36C25622R0038 SOW Attachment 02 .pdf

PDF 442 KB Posted

Attached to
Z1DZ--629-22-705-EHRM Infrastructure Upgrades – St John CBOC – Construction
Solicitation number
36C25622R0038
Issued by

View the file

Other files

File Type Posted
36C25622R0038.docx DOCX document
36C25622R0038 ICRA ILSM NEPA 110421.xlsx XLSX spreadsheet
36C25622R0038 SOW Signed Attachment 03 .pdf PDF
36C25622R0038 SOW Attachment 04-Revised.pdf PDF
36C25622R0038 WD LA20220052 Mod 1.docx DOCX document
36C25622R0038 SOW Revision 012122.docx DOCX document
36C25622R0038 COVID-19 Safety Protocols for Federal Contractors rev2.docx DOCX document
36C25622R0038 SOW Attachment 01 .jpg JPG image
36C25622R0038 Pre-Sol.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORRIDOR #1

308 SF

C O

R R

I D

O R

S

F

C O

R R

I D

S

F

CORRIDOR #4

360 SF

C O

R R

I D

S

F

C O

R R

I D

S

F

CORRIDOR #6

158 SF

AISLE #1

47 SF

854 SF

93 SF

GENERAL NOTES:

1. The work shall include, but is not limited to, upgrading facility fiber throughout the buildings to each IT closet specifically Building 1 Room 109 (see floor plan), provide a redundant fiber run throughout the facility to each IT closet, provide redundant fiber mains to the demarcation room from the provider point, provide additional outlets in each IT closet, upgrade facility power distribution as required, upgrade UPS for OIT equipment, upgrade facility HVAC distribution as required, physical security, and assessment and upgrades. Contractor shall field verify all conditions associated with the project during a pre-bid site visit.

Work shall be completed after hours and on weekends.

2. The Contractor shall ensure all below requirements from the VA Office of Electronic Healthcare Modernization Site Infrastructure and End User Device Requirements are met.

3. Power - UPS Functional Requirements: This Scope of Work includes UPS requirements for OIT equipment only. All OIT equipment in the Telecom Room shall be connected to the UPS.

A. All UPS units supporting Information Technology infrastructure shall be functional and maintain a 10-minute run-time.

B. UPS shall be managed and report the following information to a management system.

a. Overload

b. Battery Temperature High

c. Battery Charge Low

d. Battery Failure

e. Critical Condition (fan failure, low output voltage, etc) C. UPS shall support both monitoring and remote management to include full compliance with RFC-1628 – UPS Management Information Base Support for Simple Network Management Protocol (SNMP) v3.0, BaCnet and Modbus protocols.

D. UPS shall be connected to a monitoring system by Ethernet (wired or wireless) or serial interface (RS-232 or RS-485).

E. All units within one (1) year of end of life by facility Go-Live shall be replaced with new units.

a. End of Life for stand-alone units assumed to be six (6) years from date placed into service.

b. End of Life for UPS batteries assumed to be three (3) years from date replaced.

F. Most Community Based Outpatient Clinics are defined as Life Safety Protected for Physical Security and Resiliency design. However, if a specific location was designated as Mission Critical, all equipment in TR shall be connected to the critical electrical branch and Emergency Power / Backup Generator.

4. Bonding - Upstream bonding requirements to the Secondary Bonding Busbar or Primary Bonding Busbar must use two lugs. Bonding for telecommunications equipment must be performed per manufacturer's specifications. All grounding shall comply with ANSI/NECA/BICSI 607-C, Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises, November 2015.

5. Heating, Ventilation, and Air Conditioning (HVAC) Design Requirements A. Reference: U.S. Department of Veterans Affairs Office of Construction & Facilities Management HVAC Design Manual, dated May 1, 2019, https://www.cfm.va.gov/til/dManual/dmHVAC.pdf.

B. Telecommunications Rooms, Class B space temperature range 41°F to 95°F, relative humidity: 8 to 80% noncondensing.

C. Temperature and humidity shall be monitored in proximity to the OIT equipment rack. Place sensors either on populated rack or within 6 feet of rack.

D. Temperature and humidity shall be connected to a monitoring system by Ethernet (wired or wireless) or serial interface (RS-232 or RS-485).

E. In areas where there are environmental issues (e.g., steam pipes, lack of ventilation, etc.), the use of thermal curtains and additional vents will be considered as a temporary alternative, not permanent resolution.

6. Physical Security Design Requirements A. Reference: Telecommunications and Special Telecommunications Systems Design Manual, https:// www.cfm.va.gov/til/dManual/dmTelecomm.pdf.

B. Provide an electronic Security Management System (SMS) with a Physical Access Control System

(PACS).

C. Doors shall include a mechanical spring loaded “deadlocking feature” (not separate “deadbolt” lock), PACS associate electronic Personal Identity Verification (PIV) card access device with keypad, electric strike and digital Closed Caption Television (CCTV) color camera routed to and directly controlled by the facility SMS.

D. Telecommunication Room security system shall be connected to a UPS or emergency backup power system.

E. Facility programmable door controller shall be fully functional in a standalone status if connection to the SMS is lost. Once the connection is restored, the local door control system shall update the SMS, regarding all operations that occurred after the connection was interrupted. Then, the SMS shall update the local door control units to current operational function.

F. The PACS and SMS shall be fully compliant with VA’s PII, PIV "Smart" ID Card and at a minimum, FIPS 201-1 and NRTL (i.e. UL) listed and labeled.

629-22-705 EHRM Infrastructure Upgrades – St John CBOC – New Orleans, LA - Room 109

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text Physician

AutoCAD SHX Text Work Room

AutoCAD SHX Text Exam

AutoCAD SHX Text Room #5

AutoCAD SHX Text Exam

AutoCAD SHX Text Room #4

AutoCAD SHX Text Exam

AutoCAD SHX Text Room #3

AutoCAD SHX Text Exam

AutoCAD SHX Text Room #2

AutoCAD SHX Text Exam Room #1/

AutoCAD SHX Text Dietian

AutoCAD SHX Text Patient

AutoCAD SHX Text Advocate

AutoCAD SHX Text Check

AutoCAD SHX Text In/Out #4

AutoCAD SHX Text Forms/

AutoCAD SHX Text Fax

AutoCAD SHX Text Check

AutoCAD SHX Text In/Out #3

AutoCAD SHX Text Check

AutoCAD SHX Text In/Out #2

AutoCAD SHX Text Check

AutoCAD SHX Text In/Out #1

AutoCAD SHX Text Security

AutoCAD SHX Text Womens

AutoCAD SHX Text Entry

AutoCAD SHX Text Receptionist

AutoCAD SHX Text Waiting

AutoCAD SHX Text Area

AutoCAD SHX Text Specimen

AutoCAD SHX Text Collection #1

AutoCAD SHX Text Specimen

AutoCAD SHX Text Collection #2

AutoCAD SHX Text Specimen

AutoCAD SHX Text Storage

AutoCAD SHX Text Patient

AutoCAD SHX Text H/C R.R.

AutoCAD SHX Text Nurse

AutoCAD SHX Text Manager

AutoCAD SHX Text Nurse

AutoCAD SHX Text Station #1

AutoCAD SHX Text Nurse

AutoCAD SHX Text Station #2

AutoCAD SHX Text Nurse

AutoCAD SHX Text Station #3

AutoCAD SHX Text Medication

AutoCAD SHX Text Exam

AutoCAD SHX Text Room #6

AutoCAD SHX Text Exam

AutoCAD SHX Text Room #7

AutoCAD SHX Text Oberservation/ Special

AutoCAD SHX Text Exam Purpose Exam

AutoCAD SHX Text Secretary

AutoCAD SHX Text Admin

AutoCAD SHX Text Officer

AutoCAD SHX Text Stretcher

AutoCAD SHX Text W.C.

AutoCAD SHX Text Soiled

AutoCAD SHX Text Utilities

AutoCAD SHX Text Counseling

AutoCAD SHX Text Office #3

AutoCAD SHX Text Counseling

AutoCAD SHX Text Office #2

AutoCAD SHX Text Counseling

AutoCAD SHX Text Office #1

AutoCAD SHX Text Pharmacy

AutoCAD SHX Text Consultation

AutoCAD SHX Text Group/

AutoCAD SHX Text Conference #2

AutoCAD SHX Text Group/

AutoCAD SHX Text Conference #1

AutoCAD SHX Text Exam

AutoCAD SHX Text Rm #8

AutoCAD SHX Text Clean Utility/

AutoCAD SHX Text Linen Rm

AutoCAD SHX Text Social

AutoCAD SHX Text Worker

AutoCAD SHX Text Training/

AutoCAD SHX Text Break Room

AutoCAD SHX Text General/ Medical

AutoCAD SHX Text Storage

AutoCAD SHX Text Mail/

AutoCAD SHX Text Copy/Fax

AutoCAD SHX Text Mens

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text Womens

AutoCAD SHX Text Mens

AutoCAD SHX Text Electrical

AutoCAD SHX Text Telephone

AutoCAD SHX Text

HAC

AutoCAD SHX Text Clst

AutoCAD SHX Text Maintenance/

AutoCAD SHX Text Biomedical

AutoCAD SHX Text Vending Machines

AutoCAD SHX Text Phone

AutoCAD SHX Text Specimen

AutoCAD SHX Text Pass-Thru, typ.(2)

AutoCAD SHX Text Vestibule

AutoCAD SHX Text

TP

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text

TP

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text H/C

AutoCAD SHX Text

ST JOHN CLINIC FLOOR PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 3/16"=1'-0"

AutoCAD SHX Text 120A

AutoCAD SHX Text 120B

Sheets and Views
Model

File details come from the government source that posted it. Updated .