36C25518R0411-003.pdf

PDF 15 MB Posted

Attached to
Replace Operating Room 5 Equipment Project NO 589A4-17-113 Federal contract opportunity
Solicitation number
36C25518R0411
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

36C25518R0411 Final Drawings - Vol.2 - 24 Pages.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Operating Room 5 Equipment Project NO 589A4-17-113, newest first.
File Type Posted
36C25518C0181-000.docx DOCX document
36C25518R0411-0001000.docx DOCX document
36C25518R0411-0001001.pdf PDF
36C25518R0411-004.pdf PDF
36C25518R0411-001.docx DOCX document
36C25518R0411-002.pdf PDF
36C25518R0411-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THESE DRAWINGS ARE INCLUDED FOR

INFORMATIONAL PURPOSES ONLY - REFER

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-606

EQUIPMENT INFORMATION (PHILIPS)

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

wbongartz

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-607

EQUIPMENT INFORMATION

(STRYKER)

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-608

EQUIPMENT INFORMATION

(STRYKER)

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-609

EQUIPMENT INFORMATION

(STRYKER)

OR

AA

OR

BB

4.7

6.1

HYBRID OR NO. 5

G103

CARDIAC O.R.

G102

EQUIP. CONTROL

G104

STERILE

G105

EQUIP.

G103A

CORRIDOR

G160

F P

F P

F P

F P

(EX) SPRINKLER HEAD

(EX) SPRINKLER HEAD

(EX) SPRINKLER HEAD

EXISTING TO REMAIN

REMODEL AREA

PLAN NOTES

1. EXISTING SIDEWALL SPRINKLER HEADS TO REMAIN.

2. EXISTING SPRINKLER HEADS TO BE REMOVED. NEW

SPRINKLER HEADS SHALL BE INSTALLED TO PROPERLY

PROVIDE LIGHT HAZARD COVERAGE TO OPERATING ROOM.

SPRINKLER HEADS SHALL BE QUICK-RESPONSE TYPE,

CEILING RECESSED PENDANTS. FIRE PROTECTION

CONTRACTOR TO COORDINATE PIPING AND SPRINKLER

HEAD LOCATIONS WITH ALL OTHER TRADES FOR CEILING

COORDINATION. REWORK CAUSED BY LACK OF

COORDINATION SHALL NOT BE AT OWNER'S EXPENSE.

X

GENERAL NOTES

1. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO

BEGINNING WORK. BRING ANY DISCREPANCIES FROM THE

DRAWINGS AND NOTES TO THE OWNER’S REPRESENTATIVE

IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE

DEMOLITION WORK SHALL NOT JUSTIFY AN ADDITIONAL COST.

2. CONTRACTOR SHALL PROVIDE PROTECTIVE PLASTIC DROP

CLOTHS TO PROTECT THE EXISTING OCCUPIED AREAS AND

EQUIPMENT FROM DUST AND DEBRIS DURING THE

CONSTRUCTION WORK AND SHALL CLEAN THE AREAS OF ALL

CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE

WORK.

3. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED

WITH FLUID AND PROPERLY VENTED BY THIS CONTRACTOR,

ONCE NEW WORK HAS BEEN INSTALLED.

4. COORDINATE WITH THE OWNER THE REMOVAL AND

REPLACEMENT OF ALL EXISTING CEILINGS, WALL, ETC. AS

REQUIRED FOR DEMOLITION WORK.

5. ALL CUTTING AND CHANNELING OF EXISTING NON-

STRUCTURAL ELEMENTS SHALL BE ACCOMPLISHED IN A NEAT

AND WORKMANLIKE MANNER WITHOUT REMOVAL OF EXCESS

MATERIALS. THIS CONTRACTOR SHALL PATCH AND REPLACE

WITH MATERIAL SIMILAR TO ADJACENT CONSTRUCTION.

6. CUTTING OF STRUCTURAL MEMBERS IS NOT ALLOWED.

7. THIS CONTRACTOR SHALL GIVE FULL COOPERATION TO THE

OWNER IN THE SCHEDULING AND PROCEDURE OF WORK AND

SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGE FROM

FREEZING TO EXISTING SYSTEMS.

8. RELOCATE EXISTING DUCTWORK, PIPING, ELECTRICAL

CONDUITS, AND CABLING AS NECESSARY TO ACCOMPLISH

FINAL INSTALLATION AS SHOWN.

9. COORDINATE ROUTING OF PLUMBING AND HVAC PIPING WITH

DUCTWORK, LIGHTS, ARCHITECTURAL CEILING AND

STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP, JOG

OR OFFSET, AS REQUIRED TO AVOID CONFLICTS. DUCTWORK

SHALL TAKE PRECEDENCE OVER ALL PIPING, EXCEPT WHERE

GRADE MUST BE MAINTAINED FOR DRAINAGE.

10. ANY EXPENSES RISING FROM LACK OF COORDINATION SHALL

BE AT CONTRACTOR’S EXPENSE.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

C

U s e rs

\b e c k y .h e s s e \D o c u m e n ts

\1 -0

-M

A S

T E

R M

E C

H -R b e c k y .h e s s e p e c .c o m

.r v t

/9

/2

:3 :1

A

M

FP101

FIRE PROTECTION FLOOR PLANS

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

03/09/2018 BOH RMH

1/4" = 1'-0" A

FIRE PROTECTION - FIRST FLOOR

2' 4' 8'0'

1/4" = 1'-0"

N

SHEET LIST

FP101 FIRE PROTECTION FLOOR PLANS

CO

DRAWING SYMBOLS

26-P 3

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

DRAWING NUMBER WHERE DRAWN

GENERAL PLUMBING SYMBOLS

LIMIT OF DEMOLITION

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

AND EXISTING WORK

POINT OF CONNECTION BETWEEN NEW

PRESSURE GAGE

THERMOMETER

STRAINER

PIPE UP

PIPE DOWN

WALL CLEAN OUT

PLUMBING PIPING SYMBOLS

DOMESTIC HOT WATER, HOT WATER

DOMESTIC COLD WATER, COLD WATER

MEDICAL VACUUM

MEDICAL AIR

DOMESTIC HOT WATER CIRC., HOT WATER RETURN

STORM WATER

DRAIN

MA

MV MV MV

D D D

SD SD SD

SANITARY SEWER

OXYGENO2

PLUMBING VENT

PLUMBING VALVE SYMBOLS

BALL VALVE

BUTTERFLY VALVE

AUTOMATIC FLOW CONTROL VALVE

PLUMBING ABBREVIATIONS

WASTE

WATER CLOSET

WALL CLEANOUT

WATER HAMMER ARRESTER

WATER SUPPLY FIXTURE UNITS

VENT

VACUUM

VENT STACK

VENT THROUGH ROOF

TRENCH DRAIN

TEMPERATURE

THERMOSTATIC MIXING VALVE

TYPICAL

SANITARY SEWER

STAINLESS STEEL

ROOF DRAIN

ROOF LEADER

PLUMBING AND DRAINAGE INSTITUTE

POUNDS PER SQUARE INCH

OXYGEN

OUTSIDE DIAMETER

OVERFLOW DRAIN

NOT TO SCALE

MEDICAL AIR

MEDICAL

MEDICAL VACUUM

LAVATORY

POUNDS PER HOUR

INSIDE DIAMETER

INTERNATIONAL PLUMBING CODE

INDIRECT WASTE

HOT AND COLD WATER

HOSE BIBB

HUB DRAIN

HORSEPOWER

GAL

GPH

GPM

F

FD

FS

FU

EL

EWS

EX

CW

DFU

DN

DOE

DW

DWG

DWV

CI

CO

BFP

BTU

BTUH

ARCHITECT / ENGINEER

AREA DRAIN/ACCESS DOOR

ABOVE FINISH FLOOR

AIR GAP

ACCESS PANEL

AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AIR CONDITIONING

ENGINEERS

AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AMERICAN SOCIETY OF PLUMBING

ENGINEERS

W

WC

WCO

WHA

WSFU

V

VAC

VS

VTR

TD

TEMP

TMV

TYP

SAN

SS

RD

RL

PDI

PSI

GALLON

GALLONS PER HOUR

GALLONS PER MINUTE

H&CW

HB

HD

HP

ID

IPC

IW

O2

OD

OFD

NTS

MA

MED

MV

LAV

LBS/HR

A/E

AD

AFF

AG

AP

ASHRAE

ASME

ASPE

REDUCED PRESSURE BACKFLOW

PREVENTER

BRITISH THERMAL UNIT

BRITISH THERMAL UNIT PER HOUR

CAST IRON

CLEANOUT

COLD WATER

DRAINAGE FIXTURE UNITS

DOWN

DEPARTMENT OF ENERGY

DISHWASHER

DRAWING

DRAIN WASTE VENT

ELEVATION

EYE WASH STATION

EXISTING

FAHRENHEIT

FLOOR DRAIN

FLOOR SINK

FIXTURE UNITS

CONTRACTING OFFICER'S REPRESENTATIVECOR

HW

HWC

DOMESTIC HOT WATER

DOMESTIC HOT WATER CIRC

CIRCUIT SETTER

HWCP DOMESTIC HOT WATER CIRCULATION PUMP

CONDENSATE DRAINCD

RAINLEADERRL

FLOOR CLEANOUT

FLOOR CLEANOUTFCO

HYD HYDRANT

WH WALL HYDRANT

ORL OVERFLOW RAIN LEADER

SW STORM WATER

OVERFLOW RAINLEADERORL

PLUMBING PIPING TO BE REMOVED

W

PL105

A

PL105

GENERAL NOTES

1. VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE

BEGINNING WORK. PLANS ARE SCHEMATIC IN NATURE.

LAYOUT IS BASED ON BEST AVAILABLE INFORMATION.

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

AND DIMENSIONS.

2. NO PIPING, DUCTWORK, ETC. SHALL PENETRATE

STRUCTURAL MEMBERS.

3. PROVIDE MISCELLANEOUS CUTTING, PATCHING AND

REPAIRING OF FINISHES, ROOF, WALLS, ETC., AS REQUIRED

TO ACCOMMODATE THE NEW WORK.

4. G.C. IS TO PATCH ANY OPENINGS IN CORRIDORS REQUIRED

TO BE CONSTRUCTED TO LIMIT THE TRANSFER OF SMOKE

AND IN SMOKE BARRIERS AS REQUIRED TO MEET CODE

REQUIREMENTS. SEE ARCHITECTURAL DRAWINGS FOR

LOCATIONS.

5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY

EXACT LOCATION, CONFIGURATION AND ROUTING OF

EXISTING SYSTEMS REQUIRED TO REMAIN IN OPERATION

DURING THE PROJECT TO PREVENT DAMAGE DURING

DEMOLITION AND PHASING.

6. REMOVE ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING

THAT IS NOT REQUIRED FOR A WORKING INSTALLATION.

7. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO

INSTALLATION.

8. ALL CUTTING AND PATCHING SHALL BE CLOSELY

COORDINATED WITH THE G.C.

9. COORDINATE ROUTING OF PLUMBING, AND HVAC PIPING

WITH DUCTWORK, LIGHTS, ARCHITECTURAL CEILING AND

STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP,

JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS.

DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING,

EXCEPT WHERE GRADE MUST BE MAINTAINED FOR

DRAINAGE. REWORK OF INSTALLED WORK TO RESOLVE

CONFLICTS RISING FROM LACK OF COORDINATION SHALL

NOT JUSTIFY AN INCREASE IN THE CONTRACT AMOUNT.

10. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES

SHALL BE FIRE STOPPED BY THE TRADE MAKING THE

PENETRATION. REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR REQUIREMENTS.

11. DO NOT ROUTE PIPING OR DUCTWORK OVER ELECTRICAL

PANELS OR EQUIPMENT. PIPING OR DUCTWORK SHALL NOT

BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM

ROOMS, OR ELEVATOR EQUIPMENT ROOMS UNLESS

SPECIFICALLY SERVING THAT ROOM. COORDINATE WITH E.C.

PROVIDE WATERTIGHT DRIP PAN WITH DRAIN TO NEAREST

APPROVED RECEPTOR WHERE REQUIRED.

12. COORDINATE SIZE AND LOCATION OF ACCESS DOORS IN

CONSTRUCTION REQUIRED FOR ACCESS TO MECHANICAL

EQUIPMENT WITH G.C.

13. ALL WORK IS TO CONFORM WITH APPLICABLE CODES AND

STANDARDS.

14. COORDINATE ACCESS TO EQUIPMENT AND VALVES

INSTALLED ABOVE 'HARD' CEILINGS AND IN MASONRY

CHASES WITH GENERAL CONTRACTOR. PROVIDE LOCKING

ACCESS DOORS FOR INSTALLATION BY CONTRACTOR AS

REQUIRED TO SERVICE CONCEALED DAMPERS, VALVES AND

EQUIPMENT.

15. THESE DRAWINGS ARE ACCOMPANIED BY SPECIFICATIONS.

REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

16. COMPLETE COORDINATION OF DRAWINGS SHALL BE

REQUIRED BY PARAGRAPH "SUBMITTALS" IN SPECIFICATION

SECTION 220511. CONSTRUCTION SHALL NOT START ON ANY

SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE BEEN

APPROVED BY VA.

17. THIS IS A LIFE SAFETY BUILDING WHICH MEANS IT SHALL

REMAIN REASONABLY OPERATIONAL IN THE CASE OF A

SEISMIC EVENT. THEREFORE ALL STATIONARY EQUIPMENT

ON THE FLOOR SHALL BE FIXED RIGIDLY TO THE

STRUCTURE. ALL HANGING PIPING SHALL BE BRACED TO THE

STRUCTURE. REFER TO SPECIFICATION SECTION 130541.

GENERAL DEMOLITION NOTES

1. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING

WORK. BRING ANY DISCREPANCIES FROM THE DRAWINGS

AND NOTES TO THE ARCHITECT IMMEDIATELY. MINOR

CHANGES IN THE SCOPE OF THE DEMOLITION WORK SHALL

NOT JUSTIFY AN ADDITIONAL COST.

2. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL

REQUIRE ISOLATING THE PIPING RISERS OR MAINS VIA

SHUT-OFF VALVES. INSTALL NEW ISOLATION VALVES

WHERE REQUIRED FOR COMPLETION OF WORK.

3. REMOVAL OF EXISTING PLUMBING FIXTURES AND

EQUIPMENT, ETC. WILL REQUIRE CAPPING AND SEALING

EXISTING MAINS OR BRANCHES AS NECESSARY AND

REQUIRED TO ALLOW THE REMAINING SYSTEMS TO FULLY

OPERATE WITHOUT DEGRADATION. CONTRACTOR SHALL

PROVIDE PROTECTIVE PLASTIC DROP CLOTHS TO PROTECT

THE EXISTING OCCUPIED AREAS AND EQUIPMENT FROM

DUST AND DEBRIS DURING THE CONSTRUCTION WORK, AND

SHALL CLEAN THE AREAS OF ALL CONSTRUCTION DIRT

DAILY, AND UPON COMPLETION OF THE WORK. REFER TO

GENERAL CONDITIONS AND DIVISION 1 SECTIONS IN THE

SPECIFICATIONS.

4. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED

WITH PROPER FLUID AND PROPERLY VENTED BY THIS

CONTRACTOR, ONCE NEW WORK HAS BEEN INSTALLED.

5. COORDINATE WITH GENERAL CONTRACTOR THE REMOVAL

AND REPLACEMENT OF ALL EXISTING CEILINGS, WALLS, ETC.

AS REQUIRED FOR MECHANICAL DEMOLITION WORK.

6. EXISTING PIPING AND EQUIPMENT, ETC., NOT TO BE

UTILIZED IN THE COMPLETED BUILDING SHALL BE

DISCONTINUED OR REMOVED AS REQUIRED. ALL ENDS OF

DISCONTINUED PIPING SHALL BE CAPPED IN THE NEAREST

WALL, CEILING OR FLOOR SO THAT THEY ARE COMPLETELY

CONCEALED. OPENINGS LEFT IN WALLS, CEILINGS, ETC.,

WHERE EQUIPMENT AND PIPE, ETC., ARE REMOVED AND

NOT REPLACED, SHALL BE PATCHED NEATLY WITH SIMILAR

MATERIAL TO ADJACENT CONSTRUCTION. REFER TO

DRAWINGS DELINEATING NEW WORK FOR ADDITIONAL

INFORMATION REGARDING SYSTEMS OR PORTIONS OF

SYSTEMS WHERE USE IS TO BE DISCONTINUED.

7. EXISTING PIPING, FIXTURES AND EQUIPMENT THAT ARE NOT

TO BE REUSED SHALL BE REMOVED AND SHALL REMAIN THE

PROPERTY OF THE OWNER IF THEY WISH TO RETAIN

OWNERSHIP OF SAME. IF NOT, EQUIPMENT SHALL BECOME

THE PROPERTY OF THIS CONTRACTOR AND SHALL BE

REMOVED FROM THE SITE AS SOON AS PRACTICAL AND

DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND

REGULATIONS.

8. ALL CUTTING AND CHANNELING OF EXISTING BUILDING

SHALL BE ACCOMPLISHED IN A NEAT AND WORKMANLIKE

MANNER WITHOUT REMOVAL OF EXCESS MATERIALS. THIS

CONTRACTOR SHALL PATCH AND REPLACE WITH MATERIAL

SIMILAR TO ADJACENT CONSTRUCTION.

9. WHERE EXISTING PIPING AND EQUIPMENT, ETC., THAT ARE

TO BE UTILIZED IN THE COMPLETED PROGRAM CONFLICT

WITH NEW CONSTRUCTION AND THE REQUIRED

DEMOLITION, THEY SHALL BE RELOCATED AND

RECONNECTED TO MAINTAIN THE DESIRED SERVICE.

10. PORTIONS OF EXISTING SYSTEMS MAY BE SHOWN FOR

CLARITY EVEN THOUGH IT MAY NOT BE NECESSARY TO

MODIFY OR REVISE THEM. ALL EXISTING SYSTEMS ARE

SHOWN BASED ON ORIGINAL OR REMODEL BUILDING

DRAWINGS. CONTRACTOR TO VERIFY ALL EXISTING

CONDITIONS.

11. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH

THE OWNER AND OCCUPANTS OF THIS BUILDING SO AS TO

PROVIDE THE LEAST AMOUNT OF DISRUPTION OF BUILDING

ACTIVITIES AS POSSIBLE.

12. ALL ACCESSIBLE ABANDONED PIPING AND DUCTWORK

SHALL BE REMOVED AND PROPERLY DISPOSED OF.

SEISMIC BRACING NOTES

SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS

BUILDING REQUIRE SEISMIC BRACING. IT IS THE

RESPONSIBILITY OF THIS CONTRACTOR AND THE GC TO

ENGAGE A SEISMIC DESIGN ENGINEER TO DETERMINE AND

DESIGN THE REQUIRED BRACING FOR EACH SYSTEM.

SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT

LIMITED TO, THE FOLLOWING:

1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE

PROTECTION SYSTEMS.

2. COMPONENTS WEIGHING MORE THAN 400 POUNDS.

3. COMPONENTS WITH A CENTER OF MASS GREATER

THAN 4 FEET ABOVE FLOOR LEVEL AND WEIGHING

MORE THAN 20 POUNDS. (E.G. TERMINAL UNITS).

4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5

POUNDS PER FOOT. (E.G. 12x12, 22 GAUGE, SHEET

STEEL DUCTWORK AND CHILLED, HEATING,

DOMESTIC HOT, AND DOMESTIC COLD WATER PIPING

LARGER THAN 1 1/2".

FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL

COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND

CONDUITS.

THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE

BRACED:

1. PLUMBING FIXTURES

THE CONTRACTOR SHALL PROVIDE ALL COMPONENT

SUBMITTALS WITH COMPONENT WEIGHTS TO SEISMIC DESIGN

ENGINEER FOR USE IN BRACING DESIGN.

BRACING SHALL BE DESIGNED TO MEET ASCE7 AND NFPA 13

BRACING REQUIREMENTS. REFER TO ASCE7 CHAPTER 13 FOR

MORE INFORMATION ON SYSTEMS REQUIRED TO BE BRACED.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

C

U s e rs

\b e c k y .h e s s e \D o c u m e n ts

\1 -0

-M

A S

T E

R M

E C

H -R b e c k y .h e s s e p e c .c o m

.r v t

/9

/2

:3 :4

A

M

PP001

PLUMBING COVER SHEET

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

03/09/2018 RMH SLL

SHEET LIST

PP001 PLUMBING COVER SHEET

PG101 MED GAS FLOOR PLANS

OR

BB

4.7

6.1

HYBRID OR NO. 5

G103

CARDIAC O.R.

G102

EQUIP. CONTROL

G104

STERILE

G105

EQUIP.

G103A

CORRIDOR

G160

N2O N2

O2

VAC

MA

N2O N2

VAC

MA

O2

WAGD

ZVB

(EX) N2 CONTROL

PANEL

(E)3/4" (E)1 1/4" (E)3/4" (E)1/2" (E)3/4"

OR

AA

OR

BB

4.7

6.1

HYBRID OR NO. 5

G103CARDIAC O.R.

G102

EQUIP. CONTROL

G104

STERILE

G105

EQUIP.

G103A

CORRIDOR

G160

N2O N2

O2

VAC

MA

N2O N2

VAC

MA

O2

WAGD

ZVB

(EX) N2 CONTROL PANEL

N

(E)3/4" (E)1/2" (E)3/4" (E)1 1/4" (E)3/4"

(E )3

/4

(E )3

/4

(E )1

/4

(E )1

(E

)3 /4

" (E )3

/4

WAGD

O2

MA

VAC

N2O N2

W A

G D

O

M A

V A

C N

2O

N2

1/ 2"

1/ 2"

1" 1/

2" 1/

2" 3/

4"

1/ 2"

1/ 2"

1" 1/

2"

1/ 2"

3/ 4"

EXISTING TO REMAIN

REMODEL AREA

GENERAL NOTES

1. VERIFY JOB SITE CONDITIONS AND DIMENSIONS BEFORE

BEGINNING WORK. PLANS ARE SCHEMATIC IN NATURE.

LAYOUT IS BASED ON BEST AVAILABLE INFORMATION.

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

AND DIMENSIONS.

2. NO PIPING, DUCTWORK, ETC. SHALL PENETRATE

STRUCTURAL MEMBERS.

3. PROVIDE MISCELLANEOUS CUTTING, PATCHING AND

REPAIRING OF FINISHES, ROOF, WALLS, ETC., AS REQUIRED

TO ACCOMMODATE THE NEW WORK.

4. G.C. IS TO PATCH ANY OPENINGS IN CORRIDORS REQUIRED

TO BE CONSTRUCTED TO LIMIT THE TRANSFER OF SMOKE

AND IN SMOKE BARRIERS AS REQUIRED TO MEET CODE

REQUIREMENTS. SEE ARCHITECTURAL DRAWINGS FOR

LOCATIONS.

5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY

EXACT LOCATION, CONFIGURATION AND ROUTING OF

EXISTING SYSTEMS REQUIRED TO REMAIN IN OPERATION

DURING THE PROJECT TO PREVENT DAMAGE DURING

DEMOLITION AND PHASING.

6. REMOVE ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING

THAT IS NOT REQUIRED FOR A WORKING INSTALLATION.

7. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO

INSTALLATION.

8. ALL CUTTING AND PATCHING SHALL BE CLOSELY

COORDINATED WITH THE G.C.

9. COORDINATE ROUTING OF PLUMBING, AND HVAC PIPING

WITH DUCTWORK, LIGHTS, ARCHITECTURAL CEILING AND

STRUCTURAL ELEMENTS. PIPING SHALL RISE AND DROP,

JOG OR OFFSET AS REQUIRED TO AVOID CONFLICTS.

DUCTWORK SHALL TAKE PRECEDENCE OVER ALL PIPING,

EXCEPT WHERE GRADE MUST BE MAINTAINED FOR

DRAINAGE. REWORK OF INSTALLED WORK TO RESOLVE

CONFLICTS RISING FROM LACK OF COORDINATION SHALL

NOT JUSTIFY AN INCREASE IN THE CONTRACT AMOUNT.

10. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES

SHALL BE FIRE STOPPED BY THE TRADE MAKING THE

PENETRATION. REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR REQUIREMENTS.

11. DO NOT ROUTE PIPING OR DUCTWORK OVER ELECTRICAL

PANELS OR EQUIPMENT. PIPING OR DUCTWORK SHALL NOT

BE ROUTED THROUGH ELECTRICAL ROOMS, TELECOM

ROOMS, OR ELEVATOR EQUIPMENT ROOMS UNLESS

SPECIFICALLY SERVING THAT ROOM. COORDINATE WITH E.C.

PROVIDE WATERTIGHT DRIP PAN WITH DRAIN TO NEAREST

APPROVED RECEPTOR WHERE REQUIRED.

12. COORDINATE SIZE AND LOCATION OF ACCESS DOORS IN

CONSTRUCTION REQUIRED FOR ACCESS TO MECHANICAL

EQUIPMENT WITH G.C.

13. ALL WORK IS TO CONFORM WITH APPLICABLE CODES AND

STANDARDS.

14. COORDINATE ACCESS TO EQUIPMENT AND VALVES

INSTALLED ABOVE 'HARD' CEILINGS AND IN MASONRY

CHASES WITH GENERAL CONTRACTOR. PROVIDE LOCKING

ACCESS DOORS FOR INSTALLATION BY CONTRACTOR AS

REQUIRED TO SERVICE CONCEALED DAMPERS, VALVES AND

EQUIPMENT.

15. THESE DRAWINGS ARE ACCOMPANIED BY SPECIFICATIONS.

REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

16. COMPLETE COORDINATION OF DRAWINGS SHALL BE

REQUIRED BY PARAGRAPH "SUBMITTALS" IN SPECIFICATION

SECTION 220511. CONSTRUCTION SHALL NOT START ON ANY

SYSTEM UNTIL THE COORDINATION DRAWINGS HAVE BEEN

APPROVED BY VA.

17. THIS IS A LIFE SAFETY BUILDING WHICH MEANS IT SHALL

REMAIN REASONABLY OPERATIONAL IN THE CASE OF A

SEISMIC EVENT. THEREFORE ALL STATIONARY EQUIPMENT

ON THE FLOOR SHALL BE FIXED RIGIDLY TO THE

STRUCTURE. ALL HANGING PIPING SHALL BE BRACED TO THE

STRUCTURE. REFER TO SPECIFICATION SECTION 130541.

DEMO PLAN NOTES

1. REMOVE DASHED MEDICAL GAS PIPING BACK TO NORTH

WALL AND INSTALL CAP.

2. INSTALL CAP ON NITROGEN LINE.

X

PLAN NOTES

1. ANESTHESIA BOOM TO HAVE 2-OXYGEN (1/2"), 2-VACUUM

(1"), 1-MEDICAL AIR (1/2"), 1-NITROUS OXIDE (1/2"), 1-WAGD

(3/4"), AND 1-NITROGEN (1/2") CONNECTIONS FOR OUTLETS

ON BOOM. COORDINATE WITH BOOM EQUIPMENT

CONTRACTOR.

2. PERFUSION BOOM TO HAVE 2-OXYGEN (1/2"), 2-VACUUM

(1"), 2-MEDICAL AIR (1/2"), 1-NITROUS OXIDE (1/2"), 1-WAGD

(3/4"), AND 1-NITROGEN (1/2") CONNECTIONS FOR OUTLETS

ON BOOM. COORDINATE WITH BOOM EQUIPMENT

CONTRACTOR.

X

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

C

U s e rs

\b e c k y .h e s s e \D o c u m e n ts

\1 -0

-M

A S

T E

R M

E C

H -R b e c k y .h e s s e p e c .c o m

.r v t

/9

/2

:3 :3

A

M

PG101

MED GAS FLOOR PLANS

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

03/09/2018 RMH SLL

1/4" = 1'-0" A

MED GAS DEMOLITION PLAN - FIRST

FLOOR

1/4" = 1'-0" B

MED GAS PLAN - FIRST FLOOR

2' 4' 8'0'

1/4" = 1'-0"

2' 4' 8'0'

1/4" = 1'-0"

N N

GENERAL NOTES

1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE HARD

SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION

OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET

INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE

REQUIRED FOR ALL VALVES, TRAPS, DAMPERS,

CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES

INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS,

COILS, ETC.

5. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON

FLOOR PLANS ARE NECK SIZES.

6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS

FOR EXACT LOCATIONS OF CEILING DIFFUSERS,

REGISTERS, AND GRILLES.

7. SEISMIC PROVISIONS - SEE SPECS. ALL PRESSURES LISTED

ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

8. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING FULL

COORDINATION AND LAYOUT DRAWINGS PER

SPECIFICATIONS SECTION 230511, 1.4 (G). COORDINATION

SHOULD BE COMPLETED WITH ALL TRADES INCLUDED.

CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION

DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER AND

COR.

SEISMIC BRACING NOTES

SOME MECHANICAL AND PLUMBING COMPONENTS OF THIS

BUILDING REQUIRE SEISMIC BRACING. IT IS THE

RESPONSIBILITY OF THIS CONTRACTOR AND THE GC TO

ENGAGE A SEISMIC DESIGN ENGINEER TO DETERMINE AND

DESIGN THE REQUIRED BRACING FOR EACH SYSTEM.

SYSTEMS REQUIRING BRACING INCLUDE, BUT ARE NOT

LIMITED TO, THE FOLLOWING:

1. ALL LIFE-SAFETY COMPONENTS INCLUDING FIRE

PROTECTION SYSTEMS.

2. COMPONENTS WEIGHING MORE THAN 400 POUNDS.

3. COMPONENTS WITH A CENTER OF MASS GREATER

THAN 4 FEET ABOVE FLOOR LEVEL AND WEIGHING

MORE THAN 20 POUNDS. (E.G. TERMINAL UNITS).

4. DISTRIBUTION SYSTEMS WEIGHING MORE THAN 5

POUNDS PER FOOT. (E.G. 12x12, 22 GAUGE, SHEET

STEEL DUCTWORK AND CHILLED, HEATING,

DOMESTIC HOT, AND DOMESTIC COLD WATER PIPING

LARGER THAN 1 1/2".

FLEXIBLE CONNECTIONS ARE REQUIRED BETWEEN ALL

COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND

CONDUITS.

THE FOLLOWING COMPONENTS ARE NOT REQUIRED TO BE

BRACED:

1. PLUMBING FIXTURES

THE CONTRACTOR SHALL PROVIDE ALL COMPONENT

SUBMITTALS WITH COMPONENT WEIGHTS TO SEISMIC DESIGN

ENGINEER FOR USE IN BRACING DESIGN.

BRACING SHALL BE DESIGNED TO MEET ASCE7 AND NFPA 13

BRACING REQUIREMENTS. REFER TO ASCE7 CHAPTER 13 FOR

MORE INFORMATION ON SYSTEMS REQUIRED TO BE BRACED.

TEST AND BALANCE NOTES

THE TEST AND BALANCE SCOPE OF WORK IS AS FOLLOWS:

1. ALL SUPPLY AND RETURN GRILLES WITHIN PROJECT SPACE.

2. REBALANCE EXISTING TERMINAL UNIT TO PRE-

CONSTRUCTION AIRFLOW OF 2470 CFM.

NOTE: THIS LIST IS NOT INTENDED TO BE ALL INCLUSIVE. REFER

TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

C

U s e rs

\b e c k y .h e s s e \D o c u m e n ts

\1 -0

-M

A S

T E

R M

E C

H -R b e c k y .h e s s e p e c .c o m

.r v t

/9

/2

:3 :2

A

M

MM001

MECHANICAL COVER SHEET

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

03/09/2018 RMH SLL

SHEET LIST

MM001 MECHANICAL COVER SHEET

MM002 MECHANICAL COVER SHEET

MH101 MECHANICAL FLOOR PLANS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

A/E ARCHITECT/ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASEBOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

ABBREVIATIONS

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

E EXISTING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVINIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INOUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF INLINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/h LITERS PER HOUR L/m LITERS PER MINUTE L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METER PER SECOND

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKEUP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAUGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH - ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAUGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

(R) RELOCATED

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION LINE

RTU ROOFTOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CORD INJURY

SCR SILICON CONTROLLER RECTIFIER

SCV STEAM CONDENSATE VENT

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION 1)

SD-2 SCHEMATIC DESIGN (SUBMISSION 2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOR

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE

TAB TESTING, ADJUSTING, AND BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERAN'S HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM RETURN (STEAM CONDENSATE)

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMP

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOR MEASURING DEVICE

WG WATER GAUGE

WPD WATER SIDE PRESSURE DROP

YR YEAR

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

C

U s e rs

\b e c k y .h e s s e \D o c u m e n ts

\1 -0

-M

A S

T E

R M

E C

H -R b e c k y .h e s s e p e c .c o m

.r v t

/9

/2

:3 :2

A

M

MM002

MECHANICAL COVER SHEET

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

03/09/2018 RMH SLL

DRAWING SYMBOLS

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

AIR TERMINAL SYMBOLS

FAN POWERED VARIABLE VOLUME

TERMINAL UNIT WITH HEATING COIL.

MB

DOUBLE DUCT MIXING BOX.

TERMINAL UNIT WITH REHEAT COIL

DUCTWORK SYMBOLS

LIMIT OF DEMOLITION

(WALL TYPE)

(WALL TYPE)

DN

DN

UP

UP

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SQUARE 1-WAY CEILING DIFFUSERS

DUCTWORK SYMBOLS

BACK DRAFT DAMPER

BDD

SECTION.)

FC

10x8

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

FIRE DAMPER

FD

VD

DUCT WITH SOUND LINING

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

VIBRATION, OR SEISMIC

DUCTWORK SYMBOLS

DUCT MOUNTED COIL

DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)

SUPPLY

RETURN45°

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

MANUAL SPLITTER DAMPER

45°

N

2 1

POINT OF CHANGE IN DUCT CONSTRUCTION BY

STATIC PRESSURE CLASS. THE NUMBER ASSIGNS

PRESSURE CLASS (IN. OF WATER) WHICH WILL

ACCOMMODATE MAXIMUM OPERATING PRESSURE

COMBINATION FIRE/SMOKE DAMPER

1/24 IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES

THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR

ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT

INDICATES NEGATIVE PRESSURE.

STAINLESS STEEL DUCT

(ELECTRIC)

F/S DPR

AUTOMATIC CONTROL DAMPER MODULATING

AUTOMATIC CONTROL DAMPER TWO POSITION(E)10x8

H4

H7

A w 6.3

OR

AA

OR

BB

4.7

6.1

HYBRID OR NO. 5

G103

CARDIAC O.R.

G102

EQUIP. CONTROL

G104

STERILE

G105

EQUIP.

G103A

CORRIDOR

G160

(EX)16x14

16"ø (EX)30x12

(EX)12"ø

(EX)16x14

20x18

(EX)-690

(EX)TU-AHU7-11R

(R)S60C

(TYP.6)

(R)S61C

(TYP.6)

(R)S62C

(R)S52C

(R)S57C

S51C

(R)S55C

(R)S51C

(R)S50C

(R)S53C

(R)S56C

S51C

(R)S57C

(E X

)2 6x

(EX)30x14 x1

816"ø

8" ø

16x14 x1

"ø

"ø x1

(R) EXHAUST GRILLE

26x820x10 x1

(E

X )2

6x

MH101

"ø

8x

8x

"ø

8x

8x

8x5

8x5

8x5

16x14 8x10 x1

8x

6"ø

6"ø

12x5

6"ø

6"ø

6"ø

8x5

8x5

6"ø

6" (TYP.6)1

T

(EX)-80

(EX)6x6

(E X

)2 6x

(EX)-805

(EX) MEDIUM VELOCITY TAP-

OFF SERVING EQUIPMENT

ROOM TO REMAIN

w 6.3

OR

AA

OR

BB

4.7

6.1

HYBRID OR NO. 5

G103

CARDIAC O.R.

G102

EQUIP. CONTROL

G104

STERILE

G105

EQUIP.

G103A

CORRIDOR

G160

(EX)16"ø

(EX)30x12

(E X

)2 6x

(EX)18x12

(EX)16x14

(E X)2

0x

(EX)20x16

(E X

)1 2" ø

(E X

)1 2x

(EX)12x5

(EX)8x5

(EX)6"ø(EX)12x10

(EX)6"ø

(EX)10x5

(EX)12x5

(EX)6"ø

(EX)8x5

(E X

)5 x5

(EX)12x5

(E X

)6 "ø

(E X

)8 "ø

(E X

)6 "ø

(E X

)6 "ø

(EX)6"ø

(EX)6"ø

(EX)6"ø (EX)6"ø(EX)6"ø

(EX)6"ø

(EX)26x8

(EX)26x8

(EX)26x8

(EX)12x10 (EX)16x14

(EX)16x14

(EX)16x14

(EX)16x14

(EX)-690

(EX)20x18

(EX)TU-AHU7-11R

2 (TYP.)

(E X

)3 0x

T

(EX)6x6

EXISTING TO REMAIN

REMODEL AREA

MECHANICAL GENERAL NOTES

1. FIELD VERIFY ALL EXISTING CONDITIONS

PRIOR TO BEGINNING WORK. BRING ANY

DISCREPANCIES FROM THE DRAWINGS AND

NOTES TO THE OWNER’S REPRESENTATIVE

IMMEDIATELY. MINOR CHANGES IN THE

SCOPE OF THE DEMOLITION WORK SHALL

NOT JUSTIFY AN ADDITIONAL COST.

2. CONTRACTOR SHALL PROVIDE

PROTECTIVE PLASTIC DROP CLOTHS TO

PROTECT THE EXISTING OCCUPIED AREAS

AND EQUIPMENT FROM DUST AND DEBRIS

DURING THE CONSTRUCTION WORK AND

SHALL CLEAN THE AREAS OF ALL

CONSTRUCTION DIRT DAILY, AND UPON

COMPLETION OF THE WORK.

3. ALL DRAINED PIPING RISERS AND MAINS

SHALL BE REFILLED WITH FLUID AND

PROPERLY VENTED BY THIS CONTRACTOR,

ONCE NEW WORK HAS BEEN INSTALLED.

4. COORDINATE WITH THE OWNER THE

REMOVAL AND REPLACEMENT OF ALL

EXISTING CEILINGS, WALL, ETC. AS

REQUIRED FOR MECHANICAL DEMOLITION

WORK.

5. ALL CUTTING AND CHANNELING OF

EXISTING NON-STRUCTURAL ELEMENTS

SHALL BE ACCOMPLISHED IN A NEAT AND

WORKMANLIKE MANNER WITHOUT

REMOVAL OF EXCESS MATERIALS. THIS

CONTRACTOR SHALL PATCH AND REPLACE

WITH MATERIAL SIMILAR TO ADJACENT

CONSTRUCTION.

6. CUTTING OF STRUCTURAL MEMBERS IS

NOT ALLOWED.

7. THIS CONTRACTOR SHALL GIVE FULL

COOPERATION TO THE OWNER IN THE

SCHEDULING AND PROCEDURE OF WORK

AND SHALL TAKE EVERY PRECAUTION TO

PREVENT DAMAGE FROM FREEZING TO

EXISTING SYSTEMS.

8. RELOCATE EXISTING DUCTWORK, PIPING,

ELECTRICAL CONDUITS, AND CABLING AS

NECESSARY TO ACCOMPLISH FINAL

INSTALLATION AS SHOWN.

9. CAP ALL EXISTING DUCTWORK SHOWN TO

BE DISCONNECTED AND NOT RE-USED.

10. COORDINATE ROUTING OF PLUMBING AND

HVAC PIPING WITH DUCTWORK, LIGHTS,

ARCHITECTURAL CEILING AND

STRUCTURAL ELEMENTS. PIPING SHALL

RISE AND DROP, JOG OR OFFSET, AS

REQUIRED TO AVOID CONFLICTS.

DUCTWORK SHALL TAKE PRECEDENCE

OVER ALL PIPING, EXCEPT WHERE GRADE

MUST BE MAINTAINED FOR DRAINAGE.

11. ANY EXPENSES RISING FROM LACK OF

COORDINATION SHALL BE AT

CONTRACTOR’S EXPENSE. ALL DUCT AND

PIPE ELEVATIONS SHOWN IN PARENTHESIS

ARE BOTTOM OF DUCT OR PIPE UNLESS

INDICATED OTHERWISE ON PLANS.

12. ALL SUPPLY, RETURN, AND EXHAUST

BRANCHES TO GRILLES, REGISTERS, AND

DIFFUSERS SHALL HAVE A MANUAL

BALANCE DAMPER.

PLAN NOTES

1. REMOVE DASHED / SHADED DUCTWORK.

2. EXISTING DIFFUSERS TO BE REMOVED,

CLEANED, AND STORED FOR REUSE IN NEW

CONSTRUCTION. ANY DIFFUSERS NOT

REUSED IN THE PROJECT SHALL BE

RETURNED TO THE VA COR.

X

PLAN NOTES

1. CONTRACTOR TO TAKE PRE-

CONSTRUCTION READINGS ON EXHAUST

DIFFUSER. CONTRACTOR TO REBALANCE

DIFFUSER AT END OF CONSTRUCTION

BACK TO ORIGINAL AIRFLOW VALUE.

2. DIFFUSER LOCATED UNDERNEATH 16"

SUPPLY DUCT.

X

FIRST FLOOR - MP

0' - 0"

736'-0" FIRST FLOOR

736' - 0"

FIRST FLOOR

0' - 0"

SECOND FLOOR

16' - 0"

OR

AA

OR

BB

8x26

14x16

10x20

10x8

(EX)S56C

(EX)S53C

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

U

W ic h it a -F a c il\

\1

\0

\P

E C

\S e n t O u t\

-0

-0

F in a l

S e t\ M o d e ls

\1 -0

-M

A S

T E

R M

E C

H -R

.r v t

/9

/2

:0

:1

A

M

MH101

MECHANICAL FLOOR PLANS

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

03/09/2018 RMH SLL

1/4" = 1'-0" B

HVAC PLAN - FIRST FLOOR

1/4" = 1'-0"

A

HVAC DEMOLITION PLAN - FIRST FLOOR

NN

2' 4' 8'0'

1/4" = 1'-0"

2' 4' 8'0'

1/4" = 1'-0"

1/4" = 1'-0"

S WALL ELEVATION

2' 4' 8'0'

1/4" = 1'-0"

W

W1

W

W

R

R

2/3W

1/ 3W

W W

1/2W

1/ 3W

1/6W

R

W

1/2" 1/2" 1 1/2"

NTS

DUCTWORK SQUARE VANE ELBOWS

NOTE:

1.

2.

3.

4.

ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE REGARDLESS OF W

DIMENSION.

ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN

VANES AND A 3/4" [20mm] TRAILING EDGE.

WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE TYPE.

NTS

EXHAUST OR RETURN BRANCH DUCTWORK

MAIN EXHAUST OR RETURN

PLAN VIEW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4" [100mm] MIN.

BRANCH DUCT

VD

NTS

ROUND DUCT HANGERS

2500 [1133]

1320 [598]

420 [190]ONE 1 [25] x 18 GA STRAP36 [900]

TWO 1/2 [13] DIAM. RODS

TWO 3/8 [10] DIAM. RODS

ONE 1 [25] x 16 GA STRAP

84 [2100]

60 [1500]

50 [1250] 700 [317]

ONE 1 [25] x 22 GA STRAP

QUANTITY/SIZEMAX. DUCT DIAM.

26 [650]

HANGER STRAPS OR RODS

MAX. LOAD

LBS. [kg]

260 [119]

MAX.

144 [3600]

IN. [mm]

SPACING

IN. [mm] IN. [mm]

144 [3600]

144 [3600]

144 [3600]

144 [3600]

NOTE:

TABULATED DATA FROM SMACNA ALLOWS FOR

DUCT REINFORCING AND INSULATION, BUT NO

EXTERNAL LOAD.

BAND

OVER 50" [1250mm] DIAM.

HANGER RODS

BAND OF SAME SIZE

AS HANGER STRAP

LOAD RATED

FASTENERS

50" [1250mm] DIAM. & UNDER

NTS

FROM STRUCTURE

SAME AS DIFFUSER

INLET: 5'-0" MAX

FLEXIBLE DUCT SIZE

LENGTH.

12"

CEILING

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

BRANCH DUCT

FOR CHANGE OF

DIRECTION GREATER

USE RIGID ELBOWS

THAN 45°

[300mm]

FLEXIBLE AIR DUCT CONNECTOR

SEE SPECIFICATIONS FOR CLAMPS AND

SEALANT (TYP.)

TYPICAL DIFFUSER

OR REGISTER IN

LAY-IN CLG.

THERMAL INSULATION

SEE SPECIFICATIONS

NTS

DUCTWORK RADIUS ELBOWS

VANE

VANE

NOTE:

1.

2.

THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL SHORT RADIUS

ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED AND FASTENED AS

RECOMMENDED BY SMACNA.

R SHALL

EQUAL OR

BE

GREATER

THAN W.

R SHALL

EQUAL OR

BE

GREATER

THAN 1/3W.

R SHALL

EQUAL OR

BE

GREATER

THAN 1/6W.

STANDARD RADIUS OR LONG

RADIUS ELBOW

SHORT RADIUS ELBOW WITH

ONE VANE

SHORT RADIUS ELBOW WITH

TWO VANES

NTS

SECTION FOR ROUND/OVAL DUCT

HOUSING WELDED TO

DUCT SECTION

ROUND OR FLAT

OVAL DUCT

SECTION

COVER WITH HANDLE AND

CHAIN RETAINER

GASKETED AND PRESSURE

SEALED

ACCESS

AIR FLOW

AIR FLOW

NTS

NOTE:

NOT REQUIRED FOR AIR

TERMINAL UNITS.

EQUIPMENT WEIGHT 250 LBS.

[114KG] OR LESS

SEISMIC BRACING FOR LIGHT SUSPENDED

EQUIPMENT

FLOOR MOUNT EQUIPMENT RESTRAINED BY

RESILIENT PADS (TYPE DS)

FLOOR

EQUIPMENT BASE

ANCHOR BOLT

NEOPRENE WASHER &

SLEEVE

BONDED STEEL

PLATE

RESILIENT PAD

HANGER

ROD (TYP)

CROSS BRACING RODS ALL

FOUR SIDES

LOCK NUTS

(TYP)

CLAMP

SEISMIC BRACING FOR EQUIPMENT

NTS

VOLUME DAMPER DETAIL

NOTE:

1.

2.

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS

& ROUND DAMPERS.

INSULATION SEE

SPECIFICATION

DAMPER BLADE

1/8" [6mm]

CLEARANCE ALL

AROUND

OUTSIDE END BEARING

INSIDE END BEARING

HANDLE WITH

LOCKING QUADRANT

INSULATION

STAND-OFF

1/2" [15mm] ROUND ROD PIN

DUCT

STIFFEN BLADE

AS REQUIRED

SIDE ELEVATION SECTION

NTS

SUPPLY DUCTWORK TAKE-OFFS

NOTES:

1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP UP TO 25% OF

THE MAIN DUCT CFM. THE BRANCH DUCT TAKE-OFF MAY BE USED FOR

UP TO 15% OF THE MAIN DUCT CFM ANYTIME AND UP TO 40% WHEN

THE MAIN DUCT VELOCITY IS 1000 FPM [5.1 M/S] OR LESS. THE AIR SPLIT

DUCT TAKE-OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE

USED AT ANYTIME.

AIR SPLIT DUCT TAKE-OFF PLAN VIEW

BRANCH DUCT TAKE-OFF PLAN VIEW

SUPPLY REGISTER TAKE-OFF PLAN

VIEW

AIR FLOW

A

IR

F

LO

W

SUPPLY REGISTER OR

BRANCH DUCT

TURNING VANES

MAIN SUPPLY

DUCT

SEE FLOOR PLAN FOR SPLIT

DIMENSION

PROVIDE

VOLUME DAMPER

PROVIDE VOLUME

DAMPER

ADJUSTABLE

METAL ROD OR

LINKAGE

TOP OF REGISTER

MAIN

SUPPLY

DUCT

VOLUME EXTRACTOR; ADJUSTABLE FROM FULLY

CLOSED POSITION TO CFM NOTED ON FLOOR PLANS

1/4 W OR 4" [100mm] MIN.

MAIN SUPPLY DUCT

AIR FLOW AIR FLOW AIR FLOW

AIR FLOW

A

IR

F

LO

W

NTS

FLEXIBLE DUCT CONNECTIONS

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED CONNECTION ON

FAN SIDE

WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT

FLEXIBLE

MATERIAL AS

SPECIFIED

1"x1/8" [25x3mm] DRAW BAND

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

5/16" [8mm] FLANGE

DUCT

SHEET METAL SCREWS ON 12"

[300mm] CENTERS

RIVET ON 4" [100mm]

CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

1" [25mm] FLANGE & HEMALTERNATE

POSITION OF

BOLT 1 1/2" [40mm] POCKET

SLIP

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

[15mm] [15mm] [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUTFLANGED

CONNECTION ON

FAN SIDE

WASHER

FLEXIBLE MATERIAL AS

SPECIFIED

SECTION "A-A"

"B" "B"

ACCESS PANEL AND DOOR DETAIL

NTS

NOTES:

1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.

2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.

3. SEE SMACNA 2005, FIGURE 9-15ACCESS PANEL

ACCESS DOOR

CASING

GASKET

HANDLE INSIDE

FLEXIBLE

WASHER

FACTORY

FABRICATED

LATCH

SECTION "B-B"

INSULATION

DUCT

GASKET

INSULATION

INSULATION

"A"

"A"

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

C

U s e rs

\b e c k y .h e s s e \D o c u m e n ts

\1 -0

-M

A S

T E

R M

E C

H -R b e c k y .h e s s e p e c .c o m

.r v t

/9

/2

:3 :1

A

M

M-501

MECHANICAL DETAILS

03/09/2018 RMH SLL

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" [200mm] MIN.)

BAND

1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE

1/2" [15mm] DIA.

HANGER RODS WITH

36" [900mm] MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9

PSF MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

NOTES:

SEE SPECIFICATIONS FOR DETAILED

HANGER REQUIREMENTS 10. SEISMIC PROVISIONS REQUIRED - SEE SPECS

11. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED

GENERAL NOTES

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE HARD SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS

PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

8. WALL TYPE EXHAUST REGISTERS ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 7" ABOVE FINISHED FLOOR.

9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.

5 FT

THRU [20]

6 8 10

[32][25] [40]

[65]

[50]

[75]

-1312 14 -16 -

[125][100]

[150]

[250]

[200]

[300]

[400]

[350]

[450]

[600]

[500]

20 241814 16128 1064 532 2 1/21 1/21 1 1/4

[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]

--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]

THRU 3/4

[2100] [2100]

[2100]

[2700]

[2400]

NTS

SIDE VIEW TRAPEZE HANGER FOR UP TO

1000 LB. [453KG] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS

MAXIMUM PIPE/TUBING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.