This request for quote solicits offers for the replacement of walk-in freezers and refrigerators at a Department of Veterans Affairs medical center. The solicitation seeks offers for one walk-in freezer and six refrigerators, including new refrigeration systems, doors, lighting, flooring and other components. Offerors must provide pricing for the equipment, installation, and a one-year parts and labor warranty with a minimum five-year compressor warranty. The response deadline is August 17, 2020, with site visits available on August 6. The award will be made to the responsible offeror providing the most advantageous offer considering price and technical factors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25620Q1026 0002.pdf | ||
| 100-E89R13.pdf | ||
| 100-E90R7.pdf | ||
| 100-BM-G.pdf | ||
| Questions.pdf | ||
| 100-E11R.pdf | ||
| 100-E10R5.pdf | ||
| 100-E358R14.pdf | ||
| 36C25620Q1026 0002_1.docx | DOCX document | |
| 100-BM-H.pdf | ||
| 36C25620Q1026 0001.pdf | ||
| Questions for RFQ 36C25620Q1026.pdf | ||
| 36C25620Q1026 0001_1.docx | DOCX document | |
| 36C25620Q1026_1.docx | DOCX document | |
| Kitchen Floor Plan.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. DUNS: DUNS+4:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 55
580-20-3-167-0285
36C25620Q1026 07-30-2020
Kenny Holestin 7137911414 08-17-2020
23:59
Department of Veterans Affairs
Network Contracting Office 16
Michael E. DeBakey VA Medical Center
2002 Holcombe BLVD
Houston TX 77030 4298
X 100
X
333415
1250 Employees
N/A
X
Michael E. DeBakey VA Medical Center
Receiving Warehouse Building 100
Houston TX 77030-4298
Network Contracting Office 16
Michael E. DeBakey VA Medical Center
Houston TX 77030 4298
Financial Service Center
PO Box 149971
Austin TX 78714-9971
See CONTINUATION Page
Please see SoW and Schedule for work and item list.
RFQ closes 08/17/2020 @ 11:59pm CST.
Site visit 08/06/2020 @ 2pm CST. RSVP
See CONTINUATION Page x X
Kever Swafford
Contracting Officer
36C25620Q1026
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 Scope of Work
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT
2018)
C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JUN 2020)
C.3 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA
ACQUISITION OF COMMERCIAL ITEMS (APR 2020)
C.4 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND
COMPLIANCE (JUL 2018)
C.5 VAAR 852.247-73 PACKING FOR DOMESTIC SHIPMENT (OCT 2018)
C.6 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2018)
E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019)
E.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
E.4 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)
E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—
COMMERCIAL ITEMS (JUN 2020)
E.6 52.216-1 TYPE OF CONTRACT (APR 1984)
E.7 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C256 Kever Swafford
Department of Veterans Affairs Network Contracting Office 16 Michael E. DeBakey VA Medical Center 2002 Holcombe BLVD Houston TX 77030 4298
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[X] 52.232-36, Payment by Third Party
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [x] (Upon acceptance by the Government)
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment
Requests.
Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
B.2 Scope of Work
Nutrition and Food Services
Walk-in Refrigerators and Freezers Replacement- Phase II
General Information
1. LOCATION: Work performed under this scope will be for, and conducted at, the Michael E.
DeBakey Medical Center (MEDVAMC) located at 2002 Holcombe Blvd, Houston, Texas
77030
2. BACKGROUND: The Nutrition and Food Services (NFS) coolers have been unchanged since the initial construction in 1991 and have reached the end of their useful life. Ceiling and floor surfaces of the cooler are deteriorating and causing a sanitation/infection control issue. Walls are damaged from cart movement. Existing doors are at the end of their useful life and are a recurring maintenance issue. The refrigeration equipment is antiquated and extremely inefficient by current standards.
3. PURPOSE: The purpose is to fully replace the remaining original walk-in refrigerators and freezer at the MEDVAMC and upgrade all associated accessory systems to the units. The
MEDVAMC requires a contractor to perform the work necessary to accomplish this goal.
4. SCOPE: The contractor shall provide all labor, materials, tools, equipment, expertise, administration, supervision and transportation to perform all work in accordance with provided construction specifications, drawings, all documents attached to this contract, all terms and conditions of this contract, and this statement of work. A brief overview of the scope of work is included below:
a. Remove and replace (6) Refrigerators (BC-250A, BC-250T, BC-250V, BC-252, BC-
252A, BC-252C) / (1) Freezer (BC-252B) completely with Bally systems or equal. All replacement units shall be a 1-for- 1 replacement with items meeting current refrigeration and insulation standards. Installation will include all new associated sub systems associated with the function of the units. Contractor is responsible to ensure all measurements, power requirements, etc. are compatible with the infrastructure.
i. Six (6) Refrigerators / 1 Freezer floor panels; shall be manufactured in accordance with NSF #7. Overall size and layout of the walk-in to match existing conditions. (7) compartments are shown per drawing.
ii. Four-inch- foam core panels shall be Underwriters Laboratories-listed as having flame spread of 25 or lower and smoke generation of 450 or lower when tested in accordance with ASTME-84-76. Panels shall be approved by Factory Mutual as a Class 1 building type. They shall be manufactured with “foamed in place”
CFC free Enovate 3000 or Solstice foam system in accordance with the 2009
Federal Energy Standards (EISA).
iii. Installation must be completed by factory trained personnel. All work and materials shall fall in full accordance with local and or state ordinances, and with any other prevailing rules and regulations.
iv. Panels shall consist of interior and exterior metal skins precisely foamed with steel dies and roll-form equipment and thoroughly checked with gauges for accuracy. Metal skins shall be treated on the inside surface with a bonding agent to ensure a stable adhesion with the chemical bonding agents of the urethane. The metal skins shall be placed into heated molds and liquid urethane injected between them. Urethane shall be foamed in place (poured, not frothed) and, when completely cured, shall bind tenaciously to metal skins to form an insulated panel. Panels shall contain 100% urethane insulation and have no internal wood or structural members between skins unless required and approved by said consultant as structural support for external accessories. To ensure tight joints, panel edges must have foamed-in-place tongue and groove with a flexible vinyl gasket foamed-in-place on the interior and exterior of all tongue edges. Gaskets shall be resistant to damage from oil, fats, water and detergents and must be NSF-approved. Gaskets shall not be stapled or glued to metal skins.
v. Insulation shall be rigid urethane “Foamed-in-Place”. Insulation shall have a minimum R-Value of R32 for freezers. These R-values shall be determined as per Section 312 of the EISA code. For calculating the R-value of the freezer, the
K-factor of the foam at 20° F. (average foam temperature) shall be used. For calculating the R-value of the cooler, the K-factor of the foam at 55° F. (average foam temperature) shall be used. Installation must be completed by factory trained personnel. All work and materials shall fall in full accordance with local and or state ordinances, and with any other prevailing rules and regulations.
vi. All panels except corner panels shall be made in 23” and 46” widths, fully interchangeable for fast, easy assembly. Panels 11-1/2”, 17-1/4”, or 34-1/2” wide are to be furnished only if required to fit allocated space. To assure perfect alignment and maximum strength, corner panels shall employ a right-angle configuration with exterior horizontal dimensions of 12” on each side.
vii. Panels shall be equipped with a Speed-Lok (cam-lock) joining devices. The distance between locks shall not exceed 46”. Each device shall consist of a cam action, hooked locking arm placed in one panel, and a steel rod positioned in the adjoining panel, so that when the arm is rotated, the hook engages the rod and draws the panels tightly together with cam action. Arms and rods shall be housed in individual steel pockets. Pockets on one side of the panel shall be connected to pockets on the other side in width, by use of 2” wide metal straps set into and completely surrounded by insulation. When panels are joined together, these straps shall form lock-to-lock connections for superior strength.
Locking device shall be accessible from the inside to facilitate installations in confined areas, and shall be provided with flush, press-fit caps. Surface mounted plastic plugs will not be accepted.
viii. Exterior Finish- Exposed walls to be 22 ga smooth stainless steel, exposed edges of ceiling panels to be capped with 22 ga stainless steel. Unexposed walls and ceilings to be stucco embossed aluminum.
ix. Interior Finish- 22 ga stainless steel.
x. Floor will be sealed and finished with non-slip epoxy.. Lowest appropriate VOC epoxy must be used.
xi. Doors – Doors opening will be 48” x 84” (clear opening) with exception of Tray
Cart storage which shall be 60" x 78," Super doors with a reinforced 14GA. U-
Channel steel frame, backed with additional 1/4” steel plate where all hardware is mounted. This steel frame with an internal thermal breaker will prevents twisting, sagging, and eliminates the need for structural members. Doors are to be cut 8” for insulation and concrete. Finished clear door opening is to be 48” x
76”. Doors are to be furnished with Dent D60 Latch, pPolished aluminum; D69B hinges, polished aluminum. Also, the door will have a 2” dial thermometer, vapor proof light assembly with LED bulb, and an inside safety release. Super doors must have three hinges and 1/8” diamond aluminum kick plates in and out on door and frame 48” high. Doors to be furnished with 14” x 14” windows
(heated).
xii. Accessories – (a) Twelve (12) 48” LED light fixtures shall be provided as the replacement. Lights shall be suitable for wet conditions and exceed all prevailing codes. (NOTE) Seal the inside of electrical conduit in any area before it enters the walk-in cooler or freezer, where it enters a light fixture, and also including all J-boxes and control panels. (b) Freezers to include size appropriate pressure relief port. (c) Furnish blast freezer kit for doors in -20°F compartments. (d) Include six (6) compartment ID signs 10” x 2” each
“REFRIGERATOR” black with white letters and (1) compartment ID signs 10” x
2” each “FREEZER” black with white letters. Field mounted. (e) Provide ceiling support on exterior of walk-in as required. NO STRUCTURAL MEMBERS
ALLOWED INSIDE WALK-IN OTHER THAN EXISTING COLUMNS. (f) Provide
1/8” aluminum diamond tread wainscot 48” high for complete interior of all compartments.
xiii. Refrigeration- Preassembled remote, water- cooled, semi-hermetic or scroll systems shall be provided, sized for holding only, no product load calculated unless specifically noted. Systems shall be UL approved as systems (not components only). All systems shall utilize R-448A refrigerant. Coolers must be able to maintain 35°F operating temperature with a maximum run time of 16 hours under normal operating conditions. Freezers must be able to maintain -
10°/-20°F operating temperature in the freezer with a maximum run time of 18 hours under normal operating conditions (taking into consideration frequent opening and closing of doors). There shall be no re-use of existing refrigeration.
xiv. Evaporators to be provided with all necessary components for proper operation including two-speed EC fan motors with Smart-Speed™ technology.
5. Safety: All Contractor personnel working onsite at the Medical Center will be required to be
10-hour OSHA Certified and a supervisor with 30-hour OSHA certification. Contractor must maintain appropriate ventilation in work areas, including negative pressure. Safety enclosures shall be impervious, and consistent with risk level of work project.
6. Access: Although the MEDVAMC campuses are public facilities, access to facility maintenance areas, electrical areas, mechanical areas, roof access, and certain other portions of the medical facility are restricted from the general public. Accessing these areas require advance notice, pre-approval, and scheduling to gain entry. All visits and access requests to the MEDVAMC under this scope of work shall be coordinated through the
Contracting Officer Representative (COR). Health screenings and face coverings may be required by all contract staff while on site.
7. WARRANTY: Contractor shall provide full warranty (parts and labor) for 12 months from dated of acceptance. Extended compressor warranty for minimum 5 years shall also be included.
8. WORK SCHEDULE
a. Mobilization will only occur after all plans, submittals, and equipment are approved by the COR and or facility engineer.
b. The work will be done in phases as indicated above in general requirements due to food management and operational needs. Work should be scheduled outside of NFS meal service activities. Work should be scheduled between 8:00 P.M. and 5:00 A.M. Alternate work times on remote areas that do not impact food service operations may be arranged with COR.
c. Work shall commence upon receipt of a Notice to Proceed from the government and shall be completed within 90 calendar days after receipt of Notice to Proceed.
9. WORK LOCATION AND RESTRICTIONS
a. The work site location is the Michael E. DeBakey VA Medical Center, 2002 Holcombe Blvd. Houston, TX in Building 100, basement level.
b. All work shall be done between the hours of 8:00 pm and 5:00 am, excluding federal holidays, unless other times are arranged in advance and approved in writing by the COR. When the contractor’s work interferes with hospital functions, such as when work produces excessive noise, odors, dust, utility service interruptions, or other interferences with normal hospital operations that cannot be contained within the area of work, the contractor shall schedule said work at other than normal hours and as directed by the COR at no additional cost to the government.
c. Pursuant to clause 52.236-8 Other Contracts incorporated by reference under section 4.33 52.252-2 Clauses Incorporated by Reference, Contractor shall fully cooperate with the other contractors and with
Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting
Officer. If required by the Contracting Officer, Contractor shall, at no additional cost to the VA, coordinate with other VA’s activities including but not limited to construction activities near the job site to ensure the construction work under this project will be in harmony with those activities. This coordination shall include, but is not limited to, the careful scheduling of work commencement, equipment mobilization etc.
d. The following legal holidays are observed by this Government Agency:
New Year's Day January 1st
Martin Luther King's Birthday Third Monday in January
Presidents Day Third Monday in February
Memorial Day Last Monday in May
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11th
Thanksgiving Day 4th Thursday in November
Christmas Day December 25th
10. PARKING
a. Parking is rigidly controlled throughout the Medical Center. Contractor parking is only allowed in authorized areas. Contractor shall abide by all
Police requirements. Parking in designated patient parking areas is strictly prohibited. Parking for unloading equipment necessary to perform the work will be authorized in advance of starting the project.
11. STORAGE OF EQUIPMENT & MATERIALS
a. The contractor shall arrange with the COR for allocation of required workspace and for the storage of equipment and material to be used for this project. Storage space is very limited. There are no exclusive areas within the campus that can be provided to the contractor for their storage needs.
b. Additionally, no space will be made available for the placement of a contractor trailer for this project. The Contractor should schedule delivery of materials and removal of waste to limit the amount of storage space and time on site.
12. DEBRIS REMOVAL
a. Contractor shall remove waste materials and debris daily from the campus. All waste material and debris shall be removed off the site by the contractor and shall be disposed of in accordance with applicable State and Federal regulations. All recyclable materials shall be recycled, and weight tickets provided to the COR.
13. SITE UTILITIES
a. The Contractor shall note this scope of work does not detail all existing structures, utilities, or components that may potentially interfere with the contract work required. All proposed utility relocations, reallocations, and shutdowns shall be approved by the COR/Facility Engineer prior to commencing such work. The contractor shall field verify all existing utility installations and take appropriate action prior to working around any potential utility installation.
b. In the event a shutdown, restriction, or interruption of any utility services is required, a written request shall be submitted to the COR with a minimum of 72 hours’ notice. Requests shall be approved by the COR prior to commencing work.
14. PROJECT SAFETY
a. Contractor shall always comply with the following and keep a copy of the attached-on site:
i. OSHA
ii. Interim Life Safety Measure Assessment (completed on site by phase)
iii. Infection Control Risk Assessment (completed on site by phase)
iv. Hot work Permits required as needed
v. Confined Space Permits required as needed
15. INTERIM LIFE SAFETY PROTECTION MEASURES
a. Contractor is not required to prepare a formal interim life safety measures plan for this project. At a minimum, contractor shall comply with the following requirements of an interim life safety measures and fire protection plan:
b. Maintain the construction area to minimize the potential for fire or safety hazards resulting from storage of construction material, construction waste and debris during construction operations.
16. PREVENTION OF FALSE FIRE ALARMS
a. Contractor shall comply with the requirements of MEDVAMC and as directed by the COR to prevent false fire alarms.
17. MATERIAL & WORKMANSHIP QUALITY
a. All materials and workmanship shall comply with all codes, standards, and recommendations of all Authorities Having Jurisdiction (AHJ). All work shall be done in a first-class manner according to the best trade practices and to the satisfaction of the COR.
18. SECURITY
a. All contractor personnel are subject to inspection of personal effects when entering or leaving the project site.
b. Health screenings and face coverings may be required by all contract staff while on site.
SITE VISIT
A site visit will be held Thursday August 6, 2020 at 2pm CST. Location will be at the
Michael E. DeBakey VAMC located at 2002 Holcomb Blvd, Houston Texas 77030. Email
Amanda Slover (COR) Amanda.Slover@va.gov to RSVP.
Question cut off will be August 13, 2020 by 12 noon CST.
----- END--------
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
mailto:Amanda.Slover@va.gov
6.00 EA __________________ __________________
Walk in Refrigerators
1.00 EA __________________ __________________
Walk in Freezer
Installation
Warranty
GRAND TOTAL __________________
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL
ITEMS (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The
Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered;
and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims
Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the
Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the
Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the
Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by
Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt
Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-
5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting
Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the
Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the
Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The
Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the
Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain
Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and
41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with
Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments
(9) The specification.
(t) [Reserved]
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service
(TOS), or similar legal instrument or agreement, that includes any clause requiring the
Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of Clause)
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL
ITEMS
Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO
IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS
(JUN 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or
Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L.
115–91).
(3) 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115–232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[X] (1) 52.203–6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with
Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
[] (2) 52.203–13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C.
3509).
[] (3) 52.203–15, Whistleblower Protections under the American Recovery and Reinvestment
Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the
American Recovery and Reinvestment Act of 2009.)
[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards
(JUN 2020) (Pub. L. 109–282) (31 U.S.C. 6101 note).
[] (5) [Reserved]
[] (6) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[] (7) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts
(OCT 2016) (Pub. L. 111–117, section 743 of Div. C).
[X] (8) 52.209–6, Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).
[X] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters
(Oct 2018) (41 U.S.C. 2313).
[] (10) [Reserved]
[] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15
U.S.C. 657a).
[] (ii) Alternate I (MAR 2020) of 52.219-3.
[] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business
Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[] (ii) Alternate I (MAR 2020) of 52.219-4.
[] (13) [Reserved]
[] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).
[] (ii) Alternate I (MAR 2020).
[] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).
[] (ii) Alternate I (MAR 2020) of 52.219-7.
[X] (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).
[] (17)(i) 52.219–9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).
[] (ii) Alternate I (NOV 2016) of 52.219-9.
[] (iii) Alternate II (NOV 2016) of 52.219-9.
[] (iv) Alternate III (JUN 2020) of 52.219–9.
[] (v) Alternate IV (JUN 2020) of 52.219–9.
[] (18) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
[] (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).
[] (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C.
637(d)(4)(F)(i)).
[X] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside
(MAR 2020) (15 U.S.C. 657f).
[X] (22)(i) 52.219-28, Post Award Small Business Program Rerepresentation (MAR 2020)
(15 U.S.C 632(a)(2)).
[] (ii) Alternate I (MAR 2020) of 52.219-28.
[] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically
Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C.
637(m)).
[] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small
Business Concerns Eligible Under the Women-Owned Small Business Program (MAR 2020)
(15 U.S.C. 637(m)).
[] (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15
U.S.C. 644(r)).
[] (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17))
[] (27) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
[X] (28) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (JAN 2020)
(E.O. 13126).
[X] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
[X] (30)(i) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).
[] (ii) Alternate I (FEB 1999) of 52.222-26.
[X] (31)(i) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
[] (ii) Alternate I (JULY 2014) of 52.222-35.
[X] (32)(i) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C.
793).
[] (ii) Alternate I (JULY 2014) of 52.222-36.
[X] (33) 52.222–37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
[X] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act
(DEC 2010) (E.O. 13496).
[X] (35)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[] (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
[] (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-
Designated Items (May 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[X] (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (JUN 2016) (E.O. 13693).
[] (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and
Air Conditioners (JUN 2016) (E.O. 13693).
[] (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014)
(E.O.s 13423 and 13514).
[] (ii) Alternate I (OCT 2015) of 52.223-13.
[] (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
[] (ii) Alternate I (JUN 2014) of 52.223-14.
[] (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007)(42 U.S.C.
8259b).
[] (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT
2015) (E.O.s 13423 and 13514).
[] (ii) Alternate I (JUN 2014) of 52.223-16.
[X] (44) 52.223–18, Encouraging Contractor Policies to Ban Text Messaging While Driving
(JUN 2020) (E.O. 13513).
[] (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
[] (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
[] (47) (i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
[] (ii) Alternate I (JAN 2017) of 52.224-3.
[X] (48) 52.225-1, Buy American—Supplies (MAY 2014) (41 U.S.C. chapter 83).
[] (49)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (MAY 2014)
(41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19
U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-
283, 110-138, 112-41, 112-42, and 112-43.
[] (ii) Alternate I (MAY 2014) of 52.225-3.
[] (iii) Alternate II (MAY 2014) of 52.225-3.
[] (iv) Alternate III (MAY 2014) of 52.225-3.
[] (50) 52.225–5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the
Department of the Treasury).
[] (52) 52.225–26, Contractors Performing Private Security Functions Outside the United
States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for
Fiscal Year 2008; 10 U.S.C. 2302 Note).
[] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C.
5150).
[] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov
2007) (42 U.S.C. 5150).
[X] (55) 52.229–12, Tax on Certain Foreign Procurements (JUN 2020).
[] (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41
U.S.C. 4505, 10 U.S.C. 2307(f)).
[] (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
[X] (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management
(Oct 2018) (31 U.S.C. 3332).
[] (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award
Management (Jul 2013) (31 U.S.C. 3332).
[X] (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
[] (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
[] (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C.
637(d)(13)).
[] (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb
2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
[] (ii) Alternate I (Apr 2003) of 52.247-64.
[] (iii) Alternate II (FEB 2006) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
[] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
[] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards—Price
Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
[] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price
Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
[] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to
Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (MAY
2014) (41 U.S.C. chapter 67).
[] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to
Contracts for Certain Services—Requirements (MAY 2014) (41 U.S.C. chapter 67).
[] (7) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).
[] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
[] (9) 52.226–6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42
U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the
Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor
Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .