36C25624Q0934 0001.docx
DOCX document 49 KB Posted
- Attached to
- J063--Fire alarm maintenance to include nurse call system Federal contract opportunity
- Solicitation number
- 36C25624Q0934
About this file
This document is an amendment to Solicitation 36C25624Q0934 issued by the Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office. The purpose of the amendment is to provide responses to all questions received and to revise the Statement of Work.
The solicitation is for Fire Alarm and Nurse Call System Maintenance and Testing Services for the Gulf Coast Veterans Health Care System. The contractor shall provide all labor, tools, equipment, and transportation necessary to assist in maintenance of the fire alarm and nurse call systems, including diagnostic services, repairs, system downloads, software upgrades, and equipment installation as needed. The contractor shall also perform annual fire alarm testing and bi-weekly/quarterly nurse call system testing in accordance with NFPA standards. The contract includes 2,080 on-site man-hours to assist the VA electrical staff. The amendment clarifies the number of required on-site hours. Offers must be submitted by June 14, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT E NOT OF COMP W INS REQTS.docx | DOCX document | |
| ATTACHMENT F QUALITY ASSURANCE SURVEILLANCE PLAN.docx | DOCX document | |
| ATTACHMENT C Past Performance Questionaire.pdf | ||
| ATTACHMENT D CONTRACTOR CERTIFICATION.docx | DOCX document | |
| ATTACHMENT B LIST OF PAST PERF REF.docx | DOCX document | |
| ATTACHMENT A Harrison Cty MS WD 2015-5147 R22.pdf | ||
| 36C25624Q0934.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-10-2024 520-25-1-543-0003 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 Veterans Avenue Biloxi MS 39531 To all Offerors/Bidders
36C25624Q0934 06-10-2024
X X X
See CONTINUATION Page X The purpose of this amendment is to respond to all questions received. Please see attached questions and answers and revised Statement of Work. No other questions will be entertained at this time.
The closing date remains June 14, 2024, 10:00 a.m. CT.
Danette Rene' Impey Contracting Officer 06-10-2024 Questions to RFQ 36C25624Q0934
1. Per Attachment C Past Performance, it states on page 1 “IN ORDER TO DETERMINE RELEVANCY AND RECENCY, THE FOLLOWING DATA IS REQUIRED. FAILURE TO PROVIDE THIS INFORMANTION MAY RENDER THE PROPOSAL UNRESPONSIVE.” With this requirement being in the hands of those who are on the past performance, it would be highly probable that one or more may not meet this requirement for whatever reason. We can ask them to do this; however, if for any reason they do not get this information to you by the response date, it would reflect on us negatively. I would like to ask for consideration for the below options.
A. I would like to ask you to please consider having this requirement of verification of past performance provided by your office to ensure you receive the information you are requesting. Once we submit the past performance document to your office, your office can then contact the customers and request them for the survey. However, if they do not respond, this should not be viewed negatively to our RFP submittal.
It is understood that you, the offeror, has no control over the Past Performance Questionnaires (PPQ) being returned. Your offer will not be considered non-responsive because of this. Please forward the PPQ as per the instructions in the solicitation.
B. May I ask for the removal of the statement from the requirement for the past performance survey? As we have no control over whether anyone will respond to our request to provide your office with this information.
The PPQ is a pre-populated form and cannot be modified. Please see comment in 1.A. above.
2. On page 7 of the RFQ, MAINTENANCE section, it states “Through this agreement Contractor will further provide during regular work hours, the availability of one thousand forty (2080) man hours onsite to assist the VA Electrical Staff in repair, diagnosis, and service as requested.” On page 9 of the RFQ, first paragraph states “This agreement includes two thousand four hours (2,080) on-site man-hours by Contractor technicians during the course of this agreement.” Please clarify the actual man-hours needed.
The Statement of Work has been revised to state “two thousand eighty (2,080) man hours on-site, based on 40 hours a week X 52 weeks. . .”.
Questions to RFQ 36C25624Q0934 (Cont’d.)
3. What is the correct number of required hours to assist the VA? Also, are the requirements for these hours on Page 7 and 9 the same bank of hours, just repeated later in the solicitation? Or is this an additional bank of hours you’re looking for?
The correct number of hours is 2,080 on-site man hours based on 40 hours a week X 52 weeks. These hours are the same number of hours listed in the MAINTENANCE section of the Statement of Work. These are not additional hours.
SCOPE OF WORK
Fire Alarm and Nurse Call System Maintenance & Testing Services
Contractor shall provide all labor, tools, equipment, and transportation necessary to assist in maintenance of the Gulf Coast Veterans Health Care System’s EST Fire Alarm Network and Nurse Call / Code Blue (Tektone) System. Contractor shall be a local factory authorized Partner for EST fire products as manufactured by Edwards Systems and Tektone Systems. The existing Fire Alarm System consists of 2 nodes and over 5,700 devices. Node 1 has 64 networks and node 2 has 29 networks. Contactor shall provide diagnostic services, repairs, system downloads, software upgrades, and equipment removal / installation as needed on all components of the Campus Fire Alarm Networks listed below by VA Buildings. This includes any service, updates, programming, troubleshooting, in-house training, and repairs to all FireWorks workstations (7 each). The existing Nurse Call is interfaced into the Fire Alarm System for Buildings 3, 30, 1, 14, 15, and 29.
TESTING:
FIRE ALARM TESTING:
Annual Fire Alarm Test:
· Contractor shall be performed in strict accordance with the latest versions of NFPA 25, 70, and 72.
· The contractor shall be given at least 30 days notice for the annual test. The date for the test shall occur in the fourth fiscal quarter (July, August, September). The contractor shall provide all forms, reports, test equipment, and consumables (approved canned smoke, etc.) necessary to perform a complete, code compliant assessment.
· Repair labor for any discrepancies noted during the fire alarm test shall be included. The VA will provide parts, necessary support and oversight for the test.
NURSE CALL TESTING:
Bi-Weekly “Code Blue” Testing:
· Contractor will initiate a “Code Blue” test on a bi-weekly basis to coincide with the Quarterly inspections.
· “Code Blue” testing will be performed such that each unit is tested on a rotating basis.
· “Code Blue” testing will be performed bi-weekly regardless of service hours expended.
· The VA to determine time and day of each bi-weekly “Code Blue” test.
· Prior to “Code Blue” testing, Contractor will announce via the Fire Alarm Voice Evacuation interface to PBX that we will be testing the “Code Blue” system.
· After testing Contractor will announce in the same manner that “Code Blue” testing is complete and normal operation/response may continue.
Quarterly “Eyes On” Visual Inspections:
· Visually inspect all nurse call components on a weekly basis.
· Visual inspection will be done on a rotating basis, visiting each nursing unit separately such that each nursing unit will receive at minimum, 2 visits per quarter (more visits will be provided as time permits from deductions of time per paragraph 1. e.)
· Visual inspection will also include visiting the associated “Head End” equipment rooms on the same rotating basis.
· Provide any requested nurse call training to staff.
· Quarterly inspections will be provided over a 51-week period of this contract.
Annual Inspection
· Annual inspection estimated to take 2 technicians 1 week (80 hours).
· Annual inspection will be a complete functional test of all installed nurse call components.
· Scheduling of the annual inspection will be determined by the VA to allow adequate notification to the staff as “Normal Code Blue” operations will be impaired (i.e., continuous “Code Blue” messages while testing is being performed).
The method for annual testing will be as follows:
· A technician will test each filed component for proper operation.
· A 2nd technician will be stationed at the nurse call server where all activity will be monitored.
· The 2nd technician will verify with the technician performing the component testing the correct room number being tested and it’s associated “Code Blue” message.
· The server will show all activity and we will connect a local speaker so that the technician monitoring the activity can verify the correct audible message.
· In the event of an actual “Code Blue” occurrence, the technician monitoring the activity will be able to alert the staff that an actual “Code Blue” event has occurred via the Fire Alarm Voice Evac interface to PBX.
The Fire Alarm systems are contained within the following buildings:
1, 2, 3, 5, 9, 10, 13, 14,15, 16, 17, 18, 19, 21, 25, 26, 27, 28, 30, 31, 35, 37, 44, 50, 52, 53, 56, 57, 61,69, 86, 88, 91, 92, 93, 94, 95, T-45, T-102, T-104, and T-105.
See attached building device accounting spreadsheet for detailed information in each facility.
Additional Systems Components to be maintained under this contract:
· 56 Booster Power Supplies (these are devices external to cabinets)
Cabinet Components:
· 90 Liquid Crystal Displays
· 90 CPUs (fire alarm nodes)
· 55 Primary Power Supplies
· 31 Single Loop Controllers
· 9 Dual Loop Controllers
· 7 Audio Source Units
· 31 Zone Amplifiers
· 2 U. L. 5 Fireworks Workstations
· 5 Non-U. L. Fireworks Workstations
System network configuration:
· Data network hybrid “Class A”. Fiber building to building / copper within the building.
· Audio is not networked for purposes of fire. Local within the only.
· Mass Notification paging. Networked via fiber through data and networking / digital converter components to 7 buildings that have “Voice EVAC”.
INSPECTION:
· All testing and inspection procedures performed by contractor will be by the guidelines and specifications set forth by NFPA 72 and / or requirements as set forth by federal standards. Upon completion, contractor will issue a NFPA report listing the equipment tested and the results of the test. Contractor will perform one inspection per this contract annually.
MAINTENANCE:
· Contractor will provide programming and technical expertise; both scheduled and emergency service, as support to the daily operation of the VA Electrical Staff. Through this agreement Contractor will further provide during regular work hours, the availability of two thousand eighty (2,080) man hours on-site, based on 40 hours a week X 52 weeks, to assist the VA Electrical Staff in repair, diagnosis, and service as requested. As room requirements change, contractor shall add monitors as needed.
DEFINITIONS/ACRONYMS:
Engineering - Supervisor or designee (COR).
CO - Contracting Officer. Government Agent authorized to affect contract. contract changes, and issue direction.
COR - Contracting Officer Representative. Individual designated by the Contracting Officer to monitor contract performance, and coordinates performance efforts subject to authority limits designated. A designation letter identifying the COR for this project will be issued and signed by all parties.
PMI- Preventive Maintenance Inspection. Services that are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with (IAW) its original manufacturers intended design and functional capacity, with minimal incidence of malfunction or inoperative conditions.
FSE - Field Service Engineer. A person who is authorized by the contractor to perform maintenance (corrective and/or preventive) services.
ESR -Vendor Engineering Service Report. The documentation/report of services rendered for each incidence of work performance under the terms and condition of the contract.
Acceptance Signature -Authorized Department of Veterans Affairs (OVA) employee who indicates FSE demonstrated service conclusion/status and User has accepted work as complete/pending as stated in ESR.
Authorization Signature - COR's signature; indicates COR accepts work status as stated in ESR.
NFPA - National Fire Protection Association.
OEM- Original Equipment Manufacturer.
ISO- Independent Service Organization.
PO- Purchase Order. The VA document that obligates funds. Include this number, as well as the contract number, on all correspondence.
GCVHCS- Gulf Coast Veterans Health Care System
CONFORMANCE STANDARDS:
Contractor will provide a complete inspection of the campus fire alarm system prior to the expiration of this agreement. This inspection will include all test and verification points with final inspection reports in accordance with NFPA guidelines.
Locate Point By Point and Test Each Device (Detectors, Smoke Dampers, Audiovisuals Devices, Speakers, and Fire Alarm Pull Stations).
Provide third party monitoring of the fire alarm system to meet NFPA and JCAHO monitoring requirements.
· All smoke detectors shall be tested using only APPROVED methods and instruments. Verify and confirm HVAC shutdown with testing of duct detectors.
· Verify off premises transmission equipment.
· Verify electromechanical releasing devices operation (Fire Door Releases)
· Verify Fire alarm control panel batteries (Voltage w/charger, Voltage w/o charger, Battery % of Charge and Age).
· Elevator Recall and Shutdown
· Fire Optic Cable Power
· Printer Operations
· Voice Alarm Clarity
Ground Fault and Trouble Testing (A device on each initiating and signaling zone shall be disconnected to determine proper supervision of wiring. These tests shall NOT be performed at the panel).
· Fuses checked for proper rating.
· All testing of devices shall be tested in a manner recognized by the manufacturer and governing authorities.
Upon completion of each inspection and/or testing, Contractor shall complete Report of Inspection and Testing, and provide documentation to the COR and VA Safety Office.
Contractor will contact the VA Safety Office at least 30 days in advance to schedule the inspection and testing of the fire alarms systems.
Upon completion of the annual inspection Contractor will provide a complete listing of all discrepancies, failures, and/or faulty equipment discovered as a result of this inspection. Contractor will have two (2) weeks to correct any fire alarm discrepancies noted on the report. If corrections cannot be made within that timeframe, submit status report on the correction and estimated date of correction.
One complete annual test and inspection in accordance with Mississippi State Fire Marshal and issuing of the test and inspection report to customer upon completion.
As a manufacturer authorized representative of EST Fire Equipment, Contractor will provide maintenance support to the VA Electrical Department, as follows.
This agreement includes a total two thousand eighty hours (2,080) on-site man-hours by Contractor technicians during the course of this agreement (these are not additional hours). Calculation of available hours is based on forty (40) hours per week to be assigned as technical assistance to the VA Electrical Staff. Regardless of basis of calculation, hours may be scheduled at any increment by prior arraignment with Contractor through the life of this agreement. Hours will be accounted for by Contractor and report will be available upon request by the VA Engineering Department (COR), Safety, or Electrical Department.
Contractor will provide diagnosis of software and programming related issues on fire and nurse call systems in use on the date of signing of this agreement. (See Exclusions below for limitations and restrictions.)
Contractor will provide download (programming) support to the VA staff for device adds, moves, and changes performed by the VA Electrical Staff. This includes any service, updates, programming, troubleshooting, in-house training, and repairs to all Fireworks workstations (7 each) and Nurse Call stations.
Where physical device and wire-level diagnosis exceeds resources of the VA Biloxi Electrical Shop, Contractor will assist per incident as requested drawing from the provided maintenance hours in this agreement. Notify COR.
Contractor will remove and re-install equipment furnished by the VA as needed, resulting from diagnosis and / or service.
Contractor will provide system software upgrades as they become available from the manufacturer at no cost to the government.
EXCLUDES THE FOLLOWING:
Damage by others. Contractor in applications where results of diagnosis proves damage caused by others, Contractor reserves the right to invoice other parties for time expended by Contractor.
Diagnosis and repair under this agreement excludes issues created in or created by any contract project performed by others and systems not a part of the existing campus system at the time of this signing.
The provision of any equipment, components and / or cable needed in the course of performing this agreement is excluded and will be provided by the VA or upon request provided and invoiced by Contractor.
Sales Tax not applicable.
120 VAC electrical circuits for control equipment.
LAN/WAN infrastructures.
Equipment and devices interfaced to any of the maintained systems within this contract are excluded from service or responsibility of CONTRACTOR in any way. These devices and connections may include but not limited to fans, elevators, AHU controls, fire pumps, generators, and fence material. CONTRACTOR will service and maintain up to the device that is a part of a maintained system, any connections, wiring or service beyond that device to the interfaced equipment is excluded.
· Damper control functions, restoration of Air Handling Unit Operation once Fire Alarm relay has been restored.
· Labor for repairs caused by fire, water, lightning, accident, vandalism, tampering or any other act beyond the control of CONTRACTOR.
· Labor for repairs of failed equipment and/or circuit issues discovered during Fire Alarm Inspection.
· Central station monitoring and associated fees (price quotes available) Sprinkler water flow, valve tamper or pressure switches and related installation.
· Battery replacement.
HOURS OF COVERAGE:
Standard non-emergency service response shall typically be same day or within 24 hours. Contractor shall provide 24 / 7 / 365 emergency service including weekends and holidays with a response time of no more than two (2) hours. The VA will provide support as necessary from the Engineering and / or Safety Sections. Contractor shall contact Electric Shop, Safety, or COR to coordinate all work on any part of the fire alarm and nurse call system. Notify VA Boiler Plant if others cannot be contacted.
Normal business hours of coverage are Monday through Friday from 7:00 a.m. to 4:00 p.m., excluding Federal holidays. All service/repairs will be performed during normal hours of coverage unless requested or approved by the COR. Contractor's representative shall check in with Engineering upon entering the facility, and shall sign in and out of the facility with Engineering.
Standard nonemergency service response shall typically be same day or within 24 hours.
Emergency service available 24n including weekends and holidays with a response time of no more than two (2) hours is included in this maintenance support agreement. Any fire protection systems discovered at the time of inspection or added to the above premises after the date of this Agreement shall be inspected by Seller and Customer shall pay an additional price commensurate with the usual charges made by Seller and thereafter such systems will be added to the scope of this Agreement at a mutually agreed upon price.
Preventive maintenance inspections will be performed semi-annually during the months of January and July (adjusted for the basic year, depending on date of contract award). Coordinate with COR. Inspections will be scheduled at least two weeks in advance with COR.
Work performed outside the normal hours of coverage as approved by the COR shall not result in additional charges. Work performed outside normal hours of coverage at the request of the FSE shall be considered service during normal hours of coverage.
Federal Holidays observed by the GCVHCS are:
| New Years Day | Labor Day | ||
| Martin Luther King Day | Columbus Day | ||
| President's Day | Veterans Day | ||
| Memorial Day | Thanksgiving Day | ||
| Juneteenth | Christmas Day |
Independence Day
Or any other day specifically declared by the President of the United States to be a national holiday.
SCHEDULED MAINTENANCE:
The contractor shall perform PMI service to ensure that equipment listed in the schedule performs IAW the above listed Conformance Standards. The contractor shall provide and utilize procedures and checklists with worksheet originals indicating work performed, and actual values obtained (as applicable) shall be provided to the COR at the completion of the inspection/service.
PMI services shall be performed in accordance with, and during the hours defined in, the preventive maintenance schedule established herein. All exceptions to the PMI schedule shall be arranged and approved in advance with the COR.
The contractor shall furnish all documentation of all measurements and calibrations to the COR, to ensure that the system is performing in accordance with the Conformance Standards.
UNSCHEDULED MAINTENANCE:
Contractor shall maintain the equipment in accordance with the above listed Conformance Standards. The contractor shall provide repair services, which may consist of calibration, cleaning, oiling, adjusting, replacing parts, etc., and maintaining the equipment including all intervening calls necessary between regular services and calibrations. All required parts will be furnished by the contractor.
The CO, COR or designated alternate has the authority to approve/request a service call from the contractor.
Response Time: As stated in Hours of Coverage.
PARTS:
The contractor has ready access to unique and/or high mortality replacement repair parts. All parts supplied shall be compatible with existing equipment. The contractor shall use only new or rebuilt parts, approved by the OEM, and shall not install used parts or those removed from another system without written COR approval.
UPDATES:
If Applicable, Contractor shall provide all software and hardware updates upon release at no additional cost to the Government throughout the life of the contract. Software and Hardware updates are limited to those items which are commercially available (i.e.to ISOs) from the OEM and are provided by the OEM to their customers at no cost. Hardware/software update/upgrade installations shall be scheduled and performed at no additional cost to the Government.
SERVICE MANUALS:
The GCVHCS shall not provide service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSE's all operational and service manuals, schematics, parts list, etc., which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request.
DOCUMENTATION/REPORTS:
The documentation shall include detailed descriptions of the scheduled and unscheduled maintenance procedures performed, including replaced parts and prices, required to maintain the equipment in accordance with conformance standards. Such documentation on shall meet the guidelines as set forth in the above listed Conformance Standards. In addition, each ESR shall at a minimum document the following data legibly and in complete detail:
· Name of Contractor
· Name of FSE who performed services
· Contractor Service ESR Number/Log Number
· Date, Time (starting and ending), Equipment Downtime and Hours on Site for service call.
· GCVHCS PO#(s) covering the call, if outside normal working hours.
· Description of Problem Reported by COR/User.
· Identification of Equipment to be serviced:
· Equipment Inventory ID#, Manufacturer's Name, Device Name, Model, Serial#, and any other Manufacturer's identification #s.
· Itemized Description of Service Performed (including costs associated with after normal business working hours service), including:
· List of Parts (with part #s), Materials and Circuiiti Location of Problem, and Corrective Action taken.
Signatures:
· FSE performing services described.
· OVA Employee who witnessed service described.
· Equipment downtime.
NOTE: ANY ADDITIONAL CHARGES CLAIMED MUST BE APPROVED BY THE COR IN ADVANCE BEFORE THE SERVICE IS COMPLETED AND A SEPARATE PURCHASE ORDER ISSUED.
REPORTING REQUIREMENTS:
For all on-site service, the contractor shall be required to report to Engineering to log in during normal business hours, Monday through Friday. This check in is mandatory. When the service is completed, the FSE shall document services rendered on a legible ESR(s). The FSE shall be required to log out with Engineering and submit the ESR(s) to the COR. All ESRs shall be submitted to the equipment user for an "acceptance signature" and to the COR for an "authorization signature". If the COR is unavailable, a signed, authorized copy of the ESR shall be sent to the contractor after the work can be reviewed (if requested or noted on the ESR.)
ADDITIONAL CHARGES:
There will be no additional charge for time spent at the site during or after the normal hours of coverage awaiting the arrival of additional FSE and/or delivery of parts.
REPORTING REQUIRED SERVICES BEYOND THE CONTRACT SCOPE:
The Contractor shall immediately, but not later than 24 consecutive hours after discovery, notify the CO and COR (in writing) of the existence or the development of any defects in or repairs required to the scheduled equipment, which the Contractor considers he/she is not responsible for under the terms of the contract. The contractor shall furnish the CO and COR with a written estimate of the cost to make the necessary repairs.
This contract does not include labor or materials for service lines and fittings, equipment not set forth on this schedule, or operating problems related to environmental conditions, e.g. electrical, steam, water and/or ventilation that do not comply with equipment specifications. This also applies to improper operation of the equipment by operating personnel. Repairs made by the contractor, which are the result of neglect or improper operation of the equipment by the medical center, will result in issuance of a separate purchase order by the Government. Contractor must obtain a purchase order in this respect prior to affecting such repairs. Contractor must notify the contracting officer or his /her representative if the contractor is not available, prior to this type of repair and secure a purchase order before proceeding further.
CONDITION OF EQUIPMENT:
The contractor accepts responsibility for the equipment listed in an "as is" condition. Failure to inspect the equipment prior to contract award will not relieve the contractor from performance of the requirements of this contract.
COMPETENCY OF PERSONNEL SERVICING EQUIPMENT:
Each respondent must have an established business, with an office and full-time staff. The staff includes a "fully qualified" FSE and a "fully qualified" FSE who will serve as the backup.
"Fully Qualified" is based upon training and on experience in the field. For training, the FSE(s) shall have successfully completed a training program for the equipment listed in this PWS in accordance with the required commercial industry standards and be fully qualified to work on and maintain the subject equipment.
TEST EQUIPMENT:
Prior to commencement of work on this contract, the contract awardee shall provide the GCVHCS with a copy of the current calibration certification of all test equipment that is to be used by the contractor on GCVHCS' equipment, not later than ten (10) calendar days after contract award.
IDENTIFICATION & PARKING:
The contractor's FSE's shall wear visible company identification at all times while on the premises of the GCVHCS. It is the responsibility of the contractor to park in the appropriate designated parking areas, to avoid ticketing or towing. Information on parking is available from the GCVHCS Police Service.
THIRD PARTY MONITORING:
Provide third party monitoring of the fire alarm system to meet NFPA and JCAHO monitoring requirements.
Fire Alarm and Nurse Call System Maintenance and Testing Services
Page 1 of
Page 1 of
File details come from the government source that posted it. Updated .