36C25620R0159_1.docx

DOCX document 146 KB Posted

Attached to
Z1DA--629-20-113 - Fire Alarm System Replacement Federal contract opportunity
Solicitation number
36C25620R0159
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document is a request for proposal for a fire alarm system replacement project at the Southeast Louisiana Veterans Healthcare System facility in New Orleans, Louisiana. The project involves designing and constructing a fully functional, addressable fire alarm and suppression system. The tentative date for issuing the RFP is November 3, 2020, with proposals due on or around December 3, 2020. The anticipated contract award date is approximately 30 days after receipt of proposals. The contract performance period is 365 calendar days from the notice to proceed date. The estimated construction cost range is between $500,000 and $1,000,000. The procurement is set aside 100% for service-disabled veteran-owned small businesses. Interested offerors must be registered and verified as a SDVOSB concern in the Vendor Information Pages database.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--629-20-113 - Fire Alarm System Replacement, newest first.
File Type Posted
36C25620R0159 0002.docx DOCX document
S02 ATTACHMENT Device Decriptions v2.pdf PDF
S02 ATTACHMENT Life Safety Drawings v2.pdf PDF
36C25620R0159 0001.docx DOCX document
P09 Updated SOW Final (10.22.2020) 04.pdf PDF
P07 Wage Decision LA20210041 (01.01.2021).pdf PDF
S02 EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY .docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25620R0159

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE

DOCUMENTS (

Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25620R0159 X 01-07-2021 629-21-2-6590-0001 629-20-113 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Ave., Bldg. T-102, Rm A106 Biloxi MS 39531 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office (NCO) 16 400 Veterans Ave., Bldg. T-102, Rm A106 Biloxi MS 39531 William A. Geary bill.geary@va.gov

(228) 523-5178 NOTE: Any reference contained herein concerning "bid" or "bidder" means "offer" or "offeror" This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) under Public Law (PL) 109-461. Offerors must be verified as a SDVOSB in the VetBiz Vendor Information (VIP) at https://www.vip.vetbiz.va.gov. Offers received from contractors who are not SDVOSB verified in VetBiz will not be considered for award.

This is a TWO-PHASE DESIGN-BUILD ACQUISITION - All qualified SDVOSB offerors may submit for Phase I. After Phase I evaluation, selected PHASE II offerors will be notified with instructions to submit PHASE II proposals for Fire Alarm System Replacement Project No: 629-20-113.

The contractor shall provide all labor, materials, tools, equipment and supervision necessary to design and build (Design/Build) a Fire Alarm System Replacement at the Southeast Louisiana Veterans Healthcare System, New Orleans, LA 70119. See enclosed (and attached) documents for further instructions.

SITE VISIT: A site visit will be held for this project during Phase II. Only the most highly qualified offerors from Phase I evaluations will be invited to attend the site visit which will be scheduled after Phase I evaluations.

MAGNITUDE OF CONSTRUCTION PROJECT: In accordance with FAR 36.204 and VAAR 836.204, Disclosure of the Magnitude of Construction Projects, this project falls between the following price range: Between $500,000 and $1,000,000.

NAICS CODE: 236220 SMALL BUSINESS SIZE

STANDARD

: $39.5M

GEOGRAPHICAL AREA WHERE WORK IS TO BE PERFORMED: New Orleans, Louisiana

JOINT VENTURES: Joint Ventures must be verified SDVOSBs as an entity and also registered in the System For Award Management (SAM). If submitting a proposal as a Joint Venture, please provide a copy of the Joint Venture Agreement with your proposal.

***END OF ITEMS***

X X 52.211-10 X

2:00 PM

CST

02-08-2021 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c 38 U.S.C. 8127 (d) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

629-3610162 6590-854200-3223 23NRNR590

X 36C256 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Ave., Bldg. T-102, Rm A106 Biloxi MS 39531 Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714 8972 877-353-9791 512-460-5429 X

WILLIAM A. GEARY

Contracting Officer

SEE SCHEDULE OF OFFER ITEMS

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
A.3 PRICE/COST SCHEDULE6
ITEM INFORMATION6
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS7
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS8
B.PART II - RESPONSIBILITIES14
2.1 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998)37
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)37
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)37
2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)38
2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)39
2.6 52.228-1 BID GUARANTEE (SEP 1996)40
2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)40
2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)41
2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)41
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)42
2.11 PARTNERING42
REPRESENTATIONS AND CERTIFICATIONS44
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)44
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)48
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)50
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (JUL 2020)52
GENERAL CONDITIONS54
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)54
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)54
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)55
4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)56
4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)56
4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)59
4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)60
4.8 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)61
4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS64
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)65
4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)68
4.12 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020)68
4.13 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)68
4.14 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)70
4.15 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)71
4.16 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)71
4.17 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS–CPM) (NOV 2018) (ALTERNATE I)71
4.18 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)75
4.19 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)76
4.20 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)77
4.21 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)77
4.22 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (APR 2019)78
4.23 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)78
4.24 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)79
4.25 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)79
4.26 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)81
DESIGN BUILD SPECIFICATIONS82
4.27 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES82
4.28 OWNERSHIP OF ORIGINAL DOCUMENTS82
4.29 RETENTION OF REVIEW DOCUMENTS82
4.30 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING INFORMATION82
4.31 COORDINATION WITH MEDICAL CENTER83
4.32 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR83
4.33 LIST OF ATTACHMENTS83

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
_______________
_______________

CFM - Fire Alarm System Replacement project number 629-20-113

GRAND TOTAL
_______________

DESCRIPTION OF WORK: Fire Alarm System Replacement In accordance with FAR 36.204 & VAAR 836.204 Disclosure of the Magnitude of Construction Projects, the above described VA Project falls within the terms of the following cost range: Between $500,000 and $1,000,000 Page 1 of Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

Page 1 of

Page 1 of

(a)All offer materials will be forwarded by email.
(b)An offer guarantee is required.
(c)If the contract award amount exceeds $30,000 but is less than $150,000, a Payment Bond or other Alternate Payment Protection must be provided that equals 100% of the original contract price. Please see 52.228-13 Alternate Payment Protections, contained herein.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

Page 1 of Page 1 of

SECTION 00 11 21

REQUEST FOR PROPOSAL TO DESIGN BUILD

FIRE ALARM SYSTEM Replacement (Project No. 629-20-113)

SOUTHEAST LOUISIANA VTETERANS HEALTHCARE SYSTEM

NEW ORLEANS, LA

A.PART I - General
A1.Scope of Contract

A. This Request for Proposal (RFP) is issued as Two-Phase Design-Build procurement (Reference FAR 36.3). Proposals will be evaluated in Phase I to determine which offerors will submit proposals for Phase II. A maximum number of four (4) offerors will proceed to Phase II unless the contracting officer determines that a number greater than four (4) is in the Government’s interest and is consistent with the purposes and objectives of this two-phase design build project. Phase II RFP will be issued only to those successful offerors determined to be most highly qualified from Phase I. One contract will be awarded using competitive negotiation.

B. Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here in other specific tasks as further defined by this request for proposal (RFP).

A. Project Number: 629-20-113 B. Project Title: Fire Alarm System Replacement

C. Project Location: Southeast Louisiana Veterans Healthcare System
D. Scope of Work: Attached to Solicitation
E. General Drawing Submission Requirements: Shop Drawing Submission Requirements are available on the internet at the following address: http://www.cfm.va.gov/. As-built drawings for the Medical Center are available. (note: these drawings are not completely accurate. A-E shall verify existing conditions.) All drawings will be prepared with the VA Standard Title Block and Border. All drawings shall be provided in the 2017 version of AutoCAD and in PDF format. Each individual file on a DVD shall be named by numbers corresponding to the construction documents (i.e. the specs shall be named 00 11 22, 33 44 55, etc. and the drawings shall be E1, E2, etc.) and the final AutoCAD/ specifications files shall be exactly as submitted in the final submission.
F. Incorporated References: The following Department of Veterans Affairs, Office of Construction and Facilities Management, information is incorporated within the Scope of Work by reference and can be found on the VA web site at http://www.cfm.va.gov/ Master Specifications; Design Guides; Design Manuals; Standard Details; Design Alerts; and Quality Alerts.
A2.Definitions
A.Design-Build (D-B) as defined by the Department of Veterans Affairs (VA) is the procurement by the Government, under one contract, with one firm or Joint Venture (JV) for both design and construction services for a specific project.
1.Contracting Officer (C0): A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the contracting officer acting within the limits of their authority as delegated by the contracting officer. “Administrative contracting officer (ACO)” refers to a contracting officer who is administering contracts. “Termination contracting officer (TCO)” refers to a contracting officer who is settling terminated contracts. A single contracting officer may be responsible for duties in any or all of these areas.
2.Contracting Officer’s Representative (COR): The Contracting Officer's written designation of a representative responsible for administering contracts under the immediate direction of the Contracting Officer. For the purposes of this contract the term “COR” will be used herein.

3. Project Manager: The Contracting Officer's representative (COR) responsible for administering contracts under the immediate direction of the Contracting Officer. This person is the Contracting Officer's authorized representative at the construction site. The Project Manager / COR is responsible for protecting the Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc. The Resident Engineer may issue change orders to the Contractor within the limitations set forth in his delegation of authority from the Contracting Officer.

4.Design-Build Contract: This term, as used herein, refers to the Contract(s) to perform the design and construction of the project.
5.Contractor: This term, as used herein, refers to the contractor under this contract or the D-B team. The contractor or D-B team is solely responsible for the management (planning, supervision, and contract coordination), design, and (professional) services and installation (including all labor, equipment, materials, tools, and inspections) to meet the requirements of this contract.
6.Architect-Engineer (A-E): This term, as used herein, refers to the A-E firm(s) that is a part of the D-B team, also referred to as D-B A-E.

B. Source Selection Procedures

1. Source Selection Overview: In accordance with FAR 15.3, the objective of source selection is to select the proposal that represents the best value. A contracting officer is designated as the source selection authority (SSA), unless the agency head appoints another individual. The SSA establishes an evaluation team that includes appropriate contracting, legal, and technical expertise to ensure a comprehensive evaluation of offers. The award decision is based on evaluation factors and significant sub-factors that are tailored to the acquisition. The factors represent the key areas of importance and emphasis to be considered in the source selection decision; and support meaningful comparison and discrimination between and among competing proposals.

2. Evaluation: The proposal evaluation is an assessment of the proposal and the offeror’s ability to perform the prospective contract successfully. The technical, price, and source selection boards will evaluate competitive proposals and then assess their qualities solely on the factors and subfactors specified in the solicitation. Evaluations shall be conducted using a combination of adjectival ratings and numerical weights. The relative strengths, deficiencies, significant weaknesses, and risks supporting proposal evaluation shall be documented in the contract file.

3. Past Performance: Past performance information is one indicator of an offeror’s ability to perform the contract successfully. The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. This comparative assessment of past performance information is separate from the responsibility determination required under FAR Subpart 9.1.

4. Tradeoff Source Selection: If tradeoffs are performed, the source selection records shall include an assessment of each offeror’s ability to accomplish the technical requirements; and a summary, matrix, or quantitative ranking, along with appropriate supporting narrative, of each technical proposal using the evaluation factors.

5. SSA’s Final Decision: The SSA’s decision shall be based on a comparative assessment of proposals against all source selection criteria in the solicitation. While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA’s independent judgment. The source selection decision shall be documented, and the documentation shall include the rationale for any business judgments and tradeoffs made or relied on by the SSA, including benefits associated with additional costs. Although the rationale for the selection decision must be documented, that documentation need not quantify the tradeoffs that led to the decision.

6. Source Selection for this Procurement:

a. Phase I of this procurement will result in a narrowing of offerors to a maximum of four (4) firms (unless the contracting officer determines that a number greater than four (4) is in the Government’s interest and is consistent with the purposes and objectives of this two-phase design build project.) Each Evaluation Factor in Phase I and II below is to be specifically addressed not only through the submission of the SF330s but also in Narrative Format to clearly show how each Evaluation Factor is formally addressed. In Phase I, the following factors are listed in descending order of importance:
Phase I:

(1) Technical Approach

(2) Technical Qualifications (Subfactors 2a, 2b, and 2c are of equal importance)

(2a.) Key Design Personnel & Experience
(2b.) Key Construction Personnel & Experience
(2c.) Capability to Perform

(3) Past Performance

b. The Phase I successful offerors will receive a Phase II Request for Proposal (RFP). The Phase II RFP will be issued via amendment to the solicitation and issued to the four (4) most highly qualified offerors unless the contracting officer determines that a number greater than four (4) is in the Government’s best interest and is consistent with the purposes and objectives of this Two-Phase Design Build Project. The Phase I factors are not to be resubmitted in Phase II; however, the cumulative rating from the Phase I factors carries through to Phase II and is equal in importance to Factor 4 Technical Solution. Phase II Factors 4 - 6 are listed below in descending order of importance. Factor 7 (Price) will be evaluated separately by the Contracting Officer.

Phase II:

(4) Technical Solution

(5) Design Concept

(6) Draft Project Schedule and Narrative

(7) Price (Evaluated Separately by the Contracting Officer)

c. The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contract to other than the offeror submitting the lowest total price; and to award to the offeror submitting the highest technically rated or the lowest total price proposal; and to award to the offeror submitting the proposal determined to be the most advantageous best value to the Government. Offerors are advised an award may be made in Phase II without discussion or any contact concerning the proposals received. Offerors should not assume that they would be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.

A3.Pre-Proposal Site Visit
A pre-proposal site visit will be conducted in Phase II. The most highly qualified firms selected to proceed to Phase II will be invited to attend the pre-proposal site visit. The Contracting Officer will establish the date and time and notify the Phase II offerors in writing. See Federal Acquisition Regulation (FAR) Clause 52.236-27 SITE VISIT (CONSTRUCTION) ALTERNATE I, of this solicitation.
Location:Southeast Louisiana Veterans Healthcare System

2400 Canal Street, Central Energy Plant Bldg.

New Orleans, LA 70119

All Offerors, consultants, subcontractors, manufacturers and suppliers are invited to attend. The following agenda is furnished for this meeting:
1.Open meeting & Introductions;
2.Review of project and Design-Build method for construction contracting;
3.Specifications; Network analysis system and project phasing;
4.General requirements, Solicitation Documents and Offer Submission Procedure;
5.Review of "Buy American Act";
6.Questions and answers;
7.Close; and
8.Site walk through – attendance is optional.

*Please note that attendance for the pre-proposal conference and / or the site walkthrough is voluntary.

A5. Permit Requirements A. The D-B Contractor is responsible for obtaining all permits and approvals necessary to complete the project, prior to starting Construction.

A6. Selection Criteria (This section will be removed after award.)

A. In accordance with FAR part 15 The Government intends to award a contract resulting from this solicitation to the responsible Offeror on a best value basis after evaluation in accordance with the factors in the Two-Phase Design-Build solicitation. A responsibility determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.

B. Evaluations: All Phase I and Phase II proposals shall be subject to evaluation by a team of Government personnel. In Phase I of the Two-Phase Design-Build process, Offerors will submit a Phase I proposal in accordance with the three (3) evaluation factors listed in C3. Upon receipt of the Phase I proposals, the VA team will evaluate and determine the highest qualified Offerors based on their Phase I proposal submissions. The Phase I proposals will only be evaluated on the three (3) evaluation factors listed. The Offerors not selected to provide Phase II proposals will be notified that they are no longer being considered for this project. The Phase II proposals will consist of both technical and price factors, which are listed in D4. The Government intends to award without discussions; however, the Government reserves the right to conduct discussions if determined necessary based on the initial evaluation of the Phase II proposals.

B.PART II - RESPONSIBILITIES
B1.VA Team

A. The VA team consists of the following members: Contracting Officer, Project Manager/COR, Maintenance and Operations Staff, Infection Control Staff, Safety staff and any other VA staff impacted by this project.

B2. Use of Advisors A. Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide technical advice on specialized matters or on specific problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained because of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of a vendor.

B3.Design-Build Team:
A.The D-B team includes all J/V partners, consultants, and sub-contractors to the one firm. The D-B team shall provide Architectural and Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project. D-B Team prime contractor or controlling partner shall be a Service-Disabled Veteran-Owned Small business.
B.If the D-B Team and A-E contractor are a J/V (not one and the same firm), engineering and other technical consultants shall be subcontractors of the J/V Architect - not the Design-Build construction contractor or sub-contractors. If the D-B Team A-E and contractor are one and the same firm (not a J/V) those consultants shall be subcontractors of the D-B firm, not the construction subcontractors.
C.The RFP documents are intended to define existing conditions, certain required items, and design parameters to be included in the project. It is the contractor's responsibility to visit the site or ascertain the conditions at each site. In addition, the Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, the existing conditions, certain required items, and design parameters to be included in the project. It is the D-B Team’s responsibility to complete the documents and construction in a manner consistent with the intent of the RFP documents within the required period of performance.
C.PART III - PROPOSAL REQUIREMENTS (This section will be removed after award.)
C1.General

PHASE I

A.Phase I proposals shall be based on the solicitation documents issued for RFP Solicitation. Phase I proposals will be in the format stipulated elsewhere in Section C2. Phase I Proposal Format.
B.Phase I proposals shall be received on or before the date listed in Block 13a of the SF 1442. There will be no public opening of the proposals.
C.Submit Phase I proposals via email to: bill.geary@va.gov
C2.PHASE I Proposal Format
A.The Offeror shall submit the Phase I proposal in three (3) PDF documents. The proposal shall be labeled with the Offeror’s organization, business address and VA solicitation number. The Offeror shall not include any price or price related material in the Phase I proposal.

B. The Offeror shall submit the Phase I proposal via email to: bill.geary@va.gov. Include page numbers and the company name in the header or footer of each page.

C. The Offer, including title page, detailed table of contents, preface, for the Phase I proposal shall not exceed a total of 25 (twenty-five) pages in Microsoft Arial size 12 font. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.

D. A page is defined as each face of an 8.5 X 11-inch sheet of paper containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.

C3. PHASE I Proposal Evaluation Factors Offerors will be required to submit their Phase I proposal in response to the solicitation in accordance with the evaluation criteria set forth in the solicitation for Phase I. The SSEB will evaluate the Phase I proposals utilizing the criteria provided in the solicitation. After completion of the Phase I evaluations, the Contracting Officer shall select no more than four (4) of the most highly qualified offerors providing the best value. The Contracting Officer reserves the right to select more than four (4) offerors to proceed to Phase II evaluations if they deem it necessary.

1. Factor 1, Technical Approach:

Provide a brief narrative (page limitation: three (3) pages, not including cover page or table of contents) on the offeror’s proposed technical approach for this design-build project as defined in the solicitation submittal requirements. The assessment of the offeror’s method to manage the project shall be used as a means of evaluating the offeror’s ability to successfully meet the requirements of the solicitation. If the page limits are exceeded, the pages exceeding the limit will not be read or considered. The following shall be included in the narrative:

· Design Approach: Describe the techniques, processes and methods to be used specific to the subject project.

· Construction Approach: Describe the techniques and methods for this construction project to include coordination with the design packages, projected timelines and phases, and coordination of work.

· Quality Control: Describe quality control processes during design and construction phases that will lead to an effective and successful project that completes on-time within budget.

2. Factor 2, Technical Qualifications:

a. Key Design Personnel & Experience: The Offeror shall provide a resume (page limitation, two (2) pages per requested resume) for each of the following A-E personnel:

a. Lead Architect

b. Lead Structural Engineer

c. Lead Mechanical Engineer

d. Lead Electrical Engineer NOTE: These are intended to be the Architect and Engineers that will actually affix their seal to the appropriate construction drawings.

b. Key Construction Personnel & Experience: The Offeror shall also provide a resume (page limitation, two (2) pages per requested resume) for each of the following key construction or contract personnel:

a. Project Manager

b. Project Engineer

c. Site Superintendent

d. Lead personnel for any known major subcontractors.

NOTE: For each resume, include company name; name of individual; listing relevant experience; qualifications such as specialized training, education experience, etc. For any subcontractors identified, provide a resume of the lead person who will be directly involved in the work subcontracted for that company, identify any key personnel that will be assigned to the contract resulting from this solicitation, and the relevant experience of both the company and any key personnel that were identified. Please delineate the approximate percentage of work the prime contractor will perform and the approximate percentage of work the subcontractors (collectively) will perform. The VA will use the information provided to evaluate, among other things, specialized experience and technical competence.

c. Capability to Perform: The Offeror shall provide a letter from their Surety demonstrating: (1) the Offeror’s total bonding capacity, and (2) the Offeror’s current available bonding capacity. Total bonding capacity and current available bonding must be outlined in a letter dated no earlier than the solicitation release date.

3. Factor 3, Past Performance: Provide a minimum of one (1) and a maximum of five (5) projects completed within the last five (5) years similar in size, complexity and scope to this project. Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors to include A-E firms if applicable. If the contractor does not possess Design-Build (D-B) experience, provide a minimum of one (1) and a maximum of five (5) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to five (5) projects submitted for the prime contractor. For purposes of this evaluation, a relevant project is further defined as “design and/or construction completed in a clinical, hospital or other medical related use space similar in size and scope to this project.” Project(s) shall have a minimum value of $500,000 and be 100% completed for Design-Bid-Build (D-B-B) or D-B. Projects shall have a minimum value of $500,000 and be 100% completed for designs completed by the A-E firm in support of D-B or D-B-B. For multiple award and indefinite delivery/indefinite quantity type contracts, the whole contract shall not be submitted as a project; rather Offerors shall submit the work performed under a single task order as a project. If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower. The Offeror’s submission should include at a minimum:

· Project Title

· Project Location (Physical Address)

· Contract Type (Example: Design-Build, Design-Bid-Build, Design)

· Project Owner’s Name & Current Contact Information

· Brief Description of the Scope of Work (highlight relevant factors)

· Identify Project Prime Contractor, Design Firm and Major Subcontractors

· Project Start & Completion Date

· Project Original Contract Award Amount & Final Award Amount NOTE: Limit 1 project per page

· Separately provide any completed Past Performance Evaluations, if available, for any of the projects on subsequent sheets.

C4. PHASE I Evaluation of Offers The Phase I evaluations will be conducted in accordance with the Two-Phase Design-Build Evaluation process and the methodologies provided below:

A. Factor 1, Technical Approach: Will be evaluated based on the Offeror’s proposed technical approach for this design-build project as defined in the solicitation submittal requirements. The assessment of the Offeror’s method to manage the project shall be used as a means of evaluating the Offeror’s ability to successfully meet the requirements of the solicitation.

B. Factor 2, Technical Qualifications: Will be evaluated on the Offeror’s key personnel experience and capability to perform. Key personnel experience will be evaluated by the resumes provided by the Offeror. Capability to perform will be evaluated based on whether the Offeror has adequate total bonding capacity and available bonding capacity to accommodate the design and construction of the project.

C. Factor 3, Past Performance: Will be evaluated on recent and relevant experience as well as the quality rendered of the projects provided. If D-B experience is not applicable, the construction contractor and the A-E firm will be evaluated on relevant and recent projects to the applicable portion of the project, construction or design respectively. Past performance will be evaluated on the quality of the Offeror’s past performance with respect to the projects provided. When evaluating quality aspects that may be considered are timeliness of contract completion, adherence to contract schedules and timely submission of data deliverables, the contractor’s ability to comply with the terms and conditions of the contract, the overall quality of the work performed on the contract, the Offeror’s managerial performance, and if the reference would enter into a contract with the contractor again. Contractors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. Past Performance evaluations may also be conducted using information obtained from CPS or PPIRS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representatives, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

PHASE II

D1.General
A.Phase II proposals shall be based on solicitation documents issued for RFP Solicitation and the instructions provided by the Contracting Officer in the Phase II Notice To Offerors. Phase II proposals will be issued to the most highly qualified offerors from Phase I evaluations. Proposals shall be in the format stipulated in Section D2. Phase II Proposal Format.
B.Proposals shall be received on or before the date specified in the Phase II Notice To Offerors.
C.Submit Phase II proposals via email to:
1.CONTRACTING OFFICER: bill.geary@va.gov
2.Emails are limited to five (5) MB.

3. Phase II proposals will only be accepted via email.

D. Submit the original Bid Bond by mail to:

1. US Postal Service Deliveries:

Gulf Coast Veterans Health Care System Attn: Bill Geary (NCO 16) 400 Veterans Ave., Bldg. T-102, Rm A106 Biloxi, MS 39531

2. Commercial Delivery Services / Hand Carry [Mon- Fri, 7:30 AM to 4:00 PM (CST)] Gulf Coast Veterans Health Care System Attn: Bill Geary (NCO 16) 400 Veterans Ave., Bldg. T-102, Rm A106 Biloxi, MS 39531

3. Failure to furnish the required bid guarantee in the proper form and amount, by the time specified in Block 13 of the SF 1442, may result in rejection of the Phase II proposal. SEE FAR Provision 52.228-1 Bid Guarantee, of this solicitation.

d2.PHASE II Proposal Format
A.Technical, Schedule, Design Concept and Price sections of the Offerors Phase II proposals will be evaluated independently; therefore, the Offeror shall submit the Phase II proposal in four (4) Volumes (Volume I: Technical Solution, Volume II: Design Concept, Volume III: Draft Project Schedule, and Volume IV: Price). In order to evaluate Volume, I: Technical Solution, Volume II: Design Concept, and Volume III: Draft Project Schedule strictly on the merit of the material submitted, the contractor shall include NO Price information in Volume I, II, or III. The offeror shall separately bind Volumes I, II, III, and IV. All four (4) volumes must be labeled with the Offeror's organization, business address, and VA Solicitation Number.

B. The Offeror shall submit Volumes I, II, III, and IV via mail only (to bill.geary@va.gov) . No hard copies will be accepted (with the exception of the Bid Bond). Include page numbers and the company name in the header or footer of each page.

C. The Offer, including title page, detailed table of contents, and preface, for Volume I - Technical Solution shall not exceed a total of five (5) pages for detailed narrative, not including cover pages or table of contents. Submission format shall be in Microsoft Arial size 12 font or larger. Volume II – Design Concept shall not exceed a total of two (2) pages. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal. Volume III – Draft Project Schedule & Narrative shall not exceed three (3) pages (2 for schedule and 1 for narrative) and shall be formatted in a time scaled bar graph format. Volume IV – Price, the SF 1442, Representations and Certifications and acknowledged amendments shall all be part of Volume IV and will not count against the page limitations. The J/V documentation, if applicable, will not be counted in the page limit.

D. A page is defined as each face of an 8.5 X 11-inch sheet of paper containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.

E. Offeror shall include all required Representations and Certifications; and acknowledge receiving amendments by filling out section 19 of the SF 1442 and returning a signed copy of the amendment(s) with the proposal.

F.Offeror shall include their Safety or Environmental Violations and Experience Modification Rating Information as part of Volume IV. It will not be evaluated as part of Volume IV Price but will be used as part of the Responsibility Determination. It will also not count against the page limitations for Volume IV.
1.All Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the Offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, an Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
2.All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
3.Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
4.If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0.
5.The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility. *The above information is not required for subcontractors.
D3.PHASE II – Proposal Evaluation Factors

A. Factors 1 – 3 (Volumes I – III)

1. Factor 1, Volume 1, Technical Solution:

Based on the solicitation documents, site visit, and the Offeror’s Phase I Technical Approach, provide a detailed narrative (page limitation: five (5) pages for detailed narrative, not including cover pages or table of contents) describing the Offeror’s technical solution to the project to achieve design and construction design objectives as described in the solicitation. If the page limits are exceeded, the pages in excess of the limit will not be read or considered.

The Offeror’s narratives shall include, at minimum, the following technical areas:

· Fire Alarm System Replacement- Site Requirements

· Fire Alarm System Replacement- Design & Construction requirements (to include associated support areas/space)

· Hospital Construction Knowledge relative to Infection Control & Life Safety NOTE: The Offeror shall address areas of concerns, any items they determine relevant and how they will minimize risk in conjunction with the identified areas of concern. The narrative shall indicate that the Design-Build team understands the site complexities and address how their approach offers constructability advantages in an operational hospital setting.

2. Factor 2, Volume 2, Design Concept: The Offeror shall submit a preliminary (concept) design schematic (floor plan) to demonstrate their understanding of the project scope and their plan to accomplish the project (page limitation: two (2) pages for schematic layout suggestions). The design schematic shall be based on the information provided in the solicitation. The intent of the design concept is to show a clear understanding of the contract requirements, as well as to allow a creative latitude of the Offerors design team. Acceptable methods of demonstrating design concept include digital design software, architectural sketches/drawings, and/or artistic renderings. Include at a minimum an architectural floor plan to demonstrate level of innovation and ability to provide all required areas in the allotted square footage. Indicate each room name and square footage.

3. Volume III, Factor 3, Draft Project Schedule & Narrative: The Offeror shall demonstrate their understanding of the requirements and associated timeline by submitting a draft project schedule for design and construction that adheres to the project Period of Performance, Project Schedule Specification and Statement of Work. Each Offerors schedule must address the following:

· Design Phase, indicating each required design submission & important design milestones

· Construction Phase, identifying the task for each discipline and definable feature of work require to complete the project.

· Indicate when construction and design services can be concurrent

· NOTE 1: Draft project Schedule is limited to 2 pages. The project will start at the issuance of the Notice to Proceed (NTP). For the purposes of the “Draft Project Schedule”, use an NTP date of March 31, 2021. (Note that there is no guarantee the Notice to Proceed will be issued on this date and is only for facilitating the Draft Project Schedule Submission.)

· NOTE 2: Project Schedule Narrative: Include a Project Schedule Narrative along with the Draft Project Schedule indicating how impacts will be managed/mitigated. Some examples include working in and around a functioning hospital, scheduling of disruptive type work (noise, dust generating, asbestos abatement, demolishing, etc. Narrative is limited to 1 page.

B. Factor 4, Price Proposal Requirements (Volume IV) A. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the pricing schedule located on page 6 when submitting price offers. Submit a bid guarantee as stipulated in the solicitation”.

B. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s SOW/Specifications or pricing requirements or otherwise preclude the Government from evaluating the offer or render the offer as non-responsive or unacceptable.

C. If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices not provided for in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

D. In addition to the Price/Cost Schedule, Offerors shall submit a complete Breakdown of the Division Pricing for ITEM 0001.

D4. Evaluation of Offers Factors 1 – 3 (Volumes 1 – 3) The Phase II evaluations will be conducted in accordance with Two-Phase Design-Build Evaluation process and the methodologies provided below. All evaluation factors other than price, when combined, are approximately equal to price. Factors 1 – 3 are listed in descending order of importance. Factor 4 (Price) will be evaluated separately by the contracting officer.

A. Factor 1, Technical Solution: The VA will evaluate to help determine that the Offeror understands the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .