36C25518R0177-005.pdf

PDF 37 MB Posted

Attached to
657-400, MAIN LOBBY ACCESS IMPROVEMENT Federal contract opportunity
Solicitation number
36C25518R0177
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

36C25518R0177 657400_100_BID_DRAWINGS.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 657-400, MAIN LOBBY ACCESS IMPROVEMENT, newest first.
File Type Posted
36C25518R0177-00001002.pdf PDF
36C25518R0177-00001000.docx DOCX document
36C25518R0177-00001001.pdf PDF
36C25518R0177-003.pdf PDF
36C25518R0177-001.docx DOCX document
36C25518R0177-002.pdf PDF
36C25518R0177-004.pdf PDF
36C25518R0177-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA OF WORK

N

POPLAR BLUFF

N

BLDG. 1

BLDG. 2

N . W

E

ST

W O

O D

B O

U

LE

V

AR

D

BLDG. 3

BLDG. 4

BLDG. 20

BLDG. 23

BLDG. 5

BLDG. 7

BLDG. 8

IRM BLDG. 6

AREA OF

WORK

N

PROFESSIONAL SEALS

CIVIL

STRUCTURAL

ARCHITECTURAL

FIRE PROTECTION

PLUMBING

MECHANICAL

ELECTRICAL

ASBESTOS

Engineering, Inc.

18207 Edison Avenue

Chesterfield, Missouri 63005

Phone: 636.530.7770 Fax: 636.530.7877

Missouri Certificate of Authority #NC 001244

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

BANCROFT ARCHITECTS + ENGINEERS

VA PROJECT NO:

VA CONTRACT NO:

BANCROFT PROJECT NO:

PROJECT LOCATION:

PROJECT TITLE:

BUILDING NUMBER:

ARCHITECTS + ENGINEERS:

Revisions: Date

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007 T:847.952.9362 F:847.952.9403 www.bancroft-ae.com

SSC ENGINEERING, INC.

ENGINEERING CONSULTANT:

18207 Edison Avenue St. Louis, MO 63005 T:636.530.7770 F:636.530.7877

PROJECT NUMBERS:

STOCK & ASSOCIATES CONSULTING ENGINEERS

CIVIL CONSULTANT:

257 Chesterfield Business Parkway Chesterfield, MO 63005 T:636.530.9100 F:636.530.9130

JOHN. A. JURGIEL & ASSOCIATES, INC.

ENVIRONMENTAL & SAFETY CONSULTANT:

123 N. MAIN STREET

ST. CHARLES, MISSOURI 63301

T:636.757.3060 F:636.757.3064

257 Chesterfield Business Parkway St. Louis, MO 63005 T (636) 530-9100 F (636) 530-9130

18207 Edison Avenue Chesterfield, MO 63005 T (636) 530-7770 F (636) 530-7877 MO. Certificate of Authority #NC 001244

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:2

P

M

COVER SHEET

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB

657-400

G-000

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

JOHN J. PERSHING VAMC

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

IMPROVE ACCESS TO MAIN LOBBY

657-400

VA255-16-C-0252

16-126

DRAWING INDEX

NUMBER TITLE

DRAWN

BY

01 GENERAL

G-000 COVER SHEET BAE

G-001 GENERAL NOTES & SYMBOLS BAE

G-002 CODE INFORMATION AND DESIGN PROTOCOLS BAE

G-003 SITE PLAN BAE

G-004 LOWER LEVEL LIFE SAFETY PLAN BAE

G-005 FIRST FLOOR LIFE SAFETY PLAN BAE

G-006 SECOND FLOOR LIFE SAFETY PLAN BAE

G-400 PHASING GENERAL NOTES AND DETAILS BAE

G-401 PARTIAL FIRST FLOOR INFECTION CONTROL PHASING PLANS BAE

02 CIVIL

C-100 ROOF DRAIN LATERAL PLAN STOCK

03 ASBESTOS

HA-101 ABATEMENT - BASEMENT FLOOR PLAN JURGIEL

HA-102 ABATEMENT - 1ST FLOOR PLANS JURGIEL

HA-103 ABATEMENT - 2ND FLOOR PLANS JURGIEL

04 STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES SSC

S-002 STRUCTURAL GENERAL NOTES SSC

S-003 STRUCTURAL TYPICAL DETAILS SSC

S-004 STRUCTURAL TYPICAL DETAILS SSC

SD-101 STRUCTURAL FOUNDATION DEMO PLAN SSC

SD-102 STRUCTURAL ROOF DEMO PLAN SSC

S-101 STRUCTURAL FOUNDATION PLAN SSC

S-201 STRUCTURAL ROOF FRAMING PLAN SSC

S-301 STRUCTURAL FOUNDATION SECTIONS SSC

S-401 STRUCTURAL FRAMING SECTIONS SSC

05 ARCHITECTURAL

AD-100.1 PARTIAL FOUNDATION DEMOLITION PLAN BAE

AD-101 FIRST FLOOR - DEMOLITION PLAN BAE

AD-101.1 PARTIAL FIRST FLOOR DEMOLITION PLAN BAE

AD-130 PARTIAL FIRST FLOOR - REFLECTED CEILING DEMOLITION PLAN BAE

A-100.1 PARTIAL FOUNDATION PLAN BAE

A-101 FIRST FLOOR - GENERAL ARRANGEMENT PLAN BAE

A-101.1 PARTIAL FIRST FLOOR PLAN BAE

A-101.1 (ALT. 9) PARTIAL FIRST FLOOR PLAN - DEDUCT ALTERNATE 9 BAE

A-102 PARTIAL SECOND FLOOR & ROOF PLAN BAE

A-130 PARTIAL FIRST FLOOR - REFLECTED CEILING PLAN BAE

A-130 (ALT. 1) PARTIAL FIRST FLOOR - REFLECTED CEILING PLAN - DEDUCT ALTERNATE 1 BAE

A-131 REFLECTED CEILING DETAILS BAE

A-201 EXTERIOR ELEVATIONS BAE

A-202 EXTERIOR ELEVATIONS & AREAWAY ACCESS LADDER DETAILS BAE

A-301 BUILDING SECTIONS BAE

A-302 BUILDING SECTIONS BAE

A-303 BUILDING SECTIONS BAE

A-400 ENLARGED PLANS BAE

A-401 INTERIOR ELEVATIONS BAE

A-430 DETAILS BAE

A-431 DETAILS BAE

A-432 DETAILS BAE

A-433 DETAILS - AREAWAY BAE

A-500 BUILDING WALL SECTIONS BAE

A-501 BUILDING WALL SECTIONS BAE

A-510 PARTITION TYPES & DETAILS BAE

A-520 MILLWORK DETAILS BAE

A-601 DOOR & WINDOW SCHEDULE AND DETAILS BAE

I-101 PARTIAL FIRST FLOOR - FINISH PLAN & EQUIPMENT PLAN BAE

I-301 PARTIAL FIRST FLOOR - SIGNAGE PLAN BAE

I-320 SIGNAGE TYPES BAE

I-601 FINISH SCHEDULE, LEGEND, & FINISH DETAILS BAE

06 FIRE PROTECTION

FP-001 FIRE PROTECTION SYMBOLS, NOTES & SCHEDULES SSC

FPD-101 FIRE PROTECTION FIRST FLOOR PLAN – DEMOLITION SSC

FPD-102 FIRE PROTECTION SECOND FLOOR PLAN – DEMOLITION SSC

FP-101 FIRE PROTECTION FIRST FLOOR PLAN – RENOVATION SSC

FP-102 FIRE PROTECTION SECOND FLOOR PLAN – RENOVATION SSC

07 PLUMBING

P-001 PLUMBING SYMBOLS, SCHEDULES AND NOTES SSC

PD-100 PLUMBING PARTIAL BASEMENT, GROUND, 1ST, 2ND, AND 3RD FLOOR STORM PLAN - DEMOLITION SSC

P-100 PLUMBING PARTIAL BASEMENT, GROUND, 1ST, 2ND AND 3RD FLOOR STORM PLAN - RENOVATION SSC

08 MECHANICAL

M-001 MECHANICAL SYMBOLS, LEGEND AND NOTES SSC

MD-101 MECHANICAL SUB-BASEMENT & GROUND FLOOR PLANS - DEMOLITION SSC

MD-102 MECHANICAL 1ST FLOOR PLANS - DEMOLITION SSC

M-101 MECHANICAL SUB-BASEMENT AND GROUND FLOOR PLANS - RENOVATION SSC

M-102 MECHANICAL FIRST FLOOR AND ROOF PLANS - RENOVATION SSC

M-501 MECHANICAL DETAILS SSC

M-502 MECHANICAL DETAILS SSC

M-503 MECHANICAL FLOW SCHEMATICS / CONTROLS SSC

M-601 MECHANICAL SCHEDULES SSC

09 ELECTRICAL

E-001 ELECTRICAL SYMBOLS, NOTES & LEGENDS SSC

ED-101 ELECTRICAL 1ST FLOOR PLAN - DEMOLITION SSC

E-101 ELECTRICAL 1ST FLOOR LIGHTING PLAN - RENOVATION SSC

E-201 ELECTRICAL 1ST FLOOR POWER & SYSTEMS PLAN - RENOVATION SSC

E-301 ELECTRICAL BASEMENT AND ROOF POWER PLAN - RENOVATION SSC

NOT TO SCALE

VICINITY MAP

NOT TO SCALE

STATE MAP

NOT TO SCALE

SITE PLAN

NOT TO SCALE

PERSPECTIVE LOOKING NORTHEAST

35% SCHEMATIC DEVELOPMENT SUBMISSION 02-20-17

75% DESIGN DEVELOPMENT SUBMISSION 04-24-17

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

100% CONSTRUCTION DOCUMENT SUBMISSION 08-29-17

100% CD SUBMISSION - ISSUED FOR BID 12-01-17

EARTH

GRAVEL

CONCRETE

CONCRETE MASONRY UNIT

BRICK MASONRY

STEEL/STAINLESS STEEL

ALUMINUM

WOOD BLOCKING / FRAMING SHIM OR NAILER

PLYWOOD

HARDWOOD

RIGID INSULATION

BATT INSULATION

MORTAR/SAND/STUCCO/

GYPSUM BOARD

SURFACE

ACOUSTIC CEILING

CERAMIC TILE

SECTION NUMBER

SHEET WHERE DRAWN

DETAIL NUMBER

SHEET WHERE DRAWN

NAME OF LEVEL

HEIGHT ABOVE

PROJECT DATUM

XXX

X

XXXX

BUILDING &

WALL SECTION

EXTERIOR ELEVATION

DETAIL BUBBLE

SECTION DETAIL

INTERIOR ELEVATION

(MULTIPLE)

INTERIOR ELEVATION

(SINGLE)

PARTITION TYPE

WINDOW NUMBER

DOOR NUMBER

ROOM TAG

ELEVATION TAG

DRAWING TITLE AND SCALE

EQUIPMENT

NUMBER

NOTE:

SEE CORRESPONDING NUMBERED

LIST ON SHEET WHERE TAG OCCURS

UNLESS NOTED OTHERWISE.

Room name

XXX

ELEVATION

0'-0"

View Name 1/8" = 1'-0"

NORTH ARROW

N

REVISION NUMBER

X

XXXX

X

XXXX

X

XXXX

X

X

X

X

ELEVATION NUMBER AND

SHEET WHERE DRAWN

XXXX

X

XX

X

XX

XXX REVISION

NUMBER

ROOM NAME

ROOM

NUMBER

ELEVATION

NUMBER

SHEET WHERE DRAWN

ELEVATION

NUMBER AND

DIRECTION OF

VIEW

SHEET WHERE DRAWN

DETAIL NUMBER

SHEET WHERE DRAWN

/XXXXX

0 4' 8' 16'

KEYNOTE TAG

CLOCK OR

CLOCK

OUTLET

MANUAL FIRE

ALARM PULL

STATION

LIGHT

SWITCH &

DIMMER

DUPLEX

OUTLET

DUPLEX

OUTLET

DESK

INTERCOM

OUTLET

INTERCOM

STATION

TELECOMM

OUTLET

THERMO-

STAT

SPECIAL

PURPOSE

OUTLETS

SPECIAL

PURPOSE

OUTLETS

JUNCTION

BOX

WALL-MTD

TELEPHONE

OUTLET

MEDICAL

GAS

ALARM

PANEL

FEC OR

FHV

CABINET

ELECTRICAL

PANELBOARD

(FLUSH MTD)

COAT

HOOKS

(WALL-MTD)

COAT

HOOK

(DOOR-MTD)

RACEWAY

M A

X H

IG

H

R E

A C

H

M

IN

F O

R C

O N

T R

O L S

M

IN

L O

W R

E A

C H

M A

X H

IG

H

R E

A C

H

M

IN

F O

R C

O N

T R

O L S

1' - 0"

" 6

6"

EQ EQ

CARD READER,

LOCAL ALARM,

OR ARMING

STATION

SWITCH AT

DOOR OR

CASED

OPENING

AUDIBLE

AND/OR

VISUAL FIRE

ALARM

SECURITY

STROBE

LIGHT

(BLUE LIGHT)

FIREMAN'S

TELEPHONE

JACK

DISCONNECT

SWITCH &

MOTOR

STARTER

EMERGENCY

STROBE OR

LIGHT AND/OR

NURSE CALL

LIGHT

8" TYP

" 5

R E

C O

M E

N D

E D

PUSH

BUTTON

SOAP

DISPENSERS

LOW LEVEL

EXIT SIGN

(WHERE

OCCURS) AT

EXIT DOOR

WALL-MOUNTED

EXIT SIGN AT

EXIT DOOR

TACTILE

EXIT SIGN

CEILING LINE

EXIT

EXIT

EXIT

4"

TACTILE

EXIT SIGN

4" EQ EQ

O R

G R

E A

T E

R

M O

U N

T O

N S

T R

IK

E

S

ID

E

A L

IG

N W

IT

H

T O

P O

F A

D

JA

C E

N T

F R

A M

E W

H E

N D

IM

A

B O

V E

D O

O R

H E

A D

IS

O R

G R

E A

T E

R

L O

C A

T E

A B

O V

E D

O O

R F

R A

M E

W H

E N

D

IM

A B

O V

E D

O O

R H

E A

D

PRIMARY ROOM

IDENTIFICATION

SIGN (TYPE B)

FIRE

EQUIPMENT

IDENTIFICATION

SIGN (TYPE D)

MANDATORY

POLICY SIGNS

(TYPE P)

POLICIES AND

DIRECTIVES

SIGN(TYPE Q)

F.E.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

VA CONTRACT NO.

Revisions: Date

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:4

P

M

GENERAL NOTES & SYMBOLS

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB

657-400

G-001

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

VA255-16-C-0252

R

R RADIUS

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

REINF REINFORCED

REQD REQUIRED

RM ROOM

RO ROUGH OPENING

S

S SOUTH

SAN SANITARY

SCHED SCHEDULE

SF SQUARE FOOT (FEET)

SHT SHEET

SIM SIMILAR

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STOR STORAGE

SUSP SUSPEND

SV SHEET VINYL

T

T&G TOUNGE AND GROOVE

TEMP TEMPERED

TERR TERRAZZO

THK THICK

TO TOP OF

TSTAT THERMOSTAT

TYP TYPICAL

U

UNO UNLESS NOTED OTHERWISE

V

VAR VARIES

VC VA SUPPLIED, CONTRACTOR INSTALLED

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VIF VERIFY IN FIELD

VOL VOLUME

VV VA SUPPLIED & INSTALLED

VWC VINYL WALL COVERING

W

W WEST

W/ WITH

W/O WITHOUT

WC WALL COVERING

WD WOOD

WDW WINDOW

WWM WELDED WIRE FABRIC

L

LAM LAMINATE

LAV LAVATORY

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LL LEAD LINED

LT LT

M

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MLWK MILLWORK

MO MASONRY OPENING

MR MOISTURE RESISTANT

MTD MOUNTED

MTG MOUNTING

MTL METAL

N

N NORTH

N/A NOT APPLICABLE

NAT NATURAL

NIC NOT IN CONTRACT

NO NUMBER

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OFIC OWNER FURNISHED INSTALLED BY

CONTRACTOR

OH OPPOSITE HAND

OPNG OPENING

OPT OPTIONAL

P

PAT PATTERN

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PR PAIR

PRE PREFINISHED

PREP PREPARATION

PROVIDE FURNISHE AND INSTALL

PT PAINT

PTME PAINT TO MATCH EXISTING

PTN PARTITION

PWR POWER

Q

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

E

E EAST

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ENCL ENCLOSURE

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FA FIRE ALARM

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF&E FURNITURE, FIXTURE AND EQUIPMENT

FHC FIRE HOSE CABINET

FIG FIGURE

FIN FINISH

FIXT FIXTURE

FL FLOOR

FO FACE OF

FP FIRE PROTECTION OR FIREPROOF

FT FOOT

FTG FOOTING

G

GC GENERAL CONTRACTOR

GL GLASS

GYP BD GYPSUM BOARD

H

HAZ MAT HAZARDOUS MATERIALS

HDW HARWARE

HM HOLLOW METAL

HT HEIGHT

I

INCL INCLUDED

INSUL INSULATION

INT INTERIOR

J

J-BOX JUNCTION BOX

JAN JANITOR

JC JANITOR'S CLOSET

JST JOIST

JT JOINT

A

ACT ACOUSTICAL CEILING TILE

ADJ ADJACENT

AFF ABOVE FINISH FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATE

AR AS REQUIRED

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVG AVERAGE

B

BAT BATTEN

BD BOARD

BLDG BUILDING

BLK BLOCKING

BM BEAM

BO BY OWNER

CORR CORRIDOR

C

CC CONTRACTOR SUPPLIED & INSTALLED

CEM CEMENT

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

CPT CARPET

CT CERAMIC TILE

CTR CENTER

CTRL CONTROL

D

DAT DATUM

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA DIAMETER

DIFF DIFFUSER

DIM DIMENSION

DN DOWN

DR DOOR

DTL DETAIL

DWG DRAWING

ARCHITECTURAL ABBREVIATIONS

MATERIAL INDICATIONSGRAPHIC SYMBOLS STANDARD MOUNTING HEIGHTS

35% SCHEMATIC DEVELOPMENT SUBMISSION 02-20-17

75% DESIGN DEVELOPMENT SUBMISSION 04-24-17

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

BASIS OF DESIGN - PROTOCOLS

THE BASIS OF DESIGN (BOD) PROTOCOLS APPLY TO ALL SPECIFIED EQUIPMENT, CONSTRUCTION MATERIALS INDICATED AND ALL ASSEMBLY DETAILS CONTAINED WITHIN THE DRAWINGS/ DOCUMENTS OR AS SPECIFICALLY REFERENCED BY SAME. EQUIPMENT AND MATERIAL PERFORMANCE CHARACTERISTICS ALONG WITH ALL DIMENSIONAL LOGISTICS FEATURES THAT AFFECT SIZE, PLACEMENT, REQUIRED CLEARANCES, SPACING, SERVICE ACCESS, DETAILING AND CONNECTION VARIANCES, UTILITIES IMPACTS, HEIGHT, FINISHING (IF REQUIRED), AVAILABILITY, ETC., WHICH NEED TO BE IDENTIFIED TO THE COR AND ALL AFFECTED SUBCONTRACTORS AND BE FULLY COORDINATED BY THE PRIME

CONTRACTOR IF DIFFERENT FROM THE BID/ CONSTRUCTION DOCUMENTS.

BASIS OF DESIGN COMPLIANCE:

1. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND CERTIFY THAT THE CHARACTERISTICS OF THE EQUIPMENT OR MATERIAL HE/SHE WILL BE SUBMITTING FOR REVIEW MEETS OR EXCEEDS THE CAPACITY AND DUTY REQUIREMENTS AS SPECIFIED IN ANY OF THE "BASIS OF DESIGN" SPECIFICATIONS.

2. IF THE EQUIPMENT OR MATERIAL BEING SUBMITTED FOR REVIEW WILL REQUIRE THAT MODIFICATIONS NEED TO BE MADE, TO THE WORK OF THE PROVIDING CONTRACTOR OR THE WORK OF OTHER CONTRACTORS, THE SUBMITTING CONTRACTOR SHALL BE FULLY RESPONSIBLE TO ADVISE/ INFORM THE PRIME CONTRACTOR OF ANY AND ALL SUCH NECESSARY IMPACTS AND POSSIBLE DELAYS AND/OR COSTS AS A PART OF THEIR BID

AND CONSTRUCTION SCOPE OF WORK RESPONSIBILITIES.

3. THE SUBMITTING CONTRACTOR WILL BE FULLY RESPONSIBLE TO COORDINATE ALL DEVIATIONS FROM THE "BASIS OF DESIGN" INTENT WITH THE GENERAL CONTRACTOR AND ALL AFFECTED SUB-CONTRACTORS.

THE FINAL INSTALLATION SHALL NOT COMPROMISE ANY OF THE "BASIS OF DESIGN" PERFORMANCE CHARACTERISTICS NOR SHALL IT ENCUMBER ANY OF THE DESIGN LAYOUT LOGISTICAL NECESSITIES.

4. THE FINAL INSTALLATION SHALL ALSO COMPLY WITH ALL APPLICABLE BUILDING CODES, REGULATIONS, VS REQUIREMENTS PLUS ALLOW THE EQUIPMENT AND/OR MATERIALS TO FUNCTION PROPERLY AND SAFELY.

5. ALL MATERIALS OR EQUIPMENT EQUIVALENT SUBSTITUTIONS SHALL BE PROVIDED ON A CONTRACTOR PREPARED ITEMIZED LISTING PER SUBSTITUTION WITH A FULL AND DETAILED DESCRIPTION OF ALL

SPECIFICATIONS AND KNOWN DEVIATIONS FROM THE ORIGINAL BOD.

6. THE PRIME/GENERAL CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE COR AT THE BEGINNING OF THE PROJECT, ALL SUCH KNOWN DEVIATIONS AND IMPACTS FROM THE SPECIFIC BASIS OF DESIGN

SPECIFICATIONS BEFORE STARTING THE PROJECT AND/OR THE SHOP DRAWING SUBMITTAL.

7. IF ANY UNKNOWN DEVIATIONS FROM THE BOD REQUIREMENTS SURFACE DURING THE CONSTRUCTION PHASE, NOTIFY THE COR IMMEDIATELY AND IDENTIFY ALL IMPACTS FOR THE COR'S EVALUATION AND POSSIBLE

AUTHORIZATION.

FIRE RESISTIVE RATINGS

HAZARDOUS AREA SEPARATION PROTECTION

BUILDING DATA

PROJECT INFORMATION

A. ACCESSIBLE MAIN ENTRY

B. ACCESSIBLE ROUTE FROM ENTRY TO ELEVATOR LOBBY & ACCESSIBLE ELEVATOR

TO ALL FLOORS

C. ACCESSIBLE UNISEX TOILET ROOMS

D. ACCESSIBLE HI-LO DRINKING FOUNTAINS.

E. ALL CONTROLS AND OPERABLE PARTS FULLY COMPLY AND ARE BETWEEN 15" AND

48".

F. ALL SIGNAGE COMPLIES - IS OF BRAILLE AND TACTILE AND IS LOCATED ON THE

DOOR HANDLE SIDE OF DOOR. INSTALLED AT APPROPRIATE HEIGHT AND DISTANCE

FROM DOOR FRAME.

G. ALL STORAGE AREAS FULLY COMPLY - CLOSET RODS, WALL MOUNTED CABINETRY

AND ANY TYPE OF SHELVING IS AT 48" AFF TO TOP OF BOTTOM SHELF.

ABA COMPLIANCE

AUTOMATIC SPRINKLER SYSTEM REQUIREMENT

COMMON PATH TRAVEL DISTANCE

ROOF CONSTRUCTION

DEAD END CORRIDORS

TRAVEL DISTANCE TO EXITS

EXITING REQUIREMENTS

EXTERIOR NON-BEARING WALLS

COLUMNS, BEAMS, GIRDERS, TRUSSES

FLOOR CONSTRUCTION

EXTERIOR BEARING WALLS

INTERIOR BEARING WALL

APPLICABLE CODE

USE/OCCUPANCY (FIRE AREA)

BUILDING

1.5-HOUR

100 FT.

30 FT.

100 FT.

200 FT.

30 FT.

2-HOUR REQUIRED

2-HOUR REQUIRED

YES YES

NFPA 101, 2015IBC, 2015

HEALTH CARE

BUILDING FULLY SPRINKLERED

STANDPIPE SYSTEM REQUIREMENT CLASS I

2-HOUR REQUIRED

1-HOUR

(MOST RESTRICTIVE APPLIES)

200 FT.

< 5 FEET 1-HOUR

< 10 FEET 1-HOUR

<= 30 FEET 1-HOUR

> 30 FEET 0-HOUR (SEP. DIST.)0-HOUR (>40ft. SEP.)

STORAGE ROOMS > 100 SF

STORAGE ROOMS > 50 SF < 100 SF

1-HOUR

1-HOUR 1-HOUR

1-HOUR

(S.F./TOTAL BLDG.)

APPLICABLE CODE

MAXIMUM ALLOWABLE AREA

ACTUAL HEIGHT

ACTUAL AREA

NFPA 101, 2015IBC, 2015

12'-8"/1 STORY ABOVE GRADE

2000 SF

NOT LIMITED

AUTOMATIC SPRINKLER INCREASE

MAXIMUM ALLOWABLE HEIGHT

ALLOWABLE HEIGHT

CONSTRUCTION TYPE

USE GROUP

APPLICABLE CODE

USE/OCCUPANCY (FIRE AREA)

BUILDING

1-HOUR AREA

SEPARATION PARTITION

TYPE I-B TYPE II (222)

I-2; INSTITUTIONAL

1-HOUR AREA

SEPARATION PARTITION

HEALTHCARE

CH.18; NEW

NFPA 101, 2015IBC, 2015

I-2: HEALTHCARE

(504.2)

(S.F./FLR.)MAXIMUM ALLOWABLE AREA UNLIMITED

UNLIMITED

4 STORIES

5 STORIES

BUILDING FULLY SPRINKLERED

GENERAL BUILDING INFORMATION

1. CONSTRUCTION CLASSIFICATION:

2. AUTOMATIC FIRE SUPPRESSION:

3. OCCUPANCIES CLASSIFICATION:

2-HOUR PROVIDED

2-HOUR PROVIDED

2-HOUR PROVIDED

2-HOUR REQUIRED

2-HOUR PROVIDED

SOILED LINEN ROOMS 1-HOUR 1-HOUR

SHAFT ENCLOSURES (MORE THAN 4 ST.) 2-HOUR 2-HOUR

STAIRWAY (MORE THAN 4 ST.) 2-HOUR 2-HOUR

1250 SF

OCCUPANT LOADS 2000 SF/7 SF PER PERSON = 286

OCCUPANTS

CODE COMPLIANCE

APPLICABLE CODES

A. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

B. INTERNATIONAL BUILDING CODE (IBC) 2015.

C. NFPA 101 LIFE SAFETY CODE 2015.

D. NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

E. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

F. VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

G. NATIONAL ELECTRICAL CODE (NEC) 2014.

H. INTERNATIONAL PLUMBING CODE (IPC) 2015.

I. ASME BOILER AND PRESSURE VESSEL CODE 2015.

J. ASME CODE FOR PRESSURE PIPING.

K. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA

SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13).

L. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE

INSTITUTE AND COMMENTARY (ACI 318).

M. INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2015.

EGRESS REQUIREMENTS

APPLICABLE CODE NFPA 101, 2015IBC, 2015

STAIR WIDTH 48 INCHES 44 INCHES

4. AREA OF WORK:

TYPE I-B

ALL AREAS IN ACCORDANCE WITH NFPA 13

IBC GROUP I-2 OCCUPANCY

RENOVATION AND ADDITION TO THE

EXISTING MAIN LOBBY OF BUILDING 1

PROJECT AREA: 2000 SF - ADDITION

1250 SF - RENOVATION

5. BUILDING: EXISTING CONCRETE AND MASONRY STRUCTURE

ORIGINALLY BUILT CIRCA 1940 CURRENTLY USED

AS A HOSPITAL WITH A VARIETY OF OUTPATIENT

CLINIC SPACE, URGI-CENTER, PATIENT SERVICES

AND SUPPORTING DEPARTMENTS. THE BUILDING

HAS (5) OCCUPIED FLOORS (GROUND, FIRST,

SECOND, THIRD, FOURTH, FIFTH), MECHANICAL

ROOM IN THE BASEMENT, ELEVATOR SHAFT ON

SIXTH FLOOR AND A PENTHOUSE.

(1ST FLOOR ADDITION)

(EXISTING BUILDING) I-2; INSTITUTIONAL

A-3; ASSEMBLY

(1ST FLOOR ADDITION)

(EXISTING BUILDING)

(1ST FLOOR ADDITION)

(1ST FLOOR ADDITION)

(1ST FLOOR RENOVATION)

(1ST FLOOR ADDITION) WHEN PERFORMING WORK (DEMOLITION OR NEW) IN OCCUPIED SPACES, THE FOLLOWING PROTECTION PROTOCOLS WILL BE FOLLOWED ON A DAILY BASIS UNLESS MODIFIED IN WRITING BY THE COR ON A CASE BY CASE BASIS:

1. CAREFULLY MOVE/RELOCATE ANY SIGNAGE, WALL HUNG ITEMS,BLINDS, CURTAINS, ETC. THAT ARE IN THE AREA/ZONE WHERE THE WORK IS TO BE ACCOMPLISHED AND IN DANGER OF BEING DAMAGED BY THE PERFORMANCE OF THE WORK, INCLUDING DAMAGE THAT CAN BE CAUSED BY FALLING OBJECTS, DUST OR MOISTURE. NOTE: THIS ALSO APPLIES TO THE DIRECT ACCESS ROUTE THRU THE OCCUPIED ARE TO AND FROM THE ACTUAL WORK AREA/ZONE. NOTE: THE VA WILL BE RESPONSIBLE TO MOVE/RELOCATE ANY FURNITURE, EQUIPMENT, BOXES, FILES, USER BELONGINGS, ETC. THAT WOULD BE IN THE AREA OF WORK AND OBSTRUCT/INTERFERE WITH THE PERFORMANCE OF THE CONTRACTOR'S WORK. COORDINATE ALL REQUIRED VA

RELOCATIONS WITH THE COR.

2. CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE PREVENTION BARRIERS/COVERS FOR ALL SUCH ITEMS ADDRESSED ABOVE INCLUDING THE ADDITIONAL PROTECTION OF ALL WALL SURFACES/FINISHES, WINDOWS/GLAZING, DOORS, FRAMES, HARDWARE, CARPETING, FLOOR COVERINGS, WALL BASE, CEILING CONSTRUCTION, TILE, GRID, WALL ANGLES, LIGHT

FIXTURES, DIFFUSERS, GRILLES, ETC.

3. FLOOR FINISHES SHALL BE PROTECTED THROUGHOUT THE AREA WITH A 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN) TEMPORARY TARPAULIN(S)/DROP CLOTH(S) AS A MINIMUM FOR DUST, MOISTURE AND VERY LIGHT FOOT TRAFFIC

PROTECTION.

4. ALL MAIN TRAFFIC AREAS TO AND FROM ALONG WITH INSIDE THE WORK ZONE/AREAS SHALL HAVE ADDITIONAL PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/16" TEMPERED HARDBOARD (MASONITE) 4' X 8' PANELS. ALL MASONITE PANELS SHALL BE FIRMLY HELD TOGETHER AND SECURED IN PLACE VIA THE USE OF AN INDUSTRY APPROVED 2" HEAVY DUTY CONSTRUCTION ADHESIVE TAPE, INTENDED FOR THIS APPLCIATION. NOTE: ALL BOARD TO BOARD JOINTS WILL BE FULLY TAPED THE LENGTH OF THE JOINT AND ALL BOARD TO VISQUEEN JOINTS WILL BE TAPED AT 4' ON CENTER WITH A MINIMUM 8" LENGTH OF TAPE. PAINTERS TAPE AND/OR MASKING TAPE ARE NOT CONSIDERED EQUIVALENTS TO THE HD CONSTRUCTION ADHESIVE TAPE BEING SPECIFIED.

5. CONSTRUCT A TEMPORARY FULL HEIGHT, FULLY SEALED, CONTAINMENT ENCLOSURE AROUND ALL CONSTRUCTION AREAS/ZONES IN ORDER TO CONTAIN AS MUCH DUST AND DEBRIS AS POSSIBLE DURING THE PERFORMANCE OF ANY

DEMOLITION, CONSTRUCTION AND CLEAN-UP WORK.

6. THE TEMPORARY FULL HEIGHT CONTAINMENT ENCLOSURES SHOULD BE CONSTRUCTED OF A MINIMUM 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN) WITH THE USE OF THE APPROPRIATE TELESCOPICALLY ADJUSTABLE ALUMINUM OR METAL VERTICAL SPRING LOADED SUPPORT STUDS/POLES. FULL HEIGHT FOAM PADDED RAILS, PRESSURE FIT AT ALL PERIMETER WALL/PARTITION CONNECTION CONDITIONS ARE TO BE UTILIZED IN ORDER TO MINIMIZE THE USE OF TAPE SEALS ON

ALL FINISHED WALL SURFACES.

7. WHEN ALL WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC LOCATION(S), SCHEDULED TASKING AND IDENTIFIED PERIOD OF TIME THE ENTIRE AREA IS TO BE FULLY CLEANED-UP, ALL TEMPORARY CONTAINMENT ENCLOSURES AND PROTECTION REMOVED WITH ALL FURNITURE AND EQUIPMENT RETURNED TO THEIR PRIOR FUNCTIONING POSITIONS. NOTE: FULLY CLEANED- UP MEANS COMMERCIALLY VACUUM CLEANED WITH ALL SURFACES BEING FULLY WIPED DOWN AND DUST FREE AS ACCEPTED

PRIOR TO THE CONTRACTORS WORK.

8. ALL SPACES WILL BE RETURNED TO THE USER, BY THE CONTRACTOR, AS A COMMERCIALLY CLEAN ENVIRONMENT WITH ALL OPEN CONSTRUCTION SURFACES SEALED WITH TEMPORARY CONSTRUCTION MATERIALS INCLUDING THE USE OF 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN), IN ORDER TO AVOID DUST PARTICLES FROM THE CONSTRUCTION ARE IGRATING

INTO THE OCCUPIED USERS AREA/SPACE/ROOM(S).

9. UNLESS DIRECTLY SPECIFIED AND CONFIRMED BY THE COR, ALL TEMPORARY PROTECTION AND ENCLOSURES ARE TO BE SET- UP AND KNOCKED-DOWN ON A DAILY BASIS SUCH THAT THE USERS OF THE OCCUPIED AREAS ARE NOT TO BE INCONVENIENCED AND PREVENTED FROM FUNCTIONING WITHIN THEIR SPACE/AREA/ROOMS(S) DURING THEIR NORMAL BUSINESS HOURS OF

OPERATIONS.

OCCUPIED AREA PROTECTION PROTOCOLS

N. ASHRAE 90.1 - 2013.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

VA CONTRACT NO.

Revisions: Date

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:4

P

M

CODE INFORMATION AND DESIGN

PROTOCOLS

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB II

657-400

G-002

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

VA255-16-C-0252

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

B

LD

G . 2

B

LD

G . 3

BLDG. 1

BLDG. 4

BLDG. 20

BLDG. 23

BLDG. 5

BLDG. 7

BLDG. 8

IR

M

B

LD

G . 6

N . W

E S T W

O O

D B O

U

LE

V A

R D

CONTRACTOR STAGING

AREA

AREA OF WORK

APPROXIMATE LOCATION OF

CONTRACTOR STAGING AREA.

G.C. TO PROVIDE LOGISTICS PLAN

TO BE APPROVED BY VA.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

VA CONTRACT NO.

Revisions: Date

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:4

P

M

SITE PLAN

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB

657-400

G-003

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

VA255-16-C-0252

NOT TO SCALE

ARCHITECTURAL SITE PLAN

N

75% DESIGN DEVELOPMENT SUBMISSION 04-24-17

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

MEN'S

TOILET

WAX ROOM

EQUIP. STORAGE

MECH. ROOM

BREAK ROOM

TRASH CART

MECH. ROOM

GSTAIR

AC SHOP

44A

UNION OFFICE

RECORDS

44B

MECH. ROOM

CONFERENCE ROOM

45A

BACKUP STORAGE

ELEC. SHOP

ELEC. CLO.

GD

BIOMED

BIOMED SHOP

STORAGE

COUMADIN CLINIC

ELEC. STO.

COUMADIN

STO.

COUMADIN

CLO.

GSTAIR

SUPERVISOR

OFFICE

OFFICE

ELEC. CLO.

01D

CLO.

47A

TELECOMMUNICATIONS

EXAM ROOM

EXAM ROOM

14A

PROCEDURE

PROCEDURE

15A

EXAM

EYE CLINIC

16A

CHECK-IN

STORAGE

11A

MECH. ROOM

EYE CLINIC

10C

EYE CLINIC

10B

EYE CLINIC

10A

EYE GLASS SALES

EYE CLO.

09B

GSTAIR

ENTRANCE

09A

MECH. ROOM

RECONCILLIATION

07Q

ELEC. CLO.

07T

DISPENSING

07B

PHARMACY WAITING RM.

07A

DISPENSING

07H

STOCK AREA

07I

SECRETARY

07O

DIRECTOR'S OFFICE

07C

IV HOOD

ROOM

07L

IV ROOM

07E

CLO.

07P

IV TECH.

07D

CHEMO

HD ROOM

07F

NARCOTICS

ROOM

07G

HVAC RM.

07S

TOILET

07R

BREAKROOM

07N

CORRIDOR

GB

CALL CENTER

07J

PURCHASER'S

OFFICE

07K

STORAGE

07M

PIPE

CHASE

01C

CHUTE

GSTAIR

5PROSTHETICS

EXAM 1

OFFICE

STORAGE

01A

OFFICE

ALARM SYSTEM

CREDIT UNION

WOMEN'S

TOILET

79A

WOMEN'S

TOILET/SHOWER

79A

LINEN CHUTE

ELEC. CLO.

GA1

SERVER ROOM

TELECOM SWITCH

PIPE CHASE

01B

PHYSICAL THERAPY

EXAM 2

18A

WAITING ROOM

17B

CHECK-IN

17C

TOILET

17A

MEN'S

TOILET/SHOWER

MEN'S LOCKER

ROOM

CLO.

GSTAIR

STORAGE

68A

STORAGE

STORAGE

STORAGE

74 MORGUE

EMS STORAGE

WOMEN'S LOCKER

ROOM

H o o d

Va u lt

E P

D W

Frid g e

H o o d

SYMBOLS LIST

PARTITION LEGEND

0'-0" EGRESS PATH AND DISTANCE

FIRE EXTINGUISHER

EXIT SIGN

EXIT DIRECTION

FIRE BARRIER (1 HR)

AREA NOT IN CONTRACT

INTERIM LIFE SAFEY MEASURES - ILSM

1. CONTRACTOR SHALL REVIEW THE FOLLOWING SECTIONS WITHIN THE

PROJECT MANUAL FOR A FULL WRITTEN DESCRIPTION OF INTERIM

LIFE SAFETY MEASURES. SECTION 01 01 10, 1 HOUR CONSTRUCTION

SMOKE BARRIER HOUR, SECTION 01 35 26, CH 1.13 - FSS, FIRE SAFETY

SECTION, SECTION 01 35 26, CH 1.12- IC, INFECTION CONTROL AND

SECTION 01 01 10, SN, SPECIAL NOTES.

2. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY SMOKE

DETECTORS AS PER VA REQUIREMENTS. CONNECT INTO EXISTING

FIRE ALARM SYSTEM IN RESPECTIVE BUILDING AREA/ZONE.

CONTRACTOR SHALL CONSULT WITH VA FIRE ALARM CONTROL

COMPANY AND PERFORM CERTIFICATION TESTING THATTEMPORARY

DEVICES ARE IN OPERATION. SUBMIT WRITTEN CERTIFICATION TESTING

REPORT TO THE COR. AT PROJECT COMPLETION PHASE CONTRACTOR

SHALL REMOVE TEMPORARY SMOKE DETECTORS AND RESPECTIVE FIRE

ALARM WRING AND CONDUITS.

3. ONCE TEMPORARY CONSTRUCTION/SMOKE BARRIERS AND SMOKE

DETECTORS ARE IN PLACE THEN THE VA WILL DRAIN THE FIRE

PROTECTION/SPRINKLER ZONE FOR PROJECT AREA/SPACE.

CONTRACTOR SHALL ASSIST THE VA WITH THIS OPERATION AND SCOPE

OF WORK.

4. SMOKE DETECTORS SHALL BE COVERED DURING WORKING HOURS, AND

UNCOVERED DURING NON-WORKING HOURS.

5. CONTRACTOR SHALL THEN REMOVE FIRE PROTECTION BRANCH PIPING

FROM THE MAIN SPRINKLER LINE. PROVIDE CAPS/PLUGS AT

RESPECTIVE BRANCH POINTS OFF THE MAINS. AFTER CAPS/PLUGS

HAVE BEEN INSTALLED THEN THE VA WILL REFILL FIRE PROTECTION

SYSTEM WITH WATER. CONTRACTOR SHALL INSPECT ALL CAP/PLUG

LOCATIONS TO ASSURE A WATERTIGHT CONDITION AND MAKE ANY

CORRECTIONS AS NECESSARY. REFER TO FIRE PROTECTION

DRAWING FP-100 FOR EXTENT OF WORK.

6. AT PROJECT COMPLETION PHASE OF WORK THE VA WILL DRAIN THE FIRE

PROTECTION/SPRINKLER SYSTEM FOR THE INSTALLATION OF THE

RESPECTIVE BRANCH PIPING. ONCE BRANCH PIPING CONNECTIONS HAVE

BEEN MADE THEN THE FIRE PROTECTION SYSTEM WILL BE REFILLED WITH

WATER.

7. RENOVATED AREA IS NEW OCCUPANCY ASSEMBLY AND SHOULD BE FULLY

SPRINKLED WITH QUICK RESPONSE SPRINKLERS (QRS).

FIRE/SMOKE BARRIER (1HR)

FIRE BARRIER (2 HR)

FIRE/SMOKE BARRIER (2HR)

12'-0"

140'-0"

UNEXCAVATEDUNEXCAVATED

8'-0"

NEW BASEMENT EXHAUST

PIPING - REFER TO MECHANICAL

FOR EXTENT AND LOCATION OF

NEW PIPING.

EXIST. ROOMS TO BE VACATED

DURING CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

VA CONTRACT NO.

Revisions: Date

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:5

P

M

LOWER LEVEL LIFE SAFETY PLAN

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB II

657-400

G-004

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

VA255-16-C-0252

N

1/16" = 1'-0"

LOWER LEVEL LIFE SAFETY PLAN

0 8' 16' 32'

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

INFO.

DESK

MAIL

ROOM

MAIL

ROOM

POLICE

MEDICAL

RECORDS

RELEASE

OF

INFORMATION

PATIENT

REP QM

ELEV.

P1

DATA

CABLE RUN

1003A

ELEV.

P2

MEN'S

TOILET

WOMEN'S

TOILET

ACS

PRGM. SPPT.

PACT

CLOSET

1065A

AGENT

CASHIER

PRIMARY CARE

WAITING ROOM

EXAM RM./

DOCTOR OFFICE

NURSE

PRACTITIONER

EXAM RM.

EXAM ROOM

OFFICE

NUTRITION

CLINIC

HOLDING AREA

CLO.

MEN'S

TOILET

WAITING ROOM

OEF/OIF

PROGRAM

MANAGER

BUSINESS

OFFICE

1STAIR

C&P CHECK IN

TOILET/

STO.

WOMEN VETS

PROGRAM

COORDINATION

C&P STO.

ROOM

1STAIR

A

MEDICATION

ROOM

BUSINESS

OFFICE

BUSINESS

OFFICE

BUSINESS

OFFICE

OEF/OIF

CASE

MANAGER

OEF/OIF

CASE

MANAGER

EXAM

ROOM

OFFICE

LOCKER ROOM

C&P EXAM

SOILED

LINEN/

CLO.

WOMEN'S

TOILET

ELEC. CLO.

1A1

ADMISSIONS

URGENT

CARE

1STAIR

TREATMENT

ROOM

TREATMENT

ROOM

TREATMENT

ROOM

TREATMENT

ROOM

1130A

DENTAL LAB

OFFICE

CLO.

1115A

SUPPLY

ORAL

SURGERY

DENTAL

TREATMENT

CLERK'S

OFFICE

1111BREAK

RM.

DENTAL

WAITING

ROOM

COMPRESSOR

ELEC. CLO.

1110B

WAITING

ROOM

1110A

FACILITATOR

1007A

WOMEN'S

TOILET

MEN'S

TOILET

1STAIR

ASST.

FACILITATOR

PHARMACIST

1009A

EXAM

ROOM

EXAM

ROOM

1STAIR

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

1STAIR

B

EXAM

ROOM

ELEC.

CLO.

MEN'S

TOILET

EXAM

ROOM

APRN, BC

1027A

EXAM

NURSES

STATION

EXAM

ROOM

EXAM

ROOM

1025A

ACS

1064A

CALL CENTER

ELEC. CLO.

1A3

ACS

BHL

PRIMARY

CARE

MH/BHL

EXAM

ROOM

EXAM

ROOM

1STAIR

TOILET

UNUSABLE

TOILET

CLINICAL NURSE

ELEC. CLO.

STAFF WORK

AREA

EXAM ROOM

EXAM ROOM

EXAM ROOM

1STAIR

C

NURSING

CLINIC

PRIMARY CARE

EXAM ROOM

EXAM ROOM

EXAM ROOM

MEDICAL

SUPPLY

TOILET

1STAIR

MEAL ASSEMBLY

MEAL ASSEMBLY

MEAL ASSEMBLY

FOOD PREP.

INGREDIENT CONTROL

FOOD STORAGE

STO. ROOM

SUPPLY

ROOM

OXYGEN

STORAGE

WASH

ROOM

EQUIP./

COMPRESSOR

ROOM

FROZEN

FOOD

STORAGE

LOADING DOCK

STO.

ROOM

WOMEN'S

TOILET

MEN'S

TOILET

CORRIDOR D

1D

DISH WASHING

DISH WASHING

FOOD PREPARATION

1STAIR

ELEC. CLO.

1068A

ELEV.

WEST LOBBY

MAIN LOBBY

RECEPTION

1003B

VESTIBULE

EAST LOBBY

CORRIDOR

1A

CHIEF

DIETITIAN

1075A

CHIEF OF

DINING SERVICE

FOOD

COOLER

SUPERVISOR

ELEC.

CLO.

1D2

ELEC. CLO.

WOMEN'S

TOILET

TELEPHONE

SYSTEM

1060A

EXAM ROOM

ELEC. CLO.

1166A

CHILLED

FOOD

STORAGE

STO.

ROOM

CORRIDOR E

1E

CORRIDOR F

1F

CORRIDOR C

1C

CORRIDOR B

1B

20'-0"

30'-0" 30'-0"

20'-0"

20'-0"

SYMBOLS LIST

PARTITION LEGEND

0'-0" EGRESS PATH AND DISTANCE

FIRE EXTINGUISHER

EXIT SIGN

EXIT DIRECTION

FIRE BARRIER (1 HR)

AREA NOT IN CONTRACT

INTERIM LIFE SAFEY MEASURES - ILSM

1. CONTRACTOR SHALL REVIEW THE FOLLOWING SECTIONS WITHIN THE

PROJECT MANUAL FOR A FULL WRITTEN DESCRIPTION OF INTERIM

LIFE SAFETY MEASURES. SECTION 01 01 10, 1 HOUR CONSTRUCTION

SMOKE BARRIER HOUR, SECTION 01 35 26, CH 1.13 - FSS, FIRE SAFETY

SECTION, SECTION 01 35 26, CH 1.12- IC, INFECTION CONTROL AND

SECTION 01 01 10, SN, SPECIAL NOTES.

2. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY SMOKE

DETECTORS AS PER VA REQUIREMENTS. CONNECT INTO EXISTING

FIRE ALARM SYSTEM IN RESPECTIVE BUILDING AREA/ZONE.

CONTRACTOR SHALL CONSULT WITH VA FIRE ALARM CONTROL

COMPANY AND PERFORM CERTIFICATION TESTING THATTEMPORARY

DEVICES ARE IN OPERATION. SUBMIT WRITTEN CERTIFICATION TESTING

REPORT TO THE COR. AT PROJECT COMPLETION PHASE CONTRACTOR

SHALL REMOVE TEMPORARY SMOKE DETECTORS AND RESPECTIVE FIRE

ALARM WRING AND CONDUITS.

3. ONCE TEMPORARY CONSTRUCTION/SMOKE BARRIERS AND SMOKE

DETECTORS ARE IN PLACE THEN THE VA WILL DRAIN THE FIRE

PROTECTION/SPRINKLER ZONE FOR PROJECT AREA/SPACE.

CONTRACTOR SHALL ASSIST THE VA WITH THIS OPERATION AND SCOPE

OF WORK.

4. SMOKE DETECTORS SHALL BE COVERED DURING WORKING HOURS, AND

UNCOVERED DURING NON-WORKING HOURS.

5. CONTRACTOR SHALL THEN REMOVE FIRE PROTECTION BRANCH PIPING

FROM THE MAIN SPRINKLER LINE. PROVIDE CAPS/PLUGS AT

RESPECTIVE BRANCH POINTS OFF THE MAINS. AFTER CAPS/PLUGS

HAVE BEEN INSTALLED THEN THE VA WILL REFILL FIRE PROTECTION

SYSTEM WITH WATER. CONTRACTOR SHALL INSPECT ALL CAP/PLUG

LOCATIONS TO ASSURE A WATERTIGHT CONDITION AND MAKE ANY

CORRECTIONS AS NECESSARY. REFER TO FIRE PROTECTION

DRAWING FP-100 FOR EXTENT OF WORK.

6. AT PROJECT COMPLETION PHASE OF WORK THE VA WILL DRAIN THE FIRE

PROTECTION/SPRINKLER SYSTEM FOR THE INSTALLATION OF THE

RESPECTIVE BRANCH PIPING. ONCE BRANCH PIPING CONNECTIONS HAVE

BEEN MADE THEN THE FIRE PROTECTION SYSTEM WILL BE REFILLED WITH

WATER.

7. RENOVATED AREA IS NEW OCCUPANCY ASSEMBLY AND SHOULD BE FULLY

SPRINKLED WITH QUICK RESPONSE SPRINKLERS (QRS).

FIRE/SMOKE BARRIER (1HR)

FIRE BARRIER (2 HR)

FIRE/SMOKE BARRIER (2HR)

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

VA CONTRACT NO.

Revisions: Date

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:5

P

M

FIRST FLOOR LIFE SAFETY PLAN

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB II

657-400

G-005

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

VA255-16-C-0252

N

1/16" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN

0 8' 16' 32'

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

WOMEN'S

TOILET

MEN'S

TOILET

SUPPLY

ROOM

ELEV.

P1

ELEC. CLO.

2000B

ELEV.

P2

ELEV.

2STAIR

BREAK

ROOM

NUCLEAR MEDICINE

IMAGING ROOM

RADIOLOGY TECH.

OFFICE/

WORKROOM

WAITING ROOM

RADIOLOGY/LAB

WAITING ROOM

RADIOLOGY/LAB

RADIOLOGY/

LAB

CHECK IN

TOILET

2055A

PHLEBOTOMY

2STAIR

LAB

SUPERVISOR

OFFICE

HEALTH

SYSTEMS

SPECIALIST

OFFICE

PIV/REGISTRAR

ROOM

SUPERVISORY

PROGRAM

SUPPORT

ASSISTANT

OFFICE

WOMEN'S

TOILET

WOMEN'S

TOILET

PATIENT SAFETY

OFFICE

HOUSEKEEPING

CLOSET

2STAIR

ADMINISTRATIVE STORAGE/

FILE ROOM

PRIMARY CARE

MGMT.

ASSISTANT OFFICE

2113A

PRIMARY CARE

SECRETARY

OFFICE

PRIMARY CARE

ASSOC.

DIR. OFFICE

MEN'S LOCKER

ROOM

DIRECTOR'S OFFICE

FILE ROOM

CHAPEL

CHAPLAIN'S

OFFICE

COMPLIANCE

OFFICER

CONFERENCE

ROOM

STORAGE

ROOM

2STAIR

CHAPLAIN OFFICE

BEHAVIORAL

HEALTH

SUPERVISOR

ASSOCIATE DIRECTOR

SECRETARY OFFICE

ASSOCIATE

DIRECTOR

OFFICE

PROGRAM

DIRECTOR

MENTAL HEALTH

SECRETARY OFFICE

PROGRAM

DIRECTOR

MENTAL HEALTH

OFFICE

ASSOCIATE

CHIEF OF STAFF

PRIMARY CARE

OFFICE

PRIMARY CARE

PROGRAM SUPPORT

ASSISTANT

OFFICE

EEO OFFICE

EXECUTIVE

ASSISTANT

2127A

KITCHEN

SUPPLY

ROOM

2070B

LUNCHROOM/VENDING

MACHINE

EMPLOYEE

LUNCHROOM

VOLUNTEER

OFFICE

2077A

VOLUNTEER

OFFICE

HEADQUARTERS

VETERAN

CANTEEN

SERVICE

CHIEF OFFICE

2STAIR

SUPPLY

ROOM

2070A

SUPPLY

ROOM

2070C

STORAGE/SUPPLY ROOM

2074A

CANTEEN

ELEC. CLO.

2D

CORRIDOR

2075A

STORAGE

ROOM

2075B

STORAGE

ROOM

2077B

STO.

RM.

2078C

VOLUNTARY

SERVICE

CHIEF

OFFICE

2078B

VOLUNTARY

SERVICE

OFFICE

2078A

VOLUNTARY

SERVICE

OFFICE

CRAFTS

STORAGE

ROOM

OI&T & DATA

CABLE RUN

2000A

STO. RM.

2077C

STORAGE ROOM

STAIR

CONFERENCE

ROOM

DIRECTOR'S

OFFICE

2098A

CHIEF OF

STAFF

OFFICE

2098B

DIRECTOR'S

SUITE

2097B

CORRIDOR E

2E

FILE ROOM

2109B

SHAFT

CT COOLING

SYSTEM

2002A

HOT LAB

NUCLEAR MEDICINE

IMAGING ROOM

BONE DENSITY

IMAGING

ROOM

CT SCANNER

IMAGING ROOM

MEN'S

TOILET

CRASH

CART

ELEV.

MACHINE

HEMOTOLOGY

ANCILLARY

CLOSET

HOUSEKEEPING

CLO.

REAGENT/SUPPLIES

ROOM

HOUSEKEEPING

CLOSET

TOILET

CHEMISTRY

SPECIMEN &

REGEANT

STORAGE

BREAK

ROOM

LAB INFO.

OFFICE

ELEC.

CLO.

2C

LAB COAT

CLO.

2054A

MICROBIOLOGY

2037B

CULTURE

ROOM

BLOOD BANK/

HISTOLOGY

2037A

LAB

SUPPLY

ROOM

RECORDS/

SUPPLY

STORAGE

ELEC. CLO.

STO./SUPPLY

ROOM

X-RAY

IMAGING ROOM

LOCKER/

CHANGING

ROOM

STO.

ROOM

X-RAY

IMAGING ROOM

X-RAY

CONTROL ROOM

LOCKER/

CHANGING

ROOM

STO.

ROOM

X-RAY

IMAGING ROOM

2STAIR

B

TRANSCRIPT

OFFICE

RADIOLOGIST

OFFICE

RADIOLOGIST

OFFICE

2018A

RADIOLOGY

SUPERVISOR

OFFICE

2STAIR

ULTRASOUND

ULTRASOUND

WOMEN'S

TOILET

CT CONTROL

ROOM

LINEN CHUTE/

HK CLO.

STAIR

2STAIR

A

TOILET

(STO.)

STO. RM.

TOILET

CORRIDOR F

2F

ELEC.

CLO.

2F

CORRIDOR D

2D

CLO.

2042A

CORRIDOR C

2C

CT STO. ROOM/

ELECTRICAL

CLEAN

LINEN

CORRIDOR B

2B

ELEC. CLO.

2A1 CORRIDOR

SYMBOLS LIST

PARTITION LEGEND

0'-0" EGRESS PATH AND DISTANCE

FIRE EXTINGUISHER

EXIT SIGN

EXIT DIRECTION

FIRE BARRIER (1 HR)

AREA NOT IN CONTRACT

INTERIM LIFE SAFEY MEASURES - ILSM

1. CONTRACTOR SHALL REVIEW THE FOLLOWING SECTIONS WITHIN THE

PROJECT MANUAL FOR A FULL WRITTEN DESCRIPTION OF INTERIM

LIFE SAFETY MEASURES. SECTION 01 01 10, 1 HOUR CONSTRUCTION

SMOKE BARRIER HOUR, SECTION 01 35 26, CH 1.13 - FSS, FIRE SAFETY

SECTION, SECTION 01 35 26, CH 1.12- IC, INFECTION CONTROL AND

SECTION 01 01 10, SN, SPECIAL NOTES.

2. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY SMOKE

DETECTORS AS PER VA REQUIREMENTS. CONNECT INTO EXISTING

FIRE ALARM SYSTEM IN RESPECTIVE BUILDING AREA/ZONE.

CONTRACTOR SHALL CONSULT WITH VA FIRE ALARM CONTROL

COMPANY AND PERFORM CERTIFICATION TESTING THATTEMPORARY

DEVICES ARE IN OPERATION. SUBMIT WRITTEN CERTIFICATION TESTING

REPORT TO THE COR. AT PROJECT COMPLETION PHASE CONTRACTOR

SHALL REMOVE TEMPORARY SMOKE DETECTORS AND RESPECTIVE FIRE

ALARM WRING AND CONDUITS.

3. ONCE TEMPORARY CONSTRUCTION/SMOKE BARRIERS AND SMOKE

DETECTORS ARE IN PLACE THEN THE VA WILL DRAIN THE FIRE

PROTECTION/SPRINKLER ZONE FOR PROJECT AREA/SPACE.

CONTRACTOR SHALL ASSIST THE VA WITH THIS OPERATION AND SCOPE

OF WORK.

4. SMOKE DETECTORS SHALL BE COVERED DURING WORKING HOURS, AND

UNCOVERED DURING NON-WORKING HOURS.

5. CONTRACTOR SHALL THEN REMOVE FIRE PROTECTION BRANCH PIPING

FROM THE MAIN SPRINKLER LINE. PROVIDE CAPS/PLUGS AT

RESPECTIVE BRANCH POINTS OFF THE MAINS. AFTER CAPS/PLUGS

HAVE BEEN INSTALLED THEN THE VA WILL REFILL FIRE PROTECTION

SYSTEM WITH WATER. CONTRACTOR SHALL INSPECT ALL CAP/PLUG

LOCATIONS TO ASSURE A WATERTIGHT CONDITION AND MAKE ANY

CORRECTIONS AS NECESSARY. REFER TO FIRE PROTECTION

DRAWING FP-100 FOR EXTENT OF WORK.

6. AT PROJECT COMPLETION PHASE OF WORK THE VA WILL DRAIN THE FIRE

PROTECTION/SPRINKLER SYSTEM FOR THE INSTALLATION OF THE

RESPECTIVE BRANCH PIPING. ONCE BRANCH PIPING CONNECTIONS HAVE

BEEN MADE THEN THE FIRE PROTECTION SYSTEM WILL BE REFILLED WITH

WATER.

7. RENOVATED AREA IS NEW OCCUPANCY ASSEMBLY AND SHOULD BE FULLY

SPRINKLED WITH QUICK RESPONSE SPRINKLERS (QRS).

FIRE/SMOKE BARRIER (1HR)

FIRE BARRIER (2 HR)

FIRE/SMOKE BARRIER (2HR)

20'-0"

132'-0"

OPEN

TO

BELOW

NEW

ROOF RTU RTU NEW

ROOF

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

VA CONTRACT NO.

Revisions: Date

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:5

P

M

SECOND FLOOR LIFE SAFETY PLAN

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB II

657-400

G-006

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

VA255-16-C-0252

N

1/16" = 1'-0"

SECOND FLOOR LIFE SAFETY PLAN

0 8' 16' 32'

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

VA CONTRACT NO.

Revisions: Date

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:5

P

M

PERSPECTIVE IMAGES

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB

657-400

G-100

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

VA255-16-C-0252

A

PERSPECTIVE VIEW - ENTRY - SOUTH

B

PERSPECTIVE VIEW - VESTIBULE

H

PERSPECTIVE VIEW - EXTERIOR

F

PERSPECTIVE VIEW - MAIN LOBBY - NORTH

I

PERSPECTIVE VIEW - EXTERIOR 2

J

PERSPECTIVE VIEW - ROOF SCREEN 1

K

PRESPECTIVE VIEW - ROOF SCREENS

G

PERSPECTIVE VIEW - STARBUCKS

C

PERSPECTIVE VIEW - WEST LOBBY LOOKING EAST

E

PERSPECTIVE VIEW - MAIN LOBBY - NORTH WEST

D

PERSPECTIVE VIEW - WEST LOBBY AREA

35% SCHEMATIC DEVELOPMENT SUBMISSION 02-20-17

75% DESIGN DEVELOPMENT SUBMISSION 04-24-17

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

CONT. FIRESAFING

SEALANT TOP &

BOTTOM BOTH SIDES

3 5/8" MTL. RUNNER

CHANNELS TOP &

BOTTOM

3 5/8" MTL. STUDS

@ 16" O.C.

FULL DEPTH SOUND

BLANKET

1 HR. CONSTRUCTION-

UL 465

CORRIDOR SIDE

5/8" GYP. BD. TYPE

'X' EA. SIDE

EXIST'G FLOOR

TAPE VISQUINE TO

FLOOR W/ PAINTERS

TAPE

PROJECT SIDE

6 MM. (MIN.) FIRE

RETARDANT

VISQUINE

TAPE VISQUINE TO

UNDERSIDE OF

STRUCTURE W/

DUCT TAPE

EXTEND PARTITION TO

UNDERSIDE OF

EXISTING STRUCTURE

G-400

T/FLOOR

ELEV.= +0'-0"

B/STRUCTURE

ELEV.= EXIST.

TRILOGY BRAND LEVER

LOCKSET W/ REMOVABLE

CORE - STOREROOM

FUNCTION W/ KEYPAD

DOOR CLOSER

ZONE

DIGITAL PRESSURE

DIFFERENTIAL

MONITOR (TRIATEK OR

APPROVED EQUAL)

HAND SANITIZER

42" x 84" H.M. DOOR IN H.M.

FRAME, 45 MIN. RATED W/

SEALS (PAINTED YELLOW)

EXTEND PARTITION

WALLS TO

UNDERSIDE OF

EXISTING

STRUCTURE

TYPICAL FOR (1) OUTER ENTRANCE

SIMILAR FOR (1) INNER ENTRANCE (NO SIGN, SANITZER, LOCK, OR MONITOR)

CAUTION

CONSTRUCTION

PARTITION TAG

ROOM NAME

AND NUMBER

DOOR TAG

FLOOR PLAN LEGEND INFECTION CONTROL REQUIRED BY CLASS INFECTION CONTROL NOTES

PROJECT 607-14-106 IDENTIFIED AS CLASS 3 RISK GROUP

HVAC CONNECTIONS TO EXISTING SYSTEM TO BE DISCONECTED DURING CONSTRUCTION.

G.C. TO SUPPLY A NEGATIVE PRESSURE MACHINE OF SUFFICIENT SIZE & QUANTITY TO

ADEQUATELY HANDLE CONSTRUCTION AREAS.

ALL AREAS OF NEGATIVE AIR WILL BE MONITORED BY A TRIATEK MONITOR PER MADISON

VA GUIDELINES.

CONTRACTOR WILL VERIFY AND TEST NEGATIVE AIR FLOW.*

CONTRACTOR TO MAINTAIN A NEGATIVE AIR PRESSURE LOG.*

CONSTRUCTION BARRIER DETAILS TO FOLLOW DETAIL 2 THIS SHEET*

ALL TEMPORARY CONSTRUCTION DOORS TO BE METAL, 1 HR. FIRE RATED, W/METAL

FRAMES, CLOSERS AND SEALS. TEMPORARY CONSTRUCTION DOORS MUST HAVE A

SINGLE MECHANISM EXIT THAT ALLOWS QUICK EXIT FROM WITHIN THE CONSTRUCTION

AREA PER LIFE SAFETY CODES.

CONTRACTOR TO PROVIDE LOCKS ON ALL CONSTRUCTION ENTRANCES AND SUPPLY

THE COR WITH NO LESS THAN FIVE (5) KEYS. THE CONTRACTOR MUST MAINTAIN A

PROJECT SIGN-IN SHEET FOR ALL PERSONS ENTERING THE CONSTRUCTION SITE. THIS

SIGN-IN SHEET WILL BE SUPPLIED TO THE COR AT THE END OF EACH WORK WEEK.

ALL CONTRACTORS WORKING ON VA PROPERTY MUST MAINTAIN A CONTRACTOR

BADGE BEFORE BEGINNING ANY WORK ON VA PROPERTY.

ALL CONSTRUCTION ENTRANCES TO BE PROPERLY LABELED TO COMPLY WITH VA AND

OSHA REQUIREMENTS.

CONTRACTOR TO PROVIDE 24" X 36" WALK OFF MATS AND CHANGE THEM AS NEEDED

AT EACH ENTRANCE POINT.

CONTRACTOR TO PROVIDE HAND SANITIZERS AT ALL ENTRANCE POINTS.*

CONTRACTOR TO SUPPLY SPILL KIT, TO INCLUDE SHOP VAC, MULTI PURPOSE SPILL

CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP TO 30 GALLONS.

ALL NEW CONSTRUCTION MATERIALS, TOOLS AND EQUIPMENT PASSING THROUGH

HOSPITAL TO BE COVERED WITH 4 MIL. POLY SHEETS.

THE CONTRACTOR SHALL NOT BLOCK OR HINDER THE USE OF THE BUILDINGS BY

PATIENTS, STAFF & VISITORS.

ALL MATERIALS AND EQUIPMENT MUST BE PROPERLY STORED IN DESIGNATED AREAS.

ALL DEBRIS AND GARBAGE THAT IS TO BE REMOVED THROUGH THE HOSPITAL MUST BE

CONTAINED IN DUMP CARTS DESIGNED FOR THAT PURPOSE AND MUST BE COVERED

WITH A FULL COVER OR LID.

ALL DEBRIS AND GARBAGE THAT IS TO BE REMOVED THROUGH THE HOSPITAL MUST BE

CONTAINED IN FLAMMABLE MATERIALS MAY NOT BE STORED IN BUILDINGS.

COORDINATE DEBRIS REMOVAL W/ POSTED TIMES FOR ELEVATOR #5 AVAILABILITY. ALL

DEBRIS REMOVAL ON ELEVATOR #5 ONLY.*

AREA NOT

IN CONTRACT

EXISTING

PARTITION

NEW

PARTITION

EXISTING DOOR

NEW DOOR

XXXX

XXXX

X

XXX

MATERIAL DELIVERY/DEBRIS REMOVAL:

ROUTE FROM CONSTRUCTION

AREA TO SERVICE ELEVATORS

REMOVE OR ISOLATE HVAC SYSTEM

IN AREA WHERE WORK IS BEING

DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

COMPLETE ALL CRITICAL BARRIERS

I.E. SHEETROCK, PLYWOOD, PLASTIC,

TO SEAL AREA FROM NON WORK

AREA OR IMPLEMENT CONTROL CUBE

METHOD (CART W/PLASTIC COVERING

AND SEALED CONNECTION TO WORK

SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. BARRIERS

OR BE ERECTED AFTER 6:00PM M-F

OR ANYTIME ON WEEKENDS.

1.

2.

MAINTAIN NEGATIVE AIR PRESSURE

WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS.

3.

CONTAIN CONSTRUCTION WASTE

BEFORE TRANSPORT IN TIGHTLY

COVERED CONTAINERS.

4.

COVER TRANSPORT RECEPTACLES

OR CARTS. TAPE COVERING UNLESS

SOLID LID.

5.

USE OPERABLE WINDOW WHEN ACCESSIBLE FOR HEPA AIR EXHAUST. OBTAIN VA C.O.R.

APPROVAL FOR EXHAUSTING IN EXISTING DUCTWORK. SEE PLAN FOR PROPOSED

LOCATION OF HEPA EXHAUST.

1.

2.

3.

4.

DO NOT REMOVE BARRIERS FROM WORK

AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE C.O.R., OWNER'S

SAFETY DEPARTMENT, AND INFECTION

CONTROL DEPARTMENT, AND THOROUGHLY

CLEANED BY THE OWNER'S ENVIRONMENTAL

SERVICES DEPARTMENT.

REMOVE BARRIER MATERIALS CAREFULLY

TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH CONSTRUCTION.

BARRIERS TO BE REMOVED AFTER 6:00PM

M-F OR ANYTIME ON WEEKENDS.

VACUUM WORK AREA WITH HEPA

FILTERED VACUUMS.

WET MOP AREA WITH DISINFECTANT

5. REMOVE ISOLATION OF HVAC SYSTEM

IN AREAS WHERE WORK IS BEING

PERFORMED.

INFECTION CONTROL RISK ASSESSMENT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

BANCROFT ARCHITECTS + ENGINEERS Bancroft AE No.

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T:847.952.9362 F:847.952.9403 www.bancroft-ae.com Department of Veterans Affairs

VA CONTRACT NO.

Revisions: Date

U :\6

-4

_J

JP

V

A M

C (C

E N

TR

A

L) _2

0 1 7_ cr ol lin s.

rv t

/1

8/ 2 0

2:

:5

P

M

PHASING GENERAL NOTES AND

DETAILS

16-126

IMPROVE ACCESS TO MAIN

LOBBY

1500 N. WESTWOOD BLVD,

POPLAR BLUFF, MO 63901

12-01-2017 DM AB

657-400

G-400

100% CONSTRUCTION DOCUMENT SUBMISSION - ISSUED FOR BID

VA255-16-C-0252

1 1/2" = 1'-0"

DETAIL - CONSTRUCTION BARRIER

3/8" = 1'-0"

ELEVATION - TEMPORARY PROTECTION ENTRY

35% SCHEMATIC DEVELOPMENT SUBMISSION 02-20-17

75% DESIGN DEVELOPMENT SUBMISSION 04-24-17

95% CONSTRUCTION DOCUMENT SUBMISSION 07-17-17

INFO.

DESK

MAIL

ROOM

MAIL

ROOM

POLICE

MEDICAL

RECORDS

RELEASE

OF

INFORMATION

PATIENT

REP QM

ELEV.

P1

DATA

CABLE RUN

1003A

ELEV.

P2

MEN'S

TOILET

WOMEN'S

TOILET

ACS

PRGM. SPPT.

PACT

CLOSET

1065A

AGENT

CASHIER

PRIMARY CARE

WAITING ROOM

1064OFFICE

NUTRITION

CLINIC

HOLDING AREA

MEN'S

TOILET

WAITING ROOM

OEF/OIF

PROGRAM

MANAGER

BUSINESS

OFFICE

FACILITATOR

1007A

WOMEN'S

TOILET

FACILITATOR

PHARMACIST

EXAM

ROOM

EXAM

ROOM

ACS

1064A

ELEC. CLO.

1068A

ELEV.

INFO.

DESK

MAIL

ROOM

MAIL

ROOM

POLICE

MEDICAL

RECORDS

RELEASE

OF

INFORMATION

PATIENT

REP QM

ELEV.

P1

DATA

CABLE RUN

1003A

ELEV.

P2

MEN'S

TOILET

WOMEN'S

TOILET

ACS

PRGM. SPPT.

PACT

CLOSET

1065A

AGENT

CASHIER

PRIMARY CARE

WAITING ROOM

1064OFFICE

NUTRITION

CLINIC

HOLDING AREA

MEN'S

TOILET

WAITING ROOM

OEF/OIF

PROGRAM

MANAGER

BUSINESS

OFFICE

FACILITATOR

1007A

WOMEN'S

TOILET

FACILITATOR

PHARMACIST

EXAM

ROOM

EXAM

ROOM

ACS

1064A

ELEC. CLO.

1068A

ELEV.

ELEV.

P1

ELEC. CLO.

2000B

ELEV.

P2

ELEV.

BREAK

ROOM

NUCLEAR MEDICINE

IMAGING ROOM

RADIOLOGY TECH.

OFFICE/

WORKROOM

RADIOLOGY/

LAB

CHECK IN

HEALTH

SYSTEMS

SPECIALIST

OFFICE

PIV/REGISTRAR

ROOM

SUPERVISORY

PROGRAM

SUPPORT

ASSISTANT

OFFICE

CHAPLAIN OFFICE

BEHAVIORAL

HEALTH

SUPERVISOR

ASSOCIATE DIRECTOR

SECRETARY OFFICE

ASSOCIATE

DIRECTOR

OFFICE

PROGRAM

DIRECTOR

MENTAL HEALTH

SECRETARY OFFICE

PROGRAM

DIRECTOR

MENTAL HEALTH

OFFICE

ASSOCIATE

CHIEF OF STAFF

PRIMARY CARE

OFFICE

PRIMARY CARE

PROGRAM SUPPORT

ASSISTANT

OFFICE

EEO OFFICE

EXECUTIVE

ASSISTANT

2127A

OI&T & DATA

CABLE RUN

2000A

SHAFT

CT COOLING

SYSTEM

2002A

HOT LAB

NUCLEAR MEDICINE

IMAGING ROOM

BONE DENSITY

IMAGING

ROOM

CT SCANNER

IMAGING ROOM

CRASH

CART

ULTRASOUND

ULTRASOUND

WOMEN'S

TOILET

CT CONTROL

ROOM

LINEN CHUTE/

HK CLO.

STO. RM.

TOILET

CT STO. ROOM/

ELECTRICAL

MEN'S

TOILET

WOMEN'S

TOILET

SUPPLY RM.

S D

S D

ELEV.

P1

ELEC. CLO.

2000B

ELEV.

P2

ELEV.

BREAK

ROOM

NUCLEAR MEDICINE

IMAGING ROOM

RADIOL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.