36C25519R0067-003.pdf
PDF 4 MB Posted
- Attached to
- Replace Air Handler AC-S2 P/N:589A4-17-107 Federal contract opportunity
- Solicitation number
- 36C25519R0067
About this file
36C25519R0067 Drawings -Replace Air Handler AC-S2 - 14 Pages.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25519R0067-0002000.docx | DOCX document | |
| 36C25519R0067-0001000.docx | DOCX document | |
| 36C25519R0067-0001001.pdf | ||
| 36C25519R0067-002.pdf | ||
| 36C25519R0067-001.docx | DOCX document | |
| 36C25519R0067-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1
HOSPITAL DRIVE
M O
N K
D R
IV
E
STADIUM BLVD (HWY 740)
T
IG
E R
A V
E N
U E
SERVICE ROAD
Project Area Building 1 Mechanical Penthouse
N
Campus Site Map
NTS
Office of Facilities
Management
Project Number
Building Number
Drawing Number
DrawnCheckedDate
Location
Project TitleDrawing Title
ARCHITECT/ENGINEERS:
VA Project #
CONSULTANTS:
Revisions: Date:
VA FORM 08-6231 OCT 1978
on e ei gh th in ch o ne fo ot qu ar te r th re ig ht s on e h al f i nc h f oo t th re qu ar te rs
6" on e i nc h f oo t
6" a nd h al f
6" th re e i nc he s f oo t
6" 6"
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
VeteransA sffair Depa frtmento
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
18207 Edison Avenue Chesterfield, MO 63005
Tel Fax
636.530.7770 636.530.7877
Department of Veteran's Affairs Medical Center
Owner
Harry S Truman VA Medical Center
Columbia, MO
Contact: Darren Grayson
Phone: 573.814.6374
800 Hospital Drive
Email: darren.grayson@va.gov
Architect
Fox Architects
St. Louis, MO 63102
Bob Dunn p: 314.621.4343x115
1 Memorial Drive Suite 1800
Email: bdunn@fox-arch.com
Mechanical Engineer
SSC Engineering, Inc.
Chesterfield, MO 63005
Chris Cornett p: 636.530.7770
18207 Edison Avenue
Email: ccornett@sscengineering.com
Plumbing & Fire Protection Engineer
SSC Engineering, Inc.
Chesterfield, MO 63005
Chris Cornett PE, LEED, AP p: 636.530.7770
18207 Edison Avenue
Email: ccornett@sscengineering.com
Electrical Engineer
SSC Engineering, Inc.
Chesterfield, MO 63005
Mark Jones, PE p: 636.530.7770
18207 Edison Avenue
Email: mjones@sscengineering.com
Structural Engineer
SSC Engineering, Inc.
Chesterfield, MO 63005
Michael Vande Velde p: 636.530.7770
18207 Edison Avenue
Email: mvandevelde@sscengineering.com
3/16/2018 3:45:33 PM
FCA-Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
Harry S Truman Memorial Veterans' Hospital
589A4-17-107
589A4-17-107
03/16/2018 BD ZF
G0.0 800 Hospital Drive Columbia, MO 65201
Cover
100% Construction Documents - NOT FOR CONSTRUCTION
FCA-Replace Air Handler
(AC-S2)
INDEX OF DRAWINGS
General
Architectural
Director Assistant Director
Chief of Staff
Infection Control Practitioner
Chief of Facilities ManagementAssociate Director
Signature Date Signature Date Signature Date
Signature DateSignature DateSignature Date
SIGN-OFF LIST
G0.0 Cover G0.1 General Information
A1.0 Penthouse Lower Level - Demolition and Renovation A1.1 Exterior Elevations & Details
Mechanical
M0.1 Mechanical Notes, Symbols and Abbreviations M0.2 Mechanical Schedules M0.3 Mechanical Details M0.4 Mechanical Points List, Flow and Control Diagrams M1.1 Mechanical Penthouse Ductwork Plans M2.1 Mechanical Penthouse Piping Plans - AC-2 Replacement
Electrical
E0.1 Electrical Notes, Symbols, Abbreviations and Schedules E1.1 Electrical Roof and Penthouse Plan - Demolition and Renovation
Fire Protection
FP0.1 Fire Protection Symbols, Notes & Schedules FP1.1 Fire Protection Penhouse Plan - Demolition and Renovation
KNEE BRACE
LAVATORY
LINEAR FEET
LINTEL
MASONRY
MATERIAL
MAXIMUM
MEDIUM DENSITY FIBERBOARD
MECHANICAL
MANUFACTURER
MANHOLE
MINIMUM
MIRROR
MISCELLANEOUS
MASONRY OPENING
MOUNTED
METAL
NOT IN CONTRACT
NOMINAL
NOT TO SCALE
ON CENTER
OUTSIDE FACE
OPENING
OPPOSITE
PAINT
PARTICLE BOARD
PLASTIC LAMINATE
PLUMBING
PLASTIC
PAIR
PREFINISHED
PROPERTY
PRESSURE TREATED
PAINTED
PARTITION
PLYWOOD
RISER OR RADIUS
RUBBER BASE
ROOF DRAIN
REFERENCE
REINFORCED
REQUIRED
REVISION
RAILING
ROOM
ROUGH OPENING
SOLID CORE
SCHEDULE
SECTION
SHEATHING
SIMILAR
SINK
SHEET METAL
SOFFIT
SPECIFICATIONS
SQUARE
SOLID SURFACING MATERIAL
STAINLESS STEEL
STANDARD
STEEL
STRUCTURE
SUSPENDED
SLAT WALL
SYSTEM
TREAD
TOP OF CONCRETE
TELEPHONE
TEMPERED GLASS LITE
TOP OF JOIST
TOP OF STEEL
TOP OF WALL
TYPICAL
UNFINISHED
UNLESS OTHERWISE NOTED
URINAL
VINYL BASE
VINYL COMPOSITION TILE
VERTICAL
VERIFY IN FIELD
WIDTH
WITH
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WITHOUT
WATERPROOFING
YARD
KB
LAV
LF
LNTL
MAS
MAT
MAX
MDF
MECH
MFR
MH
MIN
MIR
MISC
MO
MTD
MTL
NIC
NOM
NTS
OC
OF
OPNG
OPP
P
PBD
PLAM, PL
PLBG
PLS
PR
PREF
PROP
PT
PTD
PTN
PWD
R
RB
RD
REF
REINF
REQD
REV
RLG
RM
RO
SC
SCH
SECT
SHTH
SIM
SK
SM
SOF
SPEC
SQ
SSM
SST
STD
STL
STR
SUSP
SW
SYS
T
TC
TEL
TGL
TJ
TS
TW
TYP
UF
UON
UR
VB
VCT
VERT
VIF
W W/
WCL
WD
WDW
WF
WO
WPG
YD
ACT
ADJ
ADJC
AFF
ALT
ALUM
ARCH
AVG
BD
BL
BLDG
BLKG
BOD
BR
BTWN
C
CAB
CB
CC
CG
CJ
CL
CLG
CMU
COL
CONC
CONST
CONT
CP
CRT
CS
CSJ
CST
CT
DEMO
DIA
DIM
DN
DR
DS
DTL
DWG
EA
EJ
ELECT
ELEV
EP
EQ
EQUIP
EWC
EXT
EXTG
FAB
FCU
FD
FDN
FEC
FF
FG
FHC
FIN
FLR
FLG
FLT
FPG
FR
FRP
FSK
FT
FTG
FTWD
FWP
G
GA
GL
GR
GT
GWB
HC
HD
HDBD
HDW
HDWD
HM
HOR
HR
HT
HWH
IF
INSUL
JT
REFER TO THE MATERIAL LEGEND FOR ABBREVIATIONS RELATED TO FINISHES NOT HERE LISTED
ABBREVIATIONS LIST
ACOUSTIC CEILING TILE
ADJUSTABLE
ADJACENT
ABOVE FINISHED FLOOR
ALTERNATE
ALUMINUM
ARCHITECTURAL
AVERAGE
BOARD
BLINDS
BUILDING
BLOCKING
BOTTOM OF DECK
BRICK
BETWEEN
CARPET
CABINET
CATCH BASIN
CONCRETE, COLORED
CORNER GUARD
CONTROL JOINT
CENTERLINE
CEILING
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONSTRUCTION
CONTINUOUS
COMMUNICATIONS PANEL
CATHODE RAY TUBE
CONSTRUCTION JOINT
CONCRETE, SEALED
CONCRETE, STAINED
CERAMIC TILE
DEMOLITION
DIAMETER
DIMENSION
DOWN
DOOR
DOWNSPOUT
DETAIL
DRAWING
EACH
EXPANSION JOINT
ELECTRICAL
ELEVATION
ELECTRICAL PANEL
EQUAL
EQUIPMENT
ELECTRIC WATER COOLER
EXTERIOR
EXISTING
FABRICATED
FAN COIL UNIT
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER CABINET
FINISH FLOOR
FINISH GRADE
FIRE HOSE CABINET
FINISH
FLOOR
FLASHING
FLOOR TILE
FIREPROOFING
FIRE RATING
FIBERGLASS REINFORCED PANEL
FLOOR SINK
FEET
FOOTING
FIRE TREATED WOOD
FABRIC WRAPPED PANEL
GRANITE
GAUGE
GLASS
GRADE
GROUT
GYPSUM WALLBOARD
HOLLOW CORE
HEAD
HARDBOARD
HARDWARE
HARDWOOD
HOLLOW METAL
HORIZONTAL
HANDRAIL
HEIGHT
HOT WATER HEATER
INSIDE FACE
INSULATION
JOINT
X
XX
LEGEND - SYMBOLSLEGEND - SYMBOLS
XX
XX
XXX
XX
XXX
XX
XX
T.O.
X'-X" A.F.F.
T.O.
X'-X" A.F.F.
X
YY.Y
X
X
X
XYY.Y
X
YY.Y
X
YY.Y
X
X
X
XYY.Y
X
YY.Y
XX
CONTROL POINT
KEYED NOTE
CENTER LINE MARK
REVISION NUMBER
ELEVATION DATUM
EXISTING COLUMN LINE
NEW COLUMN LINE
EXTERIOR ELEVATION MARK
X = ELEVATION NUMBER
Y = SHEET NUMBER
WINDOW NUMBER
PARTITION TYPE DETAIL MARK
X = DETAIL NUMBER
Y = SHEET NUMBER
NORTH ARROW
SECTION MARK
X = SECTION NUMBER
Y = SHEET NUMBER
EXISTING
PARTITION INTERIOR ELEVATION MARK
X = ELEVATION NUMBER
Y = SHEET NUMBER
CONTROL POINT
KEYED NOTE
CENTER LINE MARK
REVISION NUMBER
ELEVATION DATUM
EXISTING COLUMN LINE
NEW COLUMN LINE
EXTERIOR ELEVATION MARK
X = ELEVATION NUMBER
Y = SHEET NUMBER
NEW
PARTITION
NEW DOOR
W/ DOOR
NUMBER
ROOM NAME &
NUMBER
WINDOW NUMBER
PARTITION TYPE
DEMOLISHED
DOOR
EXISTING
DOOR
DETAIL MARK
X = DETAIL NUMBER
Y = SHEET NUMBER
NORTH ARROW
SECTION MARK
X = SECTION NUMBER
Y = SHEET NUMBER
DEMOLISHED
PARTITION
INTERIOR ELEVATION MARK
X = ELEVATION NUMBER
Y = SHEET NUMBER
XXEQUIPMENT TAG FLOOR MATERIAL
TRANSITION
X
YY.Y
xxxxxx
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VeteransA sffair Depa frtmento
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
3/16/2018 3:45:33 PM
General Information
G0.1 800 Hospital Drive Columbia, MO 65201
03/16/2018
100% Construction Documents - NOT FOR CONSTRUCTION
BD ZF
589A4-17-107FCA-Replace Air Handler (AC-S2)
STEEL
CONCRETE
ALUMINUM
BRICK
WOOD (FINISHED)
COMPACTED GRAN. FILL
BATT INSULATION
GYPSUM WALL BOARD
(SMALL SCALE)
CONTINUOUS
WOOD BLOCKING
HATCH INDICATIONS SHOWN AS GUIDE ONLY; HATCHING SCALES MAY NEED TO BE MODIFIED DEPENDING UPON SCALE USED
MATERIALS INDICATION
NON-CONTINUOUS
WOOD BLOCKING
EARTH
GYPSUM WALL BOARD
(LARGE SCALE)
PLYWOOD
RIGID INSULATION
SAND
PRECAST
ASPHALT
GENERAL NOTES
PHASE ALL DEMOLITION & CONSTRUCTION TO BE SEQUENCED & COORDINATED TO INSURE THAT
THE BUILDING OWNER'S OPERATIONS ARE CONTINUOUSLY MAINTAINED.
2. THESE PLANS REFLECT INFORMATION GATHERED FROM EXISTING CONDITIONS DRAWINGS &
ARCHITECT'S FIELD VERIFICATION. CONTRACTOR SHALL VERIFY ACCURACY OF INFORMATION
PRIOR TO COMMENCEMENT OF ANY DEMOLITION AND/OR CONSTRUCTION ACTIVITIES AND
REPORT ANY DISCREPANCIES TO COR.
3. ITEMS TO BE DEMOLISHED, REMOVED, OR RELOCATED ARE SHOWN DASHED. EXISTING ITEMS
TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION BY CONTRACTOR. PATCH & REPAIR
ALL RESULTING SURFACES TO REMAIN.
4.
1.
COORDINATE ALL WORK BETWEEN TRADES AS REQUIRED TO INSURE TIMELY & PROPER
INSTALLATION OF ALL BUILDING SYSTEMS.
5.
6.
ACCESS TO EMPLOYEE ENTRY AND EXIT DOORS MUST BE MAINTAINED THROUGHOUT
CONSTRUCTION. PROVIDE ALL VA REQUIRED BARRIERS AND SIGNAGE AT THE LIMITS OF THE
CONSTRUCTION SITE.
7.
PROVIDE FULLY SEALED DUST PARTITIONS AS REQUIRED AT ALL LOCATIONS WHERE
CONSTRUCTION MEETS THE EXISTING BUILDING IN ORDER TO MAINTAIN A CLEAN DUST-FREE
ENVIRONMENT INSIDE THE BUILDING.
8.
ALL GYPSUM BOARD USED IN THIS PROJECT SHALL BE TYPE "X"
CONTRACTORS SHALL VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE EXISTING
CONDITIONS AND INCLUDE THE WORK NECESSARY TO COMPLY WITH THE SCOPE OF THE WORK.
ADDITIONAL COMPENSATION WILL NOT BE CONSIDERED FOR EXTRA WORK WHEN SUCH WORK
COULD HAVE BEEN REASONABLY ASCERTAINED FROM THE PRE BID SITE VISIT REVIEW OF THE
EXISTING CONDITIONS AND THE WORK SCOPE DESCRIBED IN THE DOCUMENTS.
10.
COORDINATION OF ALL WORK AS DESCRIBED ON THE DOCUMENTS IS THE GENERAL
CONTRACTOR'S RESPONSIBILITY.
11.
PERFORM WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND
ORDINANCES HAVING JURISDICTION.
12.
IMMEDIATELY REPORT DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND FIELD
CONDITIONS, CONFIRM THE WORK IS BUILDABLE AS SHOWN.
ALL DIMENSIONS ARE FROM COLUMN CENTER LINE TO FACE OF PARTITION U.O.N. UNDER NO
CIRCUMSTANCES SHALL ANY MEASUREMENT BE SCALED FROM THE DRAWINGS. ANY
MEASUREMENT NOT GIVEN AN ACTUAL NUMBER DIMENSION SHOULD BE BROUGHT TO THE
ATTENTION OF THE COR/ARCHITECTS BEFORE PROCEEDING.
13. ALL WOOD USED IN THIS PROJECT SHALL BE FIRE-RETARDANT TREATED
14. ALL NEW PARTITIONS, UNLESS OTHERWISE SHOWN, SHALL BE 20 GA. MTL STUDS
15. COORDINATE & PROVIDE BLOCKING AS REQUIRED FOR MILLWORK & ITEMS ATTACHED OR
MOUNTED TO WALLS & CEILINGS
16. ALL INSULATING MATERIALS WITHIN WALLS & IN UNCONCEALED SPACES SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 450
17. ALL MATERIALS EXPOSED WITHIN PLENUMS ARE REQUIRED TO BE NON-COMBUSTIBLE OR SHALL
HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF NOT
MORE THAN 50 AS DETERMINED IN ACCORDANCE WITH ASTM E-84
18. PROJECT LIMIT LINES INDICATES THE AREA OF A MAJORITY OF THE PROJECT WORK. BUT
SOME WORK WILL BE REQUIRED OUTSIDE OF THE PROJECT LIMITS. REFER TO DRAWINGS AND
SPECIFICATIONS FOR INFORMATION.
THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) WILL PERFORM FIELD VERIFICATION AS
REQUIRED FOR THE DURATION OF THE PROJECT TO MONITOR PROJECT PROGRESS.
UTILITY SHUT DOWNS WILL BE COORDINATED BY IPT (INTEGRATED PROJECT TEAM) INCLUDING: COR, VA FACILITY OPERATIONS, AND GENERAL CONTRACTOR.
ANY INTEGRATED PROJECT TEAM MEMBER (IPT), INCLUDING BUT NOT LIMITED TO: CONTRACTORS / SUB-CONTRACTORS, ARCHITECTS AND/OR ENGINEERS WHO ENTER THE PROJECT BOUNDARY SHALL WEAR ALL PROPER PERSONAL PROTECTIVE EQUIPMENT (PPE’S: CERTIFIED BY OSHA) AT ALL TIMES.
SUCH PPE’S INCLUDE: HARD HATS, SAFETY GLASSES, ETC.
IF THE PROJECT AREA AND AREAS AFFECTED BY THE PROJECT INCLUDE EXISTING EQUIPMENT, SURFACES, FINISHES, MATERIALS, ETC., NOT TO BE REMOVED, THE CONTRACTOR MUST PROTECT THIS EQUIPMENT FROM DUST, DEBRIS, DAMAGE, ETC. THE CONTRACTOR MUST ALSO CLEAN THESE ITEMS/SURFACES TO THE ORIGINAL CONDITION FOUND AT THE START OF THE PROJECT PRIOR TO FINAL INSPECTION. CONTRACTOR IS RESPONSIBLE TO REPAIR/REPLACE ANY DAMAGED EQUIPMENT, ITEMS, ETC.
PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED SURFACES HAVE
BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH ADJACENT MATERIALS, COLORS, AND
FINISHES. WALL SURFACES THAT ARE PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL
COVERING, ETC.) REPLACED FROM CORNER TO CORNER AND FLOOR TO CEILING.
UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO MATCH
SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME COLOR AS FRAMES. EXISTING PARTITIONS RECEIVING NEW DOOR FRAMES THAT HAVE VINYL WALL COVERING (VWC) SHALL HAVE
THE VWC COMPLETELY REMOVED AND REPLACED WITH NEW VWC OF MATCHING TEXTURE AND
COLOR.
CORRIDOR WALLS AND PLUMBING PARTITIONS SHALL BE CONSIDERED 1 HOUR FIRE / SMOKE RATED WALLS AND NEW OR EXISTING PENETRATIONS MUST BE SEALED ACCORDINGLY WITH UL APPROVED FIRE STOPPING MATERIAL THE SAME DAY THE PENETRATION IS MADE OR DISCOVERED. ALL FLOOR SLABS, VERTICAL SHAFTS AND STAIRWELLS SHALL BE CONSIDERED 2 HOUR FIRE / SMOKE RATED SEPARATIONS AND SHALL BE SEALED ACCORDINGLY IN THE MANNER LISTED HEREIN. PENETRATIONS
THROUGH THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.
IF EXISTING WALLS ARE TO BE USED AS DUST OR SMOKE BARRIERS SEPARATING THE CONSTRUCTION AREA FROM THE MEDICAL CENTER, THE CONTRACTOR IS RESPONSIBLE FOR SEALING ALL EXISTING PENETRATIONS IN THIS WALL, EXTENDING WALL TO CEILING SLAB AND ANY OTHER WORK TO ENSURE
THE WALL MEETS THE REQUIREMENTS IN THE GENERAL REQUIREMENTS SPECIFICATIONS FOR
CONSTRUCTION BARRIERS.
WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE REMOVED, SUCH
REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, FOUNDATIONS, ETC., UNLESS NOTED
OTHERWISE. AFTER REMOVAL; FLOORS, WALLS, AND CEILINGS SHALL BE FINISHED TO MATCH
ADJOINING SURFACES.
UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE WILL BE DONE AT TIMES
OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK
MUST BE SCHEDULED WITH THE COR 72 HOURS IN ADVANCE OF SHUTDOWN.
ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED ROOMS OR AREAS
THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR CONCRETE CONSTRUCTION, SHALL BE
ENCLOSED IN METAL STUDS AND DRYWALL CHASE WALLS AS DETAILED IN THE DRAWINGS AND
FINISHED TO MATCH THE ROOM FINISH.
WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE MEDICAL CENTER OR DISRUPT A MEDICAL
CENTER FUNCTION, WILL BE DONE AT TIMES OTHER THAN NORMAL WORKING HOURS AT NO
ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE SCHEDULED WITH THE VA COR 72 HOURS
IN ADVANCE OF WORK TO TAKE PLACE
CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER OBSTRUCTIONS UNDER
ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR OBSTRUCT ACCESS TO COILS, MOTORS,
VALVES, SWITCHES, PANELS, ETC.
BEFORE THE CONTRACTOR BEGINS WORK, CONTRACTOR SHALL RECORD ANY EXISTING SYSTEM
INFORMATION SUCH AS TEMPERATURE, FLOW RATE, PRESSURE, CURRENT, VOLTAGE, OR ANY
OTHER INFORMATION NECESSARY FOR HIM TO RETURN THE AFFECTED SYSTEM TO ORIGINAL
OPERATING CONDITION. UNLESS NOTED OTHERWISE IT IS ASSUMED THAT ALL SYSTEMS (HVAC, ELECTRICAL, PLUMBING, ETC.) ARE WORKING PROPERLY IN EVERY MANNER AT THE BEGINNING OF
THE PROJECT. THE CONTRACTOR'S RECORDED MEASUREMENTS MUST BE SUBMITTED TO THE
COR FOR REVIEW AND ACCEPTANCE BEFORE ANY DEMOLITION OR OTHER RELATED WORK CAN
PROCEED.
THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS DOORS TO
CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL AREAS, ASSIGNED STORAGE
AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION
ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES DOOR REPLACEMENT, HARDWARE
REPLACEMENT, HARDWARE REPAIR, DOOR REPAIR, ETC.
CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF MATERIALS, EQUIPMENT AND
TRASH. THIS INCLUDES CARTS FOR REMOVAL OF DEMOLITION MATERIALS, PALLET JACKS FOR
EQUIPMENT MOVING, TWO OR FOUR WHEEL CARTS FOR EQUIPMENT TRANSFER, ETC.
CONTRACTOR MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS PURPOSE.
SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED DURING NORMAL WORKING HOURS AND
MUST BE SCHEDULED WITH THE COR FOR OTHER TIMES 72 HOURS IN ADVANCE OF WORK TAKING
PLACE. THIS INCLUDES JACK-HAMMERING CONCRETE, SAW-CUTTING CONCRETE, REPETITIVE
HAMMER DRILLING OF CONCRETE, ETC.
THE VA DOES NOT PROVIDE PHONES FOR THE CONTRACTOR’S USE. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO COVER THE COSTS OF A CELLUALR PHONE TO BE HELD BY THE
SUPERINTENDENT THROUGHOUT THE PROJECT. PROVIDE DIRECT PHONE NUMBER TO COR
BEFORE THE START OF THE PROJECT.
ALL ELECTRICAL CIRCUITRY TO BE CONCEALED UNLESS OTHERWISE SPECIFIED. CIRCUITING FOR
ELECTRIC DOOR HOLD OPENS IN MASONRY WALLS SHALL BE SURFACE RACEWAY.
DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT OF EACH SYSTEM.
BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL
BRANCHES, OFFSETS, FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED.
CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AFFECTING
ALL WORK, FURNISHING SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES, ETC., AS MAY BE
REQUIRED.
LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT
NO ADDITIONAL COST.
ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS, ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS. PRIOR TO ANY DEMOLITION AND CONSTRUCTION WORK, THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. AND REPORT ANY DISCREPANCIES TO THE COR.
IF THERE IS ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF PENETRATIONS OR
STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF THE ROOF, THIS WORK MUST BE DONE
BY A CONTRACTOR LICENSED BY THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE
APPROVED BY THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING
SINGLE PLY MEMBRANE ROOF WARRANTIES.
IF ASBESTOS INSULATION IS REMOVED ON THIS PROJECT ALL PIPING AND OTHER MECHANICAL ITEMS THAT HAD THE ASBESTOS INSULATION REMOVED MUST BE RE-INSULATED WITH MATERIALS
ACCORDING TO THE SPECIFICATIONS.
WHEN WORKING IN OCCUPIED AREAS OF THE MEDICAL CENTER THE CONTRACTOR CANNOT LEAVE
TOOLS, EQUIPMENT, LADDERS, ETC., UNATTENDED WHERE THEY ARE ACCESSIBLE TO PATIENTS, STAFF, VISITORS, ETC. CEILING TILES AND CEILING ACCESS PANELS MUST ALSO BE REPLACED
WHEN UNATTENDED, FOR SAFETY REASONS.
WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH NEW OR EXISTING
DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES. REMOVE AND REPLACE ANY DRYWALL THAT
HAS COME INTO CONTACT WITH WATER OR OTHER LIQUIDS.
LIVE ELECTRICAL CIRCUITS ARE BURIED WITHIN THE CONCRETE FLOOR SLABS AND THERE IS NO
RECORD OF THE EXACT LOCATIONS. THE CONTRACTOR SHALL X-RAY THE FLOOR WHEREVER THE
CONTRACTOR PLANS ON DRILLING THROUGH THE CONCRETE FLOOR SLABS. IT WILL BE THE
CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY REPAIR ANY CIRCUIT THAT HAS BEEN CUT OR
DAMAGED.
WHEN AN EXIT IS CLOSED BECAUSE OF THIS PROJECT THE CONTRACTOR MUST INSTALL
BARRICADES AND SIGNAGE AT THE EXIT DOOR. THE CONTRACTOR MUST ALSO COVER OR REMOVE
THE LIGHTED EXIT SIGN.
CONTRACTOR SHALL PROVIDE BOXES, CONDUIT, WIRE, AND RECONNECTIONS AS REQUIRED TO
RECONNECT ANY AND ALL EXISTING LIGHT FIXTURES, RECEPTACLES, OR DEVICES REMAINING IN
USE. REMOVAL OF ANY ELECTRICAL EQUIPMENT SHALL NOT AFFECT THE OPERATION OF
EQUIPMENT REMAINING IN USE.
CONTINUITY OF ALL SERVICES TO AND FROM THE FACILITIES IN THE EXISTING BUILDING SHALL BE MAINTAINED WITHOUT INTERRUPTION, EXCEPT FOR SUCH PERIODS OF TIME WHICH THE V.A. MAY DESIGNATE. IF TEMPORARY CONNECTIONS, ETC. ARE NECESSARY TO ASSURE THE CONTINUITY OF SERVICE, THEY SHALL BE FURNISHED WITHOUT ADDITIONAL CHARGE TO THE V.A. AND SHALL BE
REMOVED WHEN NO LONGER NECESSARY.
ALL EXISTING CONDUIT AND WIRING MADE ABANDONED BY THIS PROJECT OR FOUND TO BE
ABANDONED DURING DEMOLITION SHALL BE REMOVED BACK TO PANEL, BOARD, OR SWITCH.
COORDINATE THE PROVISION AND INSTALLATION OF ALL CONTROL WIRING FOR MECHANICAL
EQUIPMENT WITH THE GENERAL CONTRACTOR AND MECHANICAL CONTRACTOR.
FOR SAFETY PURPOSES THE CONTRACTOR WILL NOT WORK ON ANY ELECTRICAL EQUIPMENT HOT.
ALL SHUTDOWNS WILL BE SCHEDULED IN ADVANCE WITH THE COR.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL OPENINGS
SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE EXPENSE OF THIS
CONTRACTOR. ALL CONDUITS IN WALLS SHALL BE GROUTED OR SEALED INTO OPENINGS.
CONTRACTOR SHALL COORDINATE ‘IN-WALL’ & ‘OVERHEAD CEILING’ INSPECTIONS WITH COR PRIOR TO THE INSTALLATION OF FINISHES. IN-WALL INSPECTIONS REQUIRE 24 HOUR NOTIFICATION.
OVERHEAD CEILING INSPECTIONS REQUIRE 48 HOUR NOTIFICATION. CONTRACTOR TO SUPPLY A CART WITH A LOG SHEET AND FULL SET OF HARD COPY DRAWINGS FOR ALL INSPECTIONS. LOG SHEET SHALL BE ITEMIZED BY TYPE OF INSPECTION AND BY ROOM. NO SUCH FINISHES SHALL BE
INSTALLED WITHOUT INSPECTION APPROVAL FROM COR
19. CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY OPERATIONS, NFPA, ICRA, ILSM, VA SPECIFICATIONS, AND AS FURTHER DESCRIBED IN THIS SCOPE.
20. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL PANELS, ACCESS PANELS, ETC., TO MATCH WALL FINISH UNLESS OTHERWISE NOTED.
22.
23.
24.
21.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
47.
48.
46.
49.
50.
51.
52.
53.
54.
55.
S D
M
SD
SD
REF.
REF.
REF.
R E
F
M
M
S D
M
M
SD
SD
5 5
5.4 5.4
6 6
6.2 6.2
6.7 6.7
7 7
8 8
H
H
Hb
Hb
J
JJb
K
K
L
L
Ja
Roof
Roof
Roof
A1.1
Temporary ductwork to be removed;
See MEP Drawings for additional information and Full Scope of Work
New Air Handler - See MEP Drawings for Additional Information and Full Scope of Work
Reinstall Salvaged Precast Grill Panels, Brick, and CMU Wall after installation of Air Handler installation. Match Existing Assembly Method and Grout Color as Adjacent Grill Panel Walls.
Existing Ducts to remain; protect during construction
Existing Air Handler and Ducts to remain; protect during construction
Lower Level
Penthouse
LLP1
5 5
5.4 5.4
6 6
6.2 6.2
6.7 6.7
7 7
8 8
H
H
Hb
Hb
J
JJb
K
K
L
L
Ja
Roof
Roof
Roof
A1.1
Lower Level
Penthouse
LLP1
Remove Existing Air Handler and Ducts - See MEP Drawings for Additional Information and Full Scope of Work
Contractor to coordinate with COR the removal and storage of precast grill panels, brick, and CMU wall for Air Handler removal.
Existing Ducts to remain; protect during construction
Existing Air Handler and Ducts to remain; protect during construction
3'-0"
Remove wall at area of Temporary Duct Penetration;
See Elevation for additional information
3 / A1.1
Contractor shall demolish existing 5" thick concrete equipment pad with integral 5" concrete curb and concrete bridging at existing air handler shipping splits. Concrete pad and curb is being removed to accommodate the removal and replacement of the air handling unit which has very limited clearance with existing surrounding utilities. A credit shall be provided to the VA if it is determined the new unit can be installed without the demolition of the existing pad and curb. If the existing pad and curb are to remain, new concrete bridging shall be provided to align with new air handling unit shipping splits.
± 13'-4" V.I.F.
/2
V .I .F
Install temporary ducts;
See Mechanical Plan for Additional Information
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VeteransA sffair Depa frtmento
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
3/16/2018 3:45:31 PM
Penthouse Lower Level - Demolition & Renovation
A1.0 800 Hospital Drive Columbia, MO 65201
03/16/2018
100% Construction Documents - NOT FOR CONSTRUCTION
BD ZF
589A4-17-107FCA-Replace Air Handler (AC-S2)
N
1/8" = 1'-0"2 Penthouse Lower Level / Roof Plan - Renovation
N
1/8" = 1'-0"1 Penthouse Lower Level / Roof Plan - Demolition
REFER TO MEP
DRAWINGS FOR FULL
SCOPE OF MEP WORK
6" ± 3'-0" 6"
1) Saw-cut opening around temporary duct penetration;
coordinate with MEP drawings exact location.
2) In-fill around duct with 3 5/8" MTL Stud Framing with Exterior Grade Plywood on both sides of studs. Apply Weather-tight caulk around plywood.
3) After temporary ducts are removed; infill entire opening with Brick and CMU to match the existing wall construction. Brick to match Adjacent Brick
New ductwork shown dashed; RE: MEP Drawings for Additional Information
Existing Roof
See MEP Drawings for the Full Scope of Work
Temporary Steel Lintel Supports; See for Detail
1 / A1.1
A1.1
Existing CMU Block Wall
Existsing Brick Veneer
Exterior Grade Plywood
(3)-6Lx3-1/2x5/16 (LLV) with 6" extention at ends.
Saw Cut into Existing.
Temporary Duct; RE: MECH
R E
M
E C
H
D u c t S iz e
Exterior Grade Calking All Around Permimeter of Opening
Exterior Grade Calking All Around Permimeter of Opening
Exterior Grade Calking All Around Permimeter of Duct
Exterior Grade Calking All Around Permimeter of Duct
Exterior Grade Plywood 3 5/8" MTL Studs to Frame Opening
Penthouse 2nd Floor Existing Steel Supports to Remain
Remove and Reinstall Precast Stone Panels from this row down; Shown Dashed. Coordinate with COR storage location
Replace Existing Louver in place with new Louver. See M-Series Drawings for Additional Informatoin
Existing Precast Stone Panels to remain from this row up
Existing Exterior Duct work to remain;
Protect during construction.
Existing louver panels from second floor AC unit to remain; Protect during construction
Existing Brick Exterior Veneer
Existing Roof
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
VeteransA sffair Depa frtmento
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
3/16/2018 3:45:32 PM
Exterior Elevations & Details
A1.1 800 Hospital Drive Columbia, MO 65201
03/16/2018
100% Construction Documents - NOT FOR CONSTRUCTION
BD ZF
589A4-17-107FCA-Replace Air Handler (AC-S2)
1/2" = 1'-0"3 Elevation - Duct Penetration - North
1 1/2" = 1'-0"1 Detail - Temporary Opening
1/2" = 1'-0"2 Elevation - Louver Replacement - South
MECHANICAL ABBREVIATIONS MECHANICAL GENERAL DEMOLITION NOTES:GENERAL NOTES:
MECHANICAL GENERAL RENOVATION NOTES:
MECHANICAL SYMBOLS LEGEND MECHANICAL SYMBOLS LEGEND (CONT.)
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
03/16/2018
MECHANICAL NOTES,
SYMBOLS AND
JCC SSC
M0.1
ABBREVIATIONS
PLAN
SECTION NOTES:
ELEVATION
CHILLED WATER COIL SCHEDULE
STEAM HEATING COIL SCHEDULE
AIR HANDLING UNIT SCHEDULE
HUMIDIFIER SCHEDULE
LOUVER SCHEDULE
STEAM TRAP SCHEDULE
AIRFLOW MEASURING STATION SCHEDULE
VARIABLE FREQUENCY DRIVE SCHEDULE (REFERENCE ONLY)
HEAT RECOVERY COIL SCHEDULEEXISTING FAN SCHEDULE
VIBRATION ISOLATION AND SEISMIC RESTRAINT SCHEDULE
REQUIRED SHUT DOWNS
PUMP SCHEDULE
AC UNIT DETAIL (AC-S2)
ISOMETRIC
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
03/16/2018
MECHANICAL
SCHEDULES
JCC SSC
M0.2
DUCT ELBOW
NO SCALE NO SCALE
AREA OF OPENING =
FL
O
W
EXHAUST RETURN BRANCH CONNECTION TO MAIN
NO SCALE
SUPPLY DUCT TAKEOFF - AIR TERMINAL UNIT
NO SCALE
TYPICAL METHOD OF SECURING HANGER RODS
NO SCALE
DUCT ACCESS DOORS AND PANELS
NO SCALE
ROUND DUCT FITTINGS
FLOAT AND THERMOSTAT STEAM TRAP ASSEMBLY
INSTALLATION OF THERMOMETER WELLSWATER COILS - PIPING CONNECTIONS AIR HANDLING UNIT DRAIN TRAP DETAIL
PIPE HANGER SUPPORT DETAILS
STEAM COIL - PIPING CONNECTIONS DISPERSION TUBE (JACKETED) HUMIDIFIER
CLEVIS TYPE HANGER PIPE SUPPORT TRAPEZE HANGER PIPE SUPPORTROLLER HANGER
FLOOR MOUNTED PIPING PROTECTION DETAIL
END OF STEAM LINE DRIP TRAP
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
03/16/2018
MECHANICAL
DETAILS
JCC SSC
M0.3
UV LIGHT GRID
UV-C
N O
RA1
-DP
R
RF-1
N C
RE-DPR
ES-1
DA-T
HUM-HL
OA
MA-T
FILTER
32"x34"
Supply
Fan
VSD
N C
N C
H-VLV
LPS
N O
C
CHWR
CHWS
C-VLV
UV LIGHT GRID
UV-C
DA-TDA-T
FILTER
DA-T
HFR-C
AC-S2 CONTROL DIAGRAM
AC-S2 SEQUENCE OF OPERATION
UV-C
COORDINATE ALL SEQUENCE OF OPERATIONS WITH TEST AND
BALANCING CONTRACTOR.
CHWR
CHWS
C-VLV
DA-T
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
03/16/2018
MECHANICAL POINTS
LIST, FLOW AND
JCC SSC
M0.4
CONTROL DIAGRAMS
M
M
M
M
SD
SD SD
SD
M
SD
SD
SD
6.7
JJbKL
5.4
6.2
XAC
TEMP
EXISTING
33"Lx113"Hx160"W
OA PLENUM BOX
EXISTING 108"x80"
OA LOUVER
XEF
30"ø34"x40"
24"ø
"ø
24"ø
48"x28"
56"x24"
60"x54"
XLVR
XAC
24"x56"
0" x4 8"
36"ø 1
XRF
XL
44"x24"
60"x30" 2
1 96"x18"
36"ø 2
EXISTING 5"
CONCRETE PAD
EXISTING 5"
CONCRETE CURB
EXISTING
CONDENSATE UP 4
XAC
12' - 0"
LOWER PENTHOUSE/ROOF
25' - 1 1/4"
UPPER PENTHOUSE
K L
40"x34"
30"ø
30"ø
12' - 0"
LOWER PENTHOUSE/ROOF
25' - 1 1/4"
UPPER PENTHOUSE
55.4
24"ø30"ø
24"x56"
48"x48" 1
6.7
JJbKL
5.4
6.2
M1.1
M1.1
XAC
TEMP
EXISTING 108"x80"
OA LOUVER
XEF
XAC
60"x54"
30"ø34"x40"
36"ø
0" x4 8"
24"x56"
24"ø
60"x40"
30" DN
24"ø
30"ø
XL
44"x24"
24"ø
96"x18" 1
EXISTING
CONDENSATE UP 4
6.7
JJbKL
5.4
6.2
XAC
TEMP
EXISTING 108"x80"
OA LOUVER
XEF
LVR
XL
XAC
SA UP
24"ø
60"x54"
34"x40" 30"ø
M1.1
36"ø
36"ø
0" x4 8"
60"x40"
24"x56"
24"ø
44"x24" 1
24"ø
96"x18"1
EXISTING STEAM
CONDENSATE UP 4
AC
12' - 0"
LOWER PENTHOUSE/ROOF
25' - 1 1/4"
UPPER PENTHOUSE
6.778
28"x48"
5" BASE RAIL
LVR
24"x56"
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Veterans A sffair Depa frtment o
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
FCA Replace Air Handler (AC-S2)
100% Construction Documents - NOT FOR CONSTRUCTION
3/16/2018 1:15:18 PM
800 Hospital Drive Columbia, MO 65201
MECHANICAL PENTHOUSE
DUCTWORK PLANS
M1.1
03/16/2018 JCC SSC
589A4-17-107
MECHANICAL GENERAL NOTES:
1.
2.
REFER TO SHEET M0.1 FOR SYMBOLS, ABBREVIATIONS AND GENERAL CONSTRUCTION
NOTES.
ALL DUCTWORK AND PIPING BELOW 10'-0" A.F.F. SHALL BE INSULATED AND COVERED WITH
SHEET METAL. REFER TO SPECIFICATION 23 07 11.
MECHANICAL KEYED NOTES:
EXISTING HVAC TO REMAIN.
REMOVE HVAC SHOWN BOLD-DASHED.
BASIS OF DESIGN INCLUDES DEMOLITION OF EXISTING PAD AND CURB BY CONTRACTOR TO
ACCOMMODATE THE REMOVAL AND REPACEMENT OF THE AIR HANDLING UNIT WHICH HAS VERY
LIMITED CLEARANCE WITH EXISTING SURROUNDING UTILITES. A CREDIT SHALL BE PROVIDED TO THE VA IF IT IS DETERMINED THE NEW UNIT CAN BE INSTALLED WITHOUT THE DEMOLITION OF THE
EXISTING PAD AND CURB. IF THE EXISTING PAD AND CURB ARE TO REMAIN, NEW CONCRETE
BRIDGING SHALL TO BE PROVIDED TO ALIGN WITH NEW AIR HANDLING UNIT SHIPPING SPLITS.
COORDINATE WITH GC. REFER TO GENERAL NOTES ON M0.1 FOR LIMITATIONS ON SEVERE NOISE
PRODUCING WORK.
RELOCATION OF EXISTING PIPING AT CONTRACTORS DISCRETION TO AID INSTALLATION OF NEW
AIR HANDLER. COORDINATE IMPACT ON PHASING WITH COR.
REMOVE EXISTING DUCTWORK AND PREPARE FOR RECONNECTION.
REMOVE TWO (2) ADDITIONAL COILS (128"x32"x12") STORED IN CORNER.
DEMOLISH EXISTING LOUVER. EXISTING OPENING SHALL BE USED FOR DEMOLITION OF EXISTING
UNIT AND INSTALLATION OF NEW UNIT.
RELOCATE EXISTING DUCT SUPPORT TO EXISTING DUCTWORK TO REMAIN.
EXISTING TEMPERATURE CONTROL PANELS FOR AC-S2 TO REMAIN. PROVIDE UPS POWER SUPPLY
AS REQUIRED TO PROVIDE MINIMUM 15 MINUTES OF BACKUP POWER TO AC-S2 ACCESSORIES.
REFER TO ELECTRICAL DRAWINGS FOR RE-CIRCUITING TO EMERGENCY PANEL.
COORDINATE REMOVAL AND REINSTALLATION OF CAST CONCRETE PANELS WITH GC.
FIELD FABRICATED AND INSULATED DUCT PLENUM BOX TO TRANSITION FROM LVR-2 TO INTAKE OF
AC-S2.
SUPPLY FAN VFD LOCATION. COORDINATE WITH TCC AND EC.
RETURN FAN VFD LOCATION. COORDINATE WITH TCC AND EC.
EXISTING XAC-TEMP CONTROLS PANEL. EXTEND EXISTING CONTROLS WIRING FROM AC-2 PANEL
TO AC-TEMP PANEL. COORDINATE WITH TCC.
RECONNECT EXISTING CONTROLS TO AC-2 PANEL.
RELOCATE SMOKE DETECTOR FOR TEMPORARY PHASE. EXTEND CONTROLS WIRING TO NEW
LOCATION.
RELOCATE SMOKE DETECTOR BACK TO ORIGINAL LOCATION FOR FINAL CONNECTION.
NORTH
SCALE: 1/8" = 1'-0"
MECHANICAL LOWER PENTHOUSE DUCTWORK PLAN - TEMPORARY - DEMOLITION
SCALE: 1/8" = 1'-0"10
MECHANICAL ELEVATION 10
SCALE: 1/8" = 1'-0"11
MECHANICAL SECTION 11
NORTH
SCALE: 1/8" = 1'-0"
MECHANICAL LOWER PENTHOUSE DUCTWORK PLAN - TEMPORARY - RENOVATION
NORTH
SCALE: 1/8" = 1'-0"
MECHANICAL LOWER PENTHOUSE DUCTWORK PLAN - RENOVATION
SCALE: 1/4" = 1'-0"12
MECHANICAL SECTION 12
MECHANICAL KEYED NOTES:
MECHANICAL GENERAL NOTES:
MECHANICAL
PENTHOUSE PIPING
JCC SSC
M2.1
PLANS - AC-2 REPLACEMENT
MECHANICAL LOWER PENTHOUSE PIPING PLAN - DEMOLITION MECHANICAL LOWER PENTHOUSE PIPING PLAN - RENOVATION
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
03/16/2018
LIGHTING FIXTURE SCHEDULE
ELECTRICAL SHEET LIST
SHEET NUMBER SHEET NAME
ELECTRICAL NOTES,
SYMBOLS, ABBREVIATIONS
MRJ MRJ
AND SCHEDULES
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
E0.1
ELECTRICAL KEYED NOTES:
ELECTRICAL GENERAL NOTES:
WIREWAY SECTION
SCALE: NO SCALE
WIREWAY SECTION
SPARE
FRS-R-1-6/10
NS1
2 HP
J-H9-
480VQ
FRS-R-60
SUPPLY FAN
AC-S3
FRS-R-175
HOA
P-31
NO FUSES
NS1
2HP
600A 600A 300A
AC-S2
100 AMP CB
CUTLER HAMMER
SERIES C
HOA
PHARM
TRAN.
FRS-R-30
SPACE
INCOMING MAIN
LUGS
SPACE
AC-ER4
FRS-8
NS1
10HP
RF-3
15A FUSES
EF-E-23
FRS-5
NS1
2HP
XRF-2 ("AC-ER2")
PROVIDE NEW 10A
FUSES
3HP
HEAT REC PUMP
FRS-15
NS1
10HP
EF E-2
FRS-5
NS1
2HP
SPARE
NO FUSES
NS2
25HP
SPACE
SPACE
SPACE
SPACE
300A
AC-5
45A FUSES
XAC-5 (DEMO)
AC-5 (RETURN)
PROVIDE NEW
30A FUSES
XRF-5 (DEMO)
FRS-10
NS1
2HP
MCCP2-J7-480VQ (FRONT) - EXISTING EMERGENCY
EQUIPMENT BRANCH PANEL ELEVATION
ELECTRICAL LOWER PENTHOUSE PLAN - RENOVATION
ELECTRICAL LOWER PENTHOUSE PLAN - DEMOLITION
ELECTRICAL ROOF AND
PENTHOUSE PLAN -
MRJ MRJ
E1.1
DEMOLITION AND
RENOVATION
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
FIRE PROTECTION DELEGATED-DESIGN NOTE
FIRE PROTECTION DESIGN CRITERIA (NFPA 13 - 2016 EDITION)
HANGER SCHEDULE
ANCHORAGE & SWAY BRACING - FIRE PROTECTION SYSTEM COMPONENTS
VIBRATION ISOLATION AND SEISMIC RESTRAINT SCHEDULE
FIRE PROTECTION SPRINKLER SCHEDULE
STEEL OPEN-WEB JOIST ATTACHMENT2 NOT TO SCALE
PIPE HANGER1 NOT TO SCALE
FIRE PROTECTION SHEET LIST
SHEET NUMBER SHEET NAME
CONCRETE ATTACHMENT3 NOT TO SCALE
FIRE PUMP TESTHYDRAULIC CALCULATIONS
EXISTING FIRE PUMP SCHEDULE
FIRE PROTECTION ABBREVIATION LEGEND
FIRE PROTECTION SYMBOL LEGEND
FIRE PROTECTION GENERAL NOTES:
FIRE PROTECTION GENERAL NOTES - DEMOLITION:
FIRE PROTECTION
SYMBOLS, NOTES
JDM SSC
FP0.1
& SCHEDULES
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
FIRE PROTECTION GENERAL NOTES:
FIRE PROTECTION KEYED NOTES:
FIRE PROTECTION GENERAL NOTES DEMOLITION:
FIRE PROTECTION KEYED NOTES DEMOLITION:
FIRE PROTECTION PENTHOUSE PLAN - RENOVATIONFIRE PROTECTION PENTHOUSE PLAN - DEMOLITION
FIRE PROTECTION
PENTHOUSE PLAN -
JDM SSC
FP1.1
DEMOLITION AND
RENOVATION
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1
C th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
One Memorial Drive Suite 1800 Saint Louis, MO 63102
Tel Fax
314.621.4343 314.621.0261
9/27/2016 1:23:55 PM
FCA Replace Air Handler (AC-S2)
800 Hospital Drive Columbia, MO 65201
100% Construction Documents - NOT FOR CONSTRUCTION 589A4-17-107
Engineering, Inc.
18207 Edison Avenue Chesterfield, Missouri 63005 Phone: 636.530.7770 Fax: 636.530.7877 Missouri Certificate of Authority #NC 001244
SS
C#
S S
C #2
| Sheets |
| G0.0 - Cover |
| G0.1 - General Information |
| A1.0 - Penthouse Lower Level - Demolition & Renovation |
| A1.1 - Exterior Elevations & Details |
File details come from the government source that posted it.