36C25518R0547 0.All Drawings Combined.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25518C0228-003.docx | DOCX document | |
| 36C25518C0228-000.docx | DOCX document | |
| 36C25518R0547-0001011.pdf | ||
| 36C25518R0547-0001010.docx | DOCX document | |
| 36C25518R0547-012.docx | DOCX document | |
| 36C25518R0547-013.pdf | ||
| 36C25518R0547-010.docx | DOCX document | |
| 36C25518R0547-011.pdf | ||
| 36C25518R0547-008.pdf | ||
| 36C25518R0547-006.docx | DOCX document | |
| 36C25518R0547-007.docx | DOCX document | |
| 36C25518R0547-002.docx | DOCX document | |
| 36C25518R0547-003.docx | DOCX document | |
| 36C25518R0547-005.pdf | ||
| 36C25518R0547-004.pdf | ||
| 36C25518R0547-001.docx | DOCX document | |
| 36C25518R0547-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
200 Envoy Circle, Suite 201 Louisville KY 40299 www.paradigmusa.com
Architecture Engineering Design-Build paradigm
JOHN J. PERSHING VA MEDICAL CENTER
1500 N. WESTWOOD BLVD.
POPLAR BLUFF, MO 63901
PROJECT #657A4-17-905
REPLACE BOILER BUILDING 7
U.S. Department of Veterans Affairs
LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
PROJECT SITE MAP
AutoCAD SHX Text
PROJECT LOCATION MAP
AutoCAD SHX Text GENERAL 7.GI001 COVER SHEET COVER SHEET 7.GI002 CONSTRUCTION PHASING CONSTRUCTION PHASING STRUCTURAL 7.S-101 STRUCTURAL PLANS AND DETAILS STRUCTURAL PLANS AND DETAILS PLUMBING 7.P-001 PLUMBING ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES PLUMBING ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES 7.PD101 PLUMBING PLAN - EXISTING CONDITIONS AND DEMOLITION - FIRST FLOOR PLUMBING PLAN - EXISTING CONDITIONS AND DEMOLITION - FIRST FLOOR 7.PP101 PLUMBING PLAN - NEW WORK - FIRST FLOOR PLUMBING PLAN - NEW WORK - FIRST FLOOR 7.PP102 PLUMBING PLAN - NEW WORK - UPPER LEVEL PLUMBING PLAN - NEW WORK - UPPER LEVEL MECHANICAL 7.MP001 STEAM GENERATION GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS STEAM GENERATION GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS 7.MP101 STEAM GENERATION DEMOLITION PLANS STEAM GENERATION DEMOLITION PLANS 7.MP102 LOWER LEVEL STEAM GENERATION PLANS LOWER LEVEL STEAM GENERATION PLANS 7.MP103 FIRST LEVEL STEAM GENERATION PLANS FIRST LEVEL STEAM GENERATION PLANS 7.MP500 MECHANICAL DETAILS MECHANICAL DETAILS 7.MP501 MECHANICAL DETAILS MECHANICAL DETAILS 7.MP502 MECHANICAL DETAILS MECHANICAL DETAILS 7.MP600 MECHANICAL SCHEDULES MECHANICAL SCHEDULES 7.MP700 STEAM FLOW DIAGRAMS STEAM FLOW DIAGRAMS 7.MI800 MECHANICAL CONTROLS MECHANICAL CONTROLS ELECTRICAL 7.ES001 ELECTRICAL LEGEND ELECTRICAL LEGEND 7.ES101 ELECTRICAL DEMOLITION PLANS ELECTRICAL DEMOLITION PLANS 7.ES102 ELECTRICAL PLANS ELECTRICAL PLANS 7.ES600 ELECTRICAL DETAILS AND SCHEDULESELECTRICAL DETAILS AND SCHEDULES
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
7.GI001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
JDM
AutoCAD SHX Text
DH
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
SHED
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE BOILER BUILDING 7
AutoCAD SHX Text 657A4-17-905
AutoCAD SHX Text 07-30-2018
AutoCAD SHX Text
1500 N. WESTWOOD BLVD, POPLAR BLUFF, MO 63901
AutoCAD SHX Text
JOHN J. PERSHING VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text Exp. 6-30-19
AutoCAD SHX Text No. M 35425
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text L.
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
EXIST. B-1 EXIST. B-2 EXIST. B-3
EXIST. B-1 EXIST. B-2 B-103
EXIST. B-1 B-102 B-103
B-101 B-102 B-103
PHASE 1
ISOLATE AND DEMOLISH EXISTING B-3 AND PREPARE REMAINING PIPING FOR NEW CONNECTIONS.
EXISTING B-1, B-2, AND CONTROLS REMAIN IN OPERATION TO SERVE HOSPITAL DURING DEMOLITION OF B-3.
PHASE 2
INSTALL NEW B-103 AND NEW CONTROLS AND PUT INTO OPERATION. ONCE B-103 IS COMMISSIONED, ISOLATE AND
DEMOLISH EXISTING B-2 AND PREPARE REMAINING PIPING FOR NEW CONNECTIONS.
EXISTING B-1 AND B-103 REMAIN IN OPERATION TO SERVE HOSPITAL DURING DEMOLITION OF B-2.
PHASE 3
INSTALL NEW B-102 AND PUT INTO OPERATION. ONCE B-102 IS COMMISSIONED, ISOLATE AND DEMOLISH EXISTING B-1
AND PREPARE REMAINING PIPING FOR NEW CONNECTIONS, AND DEMOLISH EXISTING CONTROLS.
B-102, B-103, AND NEW CONTROLS REMAIN IN OPERATION TO SERVE HOSPITAL DURING DEMOLITION OF B-1.
PHASE 4
INSTALL NEW B-101 AND PUT INTO OPERATION. ONCE B-101 IS COMMISSIONED, ALL THREE NEW BOILERS SHALL
OPERATE TOGETHER ACCORDING TO CONTROLS DIAGRAMS.
DEDUCT ALTERNATE #1
CONTRACTOR SHALL PHASE INSTALLATION OF NEW BOILERS SO THAT TWO BOILERS ARE ALWAYS IN OPERATION, AND TEMPORARY BOILERS ARE NOT NECESSARY. SEE BELOW FOR PHASING OF THIS ALTERNATE.
(NOT TO SCALE)
TEMPORARY BOILERS - BASIS OF DESIGN
CONTRACTOR SHALL PROVIDE TEMPORARY BOILERS TO OPERATE DURING DEMOLITION OF B-1, B-2, AND B-3.
TEMPORARY BOILERS SHALL OPERATE UNTIL B-101, B-102, AND B-103 ARE INSTALLED, OPERATING, AND COMMISSIONED. TEMPORARY BOILERS SHALL BE DUAL FUEL AND PROVIDED IN N+1 CAPACITY, REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
CONTRACTOR SHALL CONNECT TO NATURAL GAS PIPING DOWNSTREAM OF METER FOR SERVICE OF
TEMPORARY BOILERS.
CONTRACTOR SHALL TIE INTO EXISTING BOILER FEED WATER AND STEAM PIPING AND ROUTE TEMPORARY
PIPING THROUGH WINDOW OPENINGS FOR CONNECTION TO TEMPORARY BOILERS.
CONTRACTOR TO INSTALL FENCING AROUND BOILERS AND OPERATOR TRAILER TO PREVENT UNAUTHORIZED ACCESS TO THE TEMPORARY EQUIPMENT. FENCING TO BE 8-FOOT TALL CHAIN LINK FENCE WITH A LOCKABLE GATE. FENCING TO BE REMOVED AND PAVEMENT TO BE REPAIRED TO MATCH EXISTING ONCE PROJECT IS
COMPLETED.
CONDENSATE AND BOILER FEED WATER - BASIS OF DESIGN
CONTRACTOR SHALL INSTALL NEW CONDENSATE RECEIVER, CONDENSATE PUMPS, DEAERATOR, AND BOILER FEEDWATER PUMPS PRIOR TO THE REMOVAL OF EXISTING CT-1. ONCE NEW EQUIPMENT IS INSTALLED AND OPERATIONAL, CONDENSATE SHALL BE RE-ROUTED TO NEW CONDENSATE RECEIVER AND BOILER FEEDWATER PIPING SHALL BE CONNECTED TO NEW PUMPS. SCHEDULE CHANGEOVER WITH OWNER, AND NOTIFY OWNER OF
ANY NECESSARY SHUTDOWNS AT LEAST 14 DAYS IN ADVANCE.
BUILDING 7
BUILDING 8
(NO SCOPE IN THIS
BUILDING, SHOWN
FOR REFERENCE)
EXIST. GAS METER
BUILDING 6
(NO SCOPE IN
THIS BUILDING,
SHOWN FOR
REFERENCE)
TEMPORARY BOILER LOCATION
ALTERNATE #1 BOILER DEMOLITION
AND INSTALLATION PHASING DIAGRAM
(NOT TO SCALE)
BASIS OF DESIGN EQUIPMENT REPLACEMENT
PHASING AND SITE PLAN
(IN OPERATION) (IN OPERATION) [DEMOLISHED]
(IN OPERATION) [DEMOLISHED AFTER
B-103 STARTUP]
(INSTALLED AND IN OPERATION)
[DEMOLISHED AFTER
B-102 STARTUP]
(INSTALLED AND IN OPERATION) (IN OPERATION)
(INSTALLED AND IN OPERATION) (IN OPERATION) (IN OPERATION)
DEDUCT ALTERNATE #2
CONTRACTOR SHALL INSPECT EXISTING CONDENSATE TANK, CT-1. REPORT
TANK CONDITION TO OWNER AND ENGINEER. IF TANK CONDITION IS
ACCEPTABLE TO OWNER AND ENGINEER, CONTRACTOR SHALL REPLACE
EXISTING BOILER FEEDWATER PUMPS WITH NEW CONDENSATE TRANSFER
PUMPS AS SHOWN ON 7MP501 MOUNTED ON EXISTING CT-1 SKID. PUMPS
SHALL BE REPLACED ONE AT A TIME IN ORDER TO AVOID COMPLETE SHUT-
DOWN OF CONDENSATE RETURN SYSTEM. PUMPS CANNOT BE REPLACED
UNTIL DA-1 AND TWO NEW BOILERS ARE INSTALLED AND READY FOR
OPERATION. EXISTING CONDENSATE TANK WILL TAKE PLACE OF CR-1 ON
7MP700.
N
EXIST.
CONTROLS
(IN OPERATION)
EXIST.
CONTROLS
[DEMOLISHED
AFTER NEW
CONTROLS
STARTUP]
NEW
CONTROLS
(IN OPERATION)
NEW
CONTROLS
(INSTALLED AND
IN OPERATION)
EXIST.
CONTROLS
(IN OPERATION)
NEW
CONTROLS
(IN OPERATION)
TEMPORARY
CONSTRUCTION FENCING
Architecture Engineering Design-Build paradigm 9400 Ward Parkway
Kansas City, MO 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
ISSUED FOR CONSTRUCTION
FULLY SPRINKLERED
REPLACE BOILER
BUILDING 7
657A4-17-905
1500 N. WESTWOOD BLVD, POPLAR BLUFF, MO 63901
JOHN J. PERSHING VA MEDICAL CENTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
7 GI 002
PHASING PLAN
07-30-2018 A. VELLECAS.FISCHBACH
BREAK ROOM
DEAERATOR
ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
%%UGENERAL PIPING SYMBOLS
AutoCAD SHX Text
%%U(NOT ALL SYMBOLS WILL APPLY TO THIS WORK)
AutoCAD SHX Text
HPS
AutoCAD SHX Text
HPR
AutoCAD SHX Text
MPS
AutoCAD SHX Text
MPR
AutoCAD SHX Text
LPS
AutoCAD SHX Text
LPR
AutoCAD SHX Text
PC
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
GHS
AutoCAD SHX Text
GHR
AutoCAD SHX Text V
AutoCAD SHX Text
SWS
AutoCAD SHX Text
SWR
AutoCAD SHX Text
CWR
AutoCAD SHX Text
GCR
AutoCAD SHX Text
RL
AutoCAD SHX Text
RS
AutoCAD SHX Text
RHG
AutoCAD SHX Text
CWS
AutoCAD SHX Text
GCS
AutoCAD SHX Text
MW
AutoCAD SHX Text D
AutoCAD SHX Text
GRR
AutoCAD SHX Text
GRS
AutoCAD SHX Text X
AutoCAD SHX Text
VACUUM CONDENSATE RETURN
AutoCAD SHX Text
VR
AutoCAD SHX Text
CTPS
AutoCAD SHX Text
CTPD
AutoCAD SHX Text
FWPS
AutoCAD SHX Text
FWPD
AutoCAD SHX Text
FEEDWATER SAMPLE (FROM DEAERATOR)
AutoCAD SHX Text
BOILER WATER SAMPLE
AutoCAD SHX Text
CONTINUOUS BLOWDOWN
AutoCAD SHX Text
CF
AutoCAD SHX Text
FWS
AutoCAD SHX Text
BWS
AutoCAD SHX Text
CBD
AutoCAD SHX Text
BO
AutoCAD SHX Text
CHEMICAL FEED
AutoCAD SHX Text
BOILER BLOWOFF
AutoCAD SHX Text
TUBE CLEANER WATER SUPPLY
AutoCAD SHX Text
TC
AutoCAD SHX Text A
AutoCAD SHX Text
OFL
AutoCAD SHX Text
COMPRESSED AIR
AutoCAD SHX Text
OVERFLOW
AutoCAD SHX Text
COLD WATER (CITY WATER)
AutoCAD SHX Text
LIQUEFIED PETROLEUM GAS IGNITER FUEL
AutoCAD SHX Text
NATURAL GAS IGNITER FUEL
AutoCAD SHX Text
NATURAL GAS MAIN FUEL
AutoCAD SHX Text
HW
AutoCAD SHX Text
SW
AutoCAD SHX Text
CW
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOS
AutoCAD SHX Text
LPG(I)
AutoCAD SHX Text G(I)
AutoCAD SHX Text G
AutoCAD SHX Text
HOT WATER
AutoCAD SHX Text
SOFTENED WATER
AutoCAD SHX Text
FUEL OIL RETURN
AutoCAD SHX Text
FUEL OIL SUPPLY
AutoCAD SHX Text
RH
AutoCAD SHX Text
SCH
AutoCAD SHX Text
SH
AutoCAD SHX Text
TH
AutoCAD SHX Text
PS
AutoCAD SHX Text
RC
AutoCAD SHX Text
CLEVIS-TYPE HANGER
AutoCAD SHX Text
VARIABLE SPRING-TYPE HANGER (TYPE 51)*
AutoCAD SHX Text
ROLLER-TYPE HANGER
AutoCAD SHX Text
SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*
AutoCAD SHX Text
WB
AutoCAD SHX Text
CSH
AutoCAD SHX Text
SS
AutoCAD SHX Text
%%UPIPING SYMBOLS
AutoCAD SHX Text
%%U(NOT ALL SYMBOLS WILL APPLY TO THIS WORK)
AutoCAD SHX Text TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)
AutoCAD SHX Text
BALL VALVE (ISOMETRIC OR DETAIL)
AutoCAD SHX Text
GATE VALVE WITH 3/4" HOSE ADAPTER
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
ANGLE GLOBE VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
MODULATING CONTROL VALVE
AutoCAD SHX Text
TWO POSITION CONTROL VALVE
AutoCAD SHX Text
THREE-WAY MODULATING CONTROL VALVE
AutoCAD SHX Text
AUTOMATIC BALANCING CONTROL VALVE
AutoCAD SHX Text
PRESSURE SAFETY VALVE
AutoCAD SHX Text
GATE VALVE - THREADED/FLANGED
AutoCAD SHX Text
BALL VALVE - THREADED/FLANGED
AutoCAD SHX Text
PRESSURE REGULATING VALVE
AutoCAD SHX Text
THREE-WAY TWO POSITION CONTROL VALVE
AutoCAD SHX Text
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
AutoCAD SHX Text
FLEXIBLE CONNECTION
AutoCAD SHX Text
MODULATING CONTROL BUTTERFLY VALVE
AutoCAD SHX Text
CIRCUIT SETTER VALVE
AutoCAD SHX Text
GATE VALVE WITH GLOBE-VALVED BYPASS
AutoCAD SHX Text
PLUG VALVE
AutoCAD SHX Text
CONTROL VALVE (CV) - FLOAT-OPERATED
AutoCAD SHX Text
PRESSURE REDUCING VALVE (PRV)
AutoCAD SHX Text
HOSE CONNECTOR
AutoCAD SHX Text
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
AutoCAD SHX Text
WATER LEVEL CONTROLLER
AutoCAD SHX Text
LC
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text M
AutoCAD SHX Text
%%UVALVE SYMBOLS
AutoCAD SHX Text
%%U(NOT ALL SYMBOLS WILL APPLY TO THIS WORK)
AutoCAD SHX Text
%%UGENERAL NOTES
AutoCAD SHX Text
1. DRAWINGS: DRAWINGS: : a. PLUMBING DRAWINGS ARE TO BE CONSIDERED DIAGRAMATIC AND INDICATE GENERAL ARRANGEMENT OF WORK AND SYSTEMS. IT IS NOT POSSIBLE TO INDICATE EVERY FITTING, VALVE, OFFSET, TRAP, ACCESS PANEL, ETC. THAT IS REQUIRED FOR A PROPER WORKING SYSTEM AND MAINTENENCE THEROF. NO ADDITIONAL COST WILL BE ALLOWED FOR SUCH ITEMS. b. FOR EXISTING SYSTEMS, ALL LINES AND CONDITIONS SHOWN ON THE DRAWING HAVE BEEN SHOWN IN GOOD FAITH. HOWEVER, THERE IS NO IMPLIED GUARANTEE AS TO THEIR SIZE, LOCATION, ELEVATION, COMPLIANCE WITH CURRENT CODES OR CONDITIONS. THE CONTRACTOR SHALL INVESTIGATE ALL EXISTING CONDITIONS AND SHALL MODIFY THE PROPOSED WORK AS REQUIRED OR DIRECTED. c. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT EQUIPMENT LOCATIONS, ETC. AND OTHER SPACE CONDITIONS. CHECK DRAWINGS OF OTHER TRADES TO COORDINATE PLUMBING WORK. 2. FEES/INSPECTIONS: FEES/INSPECTIONS: : a. PAY ALL FEES AND ARRANGE FOR ALL INSPECTIONS. SUCH INSPECTIONS ARE TO BE CONDUCTED BY AUTHORITIES HAVING JURISDICTION. ADVISE THE COR/G.C. OF ANY MODIFICATION TO OR DEVIATION FROM THE CONTRACT DOCUMENTS IN ORDER TO COMPLY WITH CODES. ENTERING INTO A CONTRACT WILL BE DEEMED AS EVIDENCE OF COMPLIANCE WITH THE REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION OVER THE WORK. 3. QUALITY ASSURANCE: QUALITY ASSURANCE: : a. ALL PLUMBING WORK SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL CODES AS WELL AS ALL UTILITY COMPANY REGULATIONS. THESE CODES SHALL SUPERCEDE ANY INFORMATION CONTAINED WITHIN THE DRAWING SET CONTRADICTING THESE CODES. b. EACH PIECE OF EQUIPMENT SHALL HAVE MANUFACTURER'S NAME, ADDRESS, SERIAL, AND MODEL NUMBERS ON A PLATE SECURELY ATTACHED TO IT. c. ALL PIPING ABOVE GRADE SHALL HAVE AN EXPOSED TAG TO IDENTIFY THE PIPE. d. EACH PIECE OF EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS OR AS INDICATED ON PLANS. e. ALL PLUMBING WORK SHALL BE PERFORMED BY INDIVIDUALS SKILLED IN THIS TRADE AND COMPLETED IN A PROFESSIONAL MANNER. f. EACH PIECE OF EQUIPMENT SHALL BE INSTALLED AS FREE FROM NOISE AND VIBRATION AS POSSIBLE. 4. EQUIPMENT DELIVERY AND STORAGE: EQUIPMENT DELIVERY AND STORAGE: : a. DELIVER EQUIPMENT TO THE SITE IN MANUFACTURER'S ORIGINAL PACKAGING. CLEARLY MARK EACH ITEM WITH THE PROPER IDENTIFICATION NUMBER. STORE IN SAFE DRY AREA. 5. EQUIPMENT MANUALS/SUBMITTALS: EQUIPMENT MANUALS/SUBMITTALS: : a. SUBMIT EQUIPMENT CATALOGS TO OWNER/G.C. FOR APPROVAL PRIOR TO PURCHASE AND INSTALLATION. ONCE APPROVED, PROVIDE OWNER/G.C. WITH COPIES OF THESE ITEMS. 6. SITE INSPECTION (AS REQUIRED): SITE INSPECTION (AS REQUIRED): : a. CONTRACTOR SHALL ATTEND PRE-BID WALK THROUGH AT THE SITE TO INSPECT EXISTING FACILITIES BEFORE BID IN ORDER TO ENSURE PROPER EVALUATION OF WORKING CONDITIONS AND LOCATIONS OF EXISTING EQUIPMENT AS REQUIRED. CONTRACTOR IS RESPONSIBLE FOR THE INCLUSION OF ALL REQUIRED DEMOLITION IN AREAS UNDERGOING MODIFICATION WHETHER OR NOT SUCH WORK IS INDICATED ON THE DRAWINGS. DEMOLITION SHALL GENERALLY BE ARRANGED TO AGREE WITH THE ACCOMPLISHMENT OF WORK UNDER THE VARIOUS PHASES, IF APPLICABLE, AND IN COORDINATION WITH OTHER TRADES. CONSULT ARCHITECTURAL DRAWINGS FOR OTHER REQUIREMENTS.
AutoCAD SHX Text
%%UEXECUTION
AutoCAD SHX Text
1. LAYOUT: PLUMBING LAYOUT: PLUMBING a. PRIOR TO INSTALLATION, LAYOUT ALL PLUMBING WORK IN A MANNER THAT WILL ALLOW INSTALLATION OF ALL OTHER WORK INDICATED. b. COORDINATE AND COMMUNICATE INSTALLATION OF PLUMBING WORK WITH THAT OF OTHER TRADES, SO THAT ALL WORK MAY BE INSTALLED IN SPACE AVAILABLE. c. PROVIDE ALL ADA INSULATION PROTECTION AS REQUIRED. 2. EQUIPMENT: EQUIPMENT: : a. INSTALL ALL MATERIAL AND EQUIPMENT IN A NEAT AND WORK- MANLIKE MANNER IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND PROVIDE FOR THE FOLLOWING: i. CONNECTION OF PIPING AND ACCESSORIES TO EQUIPMENT SHALL PERMIT CONNECTION OF PIPING AND ACCESSORIES TO EQUIPMENT SHALL PERMIT EASY REMOVAL WITH MINIMUM OF DISTURBANCE TO OTHER EQUIPMENT AND MATERIALS. ii. ITEMS REQUIRING INSPECTION, ADJUSTMENT, MAINTENANCE, SERVICING OR ITEMS REQUIRING INSPECTION, ADJUSTMENT, MAINTENANCE, SERVICING OR REPLACEMENT SHALL BE EASILY ACCESSIBLE. b. SLEEVE TO BE INSTALLED (2" MINIMUM AFF) FOR ALL PENETRATIONS. 3. EXISTING PLUMBING SYSTEMS: EXISTING PLUMBING SYSTEMS: : a. ALL EXISTING PIPING, MATERIALS OR EQUIPMENT NOT REQUIRED FOR THE NEW ALL EXISTING PIPING, MATERIALS OR EQUIPMENT NOT REQUIRED FOR THE NEW SYSTEM, WHETHER OR NOT SUCH ITEMS ARE INDICATED ON PLANS, SHALL BE REMOVED. THE STATUS OF ALL SUCH ITEMS SHALL BE VERIFIED BY THIS CONTRACTOR BEFORE DISCONNECTING, CAPPING OR REMOVING. b. ALL EXISTING PIPING, MATERIALS OR EQUIPMENT WHICH WILL REMAIN AS PART ALL EXISTING PIPING, MATERIALS OR EQUIPMENT WHICH WILL REMAIN AS PART OF THE ACTIVE SYSTEM SHALL BE VISUALLY INSPECTED. ANY SUCH ITEMS FOUND TO BE DEFECTIVE SHALL BE REMOVED AND REPLACED WITH NEW MATERIALS OF LIKE SUBSTANCE, SIZE AND TYPE. ALL PLUMBING SYSTEMS THAT HAVE BEEN REPAIRED, MODIFIED OR RELOCATED SHALL BE TESTED IN ACCORDANCE WITH THIS SPECIFICATION FOR NEW SYSTEMS.
AutoCAD SHX Text
%%UTESTS AND INSPECTIONS
AutoCAD SHX Text
1. DOMESTIC WATER SYSTEM - STERILIZE THE ENTIRE WATER DISTRIBUTION SYSTEM DOMESTIC WATER SYSTEM - STERILIZE THE ENTIRE WATER DISTRIBUTION SYSTEM THOROUGHLY WITH A SOLUTION CONTAINING NOT LESS THAN 50 PARTS PER MILLION OF AVAILABLE CHLORINE. USE EITHER LIQUID CHLORINE OR CALCIUM HYPOCHLORITE CONFORMING TO FEDERAL SPECIFICATIONS. ALLOW THE STERILIZING SOLUTION TO REMAIN IN THE SYSTEM FOR EIGHT HOURS. DURING WHICH TIME ALL VALVES AND FAUCETS SHALL BE OPENED AND CLOSED SEVERAL TIMES. AFTER STERILIZATION, THE SOLUTION SHALL BE FLUSHED FROM THE SYSTEM WITH CLEAN WATER UNTIL THE RESIDUAL CHLORINE CONTENT IS NOT GREATER THAN 0.2 PARTS PER MILLION UNLESS DIRECTED OTHERWISE. TEST SYSTEM HYDROSTATICALLY AT 100 PSIG MINIMUM FOR A PERIOD OF 24 HOURS WITH A PRESSURE LOSS NOT TO EXCEED 1 PSIG. 2. SANITARY DRAINAGE SYSTEM - SHALL BE WATER TESTED BEFORE FINAL SANITARY DRAINAGE SYSTEM - SHALL BE WATER TESTED BEFORE FINAL CONNECTION TO THE SANITARY SEWER. ALL OPENINGS SHALL BE PLUGGED EXCEPT THE HIGHEST OPENING WHICH SHALL PRODUCE A MINIMUM OF A 10 FOOT HEAD. THE SYSTEM SHALL RETAIN THE WATER LEVEL FOR AT LEAST 15 MINUTES AT WHICH TIME ALL JOINTS SHALL BE INSPECTED AND ALL OBSERVED LEAKS CORRECTED. 3. FINAL INSPECTION - BEFORE FINAL INSPECTION, CERTIFY IN WRITING THAT ALL FINAL INSPECTION - BEFORE FINAL INSPECTION, CERTIFY IN WRITING THAT ALL SYSTEMS ARE INSTALLED, ADJUSTED, TESTED AND READY FOR USE.
AutoCAD SHX Text
%%UOTHER
AutoCAD SHX Text
1. GUARANTEE - ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED GUARANTEE - ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED OR FIELD ERECTED BY THE CONTRACTOR. ALL FACTORY-ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLING MANUFACTURER'S GUARANTEED EQUIPMENT. THIS PERSONAL GUARANTEE SHALL EXIST FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK AND SHALL APPLY TO DEFECTS IN MATERIAL AND TO DEFECTIVE WORKMANSHIP OF ANY KIND. 2. FACTORY ASSEMBLED EQUIPMENT AND DEVICES - FOR SUCH ITEMS IN WHICH FACTORY ASSEMBLED EQUIPMENT AND DEVICES - FOR SUCH ITEMS IN WHICH THE MANUFACTURER FURNISHES A GUARANTEE, AS STANDARD TRADE PRACTICE, OBTAIN SUCH GUARANTEES AND REPLACE ANY SUCH EQUIPMENT WHICH PROVES DEFECTIVE DURING THE LIFE OF THESE GUARANTEES. 3. GUARANTEE ASSURANCE - IN THE EVENT OF FAILURE OF ANY WORK, GUARANTEE ASSURANCE - IN THE EVENT OF FAILURE OF ANY WORK, EQUIPMENT OR DEVICE DURING THE LIFE OF THE GUARANTEE, REPAIR, REPLACE OR RESTORE AT NO COST TO THE OWNER, ANY PARTS OF THE STRUCTURE OR BUILDING WHICH MAY BE DAMAGED EITHER AS THE DIRECT RESULT OF THE DEFECTIVE WORK OR AS A RESULT OF THE CONTRACTOR REPLACING THE DEFECTIVE WORK OR MATERIAL. THIS WORK SHALL BE PERFORMED AT A TIME AND IN A MANNER ACCEPTABLE TO THE OWNER.
AutoCAD SHX Text
END OF DEMOLITION
AutoCAD SHX Text
EXISTING ITEMS TO BE DEMOLISHED
AutoCAD SHX Text
CONNECTION BETWEEN NEW AND EXISTING
AutoCAD SHX Text
PHOTO INDICATOR
AutoCAD SHX Text
PD901
AutoCAD SHX Text A1
AutoCAD SHX Text
FE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AV
AutoCAD SHX Text
MV
AutoCAD SHX Text
DIRECTION OF PIPE PITCH (DOWN)
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text
REDUCER OR INCREASER
AutoCAD SHX Text
ECCENTRIC REDUCER
AutoCAD SHX Text
TOP CONNECTION, 45° OR 90°
AutoCAD SHX Text
BOTTOM CONNECTION, 45° OR 90°
AutoCAD SHX Text
SIDE CONNECTION
AutoCAD SHX Text
CAPPED OUTLET
AutoCAD SHX Text
RISE OR DROP IN PIPE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
PIPE UP
AutoCAD SHX Text
PIPE DOWN
AutoCAD SHX Text
INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES SEE DETAIL
AutoCAD SHX Text
FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES SEE DETAIL
AutoCAD SHX Text
THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES SEE DETAIL
AutoCAD SHX Text
THERMOMETER
AutoCAD SHX Text
PRESSURE GAGE
AutoCAD SHX Text
FLOW ELEMENT
AutoCAD SHX Text
REFRIGERANT SIGHT GLASS
AutoCAD SHX Text
TEST PLUG (PRESSURE/TEMPERATURE)
AutoCAD SHX Text
AUTOMATIC AIR VENT
AutoCAD SHX Text
MANUAL AIR VENT
AutoCAD SHX Text
QUICK-COUPLE HOSE CONNECTOR
AutoCAD SHX Text
* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY STANDARD PRACTICE SP-58
AutoCAD SHX Text
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
AutoCAD SHX Text
HIGH PRESSURE STEAM CONDENSATE RETURN
AutoCAD SHX Text
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
AutoCAD SHX Text
MEDIUM PRESSURE STEAM CONDENSATE RETURN
AutoCAD SHX Text
LOW PRESSURE STEAM (15 PSIG AND BELOW)
AutoCAD SHX Text
LOW PRESSURE STEAM CONDENSATE RETURN
AutoCAD SHX Text
CONDENSATE PUMP DISCHARGE
AutoCAD SHX Text
HOT WATER HEATING SUPPLY
AutoCAD SHX Text
HOT WATER HEATING RETURN
AutoCAD SHX Text
GLYCOL-WATER HEATING SUPPLY
AutoCAD SHX Text
GLYCOL-WATER HEATING RETURN
AutoCAD SHX Text
SOLAR WATER SUPPLY
AutoCAD SHX Text
SOLAR WATER RETURN
AutoCAD SHX Text
REFRIGERANT LIQUID
AutoCAD SHX Text
REFRIGERANT SUCTION
AutoCAD SHX Text
REFRIGERANT HOT GAS
AutoCAD SHX Text
CHILLED WATER SUPPLY (FROM TOWER)
AutoCAD SHX Text
CHILLED WATER RETURN (TO TOWER)
AutoCAD SHX Text
CHILLED GLYCOL-WATER SUPPLY
AutoCAD SHX Text
CHILLED GLYCOL-WATER RETURN
AutoCAD SHX Text
MAKE-UP WATER
AutoCAD SHX Text
DRAIN LINE
AutoCAD SHX Text
VENT LINE
AutoCAD SHX Text
GLYCOL-WATER RUN AROUND SUPPLY
AutoCAD SHX Text
GLYCOL-WATER RUN AROUND RETURN
AutoCAD SHX Text
EXISTING PIPE TO BE REMOVED
AutoCAD SHX Text
FEEDWATER PUMP DISCHARGE
AutoCAD SHX Text
FEEDWATER PUMP SUCTION
AutoCAD SHX Text
CONDENSATE TRANSFER PUMP DISCHARGE
AutoCAD SHX Text
CONDENSATE TRANSFER PUMP SUCTION
AutoCAD SHX Text
FLOOR-SUPPORTED PIPE STAND
AutoCAD SHX Text
RISER CLAMP (TYPE 42)*
AutoCAD SHX Text
WALL BRACKET (TYPE 31, 32, 33)*
AutoCAD SHX Text
CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*
AutoCAD SHX Text
SLIDING SUPPORTS (TYPE 35)*
AutoCAD SHX Text F FAHRENHEIT FAHRENHEIT FCO FLOOR CLEANOUT FLOOR CLEANOUT FCW FILTERED COLD WATER FILTERED COLD WATER FD FLOOR DRAIN FLOOR DRAIN FDC FIRE DEPARTMENT CONNECTION FIRE DEPARTMENT CONNECTION FM FLOW METER FLOW METER FOP FUEL OIL PUMP FUEL OIL PUMP FOR FUEL OIL RETURN FUEL OIL RETURN FOS FUEL OIL SUPPLY FUEL OIL SUPPLY FOV FUEL OIL VENT FUEL OIL VENT FS FLOOR SINK FLOOR SINK FS FLOW SWITCH FLOW SWITCH FU FIXTURE UNITS FIXTURE UNITS
AutoCAD SHX Text
(E) EXISTING ITEM TO REMAIN EXISTING ITEM TO REMAIN EL ELEVATION ELEVATION ELEVATION EMCS ENERGY MONOSERRAT AND ENERGY MONOSERRAT AND ENERGY MONOSERRAT AND CENTRAL SYSTEM EPA ENVIROMENTAL PROTECTION AGENCY ENVIROMENTAL PROTECTION AGENCY ENVIROMENTAL PROTECTION AGENCY EPACT ENERGY POLICY ACT ENERGY POLICY ACT ESC ESCUTCHEON ESCUTCHEON ESCUTCHEON ESH EMERGENCY SHOWER EMERGENCY SHOWER ET EXPANSION TANK EXPANSION TANK EWC ELECTRIC WATER COOLER ELECTRIC WATER COOLER EWC ELECTRIC WATER COOLER ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER ELECTRIC WATER HEATER EWS EYE WASH STATION EYE WASH STATION EX EXISTING EXISTING
AutoCAD SHX Text
(D) EXISTING ITEM TO BE DEMOLISHED EXISTING ITEM TO BE DEMOLISHED DCW DOMESTIC COLD WATER DOMESTIC COLD WATER DHW DOMESTIC HOT WATER DOMESTIC HOT WATER DHWR DOMESTIC HOT WATER RETURN DOMESTIC HOT WATER RETURN DHWR DOMESTIC WATER RETURN DOMESTIC WATER RETURN DHWS DOMESTIC HOT WATER SUPPLY DOMESTIC HOT WATER SUPPLY DI DEIONIZED WATER DEIONIZED WATER DN DOWN DOWN DOE DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY DS DOWNSPOUT DOWNSPOUT DW DISHWASHER DISHWASHER DWG DRAWING DRAWING DWH DOMESTIC WATER HEATER DOMESTIC WATER HEATER DWR DRINKING WATER RETURN DRINKING WATER RETURN DWS DRINKING WATER SUPPLY DRINKING WATER SUPPLY DWV DRAIN WASTE VENT DRAIN WASTE VENT
AutoCAD SHX Text C CELSIUS CELSIUS C/C CUT AND CAPPED PIPE CUT AND CAPPED PIPE CD CONDENSATE DRAIN CONDENSATE DRAIN CGA COMPRESSED GAS ASSOCIATION COMPRESSED GAS ASSOCIATION CI CAST IRON CAST IRON C/O CUT AND LEFT OPEN PIPE CUT AND LEFT OPEN PIPE CO CLEANOUT CLEANOUT CS CLINICAL SINK CLINICAL SINK CV CONTROL VALVE CONTROL VALVE CW COLD WATER COLD WATER
AutoCAD SHX Text BFP REDUCED PRESSURE BACKFLOW REDUCED PRESSURE BACKFLOW PREVENTER BHP BREAK HORSEPOWER BREAK HORSEPOWER BSP BLACK STEEL PIPE BLACK STEEL PIPE BT BATHTUB BATHTUB BTU BRITISH THERMAL UNIT BRITISH THERMAL UNIT BTU/HR BRITISH THERMAL UNIT PER HOUR BRITISH THERMAL UNIT PER HOUR
AutoCAD SHX Text A/E ARCHITECT/ENGINEER ARCHITECT/ENGINEER AD AREA DRAIN AREA DRAIN AFF ABOVE FINISH FLOOR ABOVE FINISH FLOOR AFG ABOVE FINISH GRADE ABOVE FINISH GRADE AG AIR GAP AIR GAP AP ACCESS PANEL ACCESS PANEL AS AUTOMATIC SPRINKLER AUTOMATIC SPRINKLER ASD ADJUSTABLE SPEED DRIVES ADJUSTABLE SPEED DRIVES ASD AUTOMATIC SPRINKLER DRAIN AUTOMATIC SPRINKLER DRAIN ASHRAE AMERICAN SOCIETY HEATING, AMERICAN SOCIETY HEATING, REFRIGERATION, AIR CONDITIONING ENGINEERS ASME AMERICAN SOCIETY OF MECHANICAL AMERICAN SOCIETY OF MECHANICAL ENGINEERS ASPE AMERICAN SOCIETY OF PLUMBING AMERICAN SOCIETY OF PLUMBING ENGINEERS ASR AUTOMATIC SPRINKLER RISER AUTOMATIC SPRINKLER RISER AV ACID VENT ACID VENT AW ACID WASTE ACID WASTE
AutoCAD SHX Text L/S LITER PER SECOND LITER PER SECOND LA LABORATORY AIR LABORATORY AIR LAV LAVATORY LAVATORY LBS/HR POUNDS PER HOUR POUNDS PER HOUR LCW LABORATORY COLD WATER LABORATORY COLD WATER LHW LABORATORY HOT WATER LABORATORY HOT WATER LNG LIQUID NATURAL GAS LIQUID NATURAL GAS LOX LIQUID OXYGEN LIQUID OXYGEN LV LABORATORY VACUUM LABORATORY VACUUM LW LOW WATER LOW WATER
AutoCAD SHX Text M METER METER MA MEDICAL AIR MEDICAL AIR MAV MANUAL AIR VENT MANUAL AIR VENT MBH 1000 BTUH 1000 BTUH MED MEDICAL MEDICAL MER MECHANICAL EQUIPMENT ROOM MECHANICAL EQUIPMENT ROOM MH MANHOLE MANHOLE MOU MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING MSB MOP SERVICE BASIN MOP SERVICE BASIN MV MEDICAL VACUUM MEDICAL VACUUM
AutoCAD SHX Text N2 NITROGEN NITROGEN N20 NITROUS OXIDE NITROUS OXIDE NC NORMALLY CLOSED NORMALLY CLOSED NG NATURAL GAS NATURAL GAS NIC NOT IN CONTRACT NOT IN CONTRACT NO NORMALLY OPEN NORMALLY OPEN NOM.A. NOMINAL NOMINAL NPW NON POTABLE WATER NON POTABLE WATER NTC NOT TO SCALE NOT TO SCALE
AutoCAD SHX Text O2 OXYGEN OXYGEN OC ON CENTER ON CENTER OD OUTSIDE DIAMETER OUTSIDE DIAMETER OFD OVERFLOW DRAIN OVERFLOW DRAIN OR OPERATING ROOM OPERATING ROOM OVFL OVERFLOWOVERFLOW
AutoCAD SHX Text
KW KILOWATT KILOWATT KWHR KILOWATT-HOUR KILOWATT-HOUR
AutoCAD SHX Text ICW INDUSTRIAL COLD WATER INDUSTRIAL COLD WATER INV INVERT INVERT IPC INTERNATIONAL PLUMBING CODE INTERNATIONAL PLUMBING CODE IRW IRRIGATION WATER IRRIGATION WATER IW INDIRECT WASTE INDIRECT WASTE IWH INSTANTANEOUS WATER HEATER INSTANTANEOUS WATER HEATER IWR INDUSTRIAL WATER RETURN INDUSTRIAL WATER RETURN IWS INDUSTRIAL WATER SUPPLY INDUSTRIAL WATER SUPPLY
AutoCAD SHX Text H&CW HOT AND COLD WATER HOT AND COLD WATER HB HOSE BIBB HOSE BIBB HD HUB DRAIN HUB DRAIN HEX HEAT EXCHANGER HEAT EXCHANGER HP HORSEPOWER HORSEPOWER HS HAND SINK HAND SINK HST HOT WATER STORAGE TANK (DOMESTIC) HOT WATER STORAGE TANK (DOMESTIC) HWB HOT WATER BOILER HOT WATER BOILER HWCP HOT WATER CIRCULATING PUMP HOT WATER CIRCULATING PUMP HWP HOT WATER PUMP HOT WATER PUMP HWR HOT WATER RETURN HOT WATER RETURN HWS HOT WATER SUPPLY HOT WATER SUPPLY HYD HYDRANT HYDRANT
AutoCAD SHX Text GAL GALLON GALLON GCO GRADE CLEANOUTS GRADE CLEANOUTS GPD GALLONS PER DAY GALLONS PER DAY GPH GALLONS PER HOUR GALLONS PER HOUR GPM GALLONS PER MINUTE GALLONS PER MINUTE GPR GAS PRESSURE REGULATOR GAS PRESSURE REGULATOR GRS GAS REGULATOR STATION GAS REGULATOR STATION GT GREASE TRAP GREASE TRAP GVTR GAS VENT THROUGH ROOF GAS VENT THROUGH ROOF GWH GAS FIRED WATER HEATER GAS FIRED WATER HEATER
AutoCAD SHX Text PA PASCAL PASCAL PD PRESSURE DROP OR DIFFERENCE PRESSURE DROP OR DIFFERENCE PDI PLUMBING AND DRAINAGE PLUMBING AND DRAINAGE INSTITUTE PG PRESSURE GAGE PRESSURE GAGE PP PLUMBING PUMP PLUMBING PUMP PPM PARTS PER MILLION PARTS PER MILLION PRS PRESSURE REDUCING STATION PRESSURE REDUCING STATION PRV PRESSURE REDUCING VALVE PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH PSIA POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH ATMOSPHERE PSIG POUNDS PER SQUARE INCH GAUGE POUNDS PER SQUARE INCH GAUGE PTRV PRESSURE TEMPERATURE RELIEF PRESSURE TEMPERATURE RELIEF VALVE PW POTABLE WATERPOTABLE WATER
AutoCAD SHX Text RD ROOF DRAIN ROOF DRAIN RDL ROOF DRAIN LEADER ROOF DRAIN LEADER RL ROOF LEADER ROOF LEADER RO REVERSE OSMOSIS WATER REVERSE OSMOSIS WATER RWL RAIN WATER LEADERRAIN WATER LEADER
AutoCAD SHX Text SAN SANITARY SEWER SANITARY SEWER SMACNA SHEET METAL AND AIR SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SCFM STANDARD CUBIC FOOT/MINUTE STANDARD CUBIC FOOT/MINUTE SCW SOFTENED COLD WATER SOFTENED COLD WATER SDMH STORM DRAIN MANHOLE STORM DRAIN MANHOLE SP SUMP PUMP SUMP PUMP SPR SPRINKLER LINE SPRINKLER LINE SQFT SQUARE FEET SQUARE FEET SS STAINLESS STEEL STAINLESS STEEL ST STORAGE TANK STORAGE TANK SW STORM WATERSTORM WATER
AutoCAD SHX Text TCV TEMPERATURE CONTROL VALVE TEMPERATURE CONTROL VALVE TD TEMPERATURE DIFFERENCE TEMPERATURE DIFFERENCE TD TRENCH DRAIN TRENCH DRAIN TDH TOTAL DYNAMIC HEAD TOTAL DYNAMIC HEAD TEMP TEMPERATURE TEMPERATURE TMV THERMOSTATIC MIXING VALVE THERMOSTATIC MIXING VALVE TP TRAP PRIMER TRAP PRIMER TSTAT THERMOSTAT THERMOSTAT TWR TEMPERED WATER RETURN TEMPERED WATER RETURN TWS TEMPERED WATER SUPPLY TEMPERED WATER SUPPLY TYP TYPICALTYPICAL
AutoCAD SHX Text
UPC UNIFORM PLUMBING CODEUNIFORM PLUMBING CODE
AutoCAD SHX Text V VENT VENT VAC VACUUM VACUUM VB VACUUM BREAKER VACUUM BREAKER VCO VACUUM CLEANER OUTLET VACUUM CLEANER OUTLET VP VACUUM PUMP VACUUM PUMP VS VENT STACK VENT STACK VTR VENT THROUGH ROOFVENT THROUGH ROOF
AutoCAD SHX Text W WASTE WASTE WC WATER CLOSET WATER CLOSET WCO WALL CLEANOUT WALL CLEANOUT WG WATER GAGE WATER GAGE WH WALL HYDRANT WALL HYDRANT WH WATER HEATER WATER HEATER WHA WATER HAMMER ARRESTER WATER HAMMER ARRESTER WL WATER LINE WATER LINE WM WATER METER WATER METER WPD WATER PRESSURE DROP WATER PRESSURE DROP WS WASTE STACKWASTE STACK
AutoCAD SHX Text
YCO YARD CLEANOUT YARD CLEANOUT YH YARD HYDRANTYARD HYDRANT
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
%%U(NOT ALL SYMBOLS WILL APPLY TO THIS WORK)
AutoCAD SHX Text 7.P-001
AutoCAD SHX Text
PLUMBING ABBREVIATIONS, SYMBOLS AND GENERAL NOTES
AutoCAD SHX Text
JDM
AutoCAD SHX Text
XXXXXX
AutoCAD SHX Text
NEW PIPING EQUIPMENT INDICATOR
AutoCAD SHX Text
DH
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE BOILER BUILDING 7
AutoCAD SHX Text 657A4-17-905
AutoCAD SHX Text 07-30-2018
AutoCAD SHX Text
1500 N. WESTWOOD BLVD, POPLAR BLUFF, MO 63901
AutoCAD SHX Text
JOHN J. PERSHING VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
ZEOLITE (SOFT) WATER
AutoCAD SHX Text
ZW
AutoCAD SHX Text
INDUSTRIAL COLD WATER
AutoCAD SHX Text
ICW
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text Exp. 6-30-19
AutoCAD SHX Text No. M 35425
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text L.
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
(D)BOILER B-1
AutoCAD SHX Text
(D)BOILER B-2
AutoCAD SHX Text
(D)BOILER B-3
AutoCAD SHX Text
(E)TRENCH
AutoCAD SHX Text
(E)TRENCH
AutoCAD SHX Text
(E)BLOWDOWN ECONOMIZER
AutoCAD SHX Text
(E)BOILER BLOW OFF TANK
AutoCAD SHX Text
CONTROL ROOM
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
WATER STORAGE TANK
AutoCAD SHX Text
PIPE TUNNEL
AutoCAD SHX Text
ZW
AutoCAD SHX Text
ICW
AutoCAD SHX Text (E)1-1/2"
AutoCAD SHX Text
ICW
AutoCAD SHX Text
ICW
AutoCAD SHX Text
ICW
AutoCAD SHX Text
ICW
AutoCAD SHX Text
(D)ZW/ICW TO CONDENSATE STORAGE TANK
AutoCAD SHX Text
(E) BACKFLOW PREVENTER
AutoCAD SHX Text (E)3/4"
AutoCAD SHX Text (E)1/2"
AutoCAD SHX Text (E)3"
AutoCAD SHX Text (E)1"
AutoCAD SHX Text (E)3"
AutoCAD SHX Text (E)3"
AutoCAD SHX Text (E)3"
AutoCAD SHX Text (E)2-1/2"
AutoCAD SHX Text (E)1-1/2"
AutoCAD SHX Text
(E)1" DCW, 1" DCW WASTE, 3/4" DRAIN UP TO EX. AIR CONDITIONER
AutoCAD SHX Text (E)1"
AutoCAD SHX Text (E)3/4"
AutoCAD SHX Text (E)2"
AutoCAD SHX Text (E)1-1/2"
AutoCAD SHX Text
ZW
AutoCAD SHX Text
TO (E) RESERVOIR LEVEL CONTROLLER
AutoCAD SHX Text
(E) WATER WATER PUMPS
AutoCAD SHX Text
(E)PUMP DISCHARGE
AutoCAD SHX Text NOTES A. REFER TO DWG. 7.P-001 FOR PLUMBING ABBREVIATIONS, SYMBOLS, REFER TO DWG. 7.P-001 FOR PLUMBING ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES RELATED TO THIS SHEET. B. ALL EXISTING PIPING, DUCTWORK, SPRINKLERS, CONDUIT, LIGHTING ALL EXISTING PIPING, DUCTWORK, SPRINKLERS, CONDUIT, LIGHTING OR OTHER CONSTRUCTION SHALL BE RELOCATED AS REQUIRED FOR ALL DEMOLITION AND INSTALLATION WORK. C. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH 1.4 SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED. D. REFER TO 7.PP101 FOR PLUMBING PLAN, NEW WORK.REFER TO 7.PP101 FOR PLUMBING PLAN, NEW WORK.
AutoCAD SHX Text
7.PD101
AutoCAD SHX Text
JDM
AutoCAD SHX Text
PLUMBING PLAN EXISTING CONDITIONS AND DEMOLITION FIRST FLOOR
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/4'' = 1'-0''
AutoCAD SHX Text
FLOOR PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
DH
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE BOILER BUILDING 7
AutoCAD SHX Text 657A4-17-905
AutoCAD SHX Text 07-30-2018
AutoCAD SHX Text
1500 N. WESTWOOD BLVD, POPLAR BLUFF, MO 63901
AutoCAD SHX Text
JOHN J. PERSHING VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text KEY NOTES 1. EXISTING TRENCH COVER CONTAINS LEAD-BASED PAINT. EXISTING TRENCH COVER CONTAINS LEAD-BASED PAINT. 2. EXISTING CHEMICAL FEED SYSTEM TO BE RELOCATED (3 PLASTIC EXISTING CHEMICAL FEED SYSTEM TO BE RELOCATED (3 PLASTIC SUMPS); REFER TO 7.PP101 FOR ADDITIONAL INFORMATION. 3. REMOVE EXISTING CONNECTIONS OF ZW AND ICW TO CONDENSATE REMOVE EXISTING CONNECTIONS OF ZW AND ICW TO CONDENSATE RECEIVER BACK TO MAINS AND PREPARE FOR NEW CONNECTIONS. 4. EXISTING FUEL OIL PIPING AND PUMPS TO REMAIN. REMOVE EXISTING FUEL OIL PIPING AND PUMPS TO REMAIN. REMOVE CONNECTIONS TO EXISTING BOILERS AND PROVIDE FINAL CONNECTIONS TO NEW BOILERS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text Exp. 6-30-19
AutoCAD SHX Text No. M 35425
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text L.
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
BOILER B-101
AutoCAD SHX Text
BOILER B-102
AutoCAD SHX Text
BOILER B-103
AutoCAD SHX Text
(E)TRENCH
AutoCAD SHX Text
CONTROL ROOM
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
EQUIPMENT ROOM
AutoCAD SHX Text
WATER STORAGE TANK
AutoCAD SHX Text
PIPE TUNNEL
AutoCAD SHX Text
(E)TRENCH
AutoCAD SHX Text
(E)TRENCH
AutoCAD SHX Text
(E)BLOWDOWN ECONOMIZER
AutoCAD SHX Text
(E)BOILER BLOW OFF TANK
AutoCAD SHX Text
ICW
AutoCAD SHX Text (E)1-1/2"
AutoCAD SHX Text
ICW
AutoCAD SHX Text
ICW
AutoCAD SHX Text
ICW
AutoCAD SHX Text
(E) BACKFLOW PREVENTER
AutoCAD SHX Text (E)3/4"
AutoCAD SHX Text (E)1/2"
AutoCAD SHX Text (E)3"
AutoCAD SHX Text (E)1"
AutoCAD SHX Text (E)3"
AutoCAD SHX Text (E)3"
AutoCAD SHX Text (E)3"
AutoCAD SHX Text (E)2-1/2"
AutoCAD SHX Text (E)1-1/2"
AutoCAD SHX Text
(E)1" DCW, 1" DCW WASTE, 3/4" DRAIN UP TO EX. AIR CONDITIONER
AutoCAD SHX Text (E)1"
AutoCAD SHX Text (E)3/4"
AutoCAD SHX Text (E)2"
AutoCAD SHX Text (E)1-1/2"
AutoCAD SHX Text
ZW
AutoCAD SHX Text
TO (E) RESERVOIR LEVEL CONTROLLER
AutoCAD SHX Text
(E) WATER WATER PUMPS
AutoCAD SHX Text
(E)PUMP DISCHARGE
AutoCAD SHX Text
ICW
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
1-1/2" ZW&ICW UP
AutoCAD SHX Text
ZW
AutoCAD SHX Text
ICW
AutoCAD SHX Text KEY NOTES 1. PROVIDE NEW CONNECTIONS FROM EXISTING FUEL OIL SYSTEM TO PROVIDE NEW CONNECTIONS FROM EXISTING FUEL OIL SYSTEM TO NEW BOILERS. 2. REPLACE VINYL LINER IN CONCRETE WATER STORAGE TANK. REPLACE VINYL LINER IN CONCRETE WATER STORAGE TANK. 3. RELOCATE EXISTING CHEMICAL FEED SUMPS AS REQUIRED FOR RELOCATE EXISTING CHEMICAL FEED SUMPS AS REQUIRED FOR INSTALLATION OF NEW CONDENSATE RECEIVER; REFER TO MP SHEETS FOR ADDITIONAL INFORMATION. 4. NEW CONDENSATE STORAGE TANK. PROVIDE 1-1/2" ZW AND NEW CONDENSATE STORAGE TANK. PROVIDE 1-1/2" ZW AND 1-1/2" ICW CONNECTION TO TANK; REFER TO MP SHEETS FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text NOTES A. REFER TO DWG. 7.P-001 FOR PLUMBING ABBREVIATIONS, SYMBOLS, REFER TO DWG. 7.P-001 FOR PLUMBING ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES RELATED TO THIS SHEET. B. ALL EXISTING PIPING, DUCTWORK, SPRINKLERS, CONDUIT, LIGHTING ALL EXISTING PIPING, DUCTWORK, SPRINKLERS, CONDUIT, LIGHTING OR OTHER CONSTRUCTION SHALL BE RELOCATED AS REQUIRED FOR ALL DEMOLITION AND INSTALLATION WORK. C. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH 1.4 SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED. D. REFER TO 7.PD101 FOR PLUMBING PLAN, EXISTING CONDITIONS AND REFER TO 7.PD101 FOR PLUMBING PLAN, EXISTING CONDITIONS AND DEMOLITION.
AutoCAD SHX Text
7.PP101
AutoCAD SHX Text
JDM
AutoCAD SHX Text
PLUMBING PLAN NEW WORK FIRST FLOOR
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/4'' = 1'-0''
AutoCAD SHX Text
FLOOR PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
DH
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE BOILER BUILDING 7
AutoCAD SHX Text 657A4-17-905
AutoCAD SHX Text 07-30-2018
AutoCAD SHX Text
1500 N. WESTWOOD BLVD, POPLAR BLUFF, MO 63901
AutoCAD SHX Text
JOHN J. PERSHING VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text FUEL OIL PIPING NOTES 1. PUMPS HAVE BEEN SELECTED ASSUMING THAT MECHANICAL PUMPS HAVE BEEN SELECTED ASSUMING THAT MECHANICAL ATOMIZING BURNERS WILL BE PROVIDED WITH BOOSTER PUMPS. IF BOOSTER PUMPS ARE NOT PROVIDED, RESELECT PUMPS WITH REQUIRED PRESSURE. 2. FUEL OIL PIPING INSIDE BOILER PLANT IS SCHEDULE 40 ASTM A53 FUEL OIL PIPING INSIDE BOILER PLANT IS SCHEDULE 40 ASTM A53 GRADE B OR EQUIVALENT WITH SOCKET OR BUTT WELDED FITTINGS ONLY. WHERE PIPE THREADING IS REQUIRED (IE. AT VALVES, TANK CONNECTIONS), USE PTFE PIPE SEAL PASTE. 3. DOUBLE CONTAINMENT PIPING FROM UNDERGROUND SHALL DOUBLE CONTAINMENT PIPING FROM UNDERGROUND SHALL TERMINATE WITH END SEALS INSIDE BOILER PLANT. 4. PAINT PIPING PER SPECIFICATION SECTION 09 91 00.PAINT PIPING PER SPECIFICATION SECTION 09 91 00.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text Exp. 6-30-19
AutoCAD SHX Text No. M 35425
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text L.
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BOILER ROOM BELOW
AutoCAD SHX Text
AutoCAD SHX Text
SHOP BELOW
AutoCAD SHX Text
(E)T.O.G. ELEV 111'-10 1/2"
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
(E)T.O.G. ELEV 111'-10 1/2"
AutoCAD SHX Text
(E)T.O.G. ELEV 110'-0"
AutoCAD SHX Text
(E)T.O.G. ELEV 110'-0"
AutoCAD SHX Text
(E)T.O.G. ELEV 110'-0"
AutoCAD SHX Text
(E)T.O.G. ELEV 108'-9"
AutoCAD SHX Text
(E)T.O.G. ELEV 111'-10 1/2"
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
(E)T.O.G. ELEV 108'-9"
AutoCAD SHX Text
(E)T.O.G. ELEV 117'-1-1/2"
AutoCAD SHX Text
(E)T.O.G. ELEV 117'-1-1/2"
AutoCAD SHX Text
(E)T.O.G. ELEV 108'-9"
AutoCAD SHX Text
(E)T.O.G. ELEV 108'-9"
AutoCAD SHX Text
AutoCAD SHX Text
DEAERATOR ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
ZW&ICW DOWN
AutoCAD SHX Text
ZW
AutoCAD SHX Text
ICW
AutoCAD SHX Text
AutoCAD SHX Text
GENERATOR ROOM
AutoCAD SHX Text
(E)DAY TANK WITH FUEL OIL PUMPS SERVING GENERATOR TO REMAIN
AutoCAD SHX Text KEY NOTES 1. PROVIDE NEW ZW & ICW CONNECTION TO NEW DEAERATOR TANK PROVIDE NEW ZW & ICW CONNECTION TO NEW DEAERATOR TANK (DA-1); REFER TO MP SHEETS FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text NOTES A. REFER TO DWG. 7.P-001 FOR PLUMBING ABBREVIATIONS, SYMBOLS, REFER TO DWG. 7.P-001 FOR PLUMBING ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES RELATED TO THIS SHEET. B. ALL EXISTING PIPING, DUCTWORK, SPRINKLERS, CONDUIT, LIGHTING ALL EXISTING PIPING, DUCTWORK, SPRINKLERS, CONDUIT, LIGHTING OR OTHER CONSTRUCTION SHALL BE RELOCATED AS REQUIRED FOR ALL DEMOLITION AND INSTALLATION WORK. C. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY PARAGRAPH 1.4 SUBMITTALS. CONSTRUCTION WORK SHALL NOT START ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED.
AutoCAD SHX Text
7.PP102
AutoCAD SHX Text
JDM
AutoCAD SHX Text
PLUMBING PLAN NEW WORK UPPER LEVEL
AutoCAD SHX Text F1
AutoCAD SHX Text
SCALE 1/4'' = 1'-0''
AutoCAD SHX Text
FLOOR PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
DH
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE BOILER BUILDING 7
AutoCAD SHX Text 657A4-17-905
AutoCAD SHX Text 07-30-2018
AutoCAD SHX Text
1500 N. WESTWOOD BLVD, POPLAR BLUFF, MO 63901
AutoCAD SHX Text
JOHN J. PERSHING VA MEDICAL CENTER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text Exp. 6-30-19
AutoCAD SHX Text No. M 35425
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text L
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text L.
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
GENERAL NOTES:
AIR DISTRIBUTION DEVICE IDENTIFICATION
AIR FLOW
SA-A
(2)175-8Ø
SPEC. TYPE
PIPE LINE ACCESSORIES
WITH EQUIPMENT
COMPONENTS TO BE FURNISHED
NECK SIZE
DETAIL/SECTION TITLE
NUMBER = DETAIL DESIGNATOR
LETTER = SECTION DESIGNATOR
DETAIL
SECTION CUT SYMBOL
SECTION
DESIGNATOR
INDICATES PERSPECTIVE
AND LIMITS OF SECTION
DETAIL/ENLARGED CALLOUT SYMBOL
INDICATES
LIMITS OF
DETAIL/SECTION
DETAIL/SECTION
DESIGNATOR
DRAWING WHERE
DETAIL/SECTION IS TAKENDRAWING WHERE
SECTION IS DRAWN
DRAWING WHERE
DETAIL/SECTION IS
DRAWN
SYSTEM TYPE
QUANTITY
CONSTRUCTION INTERFACE
EXISTING
DEMOLITION
MECHANICAL ABBREVIATIONS
GATE VALVE
OS&Y
OUTSIDE SCREW & YOKE
BUTTERFLY VALVE
CHECK VALVE
3-WAY VALVE
BALL VALVE
PDV
PUMP DISCHARGE VALVE
BALANCING VALVE
RELIEF, SAFETY OR THERMAL RELIEF VALVE
CONTROL VALVE
M
MOTORIZED CONTROL VALVE
SUCTION DIFFUSER
AV
AUTOMATIC AIR VENT ASSEMBLY
MV MANUAL AIR VENT - SEE SPECIFICATIONS
FOR APPROPRIATE VALVE TYPE.
FLEX CONNECTION
THERMOMETER
BFP BACKFLOW PREVENTION ASSEMBLY
SELF CONTAINED PRESSURE
REDUCING (REGULATING) VALVE
PRESSURE GAUGE
Y-TYPE STRAINER
REMOVABLE CAP
REDUCER (CONCENTRIC)
REDUCER (ECCENTRIC)
UNION
BLIND FLANGE
TEST CONNECTION
M METER
PUMP
A
M-001
A
M-001
A
M-003
HOSE GATE VALVE DRAIN
GLOBE VALVE
ANGLE VALVE
PLUG VALVE
DBB
DOUBLE BLOCK &
BLEED PLUG VALVE
IF
INSULATING FLANGE
REMOVABLE PLUG
PIPE WITH HEAT TRACE
S STRAINER
DEMOLITION
EXISTING
NEW
EXISTING
STEAM TRAP
NEW
Architecture Engineering Design-Build paradigm 9400 Ward Parkway
Kansas City, MO 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
ISSUED FOR CONSTRUCTION
FULLY SPRINKLERED
REPLACE BOILER
BUILDING 7
657A4-17-905
1500 N. WESTWOOD BLVD, POPLAR BLUFF, MO 63901
JOHN J. PERSHING VA MEDICAL CENTER
Project Number
Building…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.