36C25518R0411-003.pdf
PDF 15 MB Posted
- Attached to
- Replace Operating Room 5 Equipment Project NO 589A4-17-113 Federal contract opportunity
- Solicitation number
- 36C25518R0411
About this file
36C25518R0411 Final Drawings - Vol.2 - 24 Pages.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25518C0181-000.docx | DOCX document | |
| 36C25518R0411-0001000.docx | DOCX document | |
| 36C25518R0411-0001001.pdf | ||
| 36C25518R0411-004.pdf | ||
| 36C25518R0411-001.docx | DOCX document | |
| 36C25518R0411-002.pdf | ||
| 36C25518R0411-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THESE DRAWINGS ARE INCLUDED FOR
INFORMATIONAL PURPOSES ONLY - REFER
TO FINAL PLANS PROVIDED BY EQUIPMENT
MANUFACTURER FOR CONSTRUCTION.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
1 OWNER REVIEW COMMENTS 4-13-2018
AS-606
EQUIPMENT INFORMATION (PHILIPS)
REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113
wbongartz
TO FINAL PLANS PROVIDED BY EQUIPMENT
MANUFACTURER FOR CONSTRUCTION.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
1 OWNER REVIEW COMMENTS 4-13-2018
AS-607
EQUIPMENT INFORMATION
(STRYKER)
TO FINAL PLANS PROVIDED BY EQUIPMENT
MANUFACTURER FOR CONSTRUCTION.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
1 OWNER REVIEW COMMENTS 4-13-2018
AS-608
EQUIPMENT INFORMATION
(STRYKER)
TO FINAL PLANS PROVIDED BY EQUIPMENT
MANUFACTURER FOR CONSTRUCTION.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
1 OWNER REVIEW COMMENTS 4-13-2018
AS-609
EQUIPMENT INFORMATION
(STRYKER)
OR
AA
OR
BB
4.7
6.1
HYBRID OR NO. 5
G103
CARDIAC O.R.
G102
EQUIP. CONTROL
G104
STERILE
G105
EQUIP.
G103A
CORRIDOR
G160
F P
F P
F P
F P
(EX) SPRINKLER HEAD
(EX) SPRINKLER HEAD
(EX) SPRINKLER HEAD
EXISTING TO REMAIN
REMODEL AREA
PLAN NOTES
1. EXISTING SIDEWALL SPRINKLER HEADS TO REMAIN.
2. EXISTING SPRINKLER HEADS TO BE REMOVED. NEW
SPRINKLER HEADS SHALL BE INSTALLED TO PROPERLY
PROVIDE LIGHT HAZARD COVERAGE TO OPERATING ROOM.
SPRINKLER HEADS SHALL BE QUICK-RESPONSE TYPE,
CEILING RECESSED PENDANTS. FIRE PROTECTION
CONTRACTOR TO COORDINATE PIPING AND SPRINKLER
HEAD LOCATIONS WITH ALL OTHER TRADES FOR CEILING
COORDINATION. REWORK CAUSED BY LACK OF
COORDINATION SHALL NOT BE AT OWNER'S EXPENSE.
X
GENERAL NOTES
1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING WORK. BRING ANY DISCREPANCIES FROM THE
DRAWINGS AND NOTES TO THE OWNER’S REPRESENTATIVE
IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY AN ADDITIONAL COST.
2. CONTRACTOR SHALL PROVIDE PROTECTIVE PLASTIC DROP
CLOTHS TO PROTECT THE EXISTING OCCUPIED AREAS AND
EQUIPMENT FROM DUST AND DEBRIS DURING THE
CONSTRUCTION WORK AND SHALL CLEAN THE AREAS OF ALL
CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE
WORK.
3. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED
WITH FLUID AND PROPERLY VENTED BY THIS CONTRACTOR,
ONCE NEW WORK HAS BEEN INSTALLED.
4. COORDINATE WITH THE OWNER THE REMOVAL AND
REPLACEMENT OF ALL EXISTING CEILINGS, WALL, ETC. AS
REQUIRED FOR DEMOLITION WORK.
5. ALL CUTTING AND CHANNELING OF EXISTING NON-
STRUCTURAL ELEMENTS SHALL BE ACCOMPLISHED IN A NEAT
AND WORKMANLIKE MANNER WITHOUT REMOVAL OF EXCESS
MATERIALS. THIS CONTRACTOR SHALL PATCH AND REPLACE
WITH MATERIAL SIMILAR TO ADJACENT CONSTRUCTION.
6. CUTTING OF STRUCTURAL MEMBERS IS NOT ALLOWED.
7. THIS CONTRACTOR SHALL GIVE FULL COOPERATION TO THE
OWNER IN THE SCHEDULING AND PROCEDURE OF WORK AND
SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGE FROM
FREEZING TO EXISTING SYSTEMS.
8. RELOCATE EXISTING DUCTWORK, PIPING, ELECTRICAL
CONDUITS, AND CABLING AS NECESSARY TO ACCOMPLISH
FINAL INSTALLATION AS SHOWN.
9. COORDINATE ROUTING OF PLUMBING AND HVAC PIPING WITH
DUCTWORK, LIGHTS, ARCHITECTURAL CEILING AND
STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP, JOG
OR OFFSET, AS REQUIRED TO AVOID CONFLICTS. DUCTWORK
SHALL TAKE PRECEDENCE OVER ALL PIPING, EXCEPT WHERE
GRADE MUST BE MAINTAINED FOR DRAINAGE.
10. ANY EXPENSES RISING FROM LACK OF COORDINATION SHALL
BE AT CONTRACTOR’S EXPENSE.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
C
U s e rs
\b e c k y .h e s s e \D o c u m e n ts
\1 -0
-M
A S
T E
R M
E C
H -R b e c k y .h e s s e p e c .c o m
.r v t
/9
/2
:3 :1
A
M
FP101
FIRE PROTECTION FLOOR PLANS
REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113
03/09/2018 BOH RMH
1/4" = 1'-0" A
FIRE PROTECTION - FIRST FLOOR
2' 4' 8'0'
1/4" = 1'-0"
N
SHEET LIST
FP101 FIRE PROTECTION FLOOR PLANS
CO
DRAWING SYMBOLS
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
GENERAL PLUMBING SYMBOLS
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
STRAINER
PIPE UP
PIPE DOWN
WALL CLEAN OUT
PLUMBING PIPING SYMBOLS
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
MEDICAL VACUUM
MEDICAL AIR
DOMESTIC HOT WATER CIRC., HOT WATER RETURN
STORM WATER
DRAIN
MA
MV MV MV
D D D
SD SD SD
SANITARY SEWER
OXYGENO2
PLUMBING VENT
PLUMBING VALVE SYMBOLS
BALL VALVE
BUTTERFLY VALVE
AUTOMATIC FLOW CONTROL VALVE
PLUMBING ABBREVIATIONS
WASTE
WATER CLOSET
WALL CLEANOUT
WATER HAMMER ARRESTER
WATER SUPPLY FIXTURE UNITS
VENT
VACUUM
VENT STACK
VENT THROUGH ROOF
TRENCH DRAIN
TEMPERATURE
THERMOSTATIC MIXING VALVE
TYPICAL
SANITARY SEWER
STAINLESS STEEL
ROOF DRAIN
ROOF LEADER
PLUMBING AND DRAINAGE INSTITUTE
POUNDS PER SQUARE INCH
OXYGEN
OUTSIDE DIAMETER
OVERFLOW DRAIN
NOT TO SCALE
MEDICAL AIR
MEDICAL
MEDICAL VACUUM
LAVATORY
POUNDS PER HOUR
INSIDE DIAMETER
INTERNATIONAL PLUMBING CODE
INDIRECT WASTE
HOT AND COLD WATER
HOSE BIBB
HUB DRAIN
HORSEPOWER
GAL
GPH
GPM
F
FD
FS
FU
EL
EWS
EX
CW
DFU
DN
DOE
DW
DWG
DWV
CI
CO
BFP
BTU
BTUH
ARCHITECT / ENGINEER
AREA DRAIN/ACCESS DOOR
ABOVE FINISH FLOOR
AIR GAP
ACCESS PANEL
AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AMERICAN SOCIETY OF PLUMBING
ENGINEERS
W
WC
WCO
WHA
WSFU
V
VAC
VS
VTR
TD
TEMP
TMV
TYP
SAN
SS
RD
RL
PDI
PSI
GALLON
GALLONS PER HOUR
GALLONS PER MINUTE
H&CW
HB
HD
HP
ID
IPC
IW
O2
OD
OFD
NTS
MA
MED
MV
LAV
LBS/HR
A/E
AD
AFF
AG
AP
ASHRAE
ASME
ASPE
REDUCED PRESSURE BACKFLOW
PREVENTER
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
CAST IRON
CLEANOUT
COLD WATER
DRAINAGE FIXTURE UNITS
DOWN
DEPARTMENT OF ENERGY
DISHWASHER
DRAWING
DRAIN WASTE VENT
ELEVATION
EYE WASH STATION
EXISTING
FAHRENHEIT
FLOOR DRAIN
FLOOR SINK
FIXTURE UNITS
CONTRACTING OFFICER'S REPRESENTATIVECOR
HW
HWC
DOMESTIC HOT WATER
DOMESTIC HOT WATER CIRC
CIRCUIT SETTER
HWCP DOMESTIC HOT WATER CIRCULATION PUMP
CONDENSATE DRAINCD
RAINLEADERRL
FLOOR CLEANOUT
FLOOR CLEANOUTFCO
HYD HYDRANT
WH WALL HYDRANT
ORL OVERFLOW RAIN LEADER
SW STORM WATER
OVERFLOW RAINLEADERORL
PLUMBING PIPING TO BE REMOVED
W
PL105
A
PL105
GENERAL NOTES
1. VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE
BEGINNING WORK. PLANS ARE SCHEMATIC IN NATURE.
LAYOUT IS BASED ON BEST AVAILABLE INFORMATION.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
AND DIMENSIONS.
2. NO PIPING, DUCTWORK, ETC. SHALL PENETRATE
STRUCTURAL MEMBERS.
3. PROVIDE MISCELLANEOUS CUTTING, PATCHING AND
REPAIRING OF FINISHES, ROOF, WALLS, ETC., AS REQUIRED
TO ACCOMMODATE THE NEW WORK.
4. G.C. IS TO PATCH ANY OPENINGS IN CORRIDORS REQUIRED
TO BE CONSTRUCTED TO LIMIT THE TRANSFER OF SMOKE
AND IN SMOKE BARRIERS AS REQUIRED TO MEET CODE
REQUIREMENTS. SEE ARCHITECTURAL DRAWINGS FOR
LOCATIONS.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
EXACT LOCATION, CONFIGURATION AND ROUTING OF
EXISTING SYSTEMS REQUIRED TO REMAIN IN OPERATION
DURING THE PROJECT TO PREVENT DAMAGE DURING
DEMOLITION AND PHASING.
6. REMOVE ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING
THAT IS NOT REQUIRED FOR A WORKING INSTALLATION.
7. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO
INSTALLATION.
8. ALL CUTTING AND PATCHING SHALL BE CLOSELY
COORDINATED WITH THE G.C.
9. COORDINATE ROUTING OF PLUMBING, AND HVAC PIPING
WITH DUCTWORK, LIGHTS, ARCHITECTURAL CEILING AND
STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP,
JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS.
DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING,
EXCEPT WHERE GRADE MUST BE MAINTAINED FOR
DRAINAGE. REWORK OF INSTALLED WORK TO RESOLVE
CONFLICTS RISING FROM LACK OF COORDINATION SHALL
NOT JUSTIFY AN INCREASE IN THE CONTRACT AMOUNT.
10. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES
SHALL BE FIRE STOPPED BY THE TRADE MAKING THE
PENETRATION. REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR REQUIREMENTS.
11. DO NOT ROUTE PIPING OR DUCTWORK OVER ELECTRICAL
PANELS OR EQUIPMENT. PIPING OR DUCTWORK SHALL NOT
BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM
ROOMS, OR ELEVATOR EQUIPMENT ROOMS UNLESS
SPECIFICALLY SERVING THAT ROOM. COORDINATE WITH E.C.
PROVIDE WATERTIGHT DRIP PAN WITH DRAIN TO NEAREST
APPROVED RECEPTOR WHERE REQUIRED.
12. COORDINATE SIZE AND LOCATION OF ACCESS DOORS IN
CONSTRUCTION REQUIRED FOR ACCESS TO MECHANICAL
EQUIPMENT WITH G.C.
13. ALL WORK IS TO CONFORM WITH APPLICABLE CODES AND
STANDARDS.
14. COORDINATE ACCESS TO EQUIPMENT AND VALVES
INSTALLED ABOVE 'HARD' CEILINGS AND IN MASONRY
CHASES WITH GENERAL CONTRACTOR. PROVIDE LOCKING
ACCESS DOORS FOR INSTALLATION BY CONTRACTOR AS
REQUIRED TO SERVICE CONCEALED DAMPERS, VALVES AND
EQUIPMENT.
15. THESE DRAWINGS ARE ACCOMPANIED BY SPECIFICATIONS.
REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
16. COMPLETE COORDINATION OF DRAWINGS SHALL BE
REQUIRED BY PARAGRAPH "SUBMITTALS" IN SPECIFICATION
SECTION 220511. CONSTRUCTION SHALL NOT START ON ANY
SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE BEEN
APPROVED BY VA.
17. THIS IS A LIFE SAFETY BUILDING WHICH MEANS IT SHALL
REMAIN REASONABLY OPERATIONAL IN THE CASE OF A
SEISMIC EVENT. THEREFORE ALL STATIONARY EQUIPMENT
ON THE FLOOR SHALL BE FIXED RIGIDLY TO THE
STRUCTURE. ALL HANGING PIPING SHALL BE BRACED TO THE
STRUCTURE. REFER TO SPECIFICATION SECTION 130541.
GENERAL DEMOLITION NOTES
1. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING
WORK. BRING ANY DISCREPANCIES FROM THE DRAWINGS
AND NOTES TO THE ARCHITECT IMMEDIATELY. MINOR
CHANGES IN THE SCOPE OF THE DEMOLITION WORK SHALL
NOT JUSTIFY AN ADDITIONAL COST.
2. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL
REQUIRE ISOLATING THE PIPING RISERS OR MAINS VIA
SHUT-OFF VALVES. INSTALL NEW ISOLATION VALVES
WHERE REQUIRED FOR COMPLETION OF WORK.
3. REMOVAL OF EXISTING PLUMBING FIXTURES AND
EQUIPMENT, ETC. WILL REQUIRE CAPPING AND SEALING
EXISTING MAINS OR BRANCHES AS NECESSARY AND
REQUIRED TO ALLOW THE REMAINING SYSTEMS TO FULLY
OPERATE WITHOUT DEGRADATION. CONTRACTOR SHALL
PROVIDE PROTECTIVE PLASTIC DROP CLOTHS TO PROTECT
THE EXISTING OCCUPIED AREAS AND EQUIPMENT FROM
DUST AND DEBRIS DURING THE CONSTRUCTION WORK, AND
SHALL CLEAN THE AREAS OF ALL CONSTRUCTION DIRT
DAILY, AND UPON COMPLETION OF THE WORK. REFER TO
GENERAL CONDITIONS AND DIVISION 1 SECTIONS IN THE
SPECIFICATIONS.
4. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED
WITH PROPER FLUID AND PROPERLY VENTED BY THIS
CONTRACTOR, ONCE NEW WORK HAS BEEN INSTALLED.
5. COORDINATE WITH GENERAL CONTRACTOR THE REMOVAL
AND REPLACEMENT OF ALL EXISTING CEILINGS, WALLS, ETC.
AS REQUIRED FOR MECHANICAL DEMOLITION WORK.
6. EXISTING PIPING AND EQUIPMENT, ETC., NOT TO BE
UTILIZED IN THE COMPLETED BUILDING SHALL BE
DISCONTINUED OR REMOVED AS REQUIRED. ALL ENDS OF
DISCONTINUED PIPING SHALL BE CAPPED IN THE NEAREST
WALL, CEILING OR FLOOR SO THAT THEY ARE COMPLETELY
CONCEALED. OPENINGS LEFT IN WALLS, CEILINGS, ETC.,
WHERE EQUIPMENT AND PIPE, ETC., ARE REMOVED AND
NOT REPLACED, SHALL BE PATCHED NEATLY WITH SIMILAR
MATERIAL TO ADJACENT CONSTRUCTION. REFER TO
DRAWINGS DELINEATING NEW WORK FOR ADDITIONAL
INFORMATION REGARDING SYSTEMS OR PORTIONS OF
SYSTEMS WHERE USE IS TO BE DISCONTINUED.
7. EXISTING PIPING, FIXTURES AND EQUIPMENT THAT ARE NOT
TO BE REUSED SHALL BE REMOVED AND SHALL REMAIN THE
PROPERTY OF THE OWNER IF THEY WISH TO RETAIN
OWNERSHIP OF SAME. IF NOT, EQUIPMENT SHALL BECOME
THE PROPERTY OF THIS CONTRACTOR AND SHALL BE
REMOVED FROM THE SITE AS SOON AS PRACTICAL AND
DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND
REGULATIONS.
8. ALL CUTTING AND CHANNELING OF EXISTING BUILDING
SHALL BE ACCOMPLISHED IN A NEAT AND WORKMANLIKE
MANNER WITHOUT REMOVAL OF EXCESS MATERIALS. THIS
CONTRACTOR SHALL PATCH AND REPLACE WITH MATERIAL
SIMILAR TO ADJACENT CONSTRUCTION.
9. WHERE EXISTING PIPING AND EQUIPMENT, ETC., THAT ARE
TO BE UTILIZED IN THE COMPLETED PROGRAM CONFLICT
WITH NEW CONSTRUCTION AND THE REQUIRED
DEMOLITION, THEY SHALL BE RELOCATED AND
RECONNECTED TO MAINTAIN THE DESIRED SERVICE.
10. PORTIONS OF EXISTING SYSTEMS MAY BE SHOWN FOR
CLARITY EVEN THOUGH IT MAY NOT BE NECESSARY TO
MODIFY OR REVISE THEM. ALL EXISTING SYSTEMS ARE
SHOWN BASED ON ORIGINAL OR REMODEL BUILDING
DRAWINGS. CONTRACTOR TO VERIFY ALL EXISTING
CONDITIONS.
11. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH
THE OWNER AND OCCUPANTS OF THIS BUILDING SO AS TO
PROVIDE THE LEAST AMOUNT OF DISRUPTION OF BUILDING
ACTIVITIES AS POSSIBLE.
12. ALL ACCESSIBLE ABANDONED PIPING AND DUCTWORK
SHALL BE REMOVED AND PROPERLY DISPOSED OF.
SEISMIC BRACING NOTES
SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS
BUILDING REQUIRE SEISMIC BRACING. IT IS THE
RESPONSIBILITY OF THIS CONTRACTOR AND THE GC TO
ENGAGE A SEISMIC DESIGN ENGINEER TO DETERMINE AND
DESIGN THE REQUIRED BRACING FOR EACH SYSTEM.
SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT
LIMITED TO, THE FOLLOWING:
1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE
PROTECTION SYSTEMS.
2. COMPONENTS WEIGHING MORE THAN 400 POUNDS.
3. COMPONENTS WITH A CENTER OF MASS GREATER
THAN 4 FEET ABOVE FLOOR LEVEL AND WEIGHING
MORE THAN 20 POUNDS. (E.G. TERMINAL UNITS).
4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5
POUNDS PER FOOT. (E.G. 12x12, 22 GAUGE, SHEET
STEEL DUCTWORK AND CHILLED, HEATING,
DOMESTIC HOT, AND DOMESTIC COLD WATER PIPING
LARGER THAN 1 1/2".
FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL
COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND
CONDUITS.
THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE
BRACED:
1. PLUMBING FIXTURES
THE CONTRACTOR SHALL PROVIDE ALL COMPONENT
SUBMITTALS WITH COMPONENT WEIGHTS TO SEISMIC DESIGN
ENGINEER FOR USE IN BRACING DESIGN.
BRACING SHALL BE DESIGNED TO MEET ASCE7 AND NFPA 13
BRACING REQUIREMENTS. REFER TO ASCE7 CHAPTER 13 FOR
MORE INFORMATION ON SYSTEMS REQUIRED TO BE BRACED.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
C
U s e rs
\b e c k y .h e s s e \D o c u m e n ts
\1 -0
-M
A S
T E
R M
E C
H -R b e c k y .h e s s e p e c .c o m
.r v t
/9
/2
:3 :4
A
M
PP001
PLUMBING COVER SHEET
REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113
03/09/2018 RMH SLL
SHEET LIST
PP001 PLUMBING COVER SHEET
PG101 MED GAS FLOOR PLANS
OR
BB
4.7
6.1
HYBRID OR NO. 5
G103
CARDIAC O.R.
G102
EQUIP. CONTROL
G104
STERILE
G105
EQUIP.
G103A
CORRIDOR
G160
N2O N2
O2
VAC
MA
N2O N2
VAC
MA
O2
WAGD
ZVB
(EX) N2 CONTROL
PANEL
(E)3/4" (E)1 1/4" (E)3/4" (E)1/2" (E)3/4"
OR
AA
OR
BB
4.7
6.1
HYBRID OR NO. 5
G103CARDIAC O.R.
G102
EQUIP. CONTROL
G104
STERILE
G105
EQUIP.
G103A
CORRIDOR
G160
N2O N2
O2
VAC
MA
N2O N2
VAC
MA
O2
WAGD
ZVB
(EX) N2 CONTROL PANEL
N
(E)3/4" (E)1/2" (E)3/4" (E)1 1/4" (E)3/4"
(E )3
/4
(E )3
/4
(E )1
/4
(E )1
(E
)3 /4
" (E )3
/4
WAGD
O2
MA
VAC
N2O N2
W A
G D
O
M A
V A
C N
2O
N2
1/ 2"
1/ 2"
1" 1/
2" 1/
2" 3/
4"
1/ 2"
1/ 2"
1" 1/
2"
1/ 2"
3/ 4"
EXISTING TO REMAIN
REMODEL AREA
GENERAL NOTES
1. VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE
BEGINNING WORK. PLANS ARE SCHEMATIC IN NATURE.
LAYOUT IS BASED ON BEST AVAILABLE INFORMATION.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
AND DIMENSIONS.
2. NO PIPING, DUCTWORK, ETC. SHALL PENETRATE
STRUCTURAL MEMBERS.
3. PROVIDE MISCELLANEOUS CUTTING, PATCHING AND
REPAIRING OF FINISHES, ROOF, WALLS, ETC., AS REQUIRED
TO ACCOMMODATE THE NEW WORK.
4. G.C. IS TO PATCH ANY OPENINGS IN CORRIDORS REQUIRED
TO BE CONSTRUCTED TO LIMIT THE TRANSFER OF SMOKE
AND IN SMOKE BARRIERS AS REQUIRED TO MEET CODE
REQUIREMENTS. SEE ARCHITECTURAL DRAWINGS FOR
LOCATIONS.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY
EXACT LOCATION, CONFIGURATION AND ROUTING OF
EXISTING SYSTEMS REQUIRED TO REMAIN IN OPERATION
DURING THE PROJECT TO PREVENT DAMAGE DURING
DEMOLITION AND PHASING.
6. REMOVE ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING
THAT IS NOT REQUIRED FOR A WORKING INSTALLATION.
7. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO
INSTALLATION.
8. ALL CUTTING AND PATCHING SHALL BE CLOSELY
COORDINATED WITH THE G.C.
9. COORDINATE ROUTING OF PLUMBING, AND HVAC PIPING
WITH DUCTWORK, LIGHTS, ARCHITECTURAL CEILING AND
STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP,
JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS.
DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING,
EXCEPT WHERE GRADE MUST BE MAINTAINED FOR
DRAINAGE. REWORK OF INSTALLED WORK TO RESOLVE
CONFLICTS RISING FROM LACK OF COORDINATION SHALL
NOT JUSTIFY AN INCREASE IN THE CONTRACT AMOUNT.
10. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES
SHALL BE FIRE STOPPED BY THE TRADE MAKING THE
PENETRATION. REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR REQUIREMENTS.
11. DO NOT ROUTE PIPING OR DUCTWORK OVER ELECTRICAL
PANELS OR EQUIPMENT. PIPING OR DUCTWORK SHALL NOT
BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM
ROOMS, OR ELEVATOR EQUIPMENT ROOMS UNLESS
SPECIFICALLY SERVING THAT ROOM. COORDINATE WITH E.C.
PROVIDE WATERTIGHT DRIP PAN WITH DRAIN TO NEAREST
APPROVED RECEPTOR WHERE REQUIRED.
12. COORDINATE SIZE AND LOCATION OF ACCESS DOORS IN
CONSTRUCTION REQUIRED FOR ACCESS TO MECHANICAL
EQUIPMENT WITH G.C.
13. ALL WORK IS TO CONFORM WITH APPLICABLE CODES AND
STANDARDS.
14. COORDINATE ACCESS TO EQUIPMENT AND VALVES
INSTALLED ABOVE 'HARD' CEILINGS AND IN MASONRY
CHASES WITH GENERAL CONTRACTOR. PROVIDE LOCKING
ACCESS DOORS FOR INSTALLATION BY CONTRACTOR AS
REQUIRED TO SERVICE CONCEALED DAMPERS, VALVES AND
EQUIPMENT.
15. THESE DRAWINGS ARE ACCOMPANIED BY SPECIFICATIONS.
REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
16. COMPLETE COORDINATION OF DRAWINGS SHALL BE
REQUIRED BY PARAGRAPH "SUBMITTALS" IN SPECIFICATION
SECTION 220511. CONSTRUCTION SHALL NOT START ON ANY
SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE BEEN
APPROVED BY VA.
17. THIS IS A LIFE SAFETY BUILDING WHICH MEANS IT SHALL
REMAIN REASONABLY OPERATIONAL IN THE CASE OF A
SEISMIC EVENT. THEREFORE ALL STATIONARY EQUIPMENT
ON THE FLOOR SHALL BE FIXED RIGIDLY TO THE
STRUCTURE. ALL HANGING PIPING SHALL BE BRACED TO THE
STRUCTURE. REFER TO SPECIFICATION SECTION 130541.
DEMO PLAN NOTES
1. REMOVE DASHED MEDICAL GAS PIPING BACK TO NORTH
WALL AND INSTALL CAP.
2. INSTALL CAP ON NITROGEN LINE.
X
PLAN NOTES
1. ANESTHESIA BOOM TO HAVE 2-OXYGEN (1/2"), 2-VACUUM
(1"), 1-MEDICAL AIR (1/2"), 1-NITROUS OXIDE (1/2"), 1-WAGD
(3/4"), AND 1-NITROGEN (1/2") CONNECTIONS FOR OUTLETS
ON BOOM. COORDINATE WITH BOOM EQUIPMENT
CONTRACTOR.
2. PERFUSION BOOM TO HAVE 2-OXYGEN (1/2"), 2-VACUUM
(1"), 2-MEDICAL AIR (1/2"), 1-NITROUS OXIDE (1/2"), 1-WAGD
(3/4"), AND 1-NITROGEN (1/2") CONNECTIONS FOR OUTLETS
ON BOOM. COORDINATE WITH BOOM EQUIPMENT
CONTRACTOR.
X
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
C
U s e rs
\b e c k y .h e s s e \D o c u m e n ts
\1 -0
-M
A S
T E
R M
E C
H -R b e c k y .h e s s e p e c .c o m
.r v t
/9
/2
:3 :3
A
M
PG101
MED GAS FLOOR PLANS
REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113
03/09/2018 RMH SLL
1/4" = 1'-0" A
MED GAS DEMOLITION PLAN - FIRST
FLOOR
1/4" = 1'-0" B
MED GAS PLAN - FIRST FLOOR
2' 4' 8'0'
1/4" = 1'-0"
2' 4' 8'0'
1/4" = 1'-0"
N N
GENERAL NOTES
1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE THE HARD
SUSPENDED CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION
OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET
INSIDE DIMENSIONS.
3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE
REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,
CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE
FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS.
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES
INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,
COILS, ETC.
5. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON
FLOOR PLANS ARE NECK SIZES.
6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS
FOR EXACT LOCATIONS OF CEILING DIFFUSERS,
REGISTERS, AND GRILLES.
7. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES LISTED
ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
8. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL
COORDINATION AND LAYOUT DRAWINGS PER
SPECIFICATIONS SECTION 230511, 1.4 (G). COORDINATION
SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.
CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION
DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND
COR.
SEISMIC BRACING NOTES
SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS
BUILDING REQUIRE SEISMIC BRACING. IT IS THE
RESPONSIBILITY OF THIS CONTRACTOR AND THE GC TO
ENGAGE A SEISMIC DESIGN ENGINEER TO DETERMINE AND
DESIGN THE REQUIRED BRACING FOR EACH SYSTEM.
SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT
LIMITED TO, THE FOLLOWING:
1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE
PROTECTION SYSTEMS.
2. COMPONENTS WEIGHING MORE THAN 400 POUNDS.
3. COMPONENTS WITH A CENTER OF MASS GREATER
THAN 4 FEET ABOVE FLOOR LEVEL AND WEIGHING
MORE THAN 20 POUNDS. (E.G. TERMINAL UNITS).
4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5
POUNDS PER FOOT. (E.G. 12x12, 22 GAUGE, SHEET
STEEL DUCTWORK AND CHILLED, HEATING,
DOMESTIC HOT, AND DOMESTIC COLD WATER PIPING
LARGER THAN 1 1/2".
FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL
COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND
CONDUITS.
THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE
BRACED:
1. PLUMBING FIXTURES
THE CONTRACTOR SHALL PROVIDE ALL COMPONENT
SUBMITTALS WITH COMPONENT WEIGHTS TO SEISMIC DESIGN
ENGINEER FOR USE IN BRACING DESIGN.
BRACING SHALL BE DESIGNED TO MEET ASCE7 AND NFPA 13
BRACING REQUIREMENTS. REFER TO ASCE7 CHAPTER 13 FOR
MORE INFORMATION ON SYSTEMS REQUIRED TO BE BRACED.
TEST AND BALANCE NOTES
THE TEST AND BALANCE SCOPE OF WORK IS AS FOLLOWS:
1. ALL SUPPLY AND RETURN GRILLES WITHIN PROJECT SPACE.
2. REBALANCE EXISTING TERMINAL UNIT TO PRE-
CONSTRUCTION AIRFLOW OF 2470 CFM.
NOTE: THIS LIST IS NOT INTENDED TO BE ALL INCLUSIVE. REFER
TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
C
U s e rs
\b e c k y .h e s s e \D o c u m e n ts
\1 -0
-M
A S
T E
R M
E C
H -R b e c k y .h e s s e p e c .c o m
.r v t
/9
/2
:3 :2
A
M
MM001
MECHANICAL COVER SHEET
REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113
03/09/2018 RMH SLL
SHEET LIST
MM001 MECHANICAL COVER SHEET
MM002 MECHANICAL COVER SHEET
MH101 MECHANICAL FLOOR PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
A/E ARCHITECT/ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASEBOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
ABBREVIATIONS
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
E EXISTING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVINIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
I/O INOUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF INLINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/h LITERS PER HOUR L/m LITERS PER MINUTE L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METER PER SECOND
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKEUP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAUGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH - ABSOLUTE
PSIG POUNDS PER SQUARE INCH - GAUGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
(R) RELOCATED
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION LINE
RTU ROOFTOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CORD INJURY
SCR SILICON CONTROLLER RECTIFIER
SCV STEAM CONDENSATE VENT
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION 1)
SD-2 SCHEMATIC DESIGN (SUBMISSION 2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOR
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, AND BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERAN'S HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM RETURN (STEAM CONDENSATE)
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMP
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOR MEASURING DEVICE
WG WATER GAUGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
C
U s e rs
\b e c k y .h e s s e \D o c u m e n ts
\1 -0
-M
A S
T E
R M
E C
H -R b e c k y .h e s s e p e c .c o m
.r v t
/9
/2
:3 :2
A
M
MM002
MECHANICAL COVER SHEET
REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113
03/09/2018 RMH SLL
DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
AIR TERMINAL SYMBOLS
FAN POWERED VARIABLE VOLUME
TERMINAL UNIT WITH HEATING COIL.
MB
DOUBLE DUCT MIXING BOX.
TERMINAL UNIT WITH REHEAT COIL
DUCTWORK SYMBOLS
LIMIT OF DEMOLITION
(WALL TYPE)
(WALL TYPE)
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SQUARE 1-WAY CEILING DIFFUSERS
DUCTWORK SYMBOLS
BACK DRAFT DAMPER
BDD
SECTION.)
FC
10x8
FLEXIBLE CONNECTION, EQUIPMENT,
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL
FIRE DAMPER
FD
VD
DUCT WITH SOUND LINING
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
VIBRATION, OR SEISMIC
DUCTWORK SYMBOLS
DUCT MOUNTED COIL
DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)
SUPPLY
RETURN45°
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
MANUAL SPLITTER DAMPER
45°
N
2 1
POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE
COMBINATION FIRE/SMOKE DAMPER
1/24 IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
STAINLESS STEEL DUCT
(ELECTRIC)
F/S DPR
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION(E)10x8
H4
H7
A w 6.3
OR
AA
OR
BB
4.7
6.1
HYBRID OR NO. 5
G103
CARDIAC O.R.
G102
EQUIP. CONTROL
G104
STERILE
G105
EQUIP.
G103A
CORRIDOR
G160
(EX)16x14
16"ø (EX)30x12
(EX)12"ø
(EX)16x14
20x18
(EX)-690
(EX)TU-AHU7-11R
(R)S60C
(TYP.6)
(R)S61C
(TYP.6)
(R)S62C
(R)S52C
(R)S57C
S51C
(R)S55C
(R)S51C
(R)S50C
(R)S53C
(R)S56C
S51C
(R)S57C
(E X
)2 6x
(EX)30x14 x1
816"ø
8" ø
16x14 x1
"ø
"ø x1
(R) EXHAUST GRILLE
26x820x10 x1
(E
X )2
6x
MH101
"ø
8x
8x
"ø
8x
8x
8x5
8x5
8x5
16x14 8x10 x1
8x
6"ø
6"ø
12x5
6"ø
6"ø
6"ø
8x5
8x5
6"ø
6" (TYP.6)1
T
(EX)-80
(EX)6x6
(E X
)2 6x
(EX)-805
(EX) MEDIUM VELOCITY TAP-
OFF SERVING EQUIPMENT
ROOM TO REMAIN
w 6.3
OR
AA
OR
BB
4.7
6.1
HYBRID OR NO. 5
G103
CARDIAC O.R.
G102
EQUIP. CONTROL
G104
STERILE
G105
EQUIP.
G103A
CORRIDOR
G160
(EX)16"ø
(EX)30x12
(E X
)2 6x
(EX)18x12
(EX)16x14
(E X)2
0x
(EX)20x16
(E X
)1 2" ø
(E X
)1 2x
(EX)12x5
(EX)8x5
(EX)6"ø(EX)12x10
(EX)6"ø
(EX)10x5
(EX)12x5
(EX)6"ø
(EX)8x5
(E X
)5 x5
(EX)12x5
(E X
)6 "ø
(E X
)8 "ø
(E X
)6 "ø
(E X
)6 "ø
(EX)6"ø
(EX)6"ø
(EX)6"ø (EX)6"ø(EX)6"ø
(EX)6"ø
(EX)26x8
(EX)26x8
(EX)26x8
(EX)12x10 (EX)16x14
(EX)16x14
(EX)16x14
(EX)16x14
(EX)-690
(EX)20x18
(EX)TU-AHU7-11R
2 (TYP.)
(E X
)3 0x
T
(EX)6x6
EXISTING TO REMAIN
REMODEL AREA
MECHANICAL GENERAL NOTES
1. FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO BEGINNING WORK. BRING ANY
DISCREPANCIES FROM THE DRAWINGS AND
NOTES TO THE OWNER’S REPRESENTATIVE
IMMEDIATELY. MINOR CHANGES IN THE
SCOPE OF THE DEMOLITION WORK SHALL
NOT JUSTIFY AN ADDITIONAL COST.
2. CONTRACTOR SHALL PROVIDE
PROTECTIVE PLASTIC DROP CLOTHS TO
PROTECT THE EXISTING OCCUPIED AREAS
AND EQUIPMENT FROM DUST AND DEBRIS
DURING THE CONSTRUCTION WORK AND
SHALL CLEAN THE AREAS OF ALL
CONSTRUCTION DIRT DAILY, AND UPON
COMPLETION OF THE WORK.
3. ALL DRAINED PIPING RISERS AND MAINS
SHALL BE REFILLED WITH FLUID AND
PROPERLY VENTED BY THIS CONTRACTOR,
ONCE NEW WORK HAS BEEN INSTALLED.
4. COORDINATE WITH THE OWNER THE
REMOVAL AND REPLACEMENT OF ALL
EXISTING CEILINGS, WALL, ETC. AS
REQUIRED FOR MECHANICAL DEMOLITION
WORK.
5. ALL CUTTING AND CHANNELING OF
EXISTING NON-STRUCTURAL ELEMENTS
SHALL BE ACCOMPLISHED IN A NEAT AND
WORKMANLIKE MANNER WITHOUT
REMOVAL OF EXCESS MATERIALS. THIS
CONTRACTOR SHALL PATCH AND REPLACE
WITH MATERIAL SIMILAR TO ADJACENT
CONSTRUCTION.
6. CUTTING OF STRUCTURAL MEMBERS IS
NOT ALLOWED.
7. THIS CONTRACTOR SHALL GIVE FULL
COOPERATION TO THE OWNER IN THE
SCHEDULING AND PROCEDURE OF WORK
AND SHALL TAKE EVERY PRECAUTION TO
PREVENT DAMAGE FROM FREEZING TO
EXISTING SYSTEMS.
8. RELOCATE EXISTING DUCTWORK, PIPING,
ELECTRICAL CONDUITS, AND CABLING AS
NECESSARY TO ACCOMPLISH FINAL
INSTALLATION AS SHOWN.
9. CAP ALL EXISTING DUCTWORK SHOWN TO
BE DISCONNECTED AND NOT RE-USED.
10. COORDINATE ROUTING OF PLUMBING AND
HVAC PIPING WITH DUCTWORK, LIGHTS,
ARCHITECTURAL CEILING AND
STRUCTURAL ELEMENTS. PIPING SHALL
RISE AND DROP, JOG OR OFFSET, AS
REQUIRED TO AVOID CONFLICTS.
DUCTWORK SHALL TAKE PRECEDENCE
OVER ALL PIPING, EXCEPT WHERE GRADE
MUST BE MAINTAINED FOR DRAINAGE.
11. ANY EXPENSES RISING FROM LACK OF
COORDINATION SHALL BE AT
CONTRACTOR’S EXPENSE. ALL DUCT AND
PIPE ELEVATIONS SHOWN IN PARENTHESIS
ARE BOTTOM OF DUCT OR PIPE UNLESS
INDICATED OTHERWISE ON PLANS.
12. ALL SUPPLY, RETURN, AND EXHAUST
BRANCHES TO GRILLES, REGISTERS, AND
DIFFUSERS SHALL HAVE A MANUAL
BALANCE DAMPER.
PLAN NOTES
1. REMOVE DASHED / SHADED DUCTWORK.
2. EXISTING DIFFUSERS TO BE REMOVED,
CLEANED, AND STORED FOR REUSE IN NEW
CONSTRUCTION. ANY DIFFUSERS NOT
REUSED IN THE PROJECT SHALL BE
RETURNED TO THE VA COR.
X
PLAN NOTES
1. CONTRACTOR TO TAKE PRE-
CONSTRUCTION READINGS ON EXHAUST
DIFFUSER. CONTRACTOR TO REBALANCE
DIFFUSER AT END OF CONSTRUCTION
BACK TO ORIGINAL AIRFLOW VALUE.
2. DIFFUSER LOCATED UNDERNEATH 16"
SUPPLY DUCT.
X
FIRST FLOOR - MP
0' - 0"
736'-0" FIRST FLOOR
736' - 0"
FIRST FLOOR
0' - 0"
SECOND FLOOR
16' - 0"
OR
AA
OR
BB
8x26
14x16
10x20
10x8
(EX)S56C
(EX)S53C
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
U
W ic h it a -F a c il\
\1
\0
\P
E C
\S e n t O u t\
-0
-0
F in a l
S e t\ M o d e ls
\1 -0
-M
A S
T E
R M
E C
H -R
.r v t
/9
/2
:0
:1
A
M
MH101
MECHANICAL FLOOR PLANS
REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113
03/09/2018 RMH SLL
1/4" = 1'-0" B
HVAC PLAN - FIRST FLOOR
1/4" = 1'-0"
A
HVAC DEMOLITION PLAN - FIRST FLOOR
NN
2' 4' 8'0'
1/4" = 1'-0"
2' 4' 8'0'
1/4" = 1'-0"
1/4" = 1'-0"
S WALL ELEVATION
2' 4' 8'0'
1/4" = 1'-0"
W
W1
W
W
R
R
2/3W
1/ 3W
W W
1/2W
1/ 3W
1/6W
R
W
1/2" 1/2" 1 1/2"
NTS
DUCTWORK SQUARE VANE ELBOWS
NOTE:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE REGARDLESS OF W
DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN
VANES AND A 3/4" [20mm] TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE TYPE.
NTS
EXHAUST OR RETURN BRANCH DUCTWORK
MAIN EXHAUST OR RETURN
PLAN VIEW
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [100mm] MIN.
BRANCH DUCT
VD
NTS
ROUND DUCT HANGERS
2500 [1133]
1320 [598]
420 [190]ONE 1 [25] x 18 GA STRAP36 [900]
TWO 1/2 [13] DIAM. RODS
TWO 3/8 [10] DIAM. RODS
ONE 1 [25] x 16 GA STRAP
84 [2100]
60 [1500]
50 [1250] 700 [317]
ONE 1 [25] x 22 GA STRAP
QUANTITY/SIZEMAX. DUCT DIAM.
26 [650]
HANGER STRAPS OR RODS
MAX. LOAD
LBS. [kg]
260 [119]
MAX.
144 [3600]
IN. [mm]
SPACING
IN. [mm] IN. [mm]
144 [3600]
144 [3600]
144 [3600]
144 [3600]
NOTE:
TABULATED DATA FROM SMACNA ALLOWS FOR
DUCT REINFORCING AND INSULATION, BUT NO
EXTERNAL LOAD.
BAND
OVER 50" [1250mm] DIAM.
HANGER RODS
BAND OF SAME SIZE
AS HANGER STRAP
LOAD RATED
FASTENERS
50" [1250mm] DIAM. & UNDER
NTS
FROM STRUCTURE
SAME AS DIFFUSER
INLET: 5'-0" MAX
FLEXIBLE DUCT SIZE
LENGTH.
12"
CEILING
SUPPORT SADDLE
VOLUME DAMPER W/
LOCKING QUADSADDLE
SHEET METAL
CONICAL OUTLET
BRANCH DUCT
FOR CHANGE OF
DIRECTION GREATER
USE RIGID ELBOWS
THAN 45°
[300mm]
FLEXIBLE AIR DUCT CONNECTOR
SEE SPECIFICATIONS FOR CLAMPS AND
SEALANT (TYP.)
TYPICAL DIFFUSER
OR REGISTER IN
LAY-IN CLG.
THERMAL INSULATION
SEE SPECIFICATIONS
NTS
DUCTWORK RADIUS ELBOWS
VANE
VANE
NOTE:
1.
2.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL SHORT RADIUS
ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED AND FASTENED AS
RECOMMENDED BY SMACNA.
R SHALL
EQUAL OR
BE
GREATER
THAN W.
R SHALL
EQUAL OR
BE
GREATER
THAN 1/3W.
R SHALL
EQUAL OR
BE
GREATER
THAN 1/6W.
STANDARD RADIUS OR LONG
RADIUS ELBOW
SHORT RADIUS ELBOW WITH
ONE VANE
SHORT RADIUS ELBOW WITH
TWO VANES
NTS
SECTION FOR ROUND/OVAL DUCT
HOUSING WELDED TO
DUCT SECTION
ROUND OR FLAT
OVAL DUCT
SECTION
COVER WITH HANDLE AND
CHAIN RETAINER
GASKETED AND PRESSURE
SEALED
ACCESS
AIR FLOW
AIR FLOW
NTS
NOTE:
NOT REQUIRED FOR AIR
TERMINAL UNITS.
EQUIPMENT WEIGHT 250 LBS.
[114KG] OR LESS
SEISMIC BRACING FOR LIGHT SUSPENDED
EQUIPMENT
FLOOR MOUNT EQUIPMENT RESTRAINED BY
RESILIENT PADS (TYPE DS)
FLOOR
EQUIPMENT BASE
ANCHOR BOLT
NEOPRENE WASHER &
SLEEVE
BONDED STEEL
PLATE
RESILIENT PAD
HANGER
ROD (TYP)
CROSS BRACING RODS ALL
FOUR SIDES
LOCK NUTS
(TYP)
CLAMP
SEISMIC BRACING FOR EQUIPMENT
NTS
VOLUME DAMPER DETAIL
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS
& ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [6mm]
CLEARANCE ALL
AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH
LOCKING QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND ROD PIN
DUCT
STIFFEN BLADE
AS REQUIRED
SIDE ELEVATION SECTION
NTS
SUPPLY DUCTWORK TAKE-OFFS
NOTES:
1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP UP TO 25% OF
THE MAIN DUCT CFM. THE BRANCH DUCT TAKE-OFF MAY BE USED FOR
UP TO 15% OF THE MAIN DUCT CFM ANYTIME AND UP TO 40% WHEN
THE MAIN DUCT VELOCITY IS 1000 FPM [5.1 M/S] OR LESS. THE AIR SPLIT
DUCT TAKE-OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE
USED AT ANYTIME.
AIR SPLIT DUCT TAKE-OFF PLAN VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
SUPPLY REGISTER TAKE-OFF PLAN
VIEW
AIR FLOW
A
IR
F
LO
W
SUPPLY REGISTER OR
BRANCH DUCT
TURNING VANES
MAIN SUPPLY
DUCT
SEE FLOOR PLAN FOR SPLIT
DIMENSION
PROVIDE
VOLUME DAMPER
PROVIDE VOLUME
DAMPER
ADJUSTABLE
METAL ROD OR
LINKAGE
TOP OF REGISTER
MAIN
SUPPLY
DUCT
VOLUME EXTRACTOR; ADJUSTABLE FROM FULLY
CLOSED POSITION TO CFM NOTED ON FLOOR PLANS
1/4 W OR 4" [100mm] MIN.
MAIN SUPPLY DUCT
AIR FLOW AIR FLOW AIR FLOW
AIR FLOW
A
IR
F
LO
W
NTS
FLEXIBLE DUCT CONNECTIONS
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION ON
FAN SIDE
WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON 12"
[300mm] CENTERS
RIVET ON 4" [100mm]
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEMALTERNATE
POSITION OF
BOLT 1 1/2" [40mm] POCKET
SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUTFLANGED
CONNECTION ON
FAN SIDE
WASHER
FLEXIBLE MATERIAL AS
SPECIFIED
SECTION "A-A"
"B" "B"
ACCESS PANEL AND DOOR DETAIL
NTS
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15ACCESS PANEL
ACCESS DOOR
CASING
GASKET
HANDLE INSIDE
FLEXIBLE
WASHER
FACTORY
FABRICATED
LATCH
SECTION "B-B"
INSULATION
DUCT
GASKET
INSULATION
INSULATION
"A"
"A"
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Columbia, Missouri
C
U s e rs
\b e c k y .h e s s e \D o c u m e n ts
\1 -0
-M
A S
T E
R M
E C
H -R b e c k y .h e s s e p e c .c o m
.r v t
/9
/2
:3 :1
A
M
M-501
MECHANICAL DETAILS
03/09/2018 RMH SLL
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
BAND
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE
1/2" [15mm] DIA.
HANGER RODS WITH
36" [900mm] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTES:
SEE SPECIFICATIONS FOR DETAILED
HANGER REQUIREMENTS 10. SEISMIC PROVISIONS REQUIRED - SEE SPECS
11. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED
GENERAL NOTES
1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE HARD SUSPENDED CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS
PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS.
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.
6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
8. WALL TYPE EXHAUST REGISTERS ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 7" ABOVE FINISHED FLOOR.
9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
-1312 14 -16 -
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 241814 16128 1064 532 2 1/21 1/21 1 1/4
[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]
--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
NTS
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB. [453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING…
This is the start of the file's text. The full file is on GovTribe.