36C25518R0177-005.pdf
PDF 37 MB Posted
- Attached to
- 657-400, MAIN LOBBY ACCESS IMPROVEMENT Federal contract opportunity
- Solicitation number
- 36C25518R0177
About this file
36C25518R0177 657400_100_BID_DRAWINGS.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25518R0177-00001002.pdf | ||
| 36C25518R0177-00001000.docx | DOCX document | |
| 36C25518R0177-00001001.pdf | ||
| 36C25518R0177-003.pdf | ||
| 36C25518R0177-001.docx | DOCX document | |
| 36C25518R0177-002.pdf | ||
| 36C25518R0177-004.pdf | ||
| 36C25518R0177-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK
N
POPLAR BLUFF
N
BLDG. 1
BLDG. 2
N . W
E
ST
W O
O D
B O
U
LE
V
AR
D
BLDG. 3
BLDG. 4
BLDG. 20
BLDG. 23
BLDG. 5
BLDG. 7
BLDG. 8
IRM BLDG. 6
AREA OF
WORK
N
PROFESSIONAL SEALS
CIVIL
STRUCTURAL
ARCHITECTURAL
FIRE PROTECTION
PLUMBING
MECHANICAL
ELECTRICAL
ASBESTOS
Engineering, Inc.
18207 Edison Avenue
Chesterfield, Missouri 63005
Phone: 636.530.7770 Fax: 636.530.7877
Missouri Certificate of Authority #NC 001244
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
BANCROFT ARCHITECTS + ENGINEERS
VA PROJECT NO:
VA CONTRACT NO:
BANCROFT PROJECT NO:
PROJECT LOCATION:
PROJECT TITLE:
BUILDING NUMBER:
ARCHITECTS + ENGINEERS:
Revisions: Date
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007 T:847.952.9362 F:847.952.9403 www.bancroft-ae.com
SSC ENGINEERING, INC.
ENGINEERING CONSULTANT:
18207 Edison Avenue St. Louis, MO 63005 T:636.530.7770 F:636.530.7877
PROJECT NUMBERS:
STOCK & ASSOCIATES CONSULTING ENGINEERS
CIVIL CONSULTANT:
257 Chesterfield Business Parkway Chesterfield, MO 63005 T:636.530.9100 F:636.530.9130
JOHN. A. JURGIEL & ASSOCIATES, INC.
ENVIRONMENTAL & SAFETY CONSULTANT:
123 N. MAIN STREET
ST. CHARLES, MISSOURI 63301
T:636.757.3060 F:636.757.3064
257 Chesterfield Business Parkway St. Louis, MO 63005 T (636) 530-9100 F (636) 530-9130
18207 Edison Avenue Chesterfield, MO 63005 T (636) 530-7770 F (636) 530-7877 MO. Certificate of Authority #NC 001244
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:2
P
M
COVER SHEET
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB
657-400
G-000
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
JOHN J. PERSHING VAMC
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
IMPROVE ACCESS TO MAIN LOBBY
657-400
VA255-16-C-0252
16-126
DRAWING INDEX
NUMBER TITLE
DRAWN
BY
01 GENERAL
G-000 COVER SHEET BAE
G-001 GENERAL NOTES & SYMBOLS BAE
G-002 CODE INFORMATION AND DESIGN PROTOCOLS BAE
G-003 SITE PLAN BAE
G-004 LOWER LEVEL LIFE SAFETY PLAN BAE
G-005 FIRST FLOOR LIFE SAFETY PLAN BAE
G-006 SECOND FLOOR LIFE SAFETY PLAN BAE
G-400 PHASING GENERAL NOTES AND DETAILS BAE
G-401 PARTIAL FIRST FLOOR INFECTION CONTROL PHASING PLANS BAE
02 CIVIL
C-100 ROOF DRAIN LATERAL PLAN STOCK
03 ASBESTOS
HA-101 ABATEMENT - BASEMENT FLOOR PLAN JURGIEL
HA-102 ABATEMENT - 1ST FLOOR PLANS JURGIEL
HA-103 ABATEMENT - 2ND FLOOR PLANS JURGIEL
04 STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES SSC
S-002 STRUCTURAL GENERAL NOTES SSC
S-003 STRUCTURAL TYPICAL DETAILS SSC
S-004 STRUCTURAL TYPICAL DETAILS SSC
SD-101 STRUCTURAL FOUNDATION DEMO PLAN SSC
SD-102 STRUCTURAL ROOF DEMO PLAN SSC
S-101 STRUCTURAL FOUNDATION PLAN SSC
S-201 STRUCTURAL ROOF FRAMING PLAN SSC
S-301 STRUCTURAL FOUNDATION SECTIONS SSC
S-401 STRUCTURAL FRAMING SECTIONS SSC
05 ARCHITECTURAL
AD-100.1 PARTIAL FOUNDATION DEMOLITION PLAN BAE
AD-101 FIRST FLOOR - DEMOLITION PLAN BAE
AD-101.1 PARTIAL FIRST FLOOR DEMOLITION PLAN BAE
AD-130 PARTIAL FIRST FLOOR - REFLECTED CEILING DEMOLITION PLAN BAE
A-100.1 PARTIAL FOUNDATION PLAN BAE
A-101 FIRST FLOOR - GENERAL ARRANGEMENT PLAN BAE
A-101.1 PARTIAL FIRST FLOOR PLAN BAE
A-101.1 (ALT. 9) PARTIAL FIRST FLOOR PLAN - DEDUCT ALTERNATE 9 BAE
A-102 PARTIAL SECOND FLOOR & ROOF PLAN BAE
A-130 PARTIAL FIRST FLOOR - REFLECTED CEILING PLAN BAE
A-130 (ALT. 1) PARTIAL FIRST FLOOR - REFLECTED CEILING PLAN - DEDUCT ALTERNATE 1 BAE
A-131 REFLECTED CEILING DETAILS BAE
A-201 EXTERIOR ELEVATIONS BAE
A-202 EXTERIOR ELEVATIONS & AREAWAY ACCESS LADDER DETAILS BAE
A-301 BUILDING SECTIONS BAE
A-302 BUILDING SECTIONS BAE
A-303 BUILDING SECTIONS BAE
A-400 ENLARGED PLANS BAE
A-401 INTERIOR ELEVATIONS BAE
A-430 DETAILS BAE
A-431 DETAILS BAE
A-432 DETAILS BAE
A-433 DETAILS - AREAWAY BAE
A-500 BUILDING WALL SECTIONS BAE
A-501 BUILDING WALL SECTIONS BAE
A-510 PARTITION TYPES & DETAILS BAE
A-520 MILLWORK DETAILS BAE
A-601 DOOR & WINDOW SCHEDULE AND DETAILS BAE
I-101 PARTIAL FIRST FLOOR - FINISH PLAN & EQUIPMENT PLAN BAE
I-301 PARTIAL FIRST FLOOR - SIGNAGE PLAN BAE
I-320 SIGNAGE TYPES BAE
I-601 FINISH SCHEDULE, LEGEND, & FINISH DETAILS BAE
06 FIRE PROTECTION
FP-001 FIRE PROTECTION SYMBOLS, NOTES & SCHEDULES SSC
FPD-101 FIRE PROTECTION FIRST FLOOR PLAN – DEMOLITION SSC
FPD-102 FIRE PROTECTION SECOND FLOOR PLAN – DEMOLITION SSC
FP-101 FIRE PROTECTION FIRST FLOOR PLAN – RENOVATION SSC
FP-102 FIRE PROTECTION SECOND FLOOR PLAN – RENOVATION SSC
07 PLUMBING
P-001 PLUMBING SYMBOLS, SCHEDULES AND NOTES SSC
PD-100 PLUMBING PARTIAL BASEMENT, GROUND, 1ST, 2ND, AND 3RD FLOOR STORM PLAN - DEMOLITION SSC
P-100 PLUMBING PARTIAL BASEMENT, GROUND, 1ST, 2ND AND 3RD FLOOR STORM PLAN - RENOVATION SSC
08 MECHANICAL
M-001 MECHANICAL SYMBOLS, LEGEND AND NOTES SSC
MD-101 MECHANICAL SUB-BASEMENT & GROUND FLOOR PLANS - DEMOLITION SSC
MD-102 MECHANICAL 1ST FLOOR PLANS - DEMOLITION SSC
M-101 MECHANICAL SUB-BASEMENT AND GROUND FLOOR PLANS - RENOVATION SSC
M-102 MECHANICAL FIRST FLOOR AND ROOF PLANS - RENOVATION SSC
M-501 MECHANICAL DETAILS SSC
M-502 MECHANICAL DETAILS SSC
M-503 MECHANICAL FLOW SCHEMATICS / CONTROLS SSC
M-601 MECHANICAL SCHEDULES SSC
09 ELECTRICAL
E-001 ELECTRICAL SYMBOLS, NOTES & LEGENDS SSC
ED-101 ELECTRICAL 1ST FLOOR PLAN - DEMOLITION SSC
E-101 ELECTRICAL 1ST FLOOR LIGHTING PLAN - RENOVATION SSC
E-201 ELECTRICAL 1ST FLOOR POWER & SYSTEMS PLAN - RENOVATION SSC
E-301 ELECTRICAL BASEMENT AND ROOF POWER PLAN - RENOVATION SSC
NOT TO SCALE
VICINITY MAP
NOT TO SCALE
STATE MAP
NOT TO SCALE
SITE PLAN
NOT TO SCALE
PERSPECTIVE LOOKING NORTHEAST
35% SCHEMATIC DEVELOPMENT SUBMISSION 02-20-17
75% DESIGN DEVELOPMENT SUBMISSION 04-24-17
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
100% CONSTRUCTION DOCUMENT SUBMISSION 08-29-17
100% CD SUBMISSION - ISSUED FOR BID 12-01-17
EARTH
GRAVEL
CONCRETE
CONCRETE MASONRY UNIT
BRICK MASONRY
STEEL/STAINLESS STEEL
ALUMINUM
WOOD BLOCKING / FRAMING SHIM OR NAILER
PLYWOOD
HARDWOOD
RIGID INSULATION
BATT INSULATION
MORTAR/SAND/STUCCO/
GYPSUM BOARD
SURFACE
ACOUSTIC CEILING
CERAMIC TILE
SECTION NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
NAME OF LEVEL
HEIGHT ABOVE
PROJECT DATUM
XXX
X
XXXX
BUILDING &
WALL SECTION
EXTERIOR ELEVATION
DETAIL BUBBLE
SECTION DETAIL
INTERIOR ELEVATION
(MULTIPLE)
INTERIOR ELEVATION
(SINGLE)
PARTITION TYPE
WINDOW NUMBER
DOOR NUMBER
ROOM TAG
ELEVATION TAG
DRAWING TITLE AND SCALE
EQUIPMENT
NUMBER
NOTE:
SEE CORRESPONDING NUMBERED
LIST ON SHEET WHERE TAG OCCURS
UNLESS NOTED OTHERWISE.
Room name
XXX
ELEVATION
0'-0"
View Name 1/8" = 1'-0"
NORTH ARROW
N
REVISION NUMBER
X
XXXX
X
XXXX
X
XXXX
X
X
X
X
ELEVATION NUMBER AND
SHEET WHERE DRAWN
XXXX
X
XX
X
XX
XXX REVISION
NUMBER
ROOM NAME
ROOM
NUMBER
ELEVATION
NUMBER
SHEET WHERE DRAWN
ELEVATION
NUMBER AND
DIRECTION OF
VIEW
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
/XXXXX
0 4' 8' 16'
KEYNOTE TAG
CLOCK OR
CLOCK
OUTLET
MANUAL FIRE
ALARM PULL
STATION
LIGHT
SWITCH &
DIMMER
DUPLEX
OUTLET
DUPLEX
OUTLET
DESK
INTERCOM
OUTLET
INTERCOM
STATION
TELECOMM
OUTLET
THERMO-
STAT
SPECIAL
PURPOSE
OUTLETS
SPECIAL
PURPOSE
OUTLETS
JUNCTION
BOX
WALL-MTD
TELEPHONE
OUTLET
MEDICAL
GAS
ALARM
PANEL
FEC OR
FHV
CABINET
ELECTRICAL
PANELBOARD
(FLUSH MTD)
COAT
HOOKS
(WALL-MTD)
COAT
HOOK
(DOOR-MTD)
RACEWAY
M A
X H
IG
H
R E
A C
H
M
IN
F O
R C
O N
T R
O L S
M
IN
L O
W R
E A
C H
M A
X H
IG
H
R E
A C
H
M
IN
F O
R C
O N
T R
O L S
1' - 0"
" 6
6"
EQ EQ
CARD READER,
LOCAL ALARM,
OR ARMING
STATION
SWITCH AT
DOOR OR
CASED
OPENING
AUDIBLE
AND/OR
VISUAL FIRE
ALARM
SECURITY
STROBE
LIGHT
(BLUE LIGHT)
FIREMAN'S
TELEPHONE
JACK
DISCONNECT
SWITCH &
MOTOR
STARTER
EMERGENCY
STROBE OR
LIGHT AND/OR
NURSE CALL
LIGHT
8" TYP
" 5
R E
C O
M E
N D
E D
PUSH
BUTTON
SOAP
DISPENSERS
LOW LEVEL
EXIT SIGN
(WHERE
OCCURS) AT
EXIT DOOR
WALL-MOUNTED
EXIT SIGN AT
EXIT DOOR
TACTILE
EXIT SIGN
CEILING LINE
EXIT
EXIT
EXIT
4"
TACTILE
EXIT SIGN
4" EQ EQ
O R
G R
E A
T E
R
M O
U N
T O
N S
T R
IK
E
S
ID
E
A L
IG
N W
IT
H
T O
P O
F A
D
JA
C E
N T
F R
A M
E W
H E
N D
IM
A
B O
V E
D O
O R
H E
A D
IS
O R
G R
E A
T E
R
L O
C A
T E
A B
O V
E D
O O
R F
R A
M E
W H
E N
D
IM
A B
O V
E D
O O
R H
E A
D
PRIMARY ROOM
IDENTIFICATION
SIGN (TYPE B)
FIRE
EQUIPMENT
IDENTIFICATION
SIGN (TYPE D)
MANDATORY
POLICY SIGNS
(TYPE P)
POLICIES AND
DIRECTIVES
SIGN(TYPE Q)
F.E.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
VA CONTRACT NO.
Revisions: Date
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:4
P
M
GENERAL NOTES & SYMBOLS
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB
657-400
G-001
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
VA255-16-C-0252
R
R RADIUS
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
REINF REINFORCED
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
S
S SOUTH
SAN SANITARY
SCHED SCHEDULE
SF SQUARE FOOT (FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
SUSP SUSPEND
SV SHEET VINYL
T
T&G TOUNGE AND GROOVE
TEMP TEMPERED
TERR TERRAZZO
THK THICK
TO TOP OF
TSTAT THERMOSTAT
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
V
VAR VARIES
VC VA SUPPLIED, CONTRACTOR INSTALLED
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VIF VERIFY IN FIELD
VOL VOLUME
VV VA SUPPLIED & INSTALLED
VWC VINYL WALL COVERING
W
W WEST
W/ WITH
W/O WITHOUT
WC WALL COVERING
WD WOOD
WDW WINDOW
WWM WELDED WIRE FABRIC
L
LAM LAMINATE
LAV LAVATORY
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LL LEAD LINED
LT LT
M
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MLWK MILLWORK
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MTL METAL
N
N NORTH
N/A NOT APPLICABLE
NAT NATURAL
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OFIC OWNER FURNISHED INSTALLED BY
CONTRACTOR
OH OPPOSITE HAND
OPNG OPENING
OPT OPTIONAL
P
PAT PATTERN
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PR PAIR
PRE PREFINISHED
PREP PREPARATION
PROVIDE FURNISHE AND INSTALL
PT PAINT
PTME PAINT TO MATCH EXISTING
PTN PARTITION
PWR POWER
Q
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
E
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FA FIRE ALARM
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF&E FURNITURE, FIXTURE AND EQUIPMENT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FIXT FIXTURE
FL FLOOR
FO FACE OF
FP FIRE PROTECTION OR FIREPROOF
FT FOOT
FTG FOOTING
G
GC GENERAL CONTRACTOR
GL GLASS
GYP BD GYPSUM BOARD
H
HAZ MAT HAZARDOUS MATERIALS
HDW HARWARE
HM HOLLOW METAL
HT HEIGHT
I
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
J
J-BOX JUNCTION BOX
JAN JANITOR
JC JANITOR'S CLOSET
JST JOIST
JT JOINT
A
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
AR AS REQUIRED
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
B
BAT BATTEN
BD BOARD
BLDG BUILDING
BLK BLOCKING
BM BEAM
BO BY OWNER
CORR CORRIDOR
C
CC CONTRACTOR SUPPLIED & INSTALLED
CEM CEMENT
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CPT CARPET
CT CERAMIC TILE
CTR CENTER
CTRL CONTROL
D
DAT DATUM
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DN DOWN
DR DOOR
DTL DETAIL
DWG DRAWING
ARCHITECTURAL ABBREVIATIONS
MATERIAL INDICATIONSGRAPHIC SYMBOLS STANDARD MOUNTING HEIGHTS
35% SCHEMATIC DEVELOPMENT SUBMISSION 02-20-17
75% DESIGN DEVELOPMENT SUBMISSION 04-24-17
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
BASIS OF DESIGN - PROTOCOLS
THE BASIS OF DESIGN (BOD) PROTOCOLS APPLY TO ALL SPECIFIED EQUIPMENT, CONSTRUCTION MATERIALS INDICATED AND ALL ASSEMBLY DETAILS CONTAINED WITHIN THE DRAWINGS/ DOCUMENTS OR AS SPECIFICALLY REFERENCED BY SAME. EQUIPMENT AND MATERIAL PERFORMANCE CHARACTERISTICS ALONG WITH ALL DIMENSIONAL LOGISTICS FEATURES THAT AFFECT SIZE, PLACEMENT, REQUIRED CLEARANCES, SPACING, SERVICE ACCESS, DETAILING AND CONNECTION VARIANCES, UTILITIES IMPACTS, HEIGHT, FINISHING (IF REQUIRED), AVAILABILITY, ETC., WHICH NEED TO BE IDENTIFIED TO THE COR AND ALL AFFECTED SUBCONTRACTORS AND BE FULLY COORDINATED BY THE PRIME
CONTRACTOR IF DIFFERENT FROM THE BID/ CONSTRUCTION DOCUMENTS.
BASIS OF DESIGN COMPLIANCE:
1. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND CERTIFY THAT THE CHARACTERISTICS OF THE EQUIPMENT OR MATERIAL HE/SHE WILL BE SUBMITTING FOR REVIEW MEETS OR EXCEEDS THE CAPACITY AND DUTY REQUIREMENTS AS SPECIFIED IN ANY OF THE "BASIS OF DESIGN" SPECIFICATIONS.
2. IF THE EQUIPMENT OR MATERIAL BEING SUBMITTED FOR REVIEW WILL REQUIRE THAT MODIFICATIONS NEED TO BE MADE, TO THE WORK OF THE PROVIDING CONTRACTOR OR THE WORK OF OTHER CONTRACTORS, THE SUBMITTING CONTRACTOR SHALL BE FULLY RESPONSIBLE TO ADVISE/ INFORM THE PRIME CONTRACTOR OF ANY AND ALL SUCH NECESSARY IMPACTS AND POSSIBLE DELAYS AND/OR COSTS AS A PART OF THEIR BID
AND CONSTRUCTION SCOPE OF WORK RESPONSIBILITIES.
3. THE SUBMITTING CONTRACTOR WILL BE FULLY RESPONSIBLE TO COORDINATE ALL DEVIATIONS FROM THE "BASIS OF DESIGN" INTENT WITH THE GENERAL CONTRACTOR AND ALL AFFECTED SUB-CONTRACTORS.
THE FINAL INSTALLATION SHALL NOT COMPROMISE ANY OF THE "BASIS OF DESIGN" PERFORMANCE CHARACTERISTICS NOR SHALL IT ENCUMBER ANY OF THE DESIGN LAYOUT LOGISTICAL NECESSITIES.
4. THE FINAL INSTALLATION SHALL ALSO COMPLY WITH ALL APPLICABLE BUILDING CODES, REGULATIONS, VS REQUIREMENTS PLUS ALLOW THE EQUIPMENT AND/OR MATERIALS TO FUNCTION PROPERLY AND SAFELY.
5. ALL MATERIALS OR EQUIPMENT EQUIVALENT SUBSTITUTIONS SHALL BE PROVIDED ON A CONTRACTOR PREPARED ITEMIZED LISTING PER SUBSTITUTION WITH A FULL AND DETAILED DESCRIPTION OF ALL
SPECIFICATIONS AND KNOWN DEVIATIONS FROM THE ORIGINAL BOD.
6. THE PRIME/GENERAL CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE COR AT THE BEGINNING OF THE PROJECT, ALL SUCH KNOWN DEVIATIONS AND IMPACTS FROM THE SPECIFIC BASIS OF DESIGN
SPECIFICATIONS BEFORE STARTING THE PROJECT AND/OR THE SHOP DRAWING SUBMITTAL.
7. IF ANY UNKNOWN DEVIATIONS FROM THE BOD REQUIREMENTS SURFACE DURING THE CONSTRUCTION PHASE, NOTIFY THE COR IMMEDIATELY AND IDENTIFY ALL IMPACTS FOR THE COR'S EVALUATION AND POSSIBLE
AUTHORIZATION.
FIRE RESISTIVE RATINGS
HAZARDOUS AREA SEPARATION PROTECTION
BUILDING DATA
PROJECT INFORMATION
A. ACCESSIBLE MAIN ENTRY
B. ACCESSIBLE ROUTE FROM ENTRY TO ELEVATOR LOBBY & ACCESSIBLE ELEVATOR
TO ALL FLOORS
C. ACCESSIBLE UNISEX TOILET ROOMS
D. ACCESSIBLE HI-LO DRINKING FOUNTAINS.
E. ALL CONTROLS AND OPERABLE PARTS FULLY COMPLY AND ARE BETWEEN 15" AND
48".
F. ALL SIGNAGE COMPLIES - IS OF BRAILLE AND TACTILE AND IS LOCATED ON THE
DOOR HANDLE SIDE OF DOOR. INSTALLED AT APPROPRIATE HEIGHT AND DISTANCE
FROM DOOR FRAME.
G. ALL STORAGE AREAS FULLY COMPLY - CLOSET RODS, WALL MOUNTED CABINETRY
AND ANY TYPE OF SHELVING IS AT 48" AFF TO TOP OF BOTTOM SHELF.
ABA COMPLIANCE
AUTOMATIC SPRINKLER SYSTEM REQUIREMENT
COMMON PATH TRAVEL DISTANCE
ROOF CONSTRUCTION
DEAD END CORRIDORS
TRAVEL DISTANCE TO EXITS
EXITING REQUIREMENTS
EXTERIOR NON-BEARING WALLS
COLUMNS, BEAMS, GIRDERS, TRUSSES
FLOOR CONSTRUCTION
EXTERIOR BEARING WALLS
INTERIOR BEARING WALL
APPLICABLE CODE
USE/OCCUPANCY (FIRE AREA)
BUILDING
1.5-HOUR
100 FT.
30 FT.
100 FT.
200 FT.
30 FT.
2-HOUR REQUIRED
2-HOUR REQUIRED
YES YES
NFPA 101, 2015IBC, 2015
HEALTH CARE
BUILDING FULLY SPRINKLERED
STANDPIPE SYSTEM REQUIREMENT CLASS I
2-HOUR REQUIRED
1-HOUR
(MOST RESTRICTIVE APPLIES)
200 FT.
< 5 FEET 1-HOUR
< 10 FEET 1-HOUR
<= 30 FEET 1-HOUR
> 30 FEET 0-HOUR (SEP. DIST.)0-HOUR (>40ft. SEP.)
STORAGE ROOMS > 100 SF
STORAGE ROOMS > 50 SF < 100 SF
1-HOUR
1-HOUR 1-HOUR
1-HOUR
(S.F./TOTAL BLDG.)
APPLICABLE CODE
MAXIMUM ALLOWABLE AREA
ACTUAL HEIGHT
ACTUAL AREA
NFPA 101, 2015IBC, 2015
12'-8"/1 STORY ABOVE GRADE
2000 SF
NOT LIMITED
AUTOMATIC SPRINKLER INCREASE
MAXIMUM ALLOWABLE HEIGHT
ALLOWABLE HEIGHT
CONSTRUCTION TYPE
USE GROUP
APPLICABLE CODE
USE/OCCUPANCY (FIRE AREA)
BUILDING
1-HOUR AREA
SEPARATION PARTITION
TYPE I-B TYPE II (222)
I-2; INSTITUTIONAL
1-HOUR AREA
SEPARATION PARTITION
HEALTHCARE
CH.18; NEW
NFPA 101, 2015IBC, 2015
I-2: HEALTHCARE
(504.2)
(S.F./FLR.)MAXIMUM ALLOWABLE AREA UNLIMITED
UNLIMITED
4 STORIES
5 STORIES
BUILDING FULLY SPRINKLERED
GENERAL BUILDING INFORMATION
1. CONSTRUCTION CLASSIFICATION:
2. AUTOMATIC FIRE SUPPRESSION:
3. OCCUPANCIES CLASSIFICATION:
2-HOUR PROVIDED
2-HOUR PROVIDED
2-HOUR PROVIDED
2-HOUR REQUIRED
2-HOUR PROVIDED
SOILED LINEN ROOMS 1-HOUR 1-HOUR
SHAFT ENCLOSURES (MORE THAN 4 ST.) 2-HOUR 2-HOUR
STAIRWAY (MORE THAN 4 ST.) 2-HOUR 2-HOUR
1250 SF
OCCUPANT LOADS 2000 SF/7 SF PER PERSON = 286
OCCUPANTS
CODE COMPLIANCE
APPLICABLE CODES
A. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
B. INTERNATIONAL BUILDING CODE (IBC) 2015.
C. NFPA 101 LIFE SAFETY CODE 2015.
D. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.
E. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
F. VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
G. NATIONAL ELECTRICAL CODE (NEC) 2014.
H. INTERNATIONAL PLUMBING CODE (IPC) 2015.
I. ASME BOILER AND PRESSURE VESSEL CODE 2015.
J. ASME CODE FOR PRESSURE PIPING.
K. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13).
L. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE
INSTITUTE AND COMMENTARY (ACI 318).
M. INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2015.
EGRESS REQUIREMENTS
APPLICABLE CODE NFPA 101, 2015IBC, 2015
STAIR WIDTH 48 INCHES 44 INCHES
4. AREA OF WORK:
TYPE I-B
ALL AREAS IN ACCORDANCE WITH NFPA 13
IBC GROUP I-2 OCCUPANCY
RENOVATION AND ADDITION TO THE
EXISTING MAIN LOBBY OF BUILDING 1
PROJECT AREA: 2000 SF - ADDITION
1250 SF - RENOVATION
5. BUILDING: EXISTING CONCRETE AND MASONRY STRUCTURE
ORIGINALLY BUILT CIRCA 1940 CURRENTLY USED
AS A HOSPITAL WITH A VARIETY OF OUTPATIENT
CLINIC SPACE, URGI-CENTER, PATIENT SERVICES
AND SUPPORTING DEPARTMENTS. THE BUILDING
HAS (5) OCCUPIED FLOORS (GROUND, FIRST,
SECOND, THIRD, FOURTH, FIFTH), MECHANICAL
ROOM IN THE BASEMENT, ELEVATOR SHAFT ON
SIXTH FLOOR AND A PENTHOUSE.
(1ST FLOOR ADDITION)
(EXISTING BUILDING) I-2; INSTITUTIONAL
A-3; ASSEMBLY
(1ST FLOOR ADDITION)
(EXISTING BUILDING)
(1ST FLOOR ADDITION)
(1ST FLOOR ADDITION)
(1ST FLOOR RENOVATION)
(1ST FLOOR ADDITION) WHEN PERFORMING WORK (DEMOLITION OR NEW) IN OCCUPIED SPACES, THE FOLLOWING PROTECTION PROTOCOLS WILL BE FOLLOWED ON A DAILY BASIS UNLESS MODIFIED IN WRITING BY THE COR ON A CASE BY CASE BASIS:
1. CAREFULLY MOVE/RELOCATE ANY SIGNAGE, WALL HUNG ITEMS,BLINDS, CURTAINS, ETC. THAT ARE IN THE AREA/ZONE WHERE THE WORK IS TO BE ACCOMPLISHED AND IN DANGER OF BEING DAMAGED BY THE PERFORMANCE OF THE WORK, INCLUDING DAMAGE THAT CAN BE CAUSED BY FALLING OBJECTS, DUST OR MOISTURE. NOTE: THIS ALSO APPLIES TO THE DIRECT ACCESS ROUTE THRU THE OCCUPIED ARE TO AND FROM THE ACTUAL WORK AREA/ZONE. NOTE: THE VA WILL BE RESPONSIBLE TO MOVE/RELOCATE ANY FURNITURE, EQUIPMENT, BOXES, FILES, USER BELONGINGS, ETC. THAT WOULD BE IN THE AREA OF WORK AND OBSTRUCT/INTERFERE WITH THE PERFORMANCE OF THE CONTRACTOR'S WORK. COORDINATE ALL REQUIRED VA
RELOCATIONS WITH THE COR.
2. CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE PREVENTION BARRIERS/COVERS FOR ALL SUCH ITEMS ADDRESSED ABOVE INCLUDING THE ADDITIONAL PROTECTION OF ALL WALL SURFACES/FINISHES, WINDOWS/GLAZING, DOORS, FRAMES, HARDWARE, CARPETING, FLOOR COVERINGS, WALL BASE, CEILING CONSTRUCTION, TILE, GRID, WALL ANGLES, LIGHT
FIXTURES, DIFFUSERS, GRILLES, ETC.
3. FLOOR FINISHES SHALL BE PROTECTED THROUGHOUT THE AREA WITH A 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN) TEMPORARY TARPAULIN(S)/DROP CLOTH(S) AS A MINIMUM FOR DUST, MOISTURE AND VERY LIGHT FOOT TRAFFIC
PROTECTION.
4. ALL MAIN TRAFFIC AREAS TO AND FROM ALONG WITH INSIDE THE WORK ZONE/AREAS SHALL HAVE ADDITIONAL PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/16" TEMPERED HARDBOARD (MASONITE) 4' X 8' PANELS. ALL MASONITE PANELS SHALL BE FIRMLY HELD TOGETHER AND SECURED IN PLACE VIA THE USE OF AN INDUSTRY APPROVED 2" HEAVY DUTY CONSTRUCTION ADHESIVE TAPE, INTENDED FOR THIS APPLCIATION. NOTE: ALL BOARD TO BOARD JOINTS WILL BE FULLY TAPED THE LENGTH OF THE JOINT AND ALL BOARD TO VISQUEEN JOINTS WILL BE TAPED AT 4' ON CENTER WITH A MINIMUM 8" LENGTH OF TAPE. PAINTERS TAPE AND/OR MASKING TAPE ARE NOT CONSIDERED EQUIVALENTS TO THE HD CONSTRUCTION ADHESIVE TAPE BEING SPECIFIED.
5. CONSTRUCT A TEMPORARY FULL HEIGHT, FULLY SEALED, CONTAINMENT ENCLOSURE AROUND ALL CONSTRUCTION AREAS/ZONES IN ORDER TO CONTAIN AS MUCH DUST AND DEBRIS AS POSSIBLE DURING THE PERFORMANCE OF ANY
DEMOLITION, CONSTRUCTION AND CLEAN-UP WORK.
6. THE TEMPORARY FULL HEIGHT CONTAINMENT ENCLOSURES SHOULD BE CONSTRUCTED OF A MINIMUM 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN) WITH THE USE OF THE APPROPRIATE TELESCOPICALLY ADJUSTABLE ALUMINUM OR METAL VERTICAL SPRING LOADED SUPPORT STUDS/POLES. FULL HEIGHT FOAM PADDED RAILS, PRESSURE FIT AT ALL PERIMETER WALL/PARTITION CONNECTION CONDITIONS ARE TO BE UTILIZED IN ORDER TO MINIMIZE THE USE OF TAPE SEALS ON
ALL FINISHED WALL SURFACES.
7. WHEN ALL WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC LOCATION(S), SCHEDULED TASKING AND IDENTIFIED PERIOD OF TIME THE ENTIRE AREA IS TO BE FULLY CLEANED-UP, ALL TEMPORARY CONTAINMENT ENCLOSURES AND PROTECTION REMOVED WITH ALL FURNITURE AND EQUIPMENT RETURNED TO THEIR PRIOR FUNCTIONING POSITIONS. NOTE: FULLY CLEANED- UP MEANS COMMERCIALLY VACUUM CLEANED WITH ALL SURFACES BEING FULLY WIPED DOWN AND DUST FREE AS ACCEPTED
PRIOR TO THE CONTRACTORS WORK.
8. ALL SPACES WILL BE RETURNED TO THE USER, BY THE CONTRACTOR, AS A COMMERCIALLY CLEAN ENVIRONMENT WITH ALL OPEN CONSTRUCTION SURFACES SEALED WITH TEMPORARY CONSTRUCTION MATERIALS INCLUDING THE USE OF 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN), IN ORDER TO AVOID DUST PARTICLES FROM THE CONSTRUCTION ARE IGRATING
INTO THE OCCUPIED USERS AREA/SPACE/ROOM(S).
9. UNLESS DIRECTLY SPECIFIED AND CONFIRMED BY THE COR, ALL TEMPORARY PROTECTION AND ENCLOSURES ARE TO BE SET- UP AND KNOCKED-DOWN ON A DAILY BASIS SUCH THAT THE USERS OF THE OCCUPIED AREAS ARE NOT TO BE INCONVENIENCED AND PREVENTED FROM FUNCTIONING WITHIN THEIR SPACE/AREA/ROOMS(S) DURING THEIR NORMAL BUSINESS HOURS OF
OPERATIONS.
OCCUPIED AREA PROTECTION PROTOCOLS
N. ASHRAE 90.1 - 2013.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
VA CONTRACT NO.
Revisions: Date
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:4
P
M
CODE INFORMATION AND DESIGN
PROTOCOLS
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB II
657-400
G-002
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
VA255-16-C-0252
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
B
LD
G . 2
B
LD
G . 3
BLDG. 1
BLDG. 4
BLDG. 20
BLDG. 23
BLDG. 5
BLDG. 7
BLDG. 8
IR
M
B
LD
G . 6
N . W
E S T W
O O
D B O
U
LE
V A
R D
CONTRACTOR STAGING
AREA
AREA OF WORK
APPROXIMATE LOCATION OF
CONTRACTOR STAGING AREA.
G.C. TO PROVIDE LOGISTICS PLAN
TO BE APPROVED BY VA.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
VA CONTRACT NO.
Revisions: Date
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:4
P
M
SITE PLAN
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB
657-400
G-003
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
VA255-16-C-0252
NOT TO SCALE
ARCHITECTURAL SITE PLAN
N
75% DESIGN DEVELOPMENT SUBMISSION 04-24-17
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
MEN'S
TOILET
WAX ROOM
EQUIP. STORAGE
MECH. ROOM
BREAK ROOM
TRASH CART
MECH. ROOM
GSTAIR
AC SHOP
44A
UNION OFFICE
RECORDS
44B
MECH. ROOM
CONFERENCE ROOM
45A
BACKUP STORAGE
ELEC. SHOP
ELEC. CLO.
GD
BIOMED
BIOMED SHOP
STORAGE
COUMADIN CLINIC
ELEC. STO.
COUMADIN
STO.
COUMADIN
CLO.
GSTAIR
SUPERVISOR
OFFICE
OFFICE
ELEC. CLO.
01D
CLO.
47A
TELECOMMUNICATIONS
EXAM ROOM
EXAM ROOM
14A
PROCEDURE
PROCEDURE
15A
EXAM
EYE CLINIC
16A
CHECK-IN
STORAGE
11A
MECH. ROOM
EYE CLINIC
10C
EYE CLINIC
10B
EYE CLINIC
10A
EYE GLASS SALES
EYE CLO.
09B
GSTAIR
ENTRANCE
09A
MECH. ROOM
RECONCILLIATION
07Q
ELEC. CLO.
07T
DISPENSING
07B
PHARMACY WAITING RM.
07A
DISPENSING
07H
STOCK AREA
07I
SECRETARY
07O
DIRECTOR'S OFFICE
07C
IV HOOD
ROOM
07L
IV ROOM
07E
CLO.
07P
IV TECH.
07D
CHEMO
HD ROOM
07F
NARCOTICS
ROOM
07G
HVAC RM.
07S
TOILET
07R
BREAKROOM
07N
CORRIDOR
GB
CALL CENTER
07J
PURCHASER'S
OFFICE
07K
STORAGE
07M
PIPE
CHASE
01C
CHUTE
GSTAIR
5PROSTHETICS
EXAM 1
OFFICE
STORAGE
01A
OFFICE
ALARM SYSTEM
CREDIT UNION
WOMEN'S
TOILET
79A
WOMEN'S
TOILET/SHOWER
79A
LINEN CHUTE
ELEC. CLO.
GA1
SERVER ROOM
TELECOM SWITCH
PIPE CHASE
01B
PHYSICAL THERAPY
EXAM 2
18A
WAITING ROOM
17B
CHECK-IN
17C
TOILET
17A
MEN'S
TOILET/SHOWER
MEN'S LOCKER
ROOM
CLO.
GSTAIR
STORAGE
68A
STORAGE
STORAGE
STORAGE
74 MORGUE
EMS STORAGE
WOMEN'S LOCKER
ROOM
H o o d
Va u lt
E P
D W
Frid g e
H o o d
SYMBOLS LIST
PARTITION LEGEND
0'-0" EGRESS PATH AND DISTANCE
FIRE EXTINGUISHER
EXIT SIGN
EXIT DIRECTION
FIRE BARRIER (1 HR)
AREA NOT IN CONTRACT
INTERIM LIFE SAFEY MEASURES - ILSM
1. CONTRACTOR SHALL REVIEW THE FOLLOWING SECTIONS WITHIN THE
PROJECT MANUAL FOR A FULL WRITTEN DESCRIPTION OF INTERIM
LIFE SAFETY MEASURES. SECTION 01 01 10, 1 HOUR CONSTRUCTION
SMOKE BARRIER HOUR, SECTION 01 35 26, CH 1.13 - FSS, FIRE SAFETY
SECTION, SECTION 01 35 26, CH 1.12- IC, INFECTION CONTROL AND
SECTION 01 01 10, SN, SPECIAL NOTES.
2. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY SMOKE
DETECTORS AS PER VA REQUIREMENTS. CONNECT INTO EXISTING
FIRE ALARM SYSTEM IN RESPECTIVE BUILDING AREA/ZONE.
CONTRACTOR SHALL CONSULT WITH VA FIRE ALARM CONTROL
COMPANY AND PERFORM CERTIFICATION TESTING THATTEMPORARY
DEVICES ARE IN OPERATION. SUBMIT WRITTEN CERTIFICATION TESTING
REPORT TO THE COR. AT PROJECT COMPLETION PHASE CONTRACTOR
SHALL REMOVE TEMPORARY SMOKE DETECTORS AND RESPECTIVE FIRE
ALARM WRING AND CONDUITS.
3. ONCE TEMPORARY CONSTRUCTION/SMOKE BARRIERS AND SMOKE
DETECTORS ARE IN PLACE THEN THE VA WILL DRAIN THE FIRE
PROTECTION/SPRINKLER ZONE FOR PROJECT AREA/SPACE.
CONTRACTOR SHALL ASSIST THE VA WITH THIS OPERATION AND SCOPE
OF WORK.
4. SMOKE DETECTORS SHALL BE COVERED DURING WORKING HOURS, AND
UNCOVERED DURING NON-WORKING HOURS.
5. CONTRACTOR SHALL THEN REMOVE FIRE PROTECTION BRANCH PIPING
FROM THE MAIN SPRINKLER LINE. PROVIDE CAPS/PLUGS AT
RESPECTIVE BRANCH POINTS OFF THE MAINS. AFTER CAPS/PLUGS
HAVE BEEN INSTALLED THEN THE VA WILL REFILL FIRE PROTECTION
SYSTEM WITH WATER. CONTRACTOR SHALL INSPECT ALL CAP/PLUG
LOCATIONS TO ASSURE A WATERTIGHT CONDITION AND MAKE ANY
CORRECTIONS AS NECESSARY. REFER TO FIRE PROTECTION
DRAWING FP-100 FOR EXTENT OF WORK.
6. AT PROJECT COMPLETION PHASE OF WORK THE VA WILL DRAIN THE FIRE
PROTECTION/SPRINKLER SYSTEM FOR THE INSTALLATION OF THE
RESPECTIVE BRANCH PIPING. ONCE BRANCH PIPING CONNECTIONS HAVE
BEEN MADE THEN THE FIRE PROTECTION SYSTEM WILL BE REFILLED WITH
WATER.
7. RENOVATED AREA IS NEW OCCUPANCY ASSEMBLY AND SHOULD BE FULLY
SPRINKLED WITH QUICK RESPONSE SPRINKLERS (QRS).
FIRE/SMOKE BARRIER (1HR)
FIRE BARRIER (2 HR)
FIRE/SMOKE BARRIER (2HR)
12'-0"
140'-0"
UNEXCAVATEDUNEXCAVATED
8'-0"
NEW BASEMENT EXHAUST
PIPING - REFER TO MECHANICAL
FOR EXTENT AND LOCATION OF
NEW PIPING.
EXIST. ROOMS TO BE VACATED
DURING CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
VA CONTRACT NO.
Revisions: Date
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:5
P
M
LOWER LEVEL LIFE SAFETY PLAN
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB II
657-400
G-004
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
VA255-16-C-0252
N
1/16" = 1'-0"
LOWER LEVEL LIFE SAFETY PLAN
0 8' 16' 32'
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
INFO.
DESK
ROOM
ROOM
POLICE
MEDICAL
RECORDS
RELEASE
OF
INFORMATION
PATIENT
REP QM
ELEV.
P1
DATA
CABLE RUN
1003A
ELEV.
P2
MEN'S
TOILET
WOMEN'S
TOILET
ACS
PRGM. SPPT.
PACT
CLOSET
1065A
AGENT
CASHIER
PRIMARY CARE
WAITING ROOM
EXAM RM./
DOCTOR OFFICE
NURSE
PRACTITIONER
EXAM RM.
EXAM ROOM
OFFICE
NUTRITION
CLINIC
HOLDING AREA
CLO.
MEN'S
TOILET
WAITING ROOM
OEF/OIF
PROGRAM
MANAGER
BUSINESS
OFFICE
1STAIR
C&P CHECK IN
TOILET/
STO.
WOMEN VETS
PROGRAM
COORDINATION
C&P STO.
ROOM
1STAIR
A
MEDICATION
ROOM
BUSINESS
OFFICE
BUSINESS
OFFICE
BUSINESS
OFFICE
OEF/OIF
CASE
MANAGER
OEF/OIF
CASE
MANAGER
EXAM
ROOM
OFFICE
LOCKER ROOM
C&P EXAM
SOILED
LINEN/
CLO.
WOMEN'S
TOILET
ELEC. CLO.
1A1
ADMISSIONS
URGENT
CARE
1STAIR
TREATMENT
ROOM
TREATMENT
ROOM
TREATMENT
ROOM
TREATMENT
ROOM
1130A
DENTAL LAB
OFFICE
CLO.
1115A
SUPPLY
ORAL
SURGERY
DENTAL
TREATMENT
CLERK'S
OFFICE
1111BREAK
RM.
DENTAL
WAITING
ROOM
COMPRESSOR
ELEC. CLO.
1110B
WAITING
ROOM
1110A
FACILITATOR
1007A
WOMEN'S
TOILET
MEN'S
TOILET
1STAIR
ASST.
FACILITATOR
PHARMACIST
1009A
EXAM
ROOM
EXAM
ROOM
1STAIR
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
1STAIR
B
EXAM
ROOM
ELEC.
CLO.
MEN'S
TOILET
EXAM
ROOM
APRN, BC
1027A
EXAM
NURSES
STATION
EXAM
ROOM
EXAM
ROOM
1025A
ACS
1064A
CALL CENTER
ELEC. CLO.
1A3
ACS
BHL
PRIMARY
CARE
MH/BHL
EXAM
ROOM
EXAM
ROOM
1STAIR
TOILET
UNUSABLE
TOILET
CLINICAL NURSE
ELEC. CLO.
STAFF WORK
AREA
EXAM ROOM
EXAM ROOM
EXAM ROOM
1STAIR
C
NURSING
CLINIC
PRIMARY CARE
EXAM ROOM
EXAM ROOM
EXAM ROOM
MEDICAL
SUPPLY
TOILET
1STAIR
MEAL ASSEMBLY
MEAL ASSEMBLY
MEAL ASSEMBLY
FOOD PREP.
INGREDIENT CONTROL
FOOD STORAGE
STO. ROOM
SUPPLY
ROOM
OXYGEN
STORAGE
WASH
ROOM
EQUIP./
COMPRESSOR
ROOM
FROZEN
FOOD
STORAGE
LOADING DOCK
STO.
ROOM
WOMEN'S
TOILET
MEN'S
TOILET
CORRIDOR D
1D
DISH WASHING
DISH WASHING
FOOD PREPARATION
1STAIR
ELEC. CLO.
1068A
ELEV.
WEST LOBBY
MAIN LOBBY
RECEPTION
1003B
VESTIBULE
EAST LOBBY
CORRIDOR
1A
CHIEF
DIETITIAN
1075A
CHIEF OF
DINING SERVICE
FOOD
COOLER
SUPERVISOR
ELEC.
CLO.
1D2
ELEC. CLO.
WOMEN'S
TOILET
TELEPHONE
SYSTEM
1060A
EXAM ROOM
ELEC. CLO.
1166A
CHILLED
FOOD
STORAGE
STO.
ROOM
CORRIDOR E
1E
CORRIDOR F
1F
CORRIDOR C
1C
CORRIDOR B
1B
20'-0"
30'-0" 30'-0"
20'-0"
20'-0"
SYMBOLS LIST
PARTITION LEGEND
0'-0" EGRESS PATH AND DISTANCE
FIRE EXTINGUISHER
EXIT SIGN
EXIT DIRECTION
FIRE BARRIER (1 HR)
AREA NOT IN CONTRACT
INTERIM LIFE SAFEY MEASURES - ILSM
1. CONTRACTOR SHALL REVIEW THE FOLLOWING SECTIONS WITHIN THE
PROJECT MANUAL FOR A FULL WRITTEN DESCRIPTION OF INTERIM
LIFE SAFETY MEASURES. SECTION 01 01 10, 1 HOUR CONSTRUCTION
SMOKE BARRIER HOUR, SECTION 01 35 26, CH 1.13 - FSS, FIRE SAFETY
SECTION, SECTION 01 35 26, CH 1.12- IC, INFECTION CONTROL AND
SECTION 01 01 10, SN, SPECIAL NOTES.
2. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY SMOKE
DETECTORS AS PER VA REQUIREMENTS. CONNECT INTO EXISTING
FIRE ALARM SYSTEM IN RESPECTIVE BUILDING AREA/ZONE.
CONTRACTOR SHALL CONSULT WITH VA FIRE ALARM CONTROL
COMPANY AND PERFORM CERTIFICATION TESTING THATTEMPORARY
DEVICES ARE IN OPERATION. SUBMIT WRITTEN CERTIFICATION TESTING
REPORT TO THE COR. AT PROJECT COMPLETION PHASE CONTRACTOR
SHALL REMOVE TEMPORARY SMOKE DETECTORS AND RESPECTIVE FIRE
ALARM WRING AND CONDUITS.
3. ONCE TEMPORARY CONSTRUCTION/SMOKE BARRIERS AND SMOKE
DETECTORS ARE IN PLACE THEN THE VA WILL DRAIN THE FIRE
PROTECTION/SPRINKLER ZONE FOR PROJECT AREA/SPACE.
CONTRACTOR SHALL ASSIST THE VA WITH THIS OPERATION AND SCOPE
OF WORK.
4. SMOKE DETECTORS SHALL BE COVERED DURING WORKING HOURS, AND
UNCOVERED DURING NON-WORKING HOURS.
5. CONTRACTOR SHALL THEN REMOVE FIRE PROTECTION BRANCH PIPING
FROM THE MAIN SPRINKLER LINE. PROVIDE CAPS/PLUGS AT
RESPECTIVE BRANCH POINTS OFF THE MAINS. AFTER CAPS/PLUGS
HAVE BEEN INSTALLED THEN THE VA WILL REFILL FIRE PROTECTION
SYSTEM WITH WATER. CONTRACTOR SHALL INSPECT ALL CAP/PLUG
LOCATIONS TO ASSURE A WATERTIGHT CONDITION AND MAKE ANY
CORRECTIONS AS NECESSARY. REFER TO FIRE PROTECTION
DRAWING FP-100 FOR EXTENT OF WORK.
6. AT PROJECT COMPLETION PHASE OF WORK THE VA WILL DRAIN THE FIRE
PROTECTION/SPRINKLER SYSTEM FOR THE INSTALLATION OF THE
RESPECTIVE BRANCH PIPING. ONCE BRANCH PIPING CONNECTIONS HAVE
BEEN MADE THEN THE FIRE PROTECTION SYSTEM WILL BE REFILLED WITH
WATER.
7. RENOVATED AREA IS NEW OCCUPANCY ASSEMBLY AND SHOULD BE FULLY
SPRINKLED WITH QUICK RESPONSE SPRINKLERS (QRS).
FIRE/SMOKE BARRIER (1HR)
FIRE BARRIER (2 HR)
FIRE/SMOKE BARRIER (2HR)
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
VA CONTRACT NO.
Revisions: Date
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:5
P
M
FIRST FLOOR LIFE SAFETY PLAN
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB II
657-400
G-005
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
VA255-16-C-0252
N
1/16" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
0 8' 16' 32'
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
WOMEN'S
TOILET
MEN'S
TOILET
SUPPLY
ROOM
ELEV.
P1
ELEC. CLO.
2000B
ELEV.
P2
ELEV.
2STAIR
BREAK
ROOM
NUCLEAR MEDICINE
IMAGING ROOM
RADIOLOGY TECH.
OFFICE/
WORKROOM
WAITING ROOM
RADIOLOGY/LAB
WAITING ROOM
RADIOLOGY/LAB
RADIOLOGY/
LAB
CHECK IN
TOILET
2055A
PHLEBOTOMY
2STAIR
LAB
SUPERVISOR
OFFICE
HEALTH
SYSTEMS
SPECIALIST
OFFICE
PIV/REGISTRAR
ROOM
SUPERVISORY
PROGRAM
SUPPORT
ASSISTANT
OFFICE
WOMEN'S
TOILET
WOMEN'S
TOILET
PATIENT SAFETY
OFFICE
HOUSEKEEPING
CLOSET
2STAIR
ADMINISTRATIVE STORAGE/
FILE ROOM
PRIMARY CARE
MGMT.
ASSISTANT OFFICE
2113A
PRIMARY CARE
SECRETARY
OFFICE
PRIMARY CARE
ASSOC.
DIR. OFFICE
MEN'S LOCKER
ROOM
DIRECTOR'S OFFICE
FILE ROOM
CHAPEL
CHAPLAIN'S
OFFICE
COMPLIANCE
OFFICER
CONFERENCE
ROOM
STORAGE
ROOM
2STAIR
CHAPLAIN OFFICE
BEHAVIORAL
HEALTH
SUPERVISOR
ASSOCIATE DIRECTOR
SECRETARY OFFICE
ASSOCIATE
DIRECTOR
OFFICE
PROGRAM
DIRECTOR
MENTAL HEALTH
SECRETARY OFFICE
PROGRAM
DIRECTOR
MENTAL HEALTH
OFFICE
ASSOCIATE
CHIEF OF STAFF
PRIMARY CARE
OFFICE
PRIMARY CARE
PROGRAM SUPPORT
ASSISTANT
OFFICE
EEO OFFICE
EXECUTIVE
ASSISTANT
2127A
KITCHEN
SUPPLY
ROOM
2070B
LUNCHROOM/VENDING
MACHINE
EMPLOYEE
LUNCHROOM
VOLUNTEER
OFFICE
2077A
VOLUNTEER
OFFICE
HEADQUARTERS
VETERAN
CANTEEN
SERVICE
CHIEF OFFICE
2STAIR
SUPPLY
ROOM
2070A
SUPPLY
ROOM
2070C
STORAGE/SUPPLY ROOM
2074A
CANTEEN
ELEC. CLO.
2D
CORRIDOR
2075A
STORAGE
ROOM
2075B
STORAGE
ROOM
2077B
STO.
RM.
2078C
VOLUNTARY
SERVICE
CHIEF
OFFICE
2078B
VOLUNTARY
SERVICE
OFFICE
2078A
VOLUNTARY
SERVICE
OFFICE
CRAFTS
STORAGE
ROOM
OI&T & DATA
CABLE RUN
2000A
STO. RM.
2077C
STORAGE ROOM
STAIR
CONFERENCE
ROOM
DIRECTOR'S
OFFICE
2098A
CHIEF OF
STAFF
OFFICE
2098B
DIRECTOR'S
SUITE
2097B
CORRIDOR E
2E
FILE ROOM
2109B
SHAFT
CT COOLING
SYSTEM
2002A
HOT LAB
NUCLEAR MEDICINE
IMAGING ROOM
BONE DENSITY
IMAGING
ROOM
CT SCANNER
IMAGING ROOM
MEN'S
TOILET
CRASH
CART
ELEV.
MACHINE
HEMOTOLOGY
ANCILLARY
CLOSET
HOUSEKEEPING
CLO.
REAGENT/SUPPLIES
ROOM
HOUSEKEEPING
CLOSET
TOILET
CHEMISTRY
SPECIMEN &
REGEANT
STORAGE
BREAK
ROOM
LAB INFO.
OFFICE
ELEC.
CLO.
2C
LAB COAT
CLO.
2054A
MICROBIOLOGY
2037B
CULTURE
ROOM
BLOOD BANK/
HISTOLOGY
2037A
LAB
SUPPLY
ROOM
RECORDS/
SUPPLY
STORAGE
ELEC. CLO.
STO./SUPPLY
ROOM
X-RAY
IMAGING ROOM
LOCKER/
CHANGING
ROOM
STO.
ROOM
X-RAY
IMAGING ROOM
X-RAY
CONTROL ROOM
LOCKER/
CHANGING
ROOM
STO.
ROOM
X-RAY
IMAGING ROOM
2STAIR
B
TRANSCRIPT
OFFICE
RADIOLOGIST
OFFICE
RADIOLOGIST
OFFICE
2018A
RADIOLOGY
SUPERVISOR
OFFICE
2STAIR
ULTRASOUND
ULTRASOUND
WOMEN'S
TOILET
CT CONTROL
ROOM
LINEN CHUTE/
HK CLO.
STAIR
2STAIR
A
TOILET
(STO.)
STO. RM.
TOILET
CORRIDOR F
2F
ELEC.
CLO.
2F
CORRIDOR D
2D
CLO.
2042A
CORRIDOR C
2C
CT STO. ROOM/
ELECTRICAL
CLEAN
LINEN
CORRIDOR B
2B
ELEC. CLO.
2A1 CORRIDOR
SYMBOLS LIST
PARTITION LEGEND
0'-0" EGRESS PATH AND DISTANCE
FIRE EXTINGUISHER
EXIT SIGN
EXIT DIRECTION
FIRE BARRIER (1 HR)
AREA NOT IN CONTRACT
INTERIM LIFE SAFEY MEASURES - ILSM
1. CONTRACTOR SHALL REVIEW THE FOLLOWING SECTIONS WITHIN THE
PROJECT MANUAL FOR A FULL WRITTEN DESCRIPTION OF INTERIM
LIFE SAFETY MEASURES. SECTION 01 01 10, 1 HOUR CONSTRUCTION
SMOKE BARRIER HOUR, SECTION 01 35 26, CH 1.13 - FSS, FIRE SAFETY
SECTION, SECTION 01 35 26, CH 1.12- IC, INFECTION CONTROL AND
SECTION 01 01 10, SN, SPECIAL NOTES.
2. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY SMOKE
DETECTORS AS PER VA REQUIREMENTS. CONNECT INTO EXISTING
FIRE ALARM SYSTEM IN RESPECTIVE BUILDING AREA/ZONE.
CONTRACTOR SHALL CONSULT WITH VA FIRE ALARM CONTROL
COMPANY AND PERFORM CERTIFICATION TESTING THATTEMPORARY
DEVICES ARE IN OPERATION. SUBMIT WRITTEN CERTIFICATION TESTING
REPORT TO THE COR. AT PROJECT COMPLETION PHASE CONTRACTOR
SHALL REMOVE TEMPORARY SMOKE DETECTORS AND RESPECTIVE FIRE
ALARM WRING AND CONDUITS.
3. ONCE TEMPORARY CONSTRUCTION/SMOKE BARRIERS AND SMOKE
DETECTORS ARE IN PLACE THEN THE VA WILL DRAIN THE FIRE
PROTECTION/SPRINKLER ZONE FOR PROJECT AREA/SPACE.
CONTRACTOR SHALL ASSIST THE VA WITH THIS OPERATION AND SCOPE
OF WORK.
4. SMOKE DETECTORS SHALL BE COVERED DURING WORKING HOURS, AND
UNCOVERED DURING NON-WORKING HOURS.
5. CONTRACTOR SHALL THEN REMOVE FIRE PROTECTION BRANCH PIPING
FROM THE MAIN SPRINKLER LINE. PROVIDE CAPS/PLUGS AT
RESPECTIVE BRANCH POINTS OFF THE MAINS. AFTER CAPS/PLUGS
HAVE BEEN INSTALLED THEN THE VA WILL REFILL FIRE PROTECTION
SYSTEM WITH WATER. CONTRACTOR SHALL INSPECT ALL CAP/PLUG
LOCATIONS TO ASSURE A WATERTIGHT CONDITION AND MAKE ANY
CORRECTIONS AS NECESSARY. REFER TO FIRE PROTECTION
DRAWING FP-100 FOR EXTENT OF WORK.
6. AT PROJECT COMPLETION PHASE OF WORK THE VA WILL DRAIN THE FIRE
PROTECTION/SPRINKLER SYSTEM FOR THE INSTALLATION OF THE
RESPECTIVE BRANCH PIPING. ONCE BRANCH PIPING CONNECTIONS HAVE
BEEN MADE THEN THE FIRE PROTECTION SYSTEM WILL BE REFILLED WITH
WATER.
7. RENOVATED AREA IS NEW OCCUPANCY ASSEMBLY AND SHOULD BE FULLY
SPRINKLED WITH QUICK RESPONSE SPRINKLERS (QRS).
FIRE/SMOKE BARRIER (1HR)
FIRE BARRIER (2 HR)
FIRE/SMOKE BARRIER (2HR)
20'-0"
132'-0"
OPEN
TO
BELOW
NEW
ROOF RTU RTU NEW
ROOF
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
VA CONTRACT NO.
Revisions: Date
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:5
P
M
SECOND FLOOR LIFE SAFETY PLAN
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB II
657-400
G-006
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
VA255-16-C-0252
N
1/16" = 1'-0"
SECOND FLOOR LIFE SAFETY PLAN
0 8' 16' 32'
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
VA CONTRACT NO.
Revisions: Date
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:5
P
M
PERSPECTIVE IMAGES
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB
657-400
G-100
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
VA255-16-C-0252
A
PERSPECTIVE VIEW - ENTRY - SOUTH
B
PERSPECTIVE VIEW - VESTIBULE
H
PERSPECTIVE VIEW - EXTERIOR
F
PERSPECTIVE VIEW - MAIN LOBBY - NORTH
I
PERSPECTIVE VIEW - EXTERIOR 2
J
PERSPECTIVE VIEW - ROOF SCREEN 1
K
PRESPECTIVE VIEW - ROOF SCREENS
G
PERSPECTIVE VIEW - STARBUCKS
C
PERSPECTIVE VIEW - WEST LOBBY LOOKING EAST
E
PERSPECTIVE VIEW - MAIN LOBBY - NORTH WEST
D
PERSPECTIVE VIEW - WEST LOBBY AREA
35% SCHEMATIC DEVELOPMENT SUBMISSION 02-20-17
75% DESIGN DEVELOPMENT SUBMISSION 04-24-17
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
CONT. FIRESAFING
SEALANT TOP &
BOTTOM BOTH SIDES
3 5/8" MTL. RUNNER
CHANNELS TOP &
BOTTOM
3 5/8" MTL. STUDS
@ 16" O.C.
FULL DEPTH SOUND
BLANKET
1 HR. CONSTRUCTION-
UL 465
CORRIDOR SIDE
5/8" GYP. BD. TYPE
'X' EA. SIDE
EXIST'G FLOOR
TAPE VISQUINE TO
FLOOR W/ PAINTERS
TAPE
PROJECT SIDE
6 MM. (MIN.) FIRE
RETARDANT
VISQUINE
TAPE VISQUINE TO
UNDERSIDE OF
STRUCTURE W/
DUCT TAPE
EXTEND PARTITION TO
UNDERSIDE OF
EXISTING STRUCTURE
G-400
T/FLOOR
ELEV.= +0'-0"
B/STRUCTURE
ELEV.= EXIST.
TRILOGY BRAND LEVER
LOCKSET W/ REMOVABLE
CORE - STOREROOM
FUNCTION W/ KEYPAD
DOOR CLOSER
ZONE
DIGITAL PRESSURE
DIFFERENTIAL
MONITOR (TRIATEK OR
APPROVED EQUAL)
HAND SANITIZER
42" x 84" H.M. DOOR IN H.M.
FRAME, 45 MIN. RATED W/
SEALS (PAINTED YELLOW)
EXTEND PARTITION
WALLS TO
UNDERSIDE OF
EXISTING
STRUCTURE
TYPICAL FOR (1) OUTER ENTRANCE
SIMILAR FOR (1) INNER ENTRANCE (NO SIGN, SANITZER, LOCK, OR MONITOR)
CAUTION
CONSTRUCTION
PARTITION TAG
ROOM NAME
AND NUMBER
DOOR TAG
FLOOR PLAN LEGEND INFECTION CONTROL REQUIRED BY CLASS INFECTION CONTROL NOTES
PROJECT 607-14-106 IDENTIFIED AS CLASS 3 RISK GROUP
HVAC CONNECTIONS TO EXISTING SYSTEM TO BE DISCONECTED DURING CONSTRUCTION.
G.C. TO SUPPLY A NEGATIVE PRESSURE MACHINE OF SUFFICIENT SIZE & QUANTITY TO
ADEQUATELY HANDLE CONSTRUCTION AREAS.
ALL AREAS OF NEGATIVE AIR WILL BE MONITORED BY A TRIATEK MONITOR PER MADISON
VA GUIDELINES.
CONTRACTOR WILL VERIFY AND TEST NEGATIVE AIR FLOW.*
CONTRACTOR TO MAINTAIN A NEGATIVE AIR PRESSURE LOG.*
CONSTRUCTION BARRIER DETAILS TO FOLLOW DETAIL 2 THIS SHEET*
ALL TEMPORARY CONSTRUCTION DOORS TO BE METAL, 1 HR. FIRE RATED, W/METAL
FRAMES, CLOSERS AND SEALS. TEMPORARY CONSTRUCTION DOORS MUST HAVE A
SINGLE MECHANISM EXIT THAT ALLOWS QUICK EXIT FROM WITHIN THE CONSTRUCTION
AREA PER LIFE SAFETY CODES.
CONTRACTOR TO PROVIDE LOCKS ON ALL CONSTRUCTION ENTRANCES AND SUPPLY
THE COR WITH NO LESS THAN FIVE (5) KEYS. THE CONTRACTOR MUST MAINTAIN A
PROJECT SIGN-IN SHEET FOR ALL PERSONS ENTERING THE CONSTRUCTION SITE. THIS
SIGN-IN SHEET WILL BE SUPPLIED TO THE COR AT THE END OF EACH WORK WEEK.
ALL CONTRACTORS WORKING ON VA PROPERTY MUST MAINTAIN A CONTRACTOR
BADGE BEFORE BEGINNING ANY WORK ON VA PROPERTY.
ALL CONSTRUCTION ENTRANCES TO BE PROPERLY LABELED TO COMPLY WITH VA AND
OSHA REQUIREMENTS.
CONTRACTOR TO PROVIDE 24" X 36" WALK OFF MATS AND CHANGE THEM AS NEEDED
AT EACH ENTRANCE POINT.
CONTRACTOR TO PROVIDE HAND SANITIZERS AT ALL ENTRANCE POINTS.*
CONTRACTOR TO SUPPLY SPILL KIT, TO INCLUDE SHOP VAC, MULTI PURPOSE SPILL
CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS.
ALL NEW CONSTRUCTION MATERIALS, TOOLS AND EQUIPMENT PASSING THROUGH
HOSPITAL TO BE COVERED WITH 4 MIL. POLY SHEETS.
THE CONTRACTOR SHALL NOT BLOCK OR HINDER THE USE OF THE BUILDINGS BY
PATIENTS, STAFF & VISITORS.
ALL MATERIALS AND EQUIPMENT MUST BE PROPERLY STORED IN DESIGNATED AREAS.
ALL DEBRIS AND GARBAGE THAT IS TO BE REMOVED THROUGH THE HOSPITAL MUST BE
CONTAINED IN DUMP CARTS DESIGNED FOR THAT PURPOSE AND MUST BE COVERED
WITH A FULL COVER OR LID.
ALL DEBRIS AND GARBAGE THAT IS TO BE REMOVED THROUGH THE HOSPITAL MUST BE
CONTAINED IN FLAMMABLE MATERIALS MAY NOT BE STORED IN BUILDINGS.
COORDINATE DEBRIS REMOVAL W/ POSTED TIMES FOR ELEVATOR #5 AVAILABILITY. ALL
DEBRIS REMOVAL ON ELEVATOR #5 ONLY.*
AREA NOT
IN CONTRACT
EXISTING
PARTITION
NEW
PARTITION
EXISTING DOOR
NEW DOOR
XXXX
XXXX
X
XXX
MATERIAL DELIVERY/DEBRIS REMOVAL:
ROUTE FROM CONSTRUCTION
AREA TO SERVICE ELEVATORS
REMOVE OR ISOLATE HVAC SYSTEM
IN AREA WHERE WORK IS BEING
DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
COMPLETE ALL CRITICAL BARRIERS
I.E. SHEETROCK, PLYWOOD, PLASTIC,
TO SEAL AREA FROM NON WORK
AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART W/PLASTIC COVERING
AND SEALED CONNECTION TO WORK
SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. BARRIERS
OR BE ERECTED AFTER 6:00PM M-F
OR ANYTIME ON WEEKENDS.
1.
2.
MAINTAIN NEGATIVE AIR PRESSURE
WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS.
3.
CONTAIN CONSTRUCTION WASTE
BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
4.
COVER TRANSPORT RECEPTACLES
OR CARTS. TAPE COVERING UNLESS
SOLID LID.
5.
USE OPERABLE WINDOW WHEN ACCESSIBLE FOR HEPA AIR EXHAUST. OBTAIN VA C.O.R.
APPROVAL FOR EXHAUSTING IN EXISTING DUCTWORK. SEE PLAN FOR PROPOSED
LOCATION OF HEPA EXHAUST.
1.
2.
3.
4.
DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE C.O.R., OWNER'S
SAFETY DEPARTMENT, AND INFECTION
CONTROL DEPARTMENT, AND THOROUGHLY
CLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
BARRIERS TO BE REMOVED AFTER 6:00PM
M-F OR ANYTIME ON WEEKENDS.
VACUUM WORK AREA WITH HEPA
FILTERED VACUUMS.
WET MOP AREA WITH DISINFECTANT
5. REMOVE ISOLATION OF HVAC SYSTEM
IN AREAS WHERE WORK IS BEING
PERFORMED.
INFECTION CONTROL RISK ASSESSMENT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs
VA CONTRACT NO.
Revisions: Date
U :\6
-4
_J
JP
V
A M
C (C
E N
TR
A
L) _2
0 1 7_ cr ol lin s.
rv t
/1
8/ 2 0
2:
:5
P
M
PHASING GENERAL NOTES AND
DETAILS
16-126
IMPROVE ACCESS TO MAIN
LOBBY
1500 N. WESTWOOD BLVD,
POPLAR BLUFF, MO 63901
12-01-2017 DM AB
657-400
G-400
100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID
VA255-16-C-0252
1 1/2" = 1'-0"
DETAIL - CONSTRUCTION BARRIER
3/8" = 1'-0"
ELEVATION - TEMPORARY PROTECTION ENTRY
35% SCHEMATIC DEVELOPMENT SUBMISSION 02-20-17
75% DESIGN DEVELOPMENT SUBMISSION 04-24-17
95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17
INFO.
DESK
ROOM
ROOM
POLICE
MEDICAL
RECORDS
RELEASE
OF
INFORMATION
PATIENT
REP QM
ELEV.
P1
DATA
CABLE RUN
1003A
ELEV.
P2
MEN'S
TOILET
WOMEN'S
TOILET
ACS
PRGM. SPPT.
PACT
CLOSET
1065A
AGENT
CASHIER
PRIMARY CARE
WAITING ROOM
1064OFFICE
NUTRITION
CLINIC
HOLDING AREA
MEN'S
TOILET
WAITING ROOM
OEF/OIF
PROGRAM
MANAGER
BUSINESS
OFFICE
FACILITATOR
1007A
WOMEN'S
TOILET
FACILITATOR
PHARMACIST
EXAM
ROOM
EXAM
ROOM
ACS
1064A
ELEC. CLO.
1068A
ELEV.
INFO.
DESK
ROOM
ROOM
POLICE
MEDICAL
RECORDS
RELEASE
OF
INFORMATION
PATIENT
REP QM
ELEV.
P1
DATA
CABLE RUN
1003A
ELEV.
P2
MEN'S
TOILET
WOMEN'S
TOILET
ACS
PRGM. SPPT.
PACT
CLOSET
1065A
AGENT
CASHIER
PRIMARY CARE
WAITING ROOM
1064OFFICE
NUTRITION
CLINIC
HOLDING AREA
MEN'S
TOILET
WAITING ROOM
OEF/OIF
PROGRAM
MANAGER
BUSINESS
OFFICE
FACILITATOR
1007A
WOMEN'S
TOILET
FACILITATOR
PHARMACIST
EXAM
ROOM
EXAM
ROOM
ACS
1064A
ELEC. CLO.
1068A
ELEV.
ELEV.
P1
ELEC. CLO.
2000B
ELEV.
P2
ELEV.
BREAK
ROOM
NUCLEAR MEDICINE
IMAGING ROOM
RADIOLOGY TECH.
OFFICE/
WORKROOM
RADIOLOGY/
LAB
CHECK IN
HEALTH
SYSTEMS
SPECIALIST
OFFICE
PIV/REGISTRAR
ROOM
SUPERVISORY
PROGRAM
SUPPORT
ASSISTANT
OFFICE
CHAPLAIN OFFICE
BEHAVIORAL
HEALTH
SUPERVISOR
ASSOCIATE DIRECTOR
SECRETARY OFFICE
ASSOCIATE
DIRECTOR
OFFICE
PROGRAM
DIRECTOR
MENTAL HEALTH
SECRETARY OFFICE
PROGRAM
DIRECTOR
MENTAL HEALTH
OFFICE
ASSOCIATE
CHIEF OF STAFF
PRIMARY CARE
OFFICE
PRIMARY CARE
PROGRAM SUPPORT
ASSISTANT
OFFICE
EEO OFFICE
EXECUTIVE
ASSISTANT
2127A
OI&T & DATA
CABLE RUN
2000A
SHAFT
CT COOLING
SYSTEM
2002A
HOT LAB
NUCLEAR MEDICINE
IMAGING ROOM
BONE DENSITY
IMAGING
ROOM
CT SCANNER
IMAGING ROOM
CRASH
CART
ULTRASOUND
ULTRASOUND
WOMEN'S
TOILET
CT CONTROL
ROOM
LINEN CHUTE/
HK CLO.
STO. RM.
TOILET
CT STO. ROOM/
ELECTRICAL
MEN'S
TOILET
WOMEN'S
TOILET
SUPPLY RM.
S D
S D
ELEV.
P1
ELEC. CLO.
2000B
ELEV.
P2
ELEV.
BREAK
ROOM
NUCLEAR MEDICINE
IMAGING ROOM
RADIOL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.