36C25518R0547-010.docx

DOCX document 25 KB Posted

Attached to
657A4-17-905, REPLACE BOILERS Bldg 7 Federal contract opportunity
Solicitation number
36C25518R0547
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

36C25518R0547 36C25518R0547_1.docx

View the file

Other files for this federal contract opportunity

Other files attached to 657A4-17-905, REPLACE BOILERS Bldg 7, newest first.
File Type Posted
36C25518C0228-003.docx DOCX document
36C25518C0228-000.docx DOCX document
36C25518R0547-0001011.pdf PDF
36C25518R0547-0001010.docx DOCX document
36C25518R0547-012.docx DOCX document
36C25518R0547-013.pdf PDF
36C25518R0547-011.pdf PDF
36C25518R0547-009.pdf PDF
36C25518R0547-008.pdf PDF
36C25518R0547-006.docx DOCX document
36C25518R0547-007.docx DOCX document
36C25518R0547-002.docx DOCX document
36C25518R0547-003.docx DOCX document
36C25518R0547-005.pdf PDF
36C25518R0547-004.pdf PDF
36C25518R0547-001.docx DOCX document
36C25518R0547-000.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FedBizOpps Amendment to a Previous Combined Solicitation

CLASSIFICATION CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE

DATE (MM-DD-YYYY)

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 Z 657A4-17-905, REPLACE BOILERS Bldg 7

PRE-BID AGENDA AND SIGN IN SHEET

66048 36C25518R0547 09-14-2018 N 238220 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 John J. Pershing VAMC 1500 N Westwood Blvd Poplar Bluff, MO 63901 michael.bottary@va.gov

PRE-PROPOSAL CONFERENCE OUTLINE

Introduction

(a) Good morning, thank you for taking the time to attend this pre-bid conference.

(b) Today we will first discuss contractual issues, then we will discuss technical issues, entertain questions, and finally conduct a walk through of the areas.

(c) Before we cover the issues, let me first introduce myself and the Government staff.

CO – Mike Bottary

COR – Jerimiah Benoit

Other VA staff -

I. Contractual Issues

1. General:

(a) Project Title: Project 657A4-17-905, REPLACE BOILERS Bldg 7.

(b) Cost Range: $1,000,000 to $5,000,000

(c) Completion Time: 270 days after receipt of notice to proceed.

(d) Questions are due in writing to the Contracting Officer by 2:00 pm on August 29, 2018. The email address is listed in the solicitation. Bids are due September 14, 2018 by 2:00 PM at the NCO 15 office at 3450 S. 4th Street, Leavenworth, Kansas 66048-5012. If the proposal does not reach our office in time, it cannot be accepted for any reason. If the proposal is delivered to the Poplar Bluff VA medical center or it ends up at the Leavenworth VA Medical Center, it cannot be accepted.

(e) Fax or electronically sent bids are NOT acceptable.

(f) The project is 100% set aside for Service Disabled Veteran Owned Small Business. The successful prime contractor will be required to perform no less than 15 percent of the construction labor.

(g) Award will be made using the LOWEST PRICE TECHNICALLY ACCEPTABLE Source selection process outlined in FAR Part 15. Please pay particular attention to the proposal submittal instructions of the solicitation package. The Government plans to award without discussions.

(h) Bidders must provide a breakdown of labor and material costs by division for each bid item in the solicitation. Failure to provide a breakdown of labor and materials with the bid will render the bid technically unacceptable.

(i) Failure to acknowledge any and all amendments issued to this solicitation shall be cause for rejection of the offer.

(j) Failure to provide information is the most common reason for a proposal to fail technically. Bidders are encouraged to read the Factors for technical acceptability carefully. For example: Under Factor 5, Quality Management Program will be evaluated for its processes, practices, and procedures.( Contractor’s ability to maintain and follow construction schedules) if this is not mentioned in detail, the proposal will fail technically. Bidders are responsible for providing the information requested in the solicitation for both price and technical factors.

(k) Failure to provide an adequate Quality Control Plan which addresses the minimum standards for compliance under Factor 5 can be a technical failure.

(l) The calculation of Self-Performed and/or Subcontracted Work must be provided with the Contractor proposal (bid). Failure to provide this will be a technical failure.

(m) The pre-award Contractor Safety and Environmental Record Evaluation Form must be provided with the proposal (bid). Failure to provide this information will be a technical failure.

2. Disclaimer Statements:

(a) Remarks and explanations at the conference shall not qualify the terms of the solicitation.

(b) Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing.

3. Bonds:

(a) A bid Bond in the amount of 20% must accompany your BID.

(b) After award of the contract a Payment Bond and a Performance Bond in the amount of 100% of the contract value are due prior to a Notice to Proceed Letter being issued.

4. Buy American Act: The solicitation is subject to the Buy American Act, and it generally requires the use of American made products. Please keep this in mind when you are providing product submittal data.

5. Davis-Bacon Act/ Service Contract Act: All labor performed under this contract is subject to the Davis-Bacon Act and related labor laws, to include the payment of at least the amounts shown in the wage determination in the solicitation.

6. Other Contracting Topics:

(a) The purchase of material for this project is exempt from state sales tax. A Missouri Tax exempt certificate will be issues after contract award.

(b) The contractor is expected to maintain insurance coverage during the contract period as directed in the specifications.

(c) Progress payments will be made no later than 15 days after receipt of an acceptable invoice.

(d) There are 2 important submittals that we need at contract start-up. They are the Schedule of Values, and a Construction Schedule.

6. Questions: Are there any questions involving the general provisions of the solicitation pages?

II. Technical Issues – The Project Engineer will provide an overview of the project. After this, a walk through of the site will be held.

See attached document: S04 657A4-17-905 Replace Boilers in B7 Sign In Sheet.

File details come from the government source that posted it.