36C25618U0417-0005000.docx
DOCX document 13 KB Posted
- Solicitation number
- 36C25618U0417
About this file
36C25618U0417 0005 36C25618U0417 0005.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25618U0417-0004000.docx | DOCX document | |
| 36C25618U0417-0004001.pdf | ||
| 36C25618U0417-0003000.docx | DOCX document | |
| 36C25618U0417-0003001.pdf | ||
| 36C25618U0417-0002000.docx | DOCX document | |
| 36C25618U0417-0001000.docx | DOCX document | |
| 36C25618U0417-001.pdf | ||
| 36C25618U0417-000.docx | DOCX document | |
| 36C25618U0417-002.pdf | ||
| 36C25618U0417-003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Amendment to a Previous Combined Solicitation
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 J 667-18-4-505-0508 Removal of asbestos insulation and contaminated soil 70112 36C25618U0417 09-19-2018 N 562910 Department of Veterans Affairs Southeast Louisiana Veterans HCS 1555 Poydras Street New Orleans LA 70112 Rachel Babin Overton Brooks VAMC 510 E Stoner Ave Shreveport, LA 71101 rachel.babin@va.gov The purpose of this amendment is to answer the following:
1. The drawings identify select areas for soil removal to the 6’ depth while in the RFIs the response states the entire area beneath the West Wing. The quantity of material to be removed is dramatically different. Which response should we use for the proposal?
The CAD is only for the sub-basement west crawlspace which is the only area where the soil removal will need to take place.
2. In the RFIs, one question was a two part question. It was asked: Would the removed soil need to be replaced? Would river sand be acceptable? The response was “Yes”. Please have someone clarify if we are expected to replace all the removed soil.
River sand will be acceptable after all contaminated soil is removed from the sub-basement west crawlspace area.
File details come from the government source that posted it.