36C25519R0067-003.pdf

PDF 4 MB Posted

Attached to
Replace Air Handler AC-S2 P/N:589A4-17-107 Federal contract opportunity
Solicitation number
36C25519R0067
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

36C25519R0067 Drawings -Replace Air Handler AC-S2 - 14 Pages.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Air Handler AC-S2 P/N:589A4-17-107, newest first.
File Type Posted
36C25519R0067-0002000.docx DOCX document
36C25519R0067-0001000.docx DOCX document
36C25519R0067-0001001.pdf PDF
36C25519R0067-002.pdf PDF
36C25519R0067-001.docx DOCX document
36C25519R0067-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 1

HOSPITAL DRIVE

M O

N K

D R

IV

E

STADIUM BLVD (HWY 740)

T

IG

E R

A V

E N

U E

SERVICE ROAD

Project Area Building 1 Mechanical Penthouse

N

Campus Site Map

NTS

Office of Facilities

Management

Project Number

Building Number

Drawing Number

DrawnCheckedDate

Location

Project TitleDrawing Title

ARCHITECT/ENGINEERS:

VA Project #

CONSULTANTS:

Revisions: Date:

VA FORM 08-6231 OCT 1978

on e ei gh th in ch o ne fo ot qu ar te r th re ig ht s on e h al f i nc h f oo t th re qu ar te rs

6" on e i nc h f oo t

6" a nd h al f

6" th re e i nc he s f oo t

6" 6"

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

VeteransA sffair Depa frtmento

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

18207 Edison Avenue Chesterfield, MO 63005

Tel Fax

636.530.7770 636.530.7877

Department of Veteran's Affairs Medical Center

Owner

Harry S Truman VA Medical Center

Columbia, MO

Contact: Darren Grayson

Phone: 573.814.6374

800 Hospital Drive

Email: darren.grayson@va.gov

Architect

Fox Architects

St. Louis, MO 63102

Bob Dunn p: 314.621.4343x115

1 Memorial Drive Suite 1800

Email: bdunn@fox-arch.com

Mechanical Engineer

SSC Engineering, Inc.

Chesterfield, MO 63005

Chris Cornett p: 636.530.7770

18207 Edison Avenue

Email: ccornett@sscengineering.com

Plumbing & Fire Protection Engineer

SSC Engineering, Inc.

Chesterfield, MO 63005

Chris Cornett PE, LEED, AP p: 636.530.7770

18207 Edison Avenue

Email: ccornett@sscengineering.com

Electrical Engineer

SSC Engineering, Inc.

Chesterfield, MO 63005

Mark Jones, PE p: 636.530.7770

18207 Edison Avenue

Email: mjones@sscengineering.com

Structural Engineer

SSC Engineering, Inc.

Chesterfield, MO 63005

Michael Vande Velde p: 636.530.7770

18207 Edison Avenue

Email: mvandevelde@sscengineering.com

3/16/2018 3:45:33 PM

FCA-Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

Harry S Truman Memorial Veterans' Hospital

589A4-17-107

589A4-17-107

03/16/2018 BD ZF

G0.0 800 Hospital Drive Columbia, MO 65201

Cover

100% Construction Documents - NOT FOR CONSTRUCTION

FCA-Replace Air Handler

(AC-S2)

INDEX OF DRAWINGS

General

Architectural

Director Assistant Director

Chief of Staff

Infection Control Practitioner

Chief of Facilities ManagementAssociate Director

Signature Date Signature Date Signature Date

Signature DateSignature DateSignature Date

SIGN-OFF LIST

G0.0 Cover G0.1 General Information

A1.0 Penthouse Lower Level - Demolition and Renovation A1.1 Exterior Elevations & Details

Mechanical

M0.1 Mechanical Notes, Symbols and Abbreviations M0.2 Mechanical Schedules M0.3 Mechanical Details M0.4 Mechanical Points List, Flow and Control Diagrams M1.1 Mechanical Penthouse Ductwork Plans M2.1 Mechanical Penthouse Piping Plans - AC-2 Replacement

Electrical

E0.1 Electrical Notes, Symbols, Abbreviations and Schedules E1.1 Electrical Roof and Penthouse Plan - Demolition and Renovation

Fire Protection

FP0.1 Fire Protection Symbols, Notes & Schedules FP1.1 Fire Protection Penhouse Plan - Demolition and Renovation

KNEE BRACE

LAVATORY

LINEAR FEET

LINTEL

MASONRY

MATERIAL

MAXIMUM

MEDIUM DENSITY FIBERBOARD

MECHANICAL

MANUFACTURER

MANHOLE

MINIMUM

MIRROR

MISCELLANEOUS

MASONRY OPENING

MOUNTED

METAL

NOT IN CONTRACT

NOMINAL

NOT TO SCALE

ON CENTER

OUTSIDE FACE

OPENING

OPPOSITE

PAINT

PARTICLE BOARD

PLASTIC LAMINATE

PLUMBING

PLASTIC

PAIR

PREFINISHED

PROPERTY

PRESSURE TREATED

PAINTED

PARTITION

PLYWOOD

RISER OR RADIUS

RUBBER BASE

ROOF DRAIN

REFERENCE

REINFORCED

REQUIRED

REVISION

RAILING

ROOM

ROUGH OPENING

SOLID CORE

SCHEDULE

SECTION

SHEATHING

SIMILAR

SINK

SHEET METAL

SOFFIT

SPECIFICATIONS

SQUARE

SOLID SURFACING MATERIAL

STAINLESS STEEL

STANDARD

STEEL

STRUCTURE

SUSPENDED

SLAT WALL

SYSTEM

TREAD

TOP OF CONCRETE

TELEPHONE

TEMPERED GLASS LITE

TOP OF JOIST

TOP OF STEEL

TOP OF WALL

TYPICAL

UNFINISHED

UNLESS OTHERWISE NOTED

URINAL

VINYL BASE

VINYL COMPOSITION TILE

VERTICAL

VERIFY IN FIELD

WIDTH

WITH

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WITHOUT

WATERPROOFING

YARD

KB

LAV

LF

LNTL

MAS

MAT

MAX

MDF

MECH

MFR

MH

MIN

MIR

MISC

MO

MTD

MTL

NIC

NOM

NTS

OC

OF

OPNG

OPP

P

PBD

PLAM, PL

PLBG

PLS

PR

PREF

PROP

PT

PTD

PTN

PWD

R

RB

RD

REF

REINF

REQD

REV

RLG

RM

RO

SC

SCH

SECT

SHTH

SIM

SK

SM

SOF

SPEC

SQ

SSM

SST

STD

STL

STR

SUSP

SW

SYS

T

TC

TEL

TGL

TJ

TS

TW

TYP

UF

UON

UR

VB

VCT

VERT

VIF

W W/

WCL

WD

WDW

WF

WO

WPG

YD

ACT

ADJ

ADJC

AFF

ALT

ALUM

ARCH

AVG

BD

BL

BLDG

BLKG

BOD

BR

BTWN

C

CAB

CB

CC

CG

CJ

CL

CLG

CMU

COL

CONC

CONST

CONT

CP

CRT

CS

CSJ

CST

CT

DEMO

DIA

DIM

DN

DR

DS

DTL

DWG

EA

EJ

ELECT

ELEV

EP

EQ

EQUIP

EWC

EXT

EXTG

FAB

FCU

FD

FDN

FEC

FF

FG

FHC

FIN

FLR

FLG

FLT

FPG

FR

FRP

FSK

FT

FTG

FTWD

FWP

G

GA

GL

GR

GT

GWB

HC

HD

HDBD

HDW

HDWD

HM

HOR

HR

HT

HWH

IF

INSUL

JT

REFER TO THE MATERIAL LEGEND FOR ABBREVIATIONS RELATED TO FINISHES NOT HERE LISTED

ABBREVIATIONS LIST

ACOUSTIC CEILING TILE

ADJUSTABLE

ADJACENT

ABOVE FINISHED FLOOR

ALTERNATE

ALUMINUM

ARCHITECTURAL

AVERAGE

BOARD

BLINDS

BUILDING

BLOCKING

BOTTOM OF DECK

BRICK

BETWEEN

CARPET

CABINET

CATCH BASIN

CONCRETE, COLORED

CORNER GUARD

CONTROL JOINT

CENTERLINE

CEILING

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

CONSTRUCTION

CONTINUOUS

COMMUNICATIONS PANEL

CATHODE RAY TUBE

CONSTRUCTION JOINT

CONCRETE, SEALED

CONCRETE, STAINED

CERAMIC TILE

DEMOLITION

DIAMETER

DIMENSION

DOWN

DOOR

DOWNSPOUT

DETAIL

DRAWING

EACH

EXPANSION JOINT

ELECTRICAL

ELEVATION

ELECTRICAL PANEL

EQUAL

EQUIPMENT

ELECTRIC WATER COOLER

EXTERIOR

EXISTING

FABRICATED

FAN COIL UNIT

FLOOR DRAIN

FOUNDATION

FIRE EXTINGUISHER CABINET

FINISH FLOOR

FINISH GRADE

FIRE HOSE CABINET

FINISH

FLOOR

FLASHING

FLOOR TILE

FIREPROOFING

FIRE RATING

FIBERGLASS REINFORCED PANEL

FLOOR SINK

FEET

FOOTING

FIRE TREATED WOOD

FABRIC WRAPPED PANEL

GRANITE

GAUGE

GLASS

GRADE

GROUT

GYPSUM WALLBOARD

HOLLOW CORE

HEAD

HARDBOARD

HARDWARE

HARDWOOD

HOLLOW METAL

HORIZONTAL

HANDRAIL

HEIGHT

HOT WATER HEATER

INSIDE FACE

INSULATION

JOINT

X

XX

LEGEND - SYMBOLSLEGEND - SYMBOLS

XX

XX

XXX

XX

XXX

XX

XX

T.O.

X'-X" A.F.F.

T.O.

X'-X" A.F.F.

X

YY.Y

X

X

X

XYY.Y

X

YY.Y

X

YY.Y

X

X

X

XYY.Y

X

YY.Y

XX

CONTROL POINT

KEYED NOTE

CENTER LINE MARK

REVISION NUMBER

ELEVATION DATUM

EXISTING COLUMN LINE

NEW COLUMN LINE

EXTERIOR ELEVATION MARK

X = ELEVATION NUMBER

Y = SHEET NUMBER

WINDOW NUMBER

PARTITION TYPE DETAIL MARK

X = DETAIL NUMBER

Y = SHEET NUMBER

NORTH ARROW

SECTION MARK

X = SECTION NUMBER

Y = SHEET NUMBER

EXISTING

PARTITION INTERIOR ELEVATION MARK

X = ELEVATION NUMBER

Y = SHEET NUMBER

CONTROL POINT

KEYED NOTE

CENTER LINE MARK

REVISION NUMBER

ELEVATION DATUM

EXISTING COLUMN LINE

NEW COLUMN LINE

EXTERIOR ELEVATION MARK

X = ELEVATION NUMBER

Y = SHEET NUMBER

NEW

PARTITION

NEW DOOR

W/ DOOR

NUMBER

ROOM NAME &

NUMBER

WINDOW NUMBER

PARTITION TYPE

DEMOLISHED

DOOR

EXISTING

DOOR

DETAIL MARK

X = DETAIL NUMBER

Y = SHEET NUMBER

NORTH ARROW

SECTION MARK

X = SECTION NUMBER

Y = SHEET NUMBER

DEMOLISHED

PARTITION

INTERIOR ELEVATION MARK

X = ELEVATION NUMBER

Y = SHEET NUMBER

XXEQUIPMENT TAG FLOOR MATERIAL

TRANSITION

X

YY.Y

xxxxxx

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VeteransA sffair Depa frtmento

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

3/16/2018 3:45:33 PM

General Information

G0.1 800 Hospital Drive Columbia, MO 65201

03/16/2018

100% Construction Documents - NOT FOR CONSTRUCTION

BD ZF

589A4-17-107FCA-Replace Air Handler (AC-S2)

STEEL

CONCRETE

ALUMINUM

BRICK

WOOD (FINISHED)

COMPACTED GRAN. FILL

BATT INSULATION

GYPSUM WALL BOARD

(SMALL SCALE)

CONTINUOUS

WOOD BLOCKING

HATCH INDICATIONS SHOWN AS GUIDE ONLY; HATCHING SCALES MAY NEED TO BE MODIFIED DEPENDING UPON SCALE USED

MATERIALS INDICATION

NON-CONTINUOUS

WOOD BLOCKING

EARTH

GYPSUM WALL BOARD

(LARGE SCALE)

PLYWOOD

RIGID INSULATION

SAND

PRECAST

ASPHALT

GENERAL NOTES

PHASE ALL DEMOLITION & CONSTRUCTION TO BE SEQUENCED & COORDINATED TO INSURE THAT

THE BUILDING OWNER'S OPERATIONS ARE CONTINUOUSLY MAINTAINED.

2. THESE PLANS REFLECT INFORMATION GATHERED FROM EXISTING CONDITIONS DRAWINGS &

ARCHITECT'S FIELD VERIFICATION. CONTRACTOR SHALL VERIFY ACCURACY OF INFORMATION

PRIOR TO COMMENCEMENT OF ANY DEMOLITION AND/OR CONSTRUCTION ACTIVITIES AND

REPORT ANY DISCREPANCIES TO COR.

3. ITEMS TO BE DEMOLISHED, REMOVED, OR RELOCATED ARE SHOWN DASHED. EXISTING ITEMS

TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION BY CONTRACTOR. PATCH & REPAIR

ALL RESULTING SURFACES TO REMAIN.

4.

1.

COORDINATE ALL WORK BETWEEN TRADES AS REQUIRED TO INSURE TIMELY & PROPER

INSTALLATION OF ALL BUILDING SYSTEMS.

5.

6.

ACCESS TO EMPLOYEE ENTRY AND EXIT DOORS MUST BE MAINTAINED THROUGHOUT

CONSTRUCTION. PROVIDE ALL VA REQUIRED BARRIERS AND SIGNAGE AT THE LIMITS OF THE

CONSTRUCTION SITE.

7.

PROVIDE FULLY SEALED DUST PARTITIONS AS REQUIRED AT ALL LOCATIONS WHERE

CONSTRUCTION MEETS THE EXISTING BUILDING IN ORDER TO MAINTAIN A CLEAN DUST-FREE

ENVIRONMENT INSIDE THE BUILDING.

8.

ALL GYPSUM BOARD USED IN THIS PROJECT SHALL BE TYPE "X"

CONTRACTORS SHALL VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE EXISTING

CONDITIONS AND INCLUDE THE WORK NECESSARY TO COMPLY WITH THE SCOPE OF THE WORK.

ADDITIONAL COMPENSATION WILL NOT BE CONSIDERED FOR EXTRA WORK WHEN SUCH WORK

COULD HAVE BEEN REASONABLY ASCERTAINED FROM THE PRE BID SITE VISIT REVIEW OF THE

EXISTING CONDITIONS AND THE WORK SCOPE DESCRIBED IN THE DOCUMENTS.

10.

COORDINATION OF ALL WORK AS DESCRIBED ON THE DOCUMENTS IS THE GENERAL

CONTRACTOR'S RESPONSIBILITY.

11.

PERFORM WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND

ORDINANCES HAVING JURISDICTION.

12.

IMMEDIATELY REPORT DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND FIELD

CONDITIONS, CONFIRM THE WORK IS BUILDABLE AS SHOWN.

ALL DIMENSIONS ARE FROM COLUMN CENTER LINE TO FACE OF PARTITION U.O.N. UNDER NO

CIRCUMSTANCES SHALL ANY MEASUREMENT BE SCALED FROM THE DRAWINGS. ANY

MEASUREMENT NOT GIVEN AN ACTUAL NUMBER DIMENSION SHOULD BE BROUGHT TO THE

ATTENTION OF THE COR/ARCHITECTS BEFORE PROCEEDING.

13. ALL WOOD USED IN THIS PROJECT SHALL BE FIRE-RETARDANT TREATED

14. ALL NEW PARTITIONS, UNLESS OTHERWISE SHOWN, SHALL BE 20 GA. MTL STUDS

15. COORDINATE & PROVIDE BLOCKING AS REQUIRED FOR MILLWORK & ITEMS ATTACHED OR

MOUNTED TO WALLS & CEILINGS

16. ALL INSULATING MATERIALS WITHIN WALLS & IN UNCONCEALED SPACES SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 450

17. ALL MATERIALS EXPOSED WITHIN PLENUMS ARE REQUIRED TO BE NON-COMBUSTIBLE OR SHALL

HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF NOT

MORE THAN 50 AS DETERMINED IN ACCORDANCE WITH ASTM E-84

18. PROJECT LIMIT LINES INDICATES THE AREA OF A MAJORITY OF THE PROJECT WORK. BUT

SOME WORK WILL BE REQUIRED OUTSIDE OF THE PROJECT LIMITS. REFER TO DRAWINGS AND

SPECIFICATIONS FOR INFORMATION.

THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) WILL PERFORM FIELD VERIFICATION AS

REQUIRED FOR THE DURATION OF THE PROJECT TO MONITOR PROJECT PROGRESS.

UTILITY SHUT DOWNS WILL BE COORDINATED BY IPT (INTEGRATED PROJECT TEAM) INCLUDING: COR, VA FACILITY OPERATIONS, AND GENERAL CONTRACTOR.

ANY INTEGRATED PROJECT TEAM MEMBER (IPT), INCLUDING BUT NOT LIMITED TO: CONTRACTORS / SUB-CONTRACTORS, ARCHITECTS AND/OR ENGINEERS WHO ENTER THE PROJECT BOUNDARY SHALL WEAR ALL PROPER PERSONAL PROTECTIVE EQUIPMENT (PPE’S: CERTIFIED BY OSHA) AT ALL TIMES.

SUCH PPE’S INCLUDE: HARD HATS, SAFETY GLASSES, ETC.

IF THE PROJECT AREA AND AREAS AFFECTED BY THE PROJECT INCLUDE EXISTING EQUIPMENT, SURFACES, FINISHES, MATERIALS, ETC., NOT TO BE REMOVED, THE CONTRACTOR MUST PROTECT THIS EQUIPMENT FROM DUST, DEBRIS, DAMAGE, ETC. THE CONTRACTOR MUST ALSO CLEAN THESE ITEMS/SURFACES TO THE ORIGINAL CONDITION FOUND AT THE START OF THE PROJECT PRIOR TO FINAL INSPECTION. CONTRACTOR IS RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED EQUIPMENT, ITEMS, ETC.

PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED SURFACES HAVE

BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH ADJACENT MATERIALS, COLORS, AND

FINISHES. WALL SURFACES THAT ARE PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL

COVERING, ETC.) REPLACED FROM CORNER TO CORNER AND FLOOR TO CEILING.

UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO MATCH

SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME COLOR AS FRAMES. EXISTING PARTITIONS RECEIVING NEW DOOR FRAMES THAT HAVE VINYL WALL COVERING (VWC) SHALL HAVE

THE VWC COMPLETELY REMOVED AND REPLACED WITH NEW VWC OF MATCHING TEXTURE AND

COLOR.

CORRIDOR WALLS AND PLUMBING PARTITIONS SHALL BE CONSIDERED 1 HOUR FIRE / SMOKE RATED WALLS AND NEW OR EXISTING PENETRATIONS MUST BE SEALED ACCORDINGLY WITH UL APPROVED FIRE STOPPING MATERIAL THE SAME DAY THE PENETRATION IS MADE OR DISCOVERED. ALL FLOOR SLABS, VERTICAL SHAFTS AND STAIRWELLS SHALL BE CONSIDERED 2 HOUR FIRE / SMOKE RATED SEPARATIONS AND SHALL BE SEALED ACCORDINGLY IN THE MANNER LISTED HEREIN. PENETRATIONS

THROUGH THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.

IF EXISTING WALLS ARE TO BE USED AS DUST OR SMOKE BARRIERS SEPARATING THE CONSTRUCTION AREA FROM THE MEDICAL CENTER, THE CONTRACTOR IS RESPONSIBLE FOR SEALING ALL EXISTING PENETRATIONS IN THIS WALL, EXTENDING WALL TO CEILING SLAB AND ANY OTHER WORK TO ENSURE

THE WALL MEETS THE REQUIREMENTS IN THE GENERAL REQUIREMENTS SPECIFICATIONS FOR

CONSTRUCTION BARRIERS.

WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE REMOVED, SUCH

REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, FOUNDATIONS, ETC., UNLESS NOTED

OTHERWISE. AFTER REMOVAL; FLOORS, WALLS, AND CEILINGS SHALL BE FINISHED TO MATCH

ADJOINING SURFACES.

UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE WILL BE DONE AT TIMES

OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK

MUST BE SCHEDULED WITH THE COR 72 HOURS IN ADVANCE OF SHUTDOWN.

ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED ROOMS OR AREAS

THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR CONCRETE CONSTRUCTION, SHALL BE

ENCLOSED IN METAL STUDS AND DRYWALL CHASE WALLS AS DETAILED IN THE DRAWINGS AND

FINISHED TO MATCH THE ROOM FINISH.

WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE MEDICAL CENTER OR DISRUPT A MEDICAL

CENTER FUNCTION, WILL BE DONE AT TIMES OTHER THAN NORMAL WORKING HOURS AT NO

ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE SCHEDULED WITH THE VA COR 72 HOURS

IN ADVANCE OF WORK TO TAKE PLACE

CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER OBSTRUCTIONS UNDER

ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR OBSTRUCT ACCESS TO COILS, MOTORS,

VALVES, SWITCHES, PANELS, ETC.

BEFORE THE CONTRACTOR BEGINS WORK, CONTRACTOR SHALL RECORD ANY EXISTING SYSTEM

INFORMATION SUCH AS TEMPERATURE, FLOW RATE, PRESSURE, CURRENT, VOLTAGE, OR ANY

OTHER INFORMATION NECESSARY FOR HIM TO RETURN THE AFFECTED SYSTEM TO ORIGINAL

OPERATING CONDITION. UNLESS NOTED OTHERWISE IT IS ASSUMED THAT ALL SYSTEMS (HVAC, ELECTRICAL, PLUMBING, ETC.) ARE WORKING PROPERLY IN EVERY MANNER AT THE BEGINNING OF

THE PROJECT. THE CONTRACTOR'S RECORDED MEASUREMENTS MUST BE SUBMITTED TO THE

COR FOR REVIEW AND ACCEPTANCE BEFORE ANY DEMOLITION OR OTHER RELATED WORK CAN

PROCEED.

THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS DOORS TO

CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL AREAS, ASSIGNED STORAGE

AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION

ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES DOOR REPLACEMENT, HARDWARE

REPLACEMENT, HARDWARE REPAIR, DOOR REPAIR, ETC.

CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF MATERIALS, EQUIPMENT AND

TRASH. THIS INCLUDES CARTS FOR REMOVAL OF DEMOLITION MATERIALS, PALLET JACKS FOR

EQUIPMENT MOVING, TWO OR FOUR WHEEL CARTS FOR EQUIPMENT TRANSFER, ETC.

CONTRACTOR MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS PURPOSE.

SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED DURING NORMAL WORKING HOURS AND

MUST BE SCHEDULED WITH THE COR FOR OTHER TIMES 72 HOURS IN ADVANCE OF WORK TAKING

PLACE. THIS INCLUDES JACK-HAMMERING CONCRETE, SAW-CUTTING CONCRETE, REPETITIVE

HAMMER DRILLING OF CONCRETE, ETC.

THE VA DOES NOT PROVIDE PHONES FOR THE CONTRACTOR’S USE. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO COVER THE COSTS OF A CELLUALR PHONE TO BE HELD BY THE

SUPERINTENDENT THROUGHOUT THE PROJECT. PROVIDE DIRECT PHONE NUMBER TO COR

BEFORE THE START OF THE PROJECT.

ALL ELECTRICAL CIRCUITRY TO BE CONCEALED UNLESS OTHERWISE SPECIFIED. CIRCUITING FOR

ELECTRIC DOOR HOLD OPENS IN MASONRY WALLS SHALL BE SURFACE RACEWAY.

DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT OF EACH SYSTEM.

BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL

BRANCHES, OFFSETS, FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED.

CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AFFECTING

ALL WORK, FURNISHING SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES, ETC., AS MAY BE

REQUIRED.

LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT

NO ADDITIONAL COST.

ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS, ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS. PRIOR TO ANY DEMOLITION AND CONSTRUCTION WORK, THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. AND REPORT ANY DISCREPANCIES TO THE COR.

IF THERE IS ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF PENETRATIONS OR

STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF THE ROOF, THIS WORK MUST BE DONE

BY A CONTRACTOR LICENSED BY THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE

APPROVED BY THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING

SINGLE PLY MEMBRANE ROOF WARRANTIES.

IF ASBESTOS INSULATION IS REMOVED ON THIS PROJECT ALL PIPING AND OTHER MECHANICAL ITEMS THAT HAD THE ASBESTOS INSULATION REMOVED MUST BE RE-INSULATED WITH MATERIALS

ACCORDING TO THE SPECIFICATIONS.

WHEN WORKING IN OCCUPIED AREAS OF THE MEDICAL CENTER THE CONTRACTOR CANNOT LEAVE

TOOLS, EQUIPMENT, LADDERS, ETC., UNATTENDED WHERE THEY ARE ACCESSIBLE TO PATIENTS, STAFF, VISITORS, ETC. CEILING TILES AND CEILING ACCESS PANELS MUST ALSO BE REPLACED

WHEN UNATTENDED, FOR SAFETY REASONS.

WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH NEW OR EXISTING

DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES. REMOVE AND REPLACE ANY DRYWALL THAT

HAS COME INTO CONTACT WITH WATER OR OTHER LIQUIDS.

LIVE ELECTRICAL CIRCUITS ARE BURIED WITHIN THE CONCRETE FLOOR SLABS AND THERE IS NO

RECORD OF THE EXACT LOCATIONS. THE CONTRACTOR SHALL X-RAY THE FLOOR WHEREVER THE

CONTRACTOR PLANS ON DRILLING THROUGH THE CONCRETE FLOOR SLABS. IT WILL BE THE

CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY REPAIR ANY CIRCUIT THAT HAS BEEN CUT OR

DAMAGED.

WHEN AN EXIT IS CLOSED BECAUSE OF THIS PROJECT THE CONTRACTOR MUST INSTALL

BARRICADES AND SIGNAGE AT THE EXIT DOOR. THE CONTRACTOR MUST ALSO COVER OR REMOVE

THE LIGHTED EXIT SIGN.

CONTRACTOR SHALL PROVIDE BOXES, CONDUIT, WIRE, AND RECONNECTIONS AS REQUIRED TO

RECONNECT ANY AND ALL EXISTING LIGHT FIXTURES, RECEPTACLES, OR DEVICES REMAINING IN

USE. REMOVAL OF ANY ELECTRICAL EQUIPMENT SHALL NOT AFFECT THE OPERATION OF

EQUIPMENT REMAINING IN USE.

CONTINUITY OF ALL SERVICES TO AND FROM THE FACILITIES IN THE EXISTING BUILDING SHALL BE MAINTAINED WITHOUT INTERRUPTION, EXCEPT FOR SUCH PERIODS OF TIME WHICH THE V.A. MAY DESIGNATE. IF TEMPORARY CONNECTIONS, ETC. ARE NECESSARY TO ASSURE THE CONTINUITY OF SERVICE, THEY SHALL BE FURNISHED WITHOUT ADDITIONAL CHARGE TO THE V.A. AND SHALL BE

REMOVED WHEN NO LONGER NECESSARY.

ALL EXISTING CONDUIT AND WIRING MADE ABANDONED BY THIS PROJECT OR FOUND TO BE

ABANDONED DURING DEMOLITION SHALL BE REMOVED BACK TO PANEL, BOARD, OR SWITCH.

COORDINATE THE PROVISION AND INSTALLATION OF ALL CONTROL WIRING FOR MECHANICAL

EQUIPMENT WITH THE GENERAL CONTRACTOR AND MECHANICAL CONTRACTOR.

FOR SAFETY PURPOSES THE CONTRACTOR WILL NOT WORK ON ANY ELECTRICAL EQUIPMENT HOT.

ALL SHUTDOWNS WILL BE SCHEDULED IN ADVANCE WITH THE COR.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL OPENINGS

SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE EXPENSE OF THIS

CONTRACTOR. ALL CONDUITS IN WALLS SHALL BE GROUTED OR SEALED INTO OPENINGS.

CONTRACTOR SHALL COORDINATE ‘IN-WALL’ & ‘OVERHEAD CEILING’ INSPECTIONS WITH COR PRIOR TO THE INSTALLATION OF FINISHES. IN-WALL INSPECTIONS REQUIRE 24 HOUR NOTIFICATION.

OVERHEAD CEILING INSPECTIONS REQUIRE 48 HOUR NOTIFICATION. CONTRACTOR TO SUPPLY A CART WITH A LOG SHEET AND FULL SET OF HARD COPY DRAWINGS FOR ALL INSPECTIONS. LOG SHEET SHALL BE ITEMIZED BY TYPE OF INSPECTION AND BY ROOM. NO SUCH FINISHES SHALL BE

INSTALLED WITHOUT INSPECTION APPROVAL FROM COR

19. CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY OPERATIONS, NFPA, ICRA, ILSM, VA SPECIFICATIONS, AND AS FURTHER DESCRIBED IN THIS SCOPE.

20. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL PANELS, ACCESS PANELS, ETC., TO MATCH WALL FINISH UNLESS OTHERWISE NOTED.

22.

23.

24.

21.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

44.

45.

47.

48.

46.

49.

50.

51.

52.

53.

54.

55.

S D

M

SD

SD

REF.

REF.

REF.

R E

F

M

M

S D

M

M

SD

SD

5 5

5.4 5.4

6 6

6.2 6.2

6.7 6.7

7 7

8 8

H

H

Hb

Hb

J

JJb

K

K

L

L

Ja

Roof

Roof

Roof

A1.1

Temporary ductwork to be removed;

See MEP Drawings for additional information and Full Scope of Work

New Air Handler - See MEP Drawings for Additional Information and Full Scope of Work

Reinstall Salvaged Precast Grill Panels, Brick, and CMU Wall after installation of Air Handler installation. Match Existing Assembly Method and Grout Color as Adjacent Grill Panel Walls.

Existing Ducts to remain; protect during construction

Existing Air Handler and Ducts to remain; protect during construction

Lower Level

Penthouse

LLP1

5 5

5.4 5.4

6 6

6.2 6.2

6.7 6.7

7 7

8 8

H

H

Hb

Hb

J

JJb

K

K

L

L

Ja

Roof

Roof

Roof

A1.1

Lower Level

Penthouse

LLP1

Remove Existing Air Handler and Ducts - See MEP Drawings for Additional Information and Full Scope of Work

Contractor to coordinate with COR the removal and storage of precast grill panels, brick, and CMU wall for Air Handler removal.

Existing Ducts to remain; protect during construction

Existing Air Handler and Ducts to remain; protect during construction

3'-0"

Remove wall at area of Temporary Duct Penetration;

See Elevation for additional information

3 / A1.1

Contractor shall demolish existing 5" thick concrete equipment pad with integral 5" concrete curb and concrete bridging at existing air handler shipping splits. Concrete pad and curb is being removed to accommodate the removal and replacement of the air handling unit which has very limited clearance with existing surrounding utilities. A credit shall be provided to the VA if it is determined the new unit can be installed without the demolition of the existing pad and curb. If the existing pad and curb are to remain, new concrete bridging shall be provided to align with new air handling unit shipping splits.

± 13'-4" V.I.F.

/2

V .I .F

Install temporary ducts;

See Mechanical Plan for Additional Information

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VeteransA sffair Depa frtmento

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

3/16/2018 3:45:31 PM

Penthouse Lower Level - Demolition & Renovation

A1.0 800 Hospital Drive Columbia, MO 65201

03/16/2018

100% Construction Documents - NOT FOR CONSTRUCTION

BD ZF

589A4-17-107FCA-Replace Air Handler (AC-S2)

N

1/8" = 1'-0"2 Penthouse Lower Level / Roof Plan - Renovation

N

1/8" = 1'-0"1 Penthouse Lower Level / Roof Plan - Demolition

REFER TO MEP

DRAWINGS FOR FULL

SCOPE OF MEP WORK

6" ± 3'-0" 6"

1) Saw-cut opening around temporary duct penetration;

coordinate with MEP drawings exact location.

2) In-fill around duct with 3 5/8" MTL Stud Framing with Exterior Grade Plywood on both sides of studs. Apply Weather-tight caulk around plywood.

3) After temporary ducts are removed; infill entire opening with Brick and CMU to match the existing wall construction. Brick to match Adjacent Brick

New ductwork shown dashed; RE: MEP Drawings for Additional Information

Existing Roof

See MEP Drawings for the Full Scope of Work

Temporary Steel Lintel Supports; See for Detail

1 / A1.1

A1.1

Existing CMU Block Wall

Existsing Brick Veneer

Exterior Grade Plywood

(3)-6Lx3-1/2x5/16 (LLV) with 6" extention at ends.

Saw Cut into Existing.

Temporary Duct; RE: MECH

R E

M

E C

H

D u c t S iz e

Exterior Grade Calking All Around Permimeter of Opening

Exterior Grade Calking All Around Permimeter of Opening

Exterior Grade Calking All Around Permimeter of Duct

Exterior Grade Calking All Around Permimeter of Duct

Exterior Grade Plywood 3 5/8" MTL Studs to Frame Opening

Penthouse 2nd Floor Existing Steel Supports to Remain

Remove and Reinstall Precast Stone Panels from this row down; Shown Dashed. Coordinate with COR storage location

Replace Existing Louver in place with new Louver. See M-Series Drawings for Additional Informatoin

Existing Precast Stone Panels to remain from this row up

Existing Exterior Duct work to remain;

Protect during construction.

Existing louver panels from second floor AC unit to remain; Protect during construction

Existing Brick Exterior Veneer

Existing Roof

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

VeteransA sffair Depa frtmento

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

3/16/2018 3:45:32 PM

Exterior Elevations & Details

A1.1 800 Hospital Drive Columbia, MO 65201

03/16/2018

100% Construction Documents - NOT FOR CONSTRUCTION

BD ZF

589A4-17-107FCA-Replace Air Handler (AC-S2)

1/2" = 1'-0"3 Elevation - Duct Penetration - North

1 1/2" = 1'-0"1 Detail - Temporary Opening

1/2" = 1'-0"2 Elevation - Louver Replacement - South

MECHANICAL ABBREVIATIONS MECHANICAL GENERAL DEMOLITION NOTES:GENERAL NOTES:

MECHANICAL GENERAL RENOVATION NOTES:

MECHANICAL SYMBOLS LEGEND MECHANICAL SYMBOLS LEGEND (CONT.)

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

03/16/2018

MECHANICAL NOTES,

SYMBOLS AND

JCC SSC

M0.1

ABBREVIATIONS

PLAN

SECTION NOTES:

ELEVATION

CHILLED WATER COIL SCHEDULE

STEAM HEATING COIL SCHEDULE

AIR HANDLING UNIT SCHEDULE

HUMIDIFIER SCHEDULE

LOUVER SCHEDULE

STEAM TRAP SCHEDULE

AIRFLOW MEASURING STATION SCHEDULE

VARIABLE FREQUENCY DRIVE SCHEDULE (REFERENCE ONLY)

HEAT RECOVERY COIL SCHEDULEEXISTING FAN SCHEDULE

VIBRATION ISOLATION AND SEISMIC RESTRAINT SCHEDULE

REQUIRED SHUT DOWNS

PUMP SCHEDULE

AC UNIT DETAIL (AC-S2)

ISOMETRIC

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

03/16/2018

MECHANICAL

SCHEDULES

JCC SSC

M0.2

DUCT ELBOW

NO SCALE NO SCALE

AREA OF OPENING =

FL

O

W

EXHAUST RETURN BRANCH CONNECTION TO MAIN

NO SCALE

SUPPLY DUCT TAKEOFF - AIR TERMINAL UNIT

NO SCALE

TYPICAL METHOD OF SECURING HANGER RODS

NO SCALE

DUCT ACCESS DOORS AND PANELS

NO SCALE

ROUND DUCT FITTINGS

FLOAT AND THERMOSTAT STEAM TRAP ASSEMBLY

INSTALLATION OF THERMOMETER WELLSWATER COILS - PIPING CONNECTIONS AIR HANDLING UNIT DRAIN TRAP DETAIL

PIPE HANGER SUPPORT DETAILS

STEAM COIL - PIPING CONNECTIONS DISPERSION TUBE (JACKETED) HUMIDIFIER

CLEVIS TYPE HANGER PIPE SUPPORT TRAPEZE HANGER PIPE SUPPORTROLLER HANGER

FLOOR MOUNTED PIPING PROTECTION DETAIL

END OF STEAM LINE DRIP TRAP

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

03/16/2018

MECHANICAL

DETAILS

JCC SSC

M0.3

UV LIGHT GRID

UV-C

N O

RA1

-DP

R

RF-1

N C

RE-DPR

ES-1

DA-T

HUM-HL

OA

MA-T

FILTER

32"x34"

Supply

Fan

VSD

N C

N C

H-VLV

LPS

N O

C

CHWR

CHWS

C-VLV

UV LIGHT GRID

UV-C

DA-TDA-T

FILTER

DA-T

HFR-C

AC-S2 CONTROL DIAGRAM

AC-S2 SEQUENCE OF OPERATION

UV-C

COORDINATE ALL SEQUENCE OF OPERATIONS WITH TEST AND

BALANCING CONTRACTOR.

CHWR

CHWS

C-VLV

DA-T

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

03/16/2018

MECHANICAL POINTS

LIST, FLOW AND

JCC SSC

M0.4

CONTROL DIAGRAMS

M

M

M

M

SD

SD SD

SD

M

SD

SD

SD

6.7

JJbKL

5.4

6.2

XAC

TEMP

EXISTING

33"Lx113"Hx160"W

OA PLENUM BOX

EXISTING 108"x80"

OA LOUVER

XEF

30"ø34"x40"

24"ø

"ø

24"ø

48"x28"

56"x24"

60"x54"

XLVR

XAC

24"x56"

0" x4 8"

36"ø 1

XRF

XL

44"x24"

60"x30" 2

1 96"x18"

36"ø 2

EXISTING 5"

CONCRETE PAD

EXISTING 5"

CONCRETE CURB

EXISTING

CONDENSATE UP 4

XAC

12' - 0"

LOWER PENTHOUSE/ROOF

25' - 1 1/4"

UPPER PENTHOUSE

K L

40"x34"

30"ø

30"ø

12' - 0"

LOWER PENTHOUSE/ROOF

25' - 1 1/4"

UPPER PENTHOUSE

55.4

24"ø30"ø

24"x56"

48"x48" 1

6.7

JJbKL

5.4

6.2

M1.1

M1.1

XAC

TEMP

EXISTING 108"x80"

OA LOUVER

XEF

XAC

60"x54"

30"ø34"x40"

36"ø

0" x4 8"

24"x56"

24"ø

60"x40"

30" DN

24"ø

30"ø

XL

44"x24"

24"ø

96"x18" 1

EXISTING

CONDENSATE UP 4

6.7

JJbKL

5.4

6.2

XAC

TEMP

EXISTING 108"x80"

OA LOUVER

XEF

LVR

XL

XAC

SA UP

24"ø

60"x54"

34"x40" 30"ø

M1.1

36"ø

36"ø

0" x4 8"

60"x40"

24"x56"

24"ø

44"x24" 1

24"ø

96"x18"1

EXISTING STEAM

CONDENSATE UP 4

AC

12' - 0"

LOWER PENTHOUSE/ROOF

25' - 1 1/4"

UPPER PENTHOUSE

6.778

28"x48"

5" BASE RAIL

LVR

24"x56"

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans A sffair Depa frtment o

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

FCA Replace Air Handler (AC-S2)

100% Construction Documents - NOT FOR CONSTRUCTION

3/16/2018 1:15:18 PM

800 Hospital Drive Columbia, MO 65201

MECHANICAL PENTHOUSE

DUCTWORK PLANS

M1.1

03/16/2018 JCC SSC

589A4-17-107

MECHANICAL GENERAL NOTES:

1.

2.

REFER TO SHEET M0.1 FOR SYMBOLS, ABBREVIATIONS AND GENERAL CONSTRUCTION

NOTES.

ALL DUCTWORK AND PIPING BELOW 10'-0" A.F.F. SHALL BE INSULATED AND COVERED WITH

SHEET METAL. REFER TO SPECIFICATION 23 07 11.

MECHANICAL KEYED NOTES:

EXISTING HVAC TO REMAIN.

REMOVE HVAC SHOWN BOLD-DASHED.

BASIS OF DESIGN INCLUDES DEMOLITION OF EXISTING PAD AND CURB BY CONTRACTOR TO

ACCOMMODATE THE REMOVAL AND REPACEMENT OF THE AIR HANDLING UNIT WHICH HAS VERY

LIMITED CLEARANCE WITH EXISTING SURROUNDING UTILITES. A CREDIT SHALL BE PROVIDED TO THE VA IF IT IS DETERMINED THE NEW UNIT CAN BE INSTALLED WITHOUT THE DEMOLITION OF THE

EXISTING PAD AND CURB. IF THE EXISTING PAD AND CURB ARE TO REMAIN, NEW CONCRETE

BRIDGING SHALL TO BE PROVIDED TO ALIGN WITH NEW AIR HANDLING UNIT SHIPPING SPLITS.

COORDINATE WITH GC. REFER TO GENERAL NOTES ON M0.1 FOR LIMITATIONS ON SEVERE NOISE

PRODUCING WORK.

RELOCATION OF EXISTING PIPING AT CONTRACTORS DISCRETION TO AID INSTALLATION OF NEW

AIR HANDLER. COORDINATE IMPACT ON PHASING WITH COR.

REMOVE EXISTING DUCTWORK AND PREPARE FOR RECONNECTION.

REMOVE TWO (2) ADDITIONAL COILS (128"x32"x12") STORED IN CORNER.

DEMOLISH EXISTING LOUVER. EXISTING OPENING SHALL BE USED FOR DEMOLITION OF EXISTING

UNIT AND INSTALLATION OF NEW UNIT.

RELOCATE EXISTING DUCT SUPPORT TO EXISTING DUCTWORK TO REMAIN.

EXISTING TEMPERATURE CONTROL PANELS FOR AC-S2 TO REMAIN. PROVIDE UPS POWER SUPPLY

AS REQUIRED TO PROVIDE MINIMUM 15 MINUTES OF BACKUP POWER TO AC-S2 ACCESSORIES.

REFER TO ELECTRICAL DRAWINGS FOR RE-CIRCUITING TO EMERGENCY PANEL.

COORDINATE REMOVAL AND REINSTALLATION OF CAST CONCRETE PANELS WITH GC.

FIELD FABRICATED AND INSULATED DUCT PLENUM BOX TO TRANSITION FROM LVR-2 TO INTAKE OF

AC-S2.

SUPPLY FAN VFD LOCATION. COORDINATE WITH TCC AND EC.

RETURN FAN VFD LOCATION. COORDINATE WITH TCC AND EC.

EXISTING XAC-TEMP CONTROLS PANEL. EXTEND EXISTING CONTROLS WIRING FROM AC-2 PANEL

TO AC-TEMP PANEL. COORDINATE WITH TCC.

RECONNECT EXISTING CONTROLS TO AC-2 PANEL.

RELOCATE SMOKE DETECTOR FOR TEMPORARY PHASE. EXTEND CONTROLS WIRING TO NEW

LOCATION.

RELOCATE SMOKE DETECTOR BACK TO ORIGINAL LOCATION FOR FINAL CONNECTION.

NORTH

SCALE: 1/8" = 1'-0"

MECHANICAL LOWER PENTHOUSE DUCTWORK PLAN - TEMPORARY - DEMOLITION

SCALE: 1/8" = 1'-0"10

MECHANICAL ELEVATION 10

SCALE: 1/8" = 1'-0"11

MECHANICAL SECTION 11

NORTH

SCALE: 1/8" = 1'-0"

MECHANICAL LOWER PENTHOUSE DUCTWORK PLAN - TEMPORARY - RENOVATION

NORTH

SCALE: 1/8" = 1'-0"

MECHANICAL LOWER PENTHOUSE DUCTWORK PLAN - RENOVATION

SCALE: 1/4" = 1'-0"12

MECHANICAL SECTION 12

MECHANICAL KEYED NOTES:

MECHANICAL GENERAL NOTES:

MECHANICAL

PENTHOUSE PIPING

JCC SSC

M2.1

PLANS - AC-2 REPLACEMENT

MECHANICAL LOWER PENTHOUSE PIPING PLAN - DEMOLITION MECHANICAL LOWER PENTHOUSE PIPING PLAN - RENOVATION

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

03/16/2018

LIGHTING FIXTURE SCHEDULE

ELECTRICAL SHEET LIST

SHEET NUMBER SHEET NAME

ELECTRICAL NOTES,

SYMBOLS, ABBREVIATIONS

MRJ MRJ

AND SCHEDULES

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

E0.1

ELECTRICAL KEYED NOTES:

ELECTRICAL GENERAL NOTES:

WIREWAY SECTION

SCALE: NO SCALE

WIREWAY SECTION

SPARE

FRS-R-1-6/10

NS1

2 HP

J-H9-

480VQ

FRS-R-60

SUPPLY FAN

AC-S3

FRS-R-175

HOA

P-31

NO FUSES

NS1

2HP

600A 600A 300A

AC-S2

100 AMP CB

CUTLER HAMMER

SERIES C

HOA

PHARM

TRAN.

FRS-R-30

SPACE

INCOMING MAIN

LUGS

SPACE

AC-ER4

FRS-8

NS1

10HP

RF-3

15A FUSES

EF-E-23

FRS-5

NS1

2HP

XRF-2 ("AC-ER2")

PROVIDE NEW 10A

FUSES

3HP

HEAT REC PUMP

FRS-15

NS1

10HP

EF E-2

FRS-5

NS1

2HP

SPARE

NO FUSES

NS2

25HP

SPACE

SPACE

SPACE

SPACE

300A

AC-5

45A FUSES

XAC-5 (DEMO)

AC-5 (RETURN)

PROVIDE NEW

30A FUSES

XRF-5 (DEMO)

FRS-10

NS1

2HP

MCCP2-J7-480VQ (FRONT) - EXISTING EMERGENCY

EQUIPMENT BRANCH PANEL ELEVATION

ELECTRICAL LOWER PENTHOUSE PLAN - RENOVATION

ELECTRICAL LOWER PENTHOUSE PLAN - DEMOLITION

ELECTRICAL ROOF AND

PENTHOUSE PLAN -

MRJ MRJ

E1.1

DEMOLITION AND

RENOVATION

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

FIRE PROTECTION DELEGATED-DESIGN NOTE

FIRE PROTECTION DESIGN CRITERIA (NFPA 13 - 2016 EDITION)

HANGER SCHEDULE

ANCHORAGE & SWAY BRACING - FIRE PROTECTION SYSTEM COMPONENTS

VIBRATION ISOLATION AND SEISMIC RESTRAINT SCHEDULE

FIRE PROTECTION SPRINKLER SCHEDULE

STEEL OPEN-WEB JOIST ATTACHMENT2 NOT TO SCALE

PIPE HANGER1 NOT TO SCALE

FIRE PROTECTION SHEET LIST

SHEET NUMBER SHEET NAME

CONCRETE ATTACHMENT3 NOT TO SCALE

FIRE PUMP TESTHYDRAULIC CALCULATIONS

EXISTING FIRE PUMP SCHEDULE

FIRE PROTECTION ABBREVIATION LEGEND

FIRE PROTECTION SYMBOL LEGEND

FIRE PROTECTION GENERAL NOTES:

FIRE PROTECTION GENERAL NOTES - DEMOLITION:

FIRE PROTECTION

SYMBOLS, NOTES

JDM SSC

FP0.1

& SCHEDULES

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

FIRE PROTECTION GENERAL NOTES:

FIRE PROTECTION KEYED NOTES:

FIRE PROTECTION GENERAL NOTES DEMOLITION:

FIRE PROTECTION KEYED NOTES DEMOLITION:

FIRE PROTECTION PENTHOUSE PLAN - RENOVATIONFIRE PROTECTION PENTHOUSE PLAN - DEMOLITION

FIRE PROTECTION

PENTHOUSE PLAN -

JDM SSC

FP1.1

DEMOLITION AND

RENOVATION

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

9/27/2016 1:23:55 PM

FCA Replace Air Handler (AC-S2)

800 Hospital Drive Columbia, MO 65201

100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107

Engineering, Inc.

18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244

SS

C#

S S

C #2

Sheets
G0.0 - Cover
G0.1 - General Information
A1.0 - Penthouse Lower Level - Demolition & Renovation
A1.1 - Exterior Elevations & Details

File details come from the government source that posted it.