36C25518R0411-002.pdf

PDF 18 MB Posted

Attached to
Replace Operating Room 5 Equipment Project NO 589A4-17-113 Federal contract opportunity
Solicitation number
36C25518R0411
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

36C25518R0411 Final Drawings - Vol.1 - 10 Pages.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Operating Room 5 Equipment Project NO 589A4-17-113, newest first.
File Type Posted
36C25518C0181-000.docx DOCX document
36C25518R0411-0001000.docx DOCX document
36C25518R0411-0001001.pdf PDF
36C25518R0411-003.pdf PDF
36C25518R0411-004.pdf PDF
36C25518R0411-001.docx DOCX document
36C25518R0411-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

PROJ(D)

PLBG

PLYWD

PREFIN

RAD(R)

RESIL

REINF

REQ'D

SECT

SHWR

SPECS

REFRIG

galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG

CLR

CMU

COL

CLO

clear/clearance column closet

CAB

CJ

CC

CB

BW

CL

BOC

BRZ

BRK

BO

BRG

BUR

BTM

BS

built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet

FE

FEC

FDN

FD

east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer

ELEV

EQUIP

EW

EPDM

EXP

EXIST

EXT

E

EA

EC

EG

EIFS

EJ

ELEC

insulation interior inside diameter

INSUL

IN(")

INT

ID

inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning

HDWR

HM

HORZ

HT

HPDL

HVAC

HW

height

GB

GL

GRD

GYP

GC

HDWD

HB

grade

PART

PLAS

OVHD

partition plaster overhead

SRT

SS

SQ

miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)

NTS

OC

OA

NOM

OFF

OPNG

OD

on center overall nominal not to scale office opening

MISC

N

MO

MULL

MTL

NIC

NA

north mullion metal

SHT

SF

SB

SND

SIM

S

RM

ROW

RO

SAT

SAN

architect/ architectural

AB anchor bolt

APPROX

BLDG

BD

ARCH

BM

BLK

ADJ

AFF

AC

ACCU

ALUM

ANOD

ALT

approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum

A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout

DIA

DR

DS

DN

DO

DIM

DTL

DWG

CRS

CT

CONT

CORR

CPT

DBL

DF

conference concrete

CONF

CONC

finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic

FV

FT(')

FURR

FURN

FTG

G

GA

foot furring gas gauge

FRP

FLR

FLDG

FL

FRT

FS

FLUOR

floor finish grade finish floor

FG

FF

joistJST low volume change masonryMAS

MANUF

MATL

MAX

MECH

MEMB

MH

MIN

MIRR

manufacturer material mechanical membrane maximum minimum manhole mirror

LDR

LF

LAV

LAM

LVC

LOCN

lineal feet ladder lavatory laminate location

REF

R

RAG

RD

PT

PR

QT

PTD

JT

JAN janitor joint

PL

under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications

YD

suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room

WD

WNDW

WH

WNSCT

WC

WT

WWF

WP

VCT

VWC

VEST

VERT

W

W/

W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out

RT

SICU

central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room

FOR MEDICAL

emergency room computed tomography

FACILITIES ONLY

STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair

TLT

TV

TW

TOC

TPH

TO

TYP

UCL

T&B

T

SUSP

STRUCT

TEL

TB

T&G plate/plastic/ property line STL

STD

storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended

ICU

OR

LDRP

MRI

MICU

LTC

PT

PACU

OT

CS

CT

ER

steel standard

DRAWING SYMBOLS

95.00

TOC

98.5

TOC

98.5 E

B

NEW ELEVATION

EXISTING ELEVATION

EXISTING CONTOUR

NEW CONTOUR

TEST BORING (SITE PLANS ONLY)

EXISTING ELEVATION

EXISTING ELEVATION

PROPERTY LINE

/1 A101

/1 A101

MATCHLINE

SHT. REFERENCE

ELEVATION DATUM

(SECTIONS, ELEVATIONS ONLY)

BUILDING SECTION

WALL SECTION

DETAIL DRAWING

A3.1

BUILDING ELEVATION

A6.1 INTERIOR ELEVATION

A100

WINDOW ID TAG

DOOR NUMBER

ROOM

NAME

ROOM NAME & NUMBER

PARTITION SYMBOL

1 REVISION TAG

COLUMN LINE GRID

EQUIPMENT NUMBER

? SITE PLAN NOTES

DEMOLITION PLAN NOTES

-- PRECAST CONCRETE WALL

PANEL TAG

XXX

A101

A-4 ALTERNATE TAG

PT-XX PAINT COLOR TAG

# PLAN NOTES

X

X.X

X

X.X

CUT STONE

STEEL

PLYWOOD

FINISH WOOD

CONT WD FRAMING

WOOD BLOCKING

MATERIAL SYMBOLS

LVC FILL

GRANULAR FILL

CONCRETE MASONRY

FACE BRICK

CONCRETE

EARTH

EXISTING CONSTRUCTION

ASPHALT

GLASS

RIGID OR TAPERED

INSULATION, EIFS

BATT INSULATION

GYPSUM BOARD

SIGNATURE BLOCK

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

PRINT NAME: SIGNATURE:

MEDICAL CENTER DIRECTOR:

ASSOCIATE DIRECTOR:

CHIEF OF STAFF:

ASSOCIATE DIRECTOR OF PATIENT SERVICES:

ASSISTANT DIRECTOR:

CHIEF OF SURGERY:

CHIEF OF FACILITIES MANAGEMENT:

INFECTION CONTROL PRACTITIONER:

SAFETY OFFICER:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

GI-100

TITLE SHEET

REPLACE OPERATING ROOM 5 EQUIPMENT

HARRY S. TRUMAN MEMORIAL VETERANS HOSPITAL

REPLACE OPERATING ROOM 5 EQUIPMENT

COLUMBIA, MO

CONSTRUCTION DOCUMENTS

# 589A4-17-113

# 589A4-17-113

SHEET INDEX

GENERAL

GI-100 TITLE SHEET GENERAL

GI-101 LIFE SAFETY PLAN GENERAL

ARCHITECTURAL

AD-100 DEMOLITION PLANS ARCHITECTURAL

AS-100 FLOOR/ FINISH PLAN ARCHITECTURAL

EQUIPMENT INFORMATION

AS-600 EQUIPMENT INFORMATION (PHILIPS) EQUIPMENT INFORMATION

AS-601 EQUIPMENT INFORMATION (PHILIPS) EQUIPMENT INFORMATION

AS-602 EQUIPMENT INFORMATION (PHILIPS) EQUIPMENT INFORMATION

AS-603 EQUIPMENT INFORMATION (PHILIPS) EQUIPMENT INFORMATION

AS-604 EQUIPMENT INFORMATION (PHILIPS) EQUIPMENT INFORMATION

AS-605 EQUIPMENT INFORMATION (PHILIPS) EQUIPMENT INFORMATION

AS-606 EQUIPMENT INFORMATION (PHILIPS) EQUIPMENT INFORMATION

AS-607 EQUIPMENT INFORMATION (STRYKER) EQUIPMENT INFORMATION

AS-608 EQUIPMENT INFORMATION (STRYKER) EQUIPMENT INFORMATION

AS-609 EQUIPMENT INFORMATION (STRYKER) EQUIPMENT INFORMATION

STRUCTURAL

SS-001 GENERAL NOTES STRUCTURAL

SS-201 FIRST FLOOR FRAMING PLAN STRUCTURAL

SS-301 SECTIONS AND DETAILS STRUCTURAL

FIRE PROTECTION

FP-101 FIRE PROTECTION FLOOR PLAN FIRE PROTECTION

PLUMBING

PP001 PLUMBING COVER SHEET PLUMBING

PG101 MED GAS FLOOR PLANS PLUMBING

MECHANICAL

MM001 MECHANICAL COVER SHEET MECHANICAL

MM002 MECHANICAL COVER SHEET MECHANICAL

MH101 MECHANICAL FLOOR PLANS MECHANICAL

M-501 MECHANICAL DETAILS MECHANICAL

M-502 MECHANICAL DETAILS MECHANICAL

M-601 MECHANICAL SCHEDULES MECHANICAL

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES AND SYMBOLS ELECTRICAL

E-501 ELECTRICAL DETAILS ELECTRICAL

E-601 ELECTRICAL SCHEDULES ELECTRICAL

ED100 PARTIAL ELECTRICAL DEMOLITION PLAN -

LOWER LEVEL

ELECTRICAL

ED101 PARTIAL ELECTRICAL DEMOLITION PLAN - 1ST

FLOOR

ELECTRICAL

EL101 PARTIAL ELECTRICAL LIGHTING PLAN - 1ST

FLOOR

ELECTRICAL

EP100 PARTIAL ELECTRICAL POWER & SYSTEMS PLAN -

LOWER LEVEL

ELECTRICAL

EP101 PARTIAL ELECTRICAL POWER & SYSTEMS PLAN -

1ST FLOOR

ELECTRICAL

wbongartz

EXISTING TO REMAIN

REMODEL AREA

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

2 HR 90 MIN FIRE

90 MIN

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

2 HR 90 MIN FIRE

90 MIN

HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

2 HR 90 MIN FIRE

90 MIN

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)1 HR

2 HR

60 MIN

90 MIN

EXIT PASSAGEWAY (HORIZ.)

FIRE BARRIER

NOT

ALLOWED

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR 45 MIN FIRE

90 MIN

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

SUBDIVIDING SPACES

SMOKE BARRIER (1-2 OCCUPANCY)

20 MIN SMOKE

90 MIN

SEE NOTE [A]1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR NR

SELF OR AUTO

CLOSING

EXIT ACCESS CORRIDORS (1-2)

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

EXIT ACCESS CORRIDORS (I-1 OR I-2)

FIRE PARTITION (EXIST CONDITION)

(NON-SPRINKLERED)

1/2 HR

10/1

2"

34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

PROPERTY LINE

FEC

FACP

FSA

FAA

100'

(50)

STARTING

LOCATION

EXITING #

TRAVEL

DISTANCE

TRAVEL PATH

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS

WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS (NFPA

8.2.4.4.3) (IBC 710.8)

[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED TO A

SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 717.5.5)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES

SYMBOLS

NFPA 101-2015

NFPA 90

8.3.5.7 9.2.1

NFPA 90

8.3.5.7 9.2.1

NFPA 6.1.14.4.1

18.1.3.5.1 19.1.3.5.1

NFPA 7.2.1.4.1

7.2.4.3.7 8.3.4 18.2.2.5.3,4,5,6,7 19.2.2.5,3,4

NFPA 7.2.A.3.1 (1)

NFPA 18.1.3.8/

19.1.3.8 18.2.2.5/19.2.25 7.1.3.2.1

NFPA 8.3.5.7

9.2.1 7.2.4.3.5

1 HR

NFPA 19.3.1.1

NFPA 8.6.2

8.3.4.2 TBL

18.4.4.7.2.2 7.1.3.2.9(9)

NOT ALLOWED

UNLESS SERVING

STAIR ONLY

N/A

NFPA 8.3.4.2 TBL

19.3.2.1.3,5

NFPA 18.3.2.1.2

NFPA 8.4.1.1

19.3.2.1

NFPA 8.4.2(3)

VARIES

NFPA 8.3.4.2 TBL

8.5.4 18.3.7.8

8.5.5.2 18.3.7.3(2) 19.3.7.3(2)

NFPA 8.5.2

NFPA 8.4.2

18.2.5.7.1.4 19.2.5.7.1.1

VARIES

NR VARIES

NFPA 8.4.2

18.3.6.2 19.3.6.2

NR NONE

21.3.6 39.3.6

VERT. OPG. (SHAFT)

FIRE BARRIER

NFPA 19.3.1.1

19.2.2.7 60 MIN

[D] N/A 8.6.4.5

NFPA 7.2.6

NFPA 8.3.4.2 TBL

8.3

8.7

NFPA 221

8.2.1.3

8.6.5

19.2.2.7 18.2.2.7

8.6.2 8.6.5(3) & 2

18.3.2.1.3 19.3.2.1.2

18.3.7.3 19.3.7.3

EXIST SOL.

CORE WD.

8.3.4.2 TBL

8.3.4.2 TBL

NFPA 8.3.4.2 TBL

8.3.4.2 8.4.3 19.3.2.1.4,3,5

8.4.3

8.4.3 18.3.6.4.1 19.3.6.4.1

N/A

N/A

N/A

8.4.4.1 8.4.6.2

8.4.4.1 8.4.6.2

8.4.4.1 8.4.6.2 18.3.6.4.1

N/A

FP

TD = XX

FE

FIRE PULL STATION

BUILDING SEPARATION:

FIRE BARRIER

(FIRE WALL IN IBC)

NR

SELF OR AUTO

CLOSING

1 HR

2 HR

FIRE EXTINGUISHER

46.5"

955/13

15.8"

46.5"

955/13

3.6"

44.5

SC7, SUITE 1

(PATIENT CARE

NON-SLEEPING)

12,834 S.F.

SC6, SUITE 1

(PATIENT CARE

NON-SLEEPING)

6,414 S.F.

SC7, SUITE 2

(PATIENT CARE

NON-SLEEPING)

3,910 S.F.

SUITE

1,532 S.F.

SMOKE COMP 1-6

18,591 SF

S M

O K

E C

O M

P

-6 ,5

S

F

S M

O K

E C

O M

P

-7 ,8

S

F

UP

TD = 132'-2"

TD = 227'-0"

TD = 86'-6

STAIR #12 EXITS

THIS LEVEL

SMOKE COMP 1-6

18,591 SF

SMOKE COMP 1-7

12,834 SF

COMPLIANCE NOTE PER NFPA

19.2.5.7.3.2

PATIENT CARE NON-SLEEPING

SUITE 1, SC7 is greater than

12,500 SF BUT LESS THAN

15,000 SF AND CONTAINS BOTH

SMOKE DETECTION PER 19.3.4

AND QUICK RESPONSE

SPRINKLERS PER 19.3.5.8

1:50N

2 1 1

8 8

1 1

EXIT

ACCESS

EXIT

ACCESS

1 1

SCRUB

AREA OF WORK

AS-100

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

GI-101

LIFE SAFETY PLAN

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

1" = 80'

160'80'40'0'

N

1" = 80'-0"

1ST FLOOR KEY PLAN

3/32" = 1'-0"

PARTIAL EXISTING LIFE SAFETY PLAN - 1ST FLOOR

N 0' 4'

3/32" = 1'

8' 16'

WALL

DOOR

CEILING

AND GRID

DEMO LEGEND

ALTERNATE

SCOPE

EXISTING TO REMAIN

REMODEL AREA

NOT IN SCOPE

OF WORK

NOT IN

SCOPE OF

WORK

NOT IN

SCOPE OF

WORK

EXISTING DOOR TO BE LOCKED AND

SEALED DURING CONSTRUCTION PHASE

WITH A SIGN THAT CLEARLY STATES

"DO NOT EXIT" ON WORK SIDE AREA AND

"DO NOT NOT ENTER CONSTRUCTION

AREA" ON STERILE SIDE

5 5

6 6 6 6

6 6

6 6

6 6

6 6

8 8 8

8 8

6 6

NOT IN SCOPE

OF WORK

NOT IN

SCOPE OF

WORK

NOT IN

SCOPE OF

WORK

EXISTING CEILING TO REMAIN

CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING.

THE CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY

CONDITIONS THAT DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.

A.

GENERAL DEMOLITION NOTES:

PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY

DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.

B.

VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE DRAWINGS,

AND WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE THE INTENDED

WORK.

C.

ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS

RESPONSIBLE FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL WORK

ASSOCIATED WITH THIS CONTRACT.

D.

CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH

SURROUNDING EXISTING FINISHES NOT DISTURBED.

E.

TYPES OF FLOOR, WALL, AND CEILING FINISHES INDICATED FOR REMOVAL BY

DEMOLITION NOTES IS FOR GENERAL INFORMATION ONLY FROM INFORMATION OBTAINED

FROM EXISTING PLANS AND OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY

MATERIAL TYPES ONSITE PRIOR TO BID AND INCLUDE NECESSARY WORK IN HIS BID.

F.

ALL APPLIANCES, FURNITURE, AND EQUIPMENT TO REMAIN THE PROPERTY OF THE

OWNER - CONTRACTOR TO COORDINATE REMOVAL, RELOCATION, STORAGE OF

EQUIPMENT FROM DEMO AREAS WITH OWNER.

G.

MISCELLANEOUS FLOOR PENETRATIONS AND DEMO FOR NEW MECHANICAL AND

ELECTRICAL WORK SHALL BE COORDINATED FROM ARCHITECTURAL, MECHANICAL, AND

ELECTRICAL PLANS.

H.

REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DEMO PLANS FOR DEMOLITION,

SALVAGE AND RE-USE OF EXISTING ITEMS.

I.

PATCH FLOOR AT REMOVED WALLS AND CASEWORK PREPARE FLOOR TO RECEIVE NEW

FLOORING AS REQUIRED.

J.

ALL HOLES IN EXISTING SLAB LEFT FROM REMOVAL OF FIXTURES TO RECEIVE INFILL PER

STRUCTURAL DETAIL.

K.

REMOVE ALL STAINLESS STEEL CORNER GUARDS CAREFULLY AND GIVE TO OWNER.L.

ELEMENTS INDICATED WITH A DASHED LINE ARE TO BE DEMOLISHED AND DISPOSED OF

AS A PART OF THIS PROJECT. UNLESS NOTED OTHERWISE.

M.

IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED WITH

MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE RIGHT TO

TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS SHOULD THE

OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE OF THE

OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.

N.

CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL MATERIAL IN A LEGAL MANNER NOT

SCHEDULED FOR REUSE UNDER THIS PROJECT.

O.

IN ALL WALLS AND CEILINGS THAT ARE TO BE REMOVED THE CONTRACTOR SHALL

BE RESPONSIBLE FOR DISCONNECTING AT SOURCE AND REMOVING OR CAPPING

ELECTRICAL, PLUMBING, GAS LINES AND MECHANICAL DUCTWORK THAT IS

DISCLOSE AND NOT SCHEDULED FOR REUSE. CONTRACTOR SHALL REROUTE AND

CONTINUE ANY SYSTEM THAT MUST BE RETAINED FOR NEW CONSTRUCTION.

P.

ALL ELECTRICAL CIRCUITS FOR EQUIPMENT THAT IS TO BE REMOVED SHALL BE

DISCONNECTED AT SOURCE AND REMOVED.

Q.

ALL PIPING GAS, WATER SUPPLY, VENT, DRAIN LINES, ETC. SUPPLYING EQUIPMENT

THAT IS TO BE REMOVED SHALL BE DISCONNECTED, REMOVED AND CAPPED ABOVE

CEILING OR BELOW FLOOR. CONTRACTOR SHALL REROUTE AS NECESSARY, TO BE

BEHIND NEW CONSTRUCTION. (PATCH FLOOR BACK PRIOR TO TOPPING.)

R.

ALL MED GASES AND PLUMBING TO BE REMOVED AT WALLS SCHEDULED FOR

DEMOLITION.

S.

REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT WITHIN ROOMS SCHEDULED TO BE

DEMOLISHED. SEE MEP PIPING DRAWINGS.

T.

RETURN ALL SIGNAGE AFFECTED BY CONSTRUCTION TO OWNER.U.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AD-100

DEMOLITION PLANS

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

DEMO PLAN KEY NOTES

TAG ITEM DESCRIPTION

1 EXISTING FLOORING TO REMAIN - G.C. TO PROTECT FLOOR AS REQD. DURING CONSTRUCTION.

2 G.C. TO PROTECT EXISTING COMPONENTS THAT ARE TO REMAIN DURING CONSTRUCTION -

REPAIR AND PATCH WALL AS REQUIRED - PREPARE WALL FOR NEW PAINT FINISHES.

3 EXISTING DOCUMENTATION TABLE AND ALL OF ITS COMPONENTS TO BE REMOVED AND

SALVAGED FOR POSSIBLE RE-USE.

4 EXISTING C-ARM AND ALL OF ITS COMPONENTS TO BE REMOVED BY PHILIPS, G.C. TO

COORDINATE MECHNL. AND ELECT. DISCONNECTIONS. - G.C. TO COORD INATE SCHEDULE WITH

PHILIPS REPRESENTATIVE. EXISTING SUPPORTING STRUCTURE TO BE REMOVED BY G.C. ONCE

EXISTING C-ARM HAS BEEN REMOVED FROM PROJECT SITE. - G.C. TO COORDINATE WITH

INFECTOUS CONTROL OFFICER ALL INFECTION CONTROL REQUIREMENTS.

5 EXISTING BOOM AND ALL OF ITS COMPONENTS TO BE REMOVED BY G.C., COORDINATE MECHNL.

AND ELECT. DISCONNECTIONS. - EXISTING BOOM TO BE SALVAGED AND STORED COORDINATE

LOCATION WITH HOSPITAL REPRESENTATIVE. G.C. TO REMOVE SUPPORTING STRUCTURE ABOVE

ONCE BOOM IS RELOCATED.

6 EXISTING LIGHT FIXTURE AND ALL OF ITS COMPONENTS TO BE REMOVED BY G.C. AND SALVAGED

FOR POSSIBLE RE-USE.

7 EXISTING CEILING HATCH AND ALL OF ITS COMPONENTS TO BE REMOVED BY G.C. AND SALVAGED

FOR POSSIBLE RE-USE.

8 EXISTING MECHANICAL DIFFUSSER AND ALL OF ITS COMPONENTS TO BE REMOVED BY G.C. AND

SALVAGED FOR POSSIBLE RE-USE.

9 EXISTING CEILING AND ALL OF ITS COMPONENTS TO BE REMOVED BY G.C.

1" = 80'-0"

1ST FLOOR KEY PLAN

2' 4' 8'0'

1/4" = 1'-0"

N

N

1" = 80'

160'80'40'0'

1/4" = 1'-0" A

HYBRID OR PLAN - DEMO

1/4" = 1'-0" B

HYBRID OR CEILING PLAN - DEMO

N 2' 4' 8'0'

1/4" = 1'-0"

NOTE:

ALL EXISTING OPERATING ROOM EQUIPMENT THAT IS NOT REMOVED FROM SPACE

PRIOR TO CONSTRUCTION AND C-ARM REMOVAL IS TO BE CLEARLY TAGGED (TO

REMAIN). VERIFY WITH VA STAFF BEFORE ANY EQUIPMENT IS REMOVED OR RELOCATED.

NOTE:

G.C. TO VERIFY WITH VA STAFF PRIOR TO CONSTRUCTION A APPROVED ROUTE FOR

ENTERING AND EXITING CONSTRUCTION AREA. G.C. ALSO TO VERIFY WITH VA STAFF

LOCATION FOR GOWNING AND DE-GOWNING PRIOR TO CONSTRUCTION START.

HYBRID

OR NO. 5

G103CARDIAC

O.R.

G102

EQUIP.

CONTROL

G104

GEN. OR

G106

STERILE

G105

EQUIP.

G103A

CORRIDOR

G160

NOT IN SCOPE

OF WORK

NOT IN

SCOPE OF

WORK

NOT IN

SCOPE OF

WORK

LINE OF TEMPOERARY INFECTION

CONTROL BARRIER - VERIFY EXACT

LOCATION WITH OWNER PRIOR TO

CONSTRUCTION - G.C. TO

DETERMINE ACCESS POINTS TO

WORK AREA WITH VA STAFF

LINE OF TEMPOERARY INFECTION

CONTROL BARRIER - VERIFY EXACT

LOCATION WITH OWNER PRIOR TO

CONSTRUCTION - G.C. TO

DETERMINE ACCESS POINTS TO

WORK AREA WITH VA STAFF

AS-100

CONTRACTORS OPTION TO ACCESS SITE

THRU EXISTING OPENINGS AT EXTERIOR

WALL - CONTRACTOR TO SUBMIT PLAN AND

DETAILS TO VA STAFF (INFECTION CONTROL)

PRIOR TO ANY WORK BEING DONE.

GOWNING AND DE-GOWNING

AREA - VERIFY EXACT

REQMTS. WITH VA STAFF

(INFECTION CONTROL)

EXISTING TO REMAIN

REMODEL AREA

NOT IN

SCOPE OF

WORK

NOT IN

SCOPE OF

WORK

NOT IN

SCOPE OF

WORK

G103

9' - 6 13/16"

VERIFY W/ EQUIP.

MFGR. DWGS

BOOM MOUNT PLATE REF.

MFGR. PLANS AND DETAILS

(TYP. 6 PLACES THUS)

2' - 7 3/4" 2' - 0"

1'

8"

AS-100

DESK LEG SIMILAR

TO MOCKETT

TLKNB27-94 SATIN

ALUMINUM

R 0' - 10"

3" DIA. GROMMETT,

LOCATIONS REF. SPEC.

4' - 7 3/4"

1' - 9 1/2" 1' - 5 1/2"

45.00°

.0

NEW ADJUSTABLE SWING WALL

MOUNT BRACKET BY CONTRACTOR

REF. SPECS.

EXISTING MONITORS TO BE

RELOCATED (VERIFY MONITOR SIZE

& BRACKET REQUIREMENTS WITH

COR) - PROVIDE MONITOR MOUNTS

AND BLOCKING AS REQUIRED FOR

MOUNTS PATCH AND REPAIR WALLS

AS REQUIRED.

DESK LEG SIMILAR TO

MOCKETT TLKNB27-94

SATIN ALUMINUM

SOLID SURFACE SS-1 DESK.

CAULK ALL EDGES OF DESK

TO WALL WITH CLEAR

CAULKING - REF. SPEC. FOR

SEALING POROUS SURFACES

SUPPORT BRACKET, REF

SPEC

AS-100

CPU MOUNTED TO COUNTER

WITH CPU HOLDER, REF

SPEC. VERIFY CPU SIZE AND

QUANTITY WITH COR

PREMAUFACTURED

STAINLESS STEEL DRAWER

MOUNTED UNDER

COUNTERTOP - SIMILIAR OR

EQUAL TO GREAT OPENINGS

SUSPENDED BOX/FILE; PART #

0503.

FILE

NEW DBL. MONITOR, SLIM PROFILE,

TILTABLE FIXED WALL MOUNT BRACKET

BY CONTRACTOR - REF. SPECS.

MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO

IDENTIFY COLORS, FINISHES, TEXTURES, AND PATTERNS. PRODUCTS OF OTHER

MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND PATTERNS

OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF TECHNICAL

SPECIFICATIONS WILL BE ACCEPTABLE UPON APPROVAL IN WRITING BY

CONTRACTING OFFICER FOR FINISH REQUIREMENTS.

- THIS NOTE APPLIES TO ALL SUCH INSTANCES IN THE DRAWINGS AND

SPECIFICATIONS FOR THIS PROJECT.

3" DIA. GROMMET,

REF. SPEC.

4" 1

/4

SUPPORT BRACKET,

PAINT TO MATCH ADJ.

SURFACE; REF SPECS

1' - 8"

R E

F E

L E

V A

T

IO

N S

" SOLID SURFACE TOP W/

SQUARE, EASED EDGE ON

3/4" PLYWD OR MDF & 4"

THERMOFORMED COVED

BACK & SIDE SPLASH W/

EASED TOP EDGE

PAINT EXPOSED PLYWD

OR MDF TO MATCH

SUPPORT BRACKET

INTEGRAL

BACKSPLASH

GENERAL FINISH NOTES

A. PAINT ALL WORKSURFACE BRACKETS COLOR OF ADJACENT SURFACE.

B. ANY PORTION OF WALL WHERE EXISTING WALL PROTECTION IS DAMAGED, PATCH AND REPAIR WITH WP-1 TO

MATCH EXISTING WALL PROTECTION. WHERE TRIM IS NOT SPECIFIED, CAULK ALL EXPOSED EDGES OR SEAMS

OF WALL PROTECTION WITH CLEAR CAULKING.

EQUIPMENT GENERAL NOTES:

1. C-ARM EQUIPMENT IS TO BE GOVERMENT SUPPLIED

AND INSTALLED. ALL SITE PREPARATION TO BE

COMPLETED BY THE CONTRACTOR. REFER TO LATEST

MFGRS. PLANS AND DETAILS.

2. BOOMS TO BE SUPPLIED AND INSTALLED BY THE

CONTRACTOR. REFER TO LATEST MFGRS. PLANS AND

DETAILS.

N 2' 4' 8'0'

1/4" = 1'-0"

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-100

FLOOR/ FINISH PLAN

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

PLAN NOTES - FLOOR PLAN

# DESCRIPTION

1 REFER TO PLANS AND DETAILS PROVIDED BY C-ARM (PHILIPS BASIS OF DESIGN) MFGR.

FOR INFORMATION NOT SHOWN ON THIS PLAN.

2 REFER TO PLANS AND DETAILS PROVIDED BY BOOM (STRYKER BASIS OF DESIGN) MFGR.

FOR INFORMATION NOT SHOWN ON THIS PLAN. TYPICAL AT ALL BOOM LOCATIONS

1/4" = 1'-0" A

FLOOR / FINISH PLAN - HYBRID OR #5

1" = 80'-0"

1ST FLOOR KEY PLAN

1/4" = 1'-0" B

CEILING PLAN - HYBRID OR #5

N 2' 4' 8'0'

1/4" = 1'-0"

COLOR SCHEDULE KEY

CODE DESCRIPTION MANUFACTURER STYLE NAME STYLE / COLOR SIZE / TYPE SPECIAL INFO

PT-1 PAINT MATCH EXISTING MATCH EXISTING MATCH EXISTING TWO

TONE COLOR SCHEME

MATCH EXISTING

PT-2 PAINT SHERWIN WILLIAMS CEILING WHITE SW 7007 SEMI-GLOSS EPOXY

SS-1 SOLID SURFACE CORIAN RICE PAPER

WP-1 WALL PROTECTION INPRO MATCH EXISTING MATCH EXISTING MATCH EXISTING

FINISH SCHEDULE

RM # ROOM NAME WALLS

CEILING CEILING

TYPE COLOR

G103 HYBRID OR NO. 5 PT-1 GYP BOARD PT-2

G104 EQUIP. CONTROL EXISTING EXISTING --

1" = 1'-0"

ENLARGED DESK PLAN

1/2" = 1'-0"

DESK

1" = 1'-0"

SECTION

THESE DRAWINGS ARE INCLUDED FOR

INFORMATIONAL PURPOSES ONLY - REFER

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-600

EQUIPMENT INFORMATION (PHILIPS)

REPLACE OPERATING ROOM 5 EQUIPMENT # 589A4-17-113

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-601

EQUIPMENT INFORMATION (PHILIPS)

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-602

EQUIPMENT INFORMATION (PHILIPS)

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-603

EQUIPMENT INFORMATION (PHILIPS)

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-604

EQUIPMENT INFORMATION (PHILIPS)

TO FINAL PLANS PROVIDED BY EQUIPMENT

MANUFACTURER FOR CONSTRUCTION.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Columbia, Missouri

1 OWNER REVIEW COMMENTS 4-13-2018

AS-605

EQUIPMENT INFORMATION (PHILIPS)

File details come from the government source that posted it.