOLISH AND REPLACE
ELEVATOR HYDRAULICS, HVAC, ELECTRICAL AND
ARCHITECTURAL AS REQUIRED BY THE
SPECIFICATIONS AND SEE ELECTRICAL,
MECHANICAL AND ARCHITECTURAL DRAWINGS
FOR ADDITIONAL DETAIL.
3. CONTRACTOR SHALL SUBMIT DETAILED, SCALED
DRAWING SHOWING THE LAYOUT OF THE
PROPOSED NEW ELEVATOR HYDRAULICS, HVAC,
CONTROLS AND ELECTRICAL EQUIPMENT IN THE
ELEVATOR MACHINE ROOMS OF BUILDINGS 11 AND
96 FOR CONTRACTING OFFICER'S
REPRESENTATIVE (COR) APPROVAL. EQUIPMENT
ORDERED PRIOR TO COR APPROVAL WILL BE AT
THE CONTRACTOR'S RISK. SCALED DRAWINGS
SHALL INCLUDE, AS A MINIMUM, ALL ELEVATOR
HYDRAULIC EQUIPMENT PLACED IN THE MACHINE
ROOM AND ALL HVAC AND CONTROLS EQUIPMENT
PROPOSED FOR EACH ELEVATOR MACHINE ROOM.
4. THE CONTRACTOR SHALL FIELD COORDINATE THE
INSTALLATION OF ALL EQUIPMENT TO ENSURE
COMPLIANCE WITH THE APPROVED LAYOUT
DRAWINGS; ANY SUBSTITUTIONS OF PROPOSED
MAJOR PIECES OF EQUIPMENT SHALL BE
IMMEDIATELY REPORTED TO THE COR.
5. DEMOLISH EXISTING ELEVATOR HYDRAULIC
SYSTEMS AND THEIR ASSOCIATED CONTROLS TO
BE REPLACED, IAW SPEC SECTION 14 24 00 AND
GENERAL REQUIREMENTS SECTION 01 00 00.
AutoCAD SHX Text P4
AutoCAD SHX Text P3
AutoCAD SHX Text
HYD.UNIT P4
AutoCAD SHX Text
HYD.UNIT P3
AutoCAD SHX Text
P4 CTRL
AutoCAD SHX Text
P3 CTRL
AutoCAD SHX Text T
AutoCAD SHX Text F-1
AutoCAD SHX Text 006B
AutoCAD SHX Text P4
AutoCAD SHX Text P3
AutoCAD SHX Text P1
AutoCAD SHX Text P2
AutoCAD SHX Text
HYD.UNIT P1
AutoCAD SHX Text
HYD.UNIT P2
AutoCAD SHX Text
P1 CTRL
AutoCAD SHX Text
P2 CTRL
AutoCAD SHX Text P1
AutoCAD SHX Text P2
AutoCAD SHX Text T
AutoCAD SHX Text
MS-B96
AutoCAD SHX Text
BASEMENT PLAN - ELEVATOR MACHINE ROOM:DEMOLITION
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
PARTIAL BLDG 11
AutoCAD SHX Text
BASEMENT PLAN - ELEVATOR MACHINE ROOM:NEW WORK
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
PARTIAL BLDG 11
AutoCAD SHX Text
%%UBLDG 11 KEY PLAN
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
%%UBLDG 96 KEY PLAN
AutoCAD SHX Text
FIRST LEVEL PLAN - ELEVATOR MACHINE ROOM:DEMOLITION
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
PARTIAL BLDG 96
AutoCAD SHX Text
FIRST LEVEL PLAN - ELEVATOR MACHINE ROOM:NEW WORK
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
PARTIAL BLDG 96
ARCHITECTURAL ABBREVIATIONS
A LABEL CLASS A DOOR
A/C AIR CONDITION OR ACCESS CONTROL
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL MANUFACTURERS
ASSOCIATION
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR CONTRACT
DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm² SQUARE CENTIMETER cm ³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CONTRACTING OFFICER
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF ELECTRIC WATER COOLER
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.