36C25619Q0565-0003001.pdf
PDF 272 KB Posted
- Attached to
- Install Digital Locking System
- Solicitation number
- 36C25619Q0565
About this file
36C25619Q0565 0003 Questiosn and Answers.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25619Q0565-0003000.docx | DOCX document | |
| 36C25619Q0565-0002002.zip | ZIP file | |
| 36C25619Q0565-0002000.docx | DOCX document | |
| 36C25619Q0565-0002001.pdf | ||
| 36C25619Q0565-0001002.pdf | ||
| 36C25619Q0565-0001000.docx | DOCX document | |
| 36C25619Q0565-0001001.pdf | ||
| 36C25619Q0565.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
0003 N/A
Department of Veterans Affairs Network Contracting Office 16 Michael E. DeBakey VA Medical Center 2002 Holcombe BLVD Houston TX 77030 4298
Department of Veterans Affairs Network Contracting Office 16 Michael E. DeBakey VA Medical Center 2002 Holcombe BLVD Houston TX 77030 4298
To all Offerors/Bidders 36C25619Q0565
05-06-2019 X x x
This amendment is being issued to provide answers to vendor questions. Please view questions and answers on the continuation page of this document.
* See page 2 *
Reuben A. Zepeda Contracting Officer
X
Continuation Page 2
Q. Is it safe to assume the time of bid submission remains the same (11:59pm) considering the extended quote due date is now 5/9/2019?
A. Yes, 11:59pm CST of 5/9/2019 is the closing date and time.
Q. Would the government consider removing “Keys shall be patent protected for a minimum of 11 years (2030)” in effort to avoid unfair competitive advantage for Assa Abloy.
A. See Section - Programming Devices 4
Q. Would the government please elaborate on the delivery schedule? “The Government seeking contractor who can deliver all materials within 8 weeks from NTP. Installation shall be completed within 180 calendar days after the date of delivery for a total of 240 Days.” 8 weeks plus 180 calendar days does not calculate to 240 days. Should this be 236 days, or should this be 220 days? Please elaborate.
A. See section XVIII. Delivery Schedule
Q. Would the government please elaborate what maintenance is required for the five year extended “maintenance period.
A. See Section III. MAINTENANCE A
Q. How many days will be allowed for the VA to approve final quantiles?
A. See section I. General Requirements: C
Q. How much advance notice will need to be given to the VA in order to orchestrate a proper audience for the Key meeting?
A. See schedule I. General Requirements: C
Q. Will a VA Tier/4 BI Clearance be a requirement in order to access network closets and remote network cabinets in Mechanical Bays, or will the VA supply an escort and programming?
A. See part XVIIII. Identification Cards in SOW.
Q. 4 x 4-hour training sessions for total contract or per site.
A. per site, main campus and 9 CBOCs
Q. How many doors have wrap plates? Pg 12 of 48, Paragraph B.1?
A. Approx. 1000
Q. Is OSHA-30 training only for PM or everyone?
A. PM; the rest of the employees should have current 10-hour OSHA training
Continuation Page 3
Q. For proposal evaluation what is the relative weighting of Price versus Technical and Past Performance?
A. Since this is a supply contract the only evaluation factors other than price will be the items identified under the QUALIFICATIONS clause of the SOW and that all workers have the OSHA 10 hour and the supervisor must have OSHA 30 hour
Q. Does the VA have a desired Period of Performance or priority for the different locations?
A. Main campus would be first then CBOCs
Q. Does the VA have any specific integration requirements while the new system is installed on top of the old system?
A. Enrolling the different areas staff should be completed before install
Q. We strongly recommend increasing the Period of performance to 365 days as the current POP will dramatically increase project cost for overtime and weekend work.
A. Yes, if no additional costs are incurred
Q. This is contingent on Open Options export compatibility to import into the MEDECO CLIQ software.
The term group structure, is this meant to say Reader Groups?
A. Yes, Reader Groups
Q. Please explain maintain the open options as existing conditions. Does this mean that the system is left in existing condition and still functional?
A. Yes, this would fall under programming.
Q. Where do we provide Pricing for this request, it is not included in the pricing pages.
A. This would fall under programming
Q. Is this request to provide Servers And work stations or just to provide the specifications of the Servers and workstations?
A. There will be one server and 2 work stations for main campus and 9 remote servers and 9 work stations for the CBOCs.
Q. Where do we provide Pricing for this request, it is not included in the pricing pages?
A. Juniper switch install and in for the wall programmers
Continuation Page 4
Q. This is an open-ended request. Quoting this may require a switch for every wall mounted programmer.
Can the VA provide how many Wall Programmers will be at each location?
A. There should be one on each main and elevator lobby. SOW calls for 49 total.
Q. Where do we provide Pricing for this request, it is not included in the pricing pages?
A. This would be under installation.
Q. Five (6) MEDECO local key programming devices or approved equal Clarify if we are to provide FIVE or (6) units.
A. 5 (five)
Q. Will the VA provide this data digitally, in a compatible format, that will import in the Medeco CLIQ product?
A. This should be extracted from the Open Options Database and input into the MEDCO Database.
Q. Does Specific departments mean Groups of people in a department? How will this process work? How many groups are anticipated?
A. As many as there are Access Levels in open Options Database (123+; *note: some staff have multiple access levels assigned.
Q. Does this statement, issuance of all keys, mean we will issue keys to employees, or issue keys to specific departments as mentioned above?
A. issue keys to employees after enrolling.
Q. Do the replacement parts come form the material ordered in the pricing schedule? If overage occurs will VA purchase additional hardware as needed?
A. Requirements should be included in the survey.
Q. Please clarify the quantity of the Lock sets. Is it 550, or 1000?
A. 1000
Q. Explain the difference between final acceptance and the date the Government takes possession. Who’s choice is it and how is it decided to accept or take possession.
A. The VA will determine. Warranty periods generally start from the time of beneficial use by the VA.
‐ END OF QUESTIONS AND ANSWERS -