This is a Questions and Answers document (Amendment A0003) issued by the Department of Veterans Affairs Network Contracting Office for solicitation 36C25526R0076. The amendment promulgates responses to seven contractor questions regarding the upgrade of Building 71 restrooms for ADA compliance at a VA facility. The proposal due date was extended to Thursday, June 5, 2026, at 2:00 p.m. Central Time, with submission to the NCO-15 office in Leavenworth, Kansas.
Key responses to contractor inquiries address personnel requirements, project sequencing, and specifications. Contractors must provide a minimum of one full-time Site Safety and Health Officer per shift per site with current professional safety certification and at least three years of dedicated construction safety experience. Only two restrooms may be unavailable for use simultaneously during construction. For asbestos abatement, contractors should provide a line item for possible abatement in flooring and pipe insulation, though the extent remains unknown. Regarding door hardware, rooms 6 and 24 require new ADA-compliant lockable lever handles in satin chrome, while the remaining six restrooms require deadbolts with ADA-compliant thumbturns in antique brass with reused door knobs and supplied non-locking lever handles. Toilet partitions must be solid, high-density polyethylene conforming to Federal Specification CID A-A-60003 with dimensions matching existing installations and color to be determined during shop drawing review. All responses are binding, with specifications taking precedence over other instructions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0003 05-20-2026
589A6-24-407
36C255
Department of Veterans Affairs
Network Contracting Office (NCO) 15
3450 S 4th Street Trafficway
Leavenworth KS 66048
36C255
Department of Veterans Affairs
Network Contracting Office (NCO) 15
3450 S 4th Street Trafficway
Leavenworth KS 66048
To all Offerors/Bidders
36C25526R0076
04/30/2026
X X
This amendment is to promulgate the following changes: Please acknowledge with your proposal submissions.
Promulgate Questions with responses.
Review final list of Questions 1-7, with responses (see attached).
The proposal due date is: Thursday 05 June 2026 by 2:00pmCentral Time at NCO-15 Office, Leavenworth
All other terms and conditions remain the same.
Amendment A0003 589A6-24-407 Upgrade Bldg 71 Restrooms
ADA Compliance Questions 01-7
1. What are the key personal requirements? Of the project manager, superintendent, safety, and quality control who can wear dual hats for each role. How many of the key personnel are required to be on-site during construction?
Response: Specs trump all other instructions. See solicitation for roles, but they do not override specs. These roles will be strictly adhered to too. If there is work being conducted Site
Superintendent must be on site. if not the CO will issue a stop work at the expense of the contractor.
Revise Specification 01 35 26, Section 1.9.A. second sentence to read: The Prime Contractor shall provide a minimum of one “Full-Time” SSHO at each project site, for each shift (that may also be the Superintendent, Project Manager or CQC System Manager) that holds as current, a professional safety certification with at least 3 years of dedicated construction safety related experience.
The CQC System Manager is on the site at all times during construction.
2. Can both restrooms for each phase be closed and worked on simultaneously? If not, how many restrooms can be down and worked on at the same time?
Response: No. Only two restrooms can be unavailable for use at anytime.
3. Demolition General Note 10 and Note 12 reference asbestos found during demolition. Should we include any asbestos abatement in our proposal, or will asbestos found be treated as differing site condition?
Response: Abatement is a possibility. Provide a line item for possible abatement located in flooring, pipe insulation, etc.
4. Please advise on the extent of the abatement scope and the quantities to be abated.
Response: The extent of abatement is unknown at this time. There is possible asbestos. Lead paint removal is specified.
5. Drawing AI100 call to reuse the hardware for the new doors. The existing doors all have cylindrical handles that are not ADA compliant. Please advise if this is still acceptable.
Response: For rooms 6 and 24, provide and install an ADA compliant lockable, door lever with indicator and satin chrome finish located at ADA compliant height. For all other (6) restrooms, provide and install deadbolt with ADA compliant thumbturn interior and exterior plate in antique brass finish installed similar to existing height, re-use existing door knob, provide to COR an ADA compliant, non-locking door lever with antiqure brass finish that readily fits the door.
6. Please provide a basis of design or spec for the toilet partitions.
Amendment A0003 589A6-24-407 Upgrade Bldg 71 Restrooms
ADA Compliance Questions 01-7
Response: The toilet partitions will be solid, high-density polyethylene – water resistant, non-absorbant, Class C flame-spread rating and conforming to Fed. CID A-A-60003. Match existing dimensions. Color to be determined in shop drawings.
7. Please advise on how many restrooms can be under construction at one time.
Response: Only two restrooms can be unavailable for use at any time.
Final END of Questions